45-storey residential<br />

towers, Al-Reem Island<br />

L<br />

ed by the Group MD, YB Senator Tan Sri<br />

Datuk Tee Hock Seng, JP on 2nd Feb<br />

2009 a site visit to the construction areas <strong>of</strong><br />

KL-Kuala Selangor Expressway was<br />

organised. The group comprised <strong>of</strong> the<br />

contractor, Mudajaya Corporation, the<br />

consultants, HSSI and Endeover, the subcontractors.<br />

Progress and details <strong>of</strong><br />

contruction activities was briefed by En<br />

Amran Amir, CEO <strong>of</strong> KLSEB and Mr Yong<br />

Yee Coi, Director <strong>of</strong> Mudajaya. Other<br />

personnels during the visit included En<br />

Mohamed Raffe Chekku, Mr Tan Kwe Hee,<br />

Mr David Lee, Mr Lee Seng Fong, Mr Ooi Tat<br />

Lean and others.<br />

The 1st stop was the Templer Park<br />

Interchange at CH300000 followed by Kg<br />

Sungai Samak at CH 29000. Later the group<br />

proceeded to the 3rd stop at the Kuang<br />

System Interchange (CH21000) and Ijok<br />

Interchange (CH12000). They were also<br />

briefed on location <strong>of</strong> the permanent<br />

operation <strong>of</strong>fice and staff quaters which will<br />

be located at CH12000. The next stop was<br />

the Assam Jawa Interchange (ending <strong>of</strong> the<br />

expressway) at CH 3000. Finally the group<br />

visited the contactors's workshop at CH<br />

17200 (Kuang) and their site <strong>of</strong>fice building,<br />

NEW PROJECTS SECURED<br />

projects updates 23<br />

2 nd Central Lecture Hall & Post Graduates Center for UMS, Kota Kinabalu<br />

Bina Puri Construction Sdn Bhd secured the subcontract work from Variasi Baru Sdn Bhd for the<br />

construction and completion <strong>of</strong> the 2nd Central Lecture Hall & Post Graduates Center on Design<br />

& Build Concept for Universiti Malaysian Sabah, Kota Kinabalu. The contract sum is RM 161.6 mil<br />

and work commenced in November 2008 with 30 months contract period.<br />

8-Storey Medium Cost Apartments, Menggatal, Kota Kinabalu<br />

Bina Puri Construction Sdn Bhd in Joint venture with Kinsanuri Sdn Bhd secured the Proposed<br />

1,664 units 8-Storey Medium Cost Apartments in Kg. Darau, Menggatal, Kota Kinabalu, Sabah<br />

from the Syarikat Perumahan Negara Berhad with contract sum <strong>of</strong> RM 224.1 mil. The work<br />

commenced in February 2009 with 40 months contract period.<br />

Infrastructure Works for Pre-Clinical Building, UKM, Cheras<br />

Bina Puri Construction Sdn Bhd secured the subcontract work from Tim Sekata Sdn Bhd for the<br />

Site Clearance, Earthworks and Piling Works for the construction <strong>of</strong> Pre-Clinical Building<br />

comprising 1 Block <strong>of</strong> 22-storey Building for Medical Faculty, I Block Auditorium and 1 Block 8-<br />

Storey Car Park for Universiti Kebangsaan Malaysia in Cheras, Kuala Lumpur. The contract sum is<br />

RM 19.5 mil to be completed in September 2009.<br />

Bangunan Markas 92 Angkatan Tentera Cawangan Khas, K. Lumpur<br />

Bina Puri Construction Sdn Bhd secured the subcontract work from Pembinaan HRS Sdn Bhd for<br />

the construction <strong>of</strong> Bangunan Markas 92 Angkatan Tentera Cawangan Khas (ATCK), Genting<br />

Klang, K. Lumpur. The contract sum is RM 43 mil with construction period <strong>of</strong> 24 months.<br />

Universiti Malaysia Kelantan, Bachok, Package 2 – Building Works<br />

Konsortium Syarikat Bina Puri – TA3 JV Sdn Bhd secured Package 2 : Building Works for the<br />

Universiti Malaysia Kelantan, Kampus Bachok with contract value <strong>of</strong> RM60 mil and 15 months<br />

construction period commencing March 2009. This is continuing from Package 1 : Infrastructure<br />

Works secured earlier, and which is now nearing completion.<br />

Pusat Latihan Polis (Pulapol), K. Lumpur<br />

Bina Puri Construction Sdn Bhd secured the subcontract work from Pembinaan Tajri Sdn Bhd for<br />

the Development at Pusat Latihan Polis Kuala Lumpur comprising 1 Block <strong>of</strong> 6-Storey for Training<br />

Academy Complex; 1 Block <strong>of</strong> 3-Storey for Tactical Training Building and 1 Block <strong>of</strong> 14-Storey<br />

Class F Staff Quarters (100 units). The contract sum is RM 147 mil with construction period <strong>of</strong> 30<br />

months<br />

Site Visit to KL-Kuala Selangor<br />

Expressway<br />

The Project Team <strong>of</strong> KL - Kuala<br />

Selangor Expressway