Response to EPA Comments: RCRA Facility Investigation Phase I ...
Response to EPA Comments: RCRA Facility Investigation Phase I ...
Response to EPA Comments: RCRA Facility Investigation Phase I ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
OTi<br />
27 Naek Road<br />
Vernon<br />
Connecticut 06066<br />
860-875-7655<br />
FAX 860-872-2416<br />
A Subsidiary of GZA<br />
GeoEnvironmental<br />
Technologies, Inc.<br />
GZA Engineers and<br />
GeoEnvironmental, Inc. Scientists<br />
June 24, 1997<br />
File No. 41875<br />
U.S. Environmental Protection Agency<br />
Office of Site Remediation and Res<strong>to</strong>ration<br />
Corrective Action Section - HBT<br />
J.F.K. Federal Building<br />
Bos<strong>to</strong>n, Massachusetts 02203-2211<br />
Attention: Mr. Raphael J. Cody<br />
Project Manager<br />
Re: <strong>Response</strong> <strong>to</strong> <strong>EPA</strong> <strong>Comments</strong><br />
<strong>RCRA</strong> <strong>Facility</strong> <strong>Investigation</strong> <strong>Phase</strong> I Report<br />
T r\r\ 1 09 T<br />
Envirite Corporation: <strong>RCRA</strong> Docket No. 1-90<br />
Thomas<strong>to</strong>n, Connecticut<br />
Dear Mr. Cody:<br />
At the request of our Client, Envirite Corporation, we are submitting the attached data<br />
validation report for the UST interim measure and additional response comments <strong>to</strong> issues<br />
raised by the Town of Thomas<strong>to</strong>n and outlined in the <strong>EPA</strong> <strong>Comments</strong> appearing in theu-<br />
April 25, 1996 letter <strong>to</strong> Envirite Corporation, regarding the report: <strong>RCRA</strong> <strong>Facility</strong><br />
<strong>Investigation</strong>. <strong>Phase</strong> I Report, Thomas<strong>to</strong>n. Connecticut <strong>RCRA</strong> Docket No. 1-90-1032.<br />
We note that the validation for the August, 1996 soil gas survey performed at Envirite is<br />
not complete at this time because the analytical labora<strong>to</strong>ry has not provided the necessary<br />
documentation. We have attached a copy of Envirite's June 10, 1997 monthly status repon<br />
which provides additional information on the status of this project element.<br />
The following sections present additional discussion of select issues raised by information<br />
in reports submitted by the Town of Thomas<strong>to</strong>n.<br />
Potential migration of contaminants from Envirite's landfills:<br />
The difference in groundw^ater table gradient between the Envirite property and the<br />
Town of Thomas<strong>to</strong>n POTW is likely due <strong>to</strong> difference in the permeability of the<br />
materials which comprise the overburden aquifer rather than the presence of the<br />
Envirite Landfill.<br />
The Branch Brook channel was formerly located in the southwest portion of the<br />
Envirite Site (Page 21 of the RFI Work Plan), The former Branch Brook channel<br />
An Lqu.il Opportunity Employer M/F/V/H