Download this publication as PDF - Gripple
Download this publication as PDF - Gripple
Download this publication as PDF - Gripple
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Building structures: Concrete<br />
Stud in concrete insert Loop with ceiling clip Loop with concrete wire anchor<br />
Metal pan deck - Slab<br />
<strong>Gripple</strong> options Installation method<br />
90º Eyelet, Stud,<br />
Loop with Ceiling clip<br />
Metal pan deck - Slab<br />
Metal deck - Poured<br />
<strong>Gripple</strong> options Installation method<br />
Metal deck - Poured<br />
Drilling<br />
Left to right - 90º Eyelet, Stud, Loop with Ceiling clip<br />
<strong>Gripple</strong> options Installation method<br />
Toggle Drilling<br />
90º Eyelet, Loop with Ceiling clip Shot firing<br />
Left to right - Toggle, 90º Eyelet, Loop with Ceiling clip<br />
Toggle Pre-insert<br />
Stud Concrete inserts, internally threaded<br />
Barrel 1 ⁄4” Concrete inserts with 1 ⁄4” threaded rod<br />
Left to right - Toggle, Stud, Barrel 1 ⁄4”<br />
<strong>Gripple</strong> options Installation method<br />
Rod coupler with Barrel 3 ⁄8” Concrete inserts with 3 ⁄8” threaded rod<br />
90º Eyelet, Loop with Ceiling clip Drilling<br />
Left to right - Rod coupler with Barrel 3 ⁄8”, 90º Eyelet, Loop with Ceiling clip<br />
www.gripple.com 35