10.01.2013 Views

Download this publication as PDF - Gripple

Download this publication as PDF - Gripple

Download this publication as PDF - Gripple

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Building structures: Concrete<br />

Stud in concrete insert Loop with ceiling clip Loop with concrete wire anchor<br />

Metal pan deck - Slab<br />

<strong>Gripple</strong> options Installation method<br />

90º Eyelet, Stud,<br />

Loop with Ceiling clip<br />

Metal pan deck - Slab<br />

Metal deck - Poured<br />

<strong>Gripple</strong> options Installation method<br />

Metal deck - Poured<br />

Drilling<br />

Left to right - 90º Eyelet, Stud, Loop with Ceiling clip<br />

<strong>Gripple</strong> options Installation method<br />

Toggle Drilling<br />

90º Eyelet, Loop with Ceiling clip Shot firing<br />

Left to right - Toggle, 90º Eyelet, Loop with Ceiling clip<br />

Toggle Pre-insert<br />

Stud Concrete inserts, internally threaded<br />

Barrel 1 ⁄4” Concrete inserts with 1 ⁄4” threaded rod<br />

Left to right - Toggle, Stud, Barrel 1 ⁄4”<br />

<strong>Gripple</strong> options Installation method<br />

Rod coupler with Barrel 3 ⁄8” Concrete inserts with 3 ⁄8” threaded rod<br />

90º Eyelet, Loop with Ceiling clip Drilling<br />

Left to right - Rod coupler with Barrel 3 ⁄8”, 90º Eyelet, Loop with Ceiling clip<br />

www.gripple.com 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!