09.01.2013 Views

Response to EPA Comments: RCRA Facility Investigation Phase I ...

Response to EPA Comments: RCRA Facility Investigation Phase I ...

Response to EPA Comments: RCRA Facility Investigation Phase I ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OTi<br />

27 Naek Road<br />

Vernon<br />

Connecticut 06066<br />

860-875-7655<br />

FAX 860-872-2416<br />

A Subsidiary of GZA<br />

GeoEnvironmental<br />

Technologies, Inc.<br />

GZA Engineers and<br />

GeoEnvironmental, Inc. Scientists<br />

June 24, 1997<br />

File No. 41875<br />

U.S. Environmental Protection Agency<br />

Office of Site Remediation and Res<strong>to</strong>ration<br />

Corrective Action Section - HBT<br />

J.F.K. Federal Building<br />

Bos<strong>to</strong>n, Massachusetts 02203-2211<br />

Attention: Mr. Raphael J. Cody<br />

Project Manager<br />

Re: <strong>Response</strong> <strong>to</strong> <strong>EPA</strong> <strong>Comments</strong><br />

<strong>RCRA</strong> <strong>Facility</strong> <strong>Investigation</strong> <strong>Phase</strong> I Report<br />

T r\r\ 1 09 T<br />

Envirite Corporation: <strong>RCRA</strong> Docket No. 1-90<br />

Thomas<strong>to</strong>n, Connecticut<br />

Dear Mr. Cody:<br />

At the request of our Client, Envirite Corporation, we are submitting the attached data<br />

validation report for the UST interim measure and additional response comments <strong>to</strong> issues<br />

raised by the Town of Thomas<strong>to</strong>n and outlined in the <strong>EPA</strong> <strong>Comments</strong> appearing in theu-<br />

April 25, 1996 letter <strong>to</strong> Envirite Corporation, regarding the report: <strong>RCRA</strong> <strong>Facility</strong><br />

<strong>Investigation</strong>. <strong>Phase</strong> I Report, Thomas<strong>to</strong>n. Connecticut <strong>RCRA</strong> Docket No. 1-90-1032.<br />

We note that the validation for the August, 1996 soil gas survey performed at Envirite is<br />

not complete at this time because the analytical labora<strong>to</strong>ry has not provided the necessary<br />

documentation. We have attached a copy of Envirite's June 10, 1997 monthly status repon<br />

which provides additional information on the status of this project element.<br />

The following sections present additional discussion of select issues raised by information<br />

in reports submitted by the Town of Thomas<strong>to</strong>n.<br />

Potential migration of contaminants from Envirite's landfills:<br />

The difference in groundw^ater table gradient between the Envirite property and the<br />

Town of Thomas<strong>to</strong>n POTW is likely due <strong>to</strong> difference in the permeability of the<br />

materials which comprise the overburden aquifer rather than the presence of the<br />

Envirite Landfill.<br />

The Branch Brook channel was formerly located in the southwest portion of the<br />

Envirite Site (Page 21 of the RFI Work Plan), The former Branch Brook channel<br />

An Lqu.il Opportunity Employer M/F/V/H

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!