Download this publication as PDF - Gripple
Download this publication as PDF - Gripple
Download this publication as PDF - Gripple
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
34 www.gripple.com<br />
Building structures: Concrete<br />
3 ⁄8 Stud in concrete insert 90º Eyelet in concrete Hook in concrete ceiling anchor<br />
These are typical <strong>Gripple</strong> hanger installations seen for Metal Pan Deck with poured or slab concrete, Prec<strong>as</strong>t and<br />
C<strong>as</strong>t-in-place concrete ceiling structures.<br />
Contact your <strong>Gripple</strong> Territory Manager for additional solution <strong>as</strong>sistance and options.<br />
Prec<strong>as</strong>t concrete<br />
<strong>Gripple</strong> options Installation method<br />
90º Eyelet, Stud,<br />
Loop with Ceiling clip<br />
C<strong>as</strong>t-in-place concrete<br />
Drilling<br />
Left to right - 90º Eyelet, Stud, Loop with Ceiling clip<br />
<strong>Gripple</strong> options Installation method<br />
Stud Concrete inserts. internally threaded<br />
90º Eyelet, Loop with Ceiling clip Shot firing<br />
C<strong>as</strong>t-in-place concrete<br />
Left to right - Stud, 90º Eyelet, Loop with Ceiling clip<br />
<strong>Gripple</strong> options Installation method<br />
90º Eyelet, Stud,<br />
Loop with Ceiling clip<br />
Drilling<br />
Left to right - 90º Eyelet, Stud, Loop with Ceiling clip