BRIEF HISTORY<br />

The brothers, Late Sh. BALDEV SINGH and Late Sh. SANTOKH SINGH originally from Rajpura (District<br />

Patiala, Punjab), started the electrical installation works in 1969 and undertook the jobs under the<br />

names & styles of Baldev Singh & Bros., Santokh Singh & Bros., Ceco Electricals, <strong>Chandigarh</strong> Electro<br />

<strong>Control</strong>s & <strong>Chandigarh</strong> Electricals Private Limited. The group got divided on 1 st April 2003 & one of the<br />

family member Charanjit Singh S/o Late Sh. Baldev Singh is controlling the CHANDIGARH ELECTRO<br />

CONTROLS Since 1989, manufacturing unit of electrical control panels at 749, Industrial Area, Phase–II,<br />

<strong>Chandigarh</strong>, SIMARTECH CONTROLS state of art manufacturing unit for sub station equipments at 9-G,<br />

Apparel Park cum Industrial Area, Katha, Baddi (Himachal Pardesh) and SIMARTECH PROJECTS &<br />

SERVICES LIMITED a <strong>Company</strong> of totally qualified experienced professional directors. The <strong>Company</strong> is<br />

engaged in Electrical Installation Works on Turnkey Basis. Also engaged in manufacturing Raceways,<br />

Cable Trays, Trunking, Towers, sub station equipments as per requirement of the project. The<br />

company has been adding professionals from time to time, thus making the group well organized. The<br />

group is having Head Office at 749, Industrial Area, Phase II, <strong>Chandigarh</strong> and also having office at<br />

Mumbai; E-401, "OLYMPIA", Royal Complex, Opp. Shanti Nagar, Sector X, Mira Road (East), Thane –<br />

401107. The company is maintaining a very good market in the entire region and is well known for the<br />

electrical jobs of any type.<br />

THE RANGE OF OUR WORKS / PRODUCTS<br />

We have a very range of quality works performed by qualified and experienced technician and<br />

technical advisers. Every stage of our production work is carefully supervised and monitored for<br />

reliability, quality and prompt services. We are one of the leading quality manufacturers of MV 11KV<br />

& LV 415/433V <strong>Panel</strong>s in the region. The brief detail of our works / products is as given below;<br />

MANUFACTURING :-<br />

PROFILE<br />

� 11KV VCB / SF6 & 33Kv SF6 <strong>Panel</strong>s under technical support from ABB Nashik.<br />

� Motor <strong>Control</strong> Centre. (MCCs)<br />

� Power <strong>Control</strong> Centre. (PCCs)<br />

� Distribution Board. (DBs)<br />

� DG Set <strong>Panel</strong>s / AMF <strong>Panel</strong>s.<br />

� Machine <strong>Control</strong> <strong>Panel</strong>s.<br />

� Auto PF <strong>Control</strong> <strong>Panel</strong>s.<br />

� Bus Bar Ducts Aluminum / Copper.<br />

� Switch Board etc as per requirement of customers.<br />

� DG Sets & Silent Canopy for DG Sets.<br />

� Perforated / Ladder type cable trays painted/hot dip galvanized.<br />

� Raceway / Trunking.


CONTRACTORSHIP JOBS :-<br />

To supply the material of the best quality for all type of electrical installation<br />

work for any type of project.<br />

To install, test and commissioning of job of sub station upto 132 KV.<br />

Installation, testing and commissioning of DG Sets.<br />

Internal Plant Cabling and earthling for power and lighting.<br />

Dehydration of transformer oil.<br />

Designing / Estimations of electrical installations for any type of project,<br />

including the costing.<br />

TOOLS / MACHINARY<br />

We have sufficient automatic & mechanical plant & machinery like NC Cutting, Bending &<br />

Punching Machines, 7 tank process, powder coating plant for panel manufacturing & for site<br />

executions complete workshop having pedestal drills, power hacksaw, hand drill, grinders,<br />

welding machines, crimping tools, ladders etc. The moveable machinery is arranged as per site<br />

requirement & latest machinery is added to get the best result.<br />

TESTING EQUIPMENTS<br />

We have in house testing facilities, HV upto 35KV, Contact Resistance / Mili volt drop test,<br />

Primary current injection upto 4000A, Secondary current injection upto 30A, under and over<br />

voltage testing, meggers, earth resistance test, lux testing, line load analyzer equipment showing<br />

current, voltage, frequency, KVA, KVAh, KW, KWh, PF, Harmonic analyzer etc.<br />

MAN POWER<br />

We are having well organized man power. We have sufficient Administration staff, Commercial<br />

staff, Engineering staff, Workshop staff & workers to meet project requirement. In brief we are<br />

having Managers, Supervisors, Draftsman, Accountants, Office assistants, Foreman, Fabrication<br />

workers, Electricians, Bus Bar fitter, Painter, Earth digging persons, Fitters and Helpers.<br />

EXPERIENCE<br />

We are having experience in Industries like chemical/pharmaceuticals/fermentation, textile,<br />

spinning, sugar, distilleries/breweries, automobile and electrical/electronics. Buildings like<br />

shopping complex, multi-story complexes, R&D Centre and Administrative offices.<br />

Communications like Tele-communications, call centers & computer centers. Power Projects &<br />

Sub Stations, Security systems, hotels, hospital, auditoriums, stadiums, grouping housing, parks<br />

lighting, fountains, music lighting & fountains, UPS. Retro fitting works and<br />

Revamping/Augmentation of existing system.


TOTAL SALES FOR ALL OUR<br />

FIRMS / COMPANY<br />

1995-1996 : Rs. 200 LAC<br />

1996-1997 : Rs. 313 LAC<br />

1997-1998 : Rs. 281 LAC<br />

1998-1999 : Rs. 266 LAC<br />

1999-2000 : Rs. 210 LAC<br />

2000-2001 : Rs. 280 LAC<br />

2001-2002 : Rs. 300 LAC<br />

2002-2003 : Rs. 400 LAC<br />

2003-2004 : Rs. 415 LAC<br />

2004-2005 : Rs. 525 LAC<br />

2005-2006 : Rs. 650 LAC<br />

2006-2007 : Rs. 800 LAC<br />

2007-2008 : Rs. 800 LAC<br />

2008-2009 : Rs. 1000 Lac<br />

2009-2010 : Rs. 1000 Lac


S.<br />

No.<br />

CUSTOMER NAME &<br />

ADDRESS<br />

1 Amrit Banaspati Co. Limited,<br />

<strong>Chandigarh</strong> Road, Rajpura (Pb)<br />

2 Abhishek Industries Limited<br />

Baranala Punjab<br />

3 Amber Enterprises (P)<br />

Limited,Rajpura<br />

4 Anand Gates India (P) Limited,<br />

<strong>Chandigarh</strong> Ambala Road Lalru<br />

(Pb).<br />

5 Auro Spinning Mills, A unit of<br />

M/s Vardhman spinning. Baddi<br />

Distt Solan (HP).<br />

6 Auro Textile Mills A unit of M/s<br />

Vardhman spinning. Baddi Distt<br />

Solan (HP).<br />

7 Alliance Formulations, EPIP,<br />

Jharmajri, Baddi, Distt Solan<br />

(HP)<br />

Alliance Formulations, EPIP,<br />

Jharmajri, Baddi, Distt Solan<br />

(HP)<br />

8 Alliance India, Village Jundi<br />

Kalan, Near EPIP Phase-1,<br />

Jharmajri, Baddi, Distt Solan<br />

9 Aggarwal & <strong>Company</strong>,<br />

HPSIDC, Industrial Area, Baddi<br />

(HP)<br />

10 Asian Cement <strong>Company</strong>,<br />

Village Beer Palasi, Nalagarh,<br />

Distt Solan (HP)<br />

11 M/s ALVES, Nalagarh, Distt<br />

Solan (HP)<br />

12 Batliboi Enviromental<br />

Engineering Ltd., c/o Punjab<br />

Energy Development Agency,<br />

Heobowal Dairy Complex,<br />

Ludhiana (Pb).<br />

13 B.L. Kashyap & Sons C/o Fortis<br />

Healthcare Mohali (Pb)<br />

14 Bihar Sponge Iron Limited,<br />

Chandil,Jamshedpur<br />

(Jharkhand)<br />

15 Betts India Pvt. Ltd. Village<br />

Bataulikalan Baddi HP.<br />

16<br />

17<br />

Best Medicines Pvt. Ltd. Village<br />

Bataulikalan Baddi HP.<br />

Bright Autoplast Pvt. Ltd.,<br />

Sohna, Gurgaun (Hr).<br />

DETAIL OF WORK EXECUTED SINCE 1996<br />

WORK<br />

STARTING<br />

TIME<br />

WORK<br />

COMPLETION<br />

TIME<br />

VALUE<br />

(In Lac)<br />

TYPE OF JOB<br />

Sep-99 Dec-00 8.80 Supply & Commissioning of<br />

distribution boards for Ghee<br />

Plant.<br />

Oct-04 Dec-04 11.00 11KV VCB <strong>Panel</strong><br />

Oct-00 Oct-02 7.50 Supply of control panel for<br />

air conditioning units<br />

Sep-98 Mar-99 4.00 Supply & Commissioning of<br />

capacitor panels<br />

Mar-00 Mar-00 5.71 Supply & Commissioning of<br />

distribution boards for TFO.<br />

Aug-99 Sep-99 13.45 Supply & Commissioning of<br />

distribution boards for<br />

Colouring.<br />

Nov-03<br />

Dec-06<br />

Mar-04<br />

Mar-07<br />

12.00<br />

20.00<br />

Supply, Erection, Testing &<br />

Commissioning of complete<br />

electrical sub station.<br />

Supply, Erection, Testing &<br />

Commissioning of complete<br />

electrical sub station.<br />

Nov-04 Jun-05 40.00 Supply, Erection, Testing &<br />

Commissioning of complete<br />

electrical sub station.<br />

Feb-03 Mar-03 4.00 -do-<br />

May-04 Mar-06 15.00 Only Labour jobs for<br />

dismantling of cement plant<br />

from Vishakhapatnam and<br />

erection at Nalagarh<br />

complete electricals 33KV<br />

switch yard, plant cabling<br />

earthing & lighting etc.<br />

Apr-07 Oct-07 50.00 Supply, Erection, Testing &<br />

Commissioning of complete<br />

electrical sub station.<br />

Sep-03 Mar-04 12.50 Complete Electrical works<br />

of 1.5MW bio gas power<br />

project.<br />

Apr-01 May-01 2.20 Supply & Commissioning of<br />

BMS <strong>Panel</strong>s.<br />

Dec-02 Apr-02 37.00 Supply & Commissioning of<br />

distribution board for 5MW<br />

Co Generation Power Plant.<br />

Jul-05 Apr-06 46.00 Complete Electrical work on<br />

turnkey basis.<br />

Jul-06<br />

Apr-09<br />

May-07<br />

Sep-09<br />

60.00<br />

10.00<br />

Complete Electrical work on<br />

turnkey basis 1250KVA<br />

Load including VCB, LT<br />

<strong>Panel</strong>, Cable etc.<br />

Supply & Commissioning of<br />

11kV <strong>Panel</strong>s.


18 Carnation Auto India (P) Ltd.,<br />

Sector 127, IHDP,<br />

Noida (UP).<br />

19 <strong>Chandigarh</strong> Distillers & Bottlers<br />

Limited Banur Distt. Patiala<br />

(Punjab)<br />

<strong>Chandigarh</strong> Distillers & Bottlers<br />

Limited Banur Distt. Patiala<br />

(Punjab)<br />

<strong>Chandigarh</strong> Distillers & Bottlers<br />

Limited Banur Distt. Patiala<br />

(Punjab)<br />

<strong>Chandigarh</strong> Distillers & Bolttlers<br />

Ltd., Banur (Pb).<br />

20 Chandika Press Limited 126,<br />

Industrial Area, Phase I,<br />

<strong>Chandigarh</strong>.<br />

21 Dabur India Limited, 109<br />

Industrial Area, HPSIDC Baddi<br />

Distt Solan (HP).<br />

22 DCM Engineering Products<br />

Village Asron Ropar (Pb).<br />

23 Doaba Amusements (P)<br />

Limited Village Sohara,<br />

Landran, Mohali Punjab<br />

24 Dantal Hydraulics (P) Limited<br />

Plot No. 50, Sector 3 IMT<br />

Manesar Haryana<br />

25 Effluent Equipment, Focal<br />

Point, Rajpura (Pb).<br />

26<br />

27<br />

Essar Engineers, Sector 40,<br />

<strong>Chandigarh</strong><br />

Esys Information Technologies<br />

Ltd. U/O from Consort Builders<br />

Nalagarh (HP)<br />

28 Fortis Healthcare Limited,<br />

Sector 62, Mohali (Pb).<br />

29 Gabriel India Limited<br />

Parwanoo, Distt Solan (HP).<br />

30 Global Knitfab Limited, Barwala<br />

Road, Dera Bassi Distt. Patiala<br />

(Pb).<br />

31 Green Valley Products India<br />

Private Limited, HPSIDC,<br />

Baddi, Distt Solan (HP)<br />

32 Gujrat Ambuja Cement Limited,<br />

Sector 9, Madhya Marg,<br />

<strong>Chandigarh</strong>.<br />

33 Groz Beckert Asia Limited,<br />

Industrial Area, Phase I,<br />

<strong>Chandigarh</strong>.<br />

Jan-09 Aug-09 100.00 Complete electrification of<br />

Car Repair Solution hubs of<br />

Noida – 2 Nos, Amritsar – 1<br />

Apr-96<br />

Apr-04<br />

Apr-06<br />

Feb-09<br />

Aug-97<br />

Mar-05<br />

Mar-07<br />

Mar-09<br />

41.00<br />

70.85<br />

100.00<br />

65.00<br />

No. & Gurgaun – 1 No. Site.<br />

Supply & Commissioning of<br />

distribution boards.<br />

Complete electrification of<br />

2x1000kva Sub Station<br />

Supply & Commissioning of<br />

distribution boards.<br />

Complete electrification of<br />

plants, 3.1MW TG Set.<br />

Supply & Commissioning of<br />

distribution boards.<br />

Complete electrification of<br />

plants, 8.25MW TG Set,<br />

66kV Sub Station 10 MVA &<br />

3.15 MVA<br />

Complete panels for Grain<br />

Mill Plant<br />

Feb-96 May-96 4.90 Supply & Commissioning of<br />

complete electrical wiring<br />

for printing press.<br />

Sep-96 Feb-98 37.76 Supply & Commissioning of<br />

distribution boards for<br />

Sofgel project.<br />

Oct-96 Jan-98 13.55 Supply & Commissioning of<br />

distribution boards for Al<br />

casting.<br />

Mar-02 Apr-02 5.00 Complete designing,<br />

manufacturing &<br />

commissioning of panels for<br />

project.<br />

Oct-05 May-06 65.00 Complete electrification of<br />

New project from designing<br />

to commissioning on<br />

turnkey basis.<br />

Aug-96 Dec-97 7.26 Supply & Commissioning of<br />

distribution boards for ETP<br />

project.<br />

Aug-00 Till date 25.00 Supply of panels and<br />

boards for ups distribution<br />

system. (Regular<br />

customer for each<br />

installations)<br />

Feb-09 In hands 125.00 Complete electrification of<br />

plant.<br />

Feb-00 Feb-00 11.50 Supply & Commissioning of<br />

UPS distribution boards.<br />

Jan-96 Sep-96 3.80 Supply & Commissioning of<br />

complete electrical power<br />

wiring for bearing line<br />

Apr-96 Oct-96 8.70 Supply & Commissioning of<br />

distribution boards for<br />

knitting project<br />

Feb-01 Mar-01 3.57 Supply & Commissioning of<br />

Lal Dant Manjan distribution<br />

boards.<br />

Mar-99 Sep-99 1.05 Modification of some<br />

electrical power system for<br />

<strong>Chandigarh</strong> office.<br />

Jan-99 Mar-99 31.35 Supply & Commissioning of<br />

distribution boards (Sub<br />

Station restructuring).


34<br />

35<br />

Godrej Consumer Care Limited<br />

Industrial Area, Baddi (HP)<br />

Godrej Consumer Care Limited<br />

Industrial Area, Baddi (HP)<br />

Godrej & Boycee Mfg Ltd<br />

Mohali (Punjab)<br />

Hanumant Builders &<br />

Developers (P) Ltd.,<br />

Project Bollywood heights<br />

Zirakpur (Pb)<br />

36 Himachal Fastner Pvt. Limited<br />

Parwanoo, Distt Solan (HP)<br />

37 Hutchison Max Telecom<br />

Limited, Sector 9, Madhya<br />

Marg, <strong>Chandigarh</strong>.<br />

38 Holiday on Hill Resorts (P) Ltd,<br />

Kandaghat, Distt Shimla (HP)<br />

39 Hitech Gases Limited, Industrial<br />

Focal Point, Sector 66, Mohali<br />

40 Hindustan amusement (P) Ltd,<br />

Dehradun (Utranchal)<br />

41 ICI India Limited, Industrial<br />

Phase VIIIB, S.A.S. Nagar<br />

Mohali (Pb).<br />

42 Imperial Marketing Services,<br />

Sector 26, Madhya Marg,<br />

<strong>Chandigarh</strong>.<br />

43 Inde Dutch System, Sector 26,<br />

Madhya Marg, <strong>Chandigarh</strong>.<br />

Jan-04<br />

July-06<br />

July-08<br />

Feb-09<br />

May-04<br />

Sept-06<br />

Sept-08<br />

In hand<br />

15.00<br />

12.00<br />

16.50<br />

100.00<br />

Supply & Commissioning of<br />

distribution boards/MCCs<br />

Supply of 11kV VCB <strong>Panel</strong>s<br />

Supply of 11kV SF6 <strong>Panel</strong>s.<br />

Supply & Commissioning of<br />

LT <strong>Panel</strong>s, Pre paid<br />

metering system<br />

computerized.<br />

Oct-98 Mar-99 6.00 Complete Electrification of<br />

Project, Designing to<br />

commissioning (Complete<br />

plant renovated).<br />

Oct-98 Nov-98 2.25 Modification of some<br />

electrical power system for<br />

<strong>Chandigarh</strong> office.<br />

Oct-03 Jan-04 15.00 Complete project 11KV sub<br />

station to LT <strong>Panel</strong> supply,<br />

erection, testing &<br />

commissioning.<br />

Oct-03 Dec-03 2.50 Complete project 11KV sub<br />

station to LT <strong>Panel</strong> supply,<br />

erection, testing &<br />

commissioning.<br />

Jan-03 Dec-03 2.50 Supply of main panel<br />

Dec-97 Aug-98 4.64 Supply & Commissioning of<br />

distribution boards (R&D<br />

Block).<br />

Aug-00 Sep-01 5.50 Complete Electrification of<br />

Ammway, Designing to<br />

commissioning. (All stores<br />

in <strong>Chandigarh</strong> Region)<br />

Dec-98 Dec-98 1.22 Supply & Commissioning of<br />

Main distribution boards.<br />

44 IDS Infotech Limited, Mohali Sep-02 Nov-02 10.00 Supply, Erection Testing &<br />

Commissioning of 11/.415V<br />

Sub Station including DG<br />

45 Institute of Engineering &<br />

Technologies, Bhaddal. Distt<br />

Ropar (Pb).<br />

46 Industrial Organics Limited<br />

Barnala Punjab<br />

47 Jagdambe Organics Limited,<br />

Sector 9, <strong>Chandigarh</strong>.<br />

48 Johnson & Johnson Limited,<br />

Baddi, Distt. Solan (HP)<br />

49 Kaiser Hospitals Limited,<br />

Sector 21, Panchkula (Hr)<br />

50 Kanhai Contractor for ICICI<br />

Banks at various places in<br />

Punjab, Haryana, HP & UA<br />

51 Khet-Se Agriproduce India (P)<br />

Limited (A TATA Chemicals<br />

company) Malerkotla (Pb)<br />

52 Kumagai-Skanska-HCC-Itochi<br />

Group, (Delhi Metro project)<br />

53 Lotus Herbal, HPSIDC<br />

Industrial Area, Baddi (HP)<br />

54 M.L. Gupta & Associates, ETP<br />

Project Shimla<br />

Sets.<br />

Aug-00 Sep-00 27.00 Complete Electrification of<br />

Engineering College,<br />

Designing to<br />

commissioning.<br />

Sep-05 Dec-05 5.80 11KV VCB <strong>Panel</strong><br />

Mar-00 Mar-01 3.00 Supply & Commissioning of<br />

Main distribution boards.<br />

Jul-06 Mar-07 75.00 Supply & Commissioning of<br />

Main distribution boards.<br />

Mar-00 Jun-01 6.50 All <strong>Panel</strong>s<br />

Apr-02 Oct-07 55.00 Complete Electrification of<br />

Project, Designing to<br />

commissioning. (All<br />

Branches of ICICI Bank in<br />

Region North)<br />

Mar-08 Sept-08 60.00 Complete Electrification of<br />

Project, Designing to<br />

commissioning.<br />

Nov-03 Dec-03 3.50 Supply of <strong>Panel</strong>s for tunnels<br />

construction works.<br />

Nov-03 Dec-03 1.85 Supply of <strong>Panel</strong>s for tunnels<br />

construction works.<br />

Nov-02 Dec-03 1.85 Supply of <strong>Panel</strong>s


55 Madhu Irritech, Sector 40,<br />

<strong>Chandigarh</strong><br />

56 Microyans Flocks Pvt. Limited,<br />

Handesara Road, Lalru Distt<br />

57<br />

58<br />

59<br />

Patiala (Pb).<br />

Modi Sugar Limited, Modi<br />

Nagar, Distt. Gaziabad ( UP).<br />

Morgardshammer India Ltd<br />

Meerut (UP)<br />

MHB Filters India Pvt Ltd<br />

Nalagarh (HP)<br />

60 Northern Aromatic Limited,<br />

Village Billanwali, Baddi, Distt.<br />

Solan (HP)<br />

61 Nibber Casting Pvt. Limited,<br />

Behind Focal Point, Dera Bassi<br />

(Pb).<br />

62 Niranjan Decoflocks Pvt.<br />

Limited, Handesara Road,<br />

Lalru, Distt. Patiala (Pb).<br />

63 Nectar Lifesciences Limited,<br />

Bataulikala Baddi HP.<br />

64 Pamwi Tissues Limited<br />

Barotiwala Distt Solan (HP).<br />

65 Parabolic Drugs Limited Village<br />

Sudran Via Mubarkpur, Dera<br />

Bassi (Pb)<br />

Parabolic Drugs Limited Village<br />

Sudran Via Mubarkpur, Dera<br />

Bassi (Pb)<br />

66 Punjab Tractors Limited<br />

(Swaraj Foundary Division)<br />

Village Sialbamajri, Distt Ropar<br />

67 Punjab Tractors Limited<br />

(Swaraj Combine Division)<br />

Village Chapparchiri, Distt<br />

Ropar (Pb).<br />

68 Punjab Tractor Limited (Swaraj<br />

Tractor Division) Industrial<br />

Phase IV, S.A.S. Nagar (Pb).<br />

69 Punjab Scooter Limited, Nabha<br />

Distt Patiala (Pb).<br />

70 Punwire Paging Services<br />

Limited, Industrial Phase VII,<br />

S.A.S. Nagar (Pb)<br />

71 Purolator India Limited,<br />

Parwanoo, Distt Solan (HP).<br />

72 Pritika Industries Limited, C94,<br />

Industial Phase VII, S.A.S.<br />

Nagar, Mohali (Pb)<br />

Jan-00 Till date 10.00 Supply & Commissioning of<br />

Irrigation system starters for<br />

motors. (All Landscaping<br />

Fountain <strong>Panel</strong>s for sites<br />

Region North)<br />

Mar-01 Jun-01 2.00 Complete Electrification of<br />

Project, Designing to<br />

Aug-99<br />

Sept-07<br />

May-09<br />

Sep-08<br />

Dec-07<br />

Aug-09<br />

263.61<br />

18.00<br />

40.00<br />

commissioning.<br />

Supply & Commissioning of<br />

distribution boards (for<br />

every project after 1999<br />

which includes the 2MW<br />

TG, 2MW-C TG, 3.1MW<br />

TG, Candi Plant, Mill<br />

upgradation Repeat<br />

orders every year)<br />

Supply & Commissioning of<br />

L.T. <strong>Panel</strong>s.<br />

Complete Electrification of<br />

Project.<br />

Jan-98 Sep-98 14.91 Supply & Commissioning of<br />

Main distribution boards for<br />

Perfumery.<br />

Sep-97 Feb-98 11.09 Complete Electrification of<br />

Project, Designing to<br />

commissioning.<br />

Mar-01 Jan-01 21.50 Complete Electrification of<br />

Project, Designing to<br />

commissioning.<br />

Mar-06 May-06 4.25 11KV VCB <strong>Panel</strong><br />

Aug-96 Dec-96 1.70 Modification of some<br />

electrical power system<br />

(Main <strong>Panel</strong> L&T<br />

Feb-97<br />

Jun-04<br />

Dec-97<br />

Dec-04<br />

5.50<br />

7.40<br />

overhauling)<br />

Complete Electrification of<br />

Project, Designing to<br />

commissioning.<br />

Complete Electrification of<br />

Project, Designing to<br />

commissioning.<br />

Feb-97 Feb-98 4.40 Supply & Commissioning of<br />

Casting line distribution<br />

boards.<br />

Apr-96 Jul-98 58.76 Supply & Commissioning of<br />

complete electrical power<br />

Wiring for new tractor<br />

project.<br />

Apr-96 Jul-03 35.00 Supply & Commissioning of<br />

complete electrical power<br />

Wiring (Every Project on<br />

repeat order for<br />

upgradatin of entire<br />

machine shop)<br />

Jun-96 Jul-96 0.50 Supply & Commissioning of<br />

New chair Line DB.<br />

Oct-96 Aug-97 5.14 Supply & Commissioning of<br />

complete electrical power<br />

Wiring for paging stations at<br />

various places in India.<br />

Apr-96 Aug-06 65.00 Complete Electrification of<br />

Project & up gradation,<br />

Designing to<br />

commissioning. For all<br />

expansions.<br />

Dec-98 Jan-99 3.33 Complete Electrification of<br />

Project, Designing to<br />

commissioning.


73 Punjab University Sector 14, Dec-02 Jan-03 2.00 Supply & Installation of<br />

<strong>Chandigarh</strong><br />

<strong>Panel</strong>s<br />

74 Purewal & Associates Limited, Feb-04 Mar-04 2.50 Supply & Commissioning of<br />

Dharampur (HP)<br />

complete panel for new<br />

project<br />

75 Panacea Biotech Limited, Jan-05 Mar-05 20.00 Supply & Commissioning of<br />

Baddi (HP)<br />

complete HT 11kV panels<br />

for new project<br />

76 Quark Media House (I) Pvt. Sep-98 Dec-98 5.88 Supply & Commissioning of<br />

Ltd.-Chd.<br />

complete electrical power &<br />

Lighting Wiring<br />

77 Quality Machines Parwanoo Apr-00 Oct-02 4.50 Machine control <strong>Panel</strong>s<br />

78 Ranbaxy Laboratories Limited,<br />

Industrial Phase IX, Mohali<br />

(Pb), Paonta Sahib, Gurgaun.<br />

Ranbaxy SEZ, Mohali<br />

79 Ranbro Brakes India Limited,<br />

Ambala <strong>Chandigarh</strong> Road,<br />

Lalru, Distt. Patiala (Pb).<br />

80 Research & Development<br />

Centre SASE Plot No. 1 Sector<br />

37A <strong>Chandigarh</strong>.<br />

81 SBEC Sugar Limited, Village<br />

Loyian Malakpur Loyian,<br />

Barout, Distt Bhagpat (UP)<br />

82 SI-AL SBEC Bioenergy Limited<br />

Village Loyian Malakpur, Tehsil<br />

Barout, Distt Bhagpat (UP)<br />

83 Siel Chemical Complex, Siel<br />

Complex, Rajpura Distt Patiala<br />

(Pb).<br />

84 Steel Strips Limited, Sab Mall,<br />

Noida, (UP).<br />

85 Surya Medicare Limited,<br />

Barwala Road, Dera Bassi<br />

Distt. Patiala (Pb).<br />

86 Surya Pharmaceuticals Limited,<br />

Panchkula (Hr), & Baddi (HP).<br />

87 SUS Engineering College<br />

Tangori Distt Ropar (Pb)<br />

88 Swaraj Engine Limited,<br />

Industrial Phase IX, Mohali.<br />

(Pb).<br />

89 Swaraj Mazda Limited, Village<br />

Asron Ropar (Pb).<br />

90<br />

91<br />

92<br />

Spray Engineering Devices Ltd.<br />

HPSIDC Industrial Area, Baddi<br />

(HP).<br />

Spray Engineering Devices Ltd.<br />

C-82, Industrial Phase VII,<br />

S.A.S. Nagar, Mohali Pb.<br />

Shoghi Communication Limited,<br />

Indstrial Area, Shoghi Shimla<br />

Apr-96<br />

Apr-08<br />

Sep-02<br />

July-08<br />

108.00<br />

7.65<br />

Supply & Commissioning of<br />

11kV <strong>Panel</strong>s, MCC panels<br />

& distribution boards for<br />

Bulk drug plants, Admn,<br />

R&D Centre. (Repeat<br />

orders for all projects)<br />

Supply of 11kV VCB <strong>Panel</strong>s<br />

Sep-96 Oct-96 10.80 Supply & Commissioning of<br />

Project distribution boards.<br />

Oct-00 Dec-00 4.90 Complete Electrification of<br />

UPS wiring, Designing to<br />

commissioning.<br />

Sep-97 Aug 07 146.85 Supply & Commissioning of<br />

distribution boards for<br />

Sugar Plant & Turbines.<br />

(Repeat orders for all<br />

projects)<br />

Jan-01 Feb-04 69.40 Supply & Commissioning of<br />

distribution boards for 2MW<br />

Co Generation Power Plant.<br />

(Repeat orders for all<br />

projects)<br />

Mar-98 Dec-99 10.70 Supply & Commissioning of<br />

Auto Change Over panels<br />

for Alkali Project<br />

Jul-99 Jul-01 10.50 Supply & Commissioning of<br />

SAB Mall Noida distribution<br />

boards.<br />

Sep-96 Dec-99 9.76 Complete Electrification of<br />

Bulk drug Project,<br />

Designing to<br />

commissioning. (Repeat<br />

orders for all projects)<br />

Apr-96 Dec-97 11.90 Complete Electrification of<br />

Bulk drug Project,<br />

Designing to<br />

commissioning.<br />

Jul-02 Sep-02 3.25 Designing, Manufacturing,<br />

Erection of <strong>Panel</strong>s for Sub<br />

Station & college electrical<br />

distribution.<br />

Dec-96 Jan-98 20.12 Supply & Commissioning of<br />

complete electrical power<br />

Wiring for Engine Project.<br />

Jul-97 Jan-98 1.78 Supply & Commissioning of<br />

complete electrical power<br />

Jan-02<br />

Jan-08<br />

Jan-01<br />

Apr-08<br />

Dec-08<br />

Jan-03<br />

135.00<br />

140.00<br />

2.05<br />

Wiring<br />

Supply of <strong>Panel</strong>s & Cable<br />

Trays & Plant electrification<br />

of unit-III.<br />

Complete Electrification of<br />

Project, Designing to<br />

commissioning.<br />

Supply of <strong>Panel</strong> boards.


93 M/s Stumpp, Schuele &<br />

Somappa Pvt Ltd,<br />

May-09<br />

Jul-09 30,0 Complete Electrification of<br />

Project<br />

94<br />

Sohna, Gurgaun (Hr).<br />

Thermax Limited - Pune. Mar-98 Jan-00 5.82 Supply & Commissioning of<br />

ETP Motor distribution<br />

<strong>Panel</strong>s.<br />

95 Tube Product of India,<br />

Dec-02 Jun-03 15.00 Complete electrical works<br />

Industrial Area, Mohali (Pb)<br />

for new plant including<br />

panels.<br />

96 Titan Industries Limited EPIP, Jun-04 Aug-06 143.00 Complete electrical works<br />

Jharmajri Baddi (HP),<br />

for new watch assembly<br />

Dehradun & Roorkee (UA)<br />

unit including panels.<br />

(Repeat orders for 4<br />

projects)<br />

97 TATA Teleservices Limited, Jul-04 Sep-04 48.00 Complete electrical works<br />

Kasumati Shimla (HP)<br />

for MSC including panels.<br />

98 Tesna Tech (P) Limited, Baddi,<br />

Distt. Solan (HP)<br />

Mar-07 May-07 22.00 Complete electrical works.<br />

99 Vamshi Exports Limited<br />

Jul-05 Jun-07 60.00 Complete panels for 1st of<br />

Asansol (West Bengal) &<br />

Barabanki (UP)<br />

project.<br />

100 Vodafone, C-131, Industrial Jul-08 Sept-07 35.00 Complete electrification of<br />

Phase VIII, Mohali<br />

2 nd floor electrification.<br />

101 Wahid Sandhar Sugars Limited, Jul-07 Oct 07 20.00 Power Export Job 2 MW to<br />

GT Road, Phagwara (Punjab)<br />

PSEB (Co-Generation)<br />

Jul-08 Apr-09 300.00 Co-Gen & Power Export 12<br />

MW TG<br />

102 Zen Machine Pvt. Limited, Mar-96 Jun-01 5.19 Supply & Commissioning of<br />

Mohali (Pb).<br />

Machine distribution boards.<br />

Note The above given list is of those works which are done on the name of M/s <strong>Chandigarh</strong><br />

Electro <strong>Control</strong>s, In addition to this we have done lot of jobs on our sister concern<br />

names- <strong>Chandigarh</strong> Electricals (P) Ltd., CECO Electricals, Baldev Singh & Bros and<br />

Santokh Singh & Bros, in Ranbaxy at various places, Punjab Tractors, Max, DSM,<br />

Quark, Steel Strips, Gontermann, Vardhman and many more. Some valued certificates<br />

are enclosed here with for your reference. We Were awarded Ranbaxy partnership<br />

award in 1997 for outstanding commitment to highest principles of mutual and<br />

sustainable partnership through excellence M/s Santokh Singh & Bros.


List of Latest Major Customers<br />

Name of Customer Name of project head Name of our group concern Order<br />

Value<br />

Asian Concretes &<br />

Cements (P) Ltd., Beer<br />

Palassi, Nalagarh (HP)<br />

Titan Industries Limited,<br />

Pant Nagar (Utrakhand)<br />

Concept Pharmaceuticals<br />

Limited, Roorkee<br />

(Utrakhand)<br />

Mahle Filter System India<br />

Limited, Parwanoo (HP)<br />

Aspee Sons & Precisions,<br />

Barotiwala (HP)<br />

Pritika Autocast (P)<br />

Limted, Tahliwal Una (HP)<br />

Wrigley India (P) Limted,<br />

Katha Baddi (HP)<br />

Wahid Sandhar Sugars<br />

Limited, G.T. Road,<br />

Phagwara (Punjab)<br />

Khet-se Agriproduce (P)<br />

Limited Malerkotla<br />

(Punjab) A joint venture<br />

of Tatal Chemical & Total<br />

Produce Ireland.<br />

Spray Engineering Devices<br />

Limited, Baddi (HP) &<br />

Mohali (Punjab).<br />

Carnation Auto India (P)<br />

Limited, Noida (UP)<br />

Project location Noida &<br />

Amritsar.<br />

Vodafone Essar Limited,<br />

Mohali (Punjab)<br />

Titan Industries Limited,<br />

Baddi, Dehradun &<br />

Roorkee projects.<br />

Mr. Harish Aggarwal<br />

(9815604545)<br />

Mr. Raghunathan<br />

(9443325071) & Mr<br />

Sanjeev Jaiswal<br />

(9219544404)<br />

Mr. Sudhir Tipre<br />

(9372877881)<br />

Mr. Keshav Mahajan<br />

(9816033784)<br />

Mr. Arvind Matharu<br />

(9915011227)<br />

Mr. Ajay Rai<br />

(9815473399)<br />

Mr. Pankaj Nagre<br />

(9905055483)<br />

Mr. B.S. Garewal<br />

(9855494444)<br />

Mr. Suburoto Beneragi<br />

(9958294912)<br />

Mr. Prateek Verma<br />

(9316037801)<br />

Mr. Sanjay Khosla<br />

(9650497625)<br />

Simartech Projects &<br />

Services Limited &<br />

Simartech <strong>Control</strong>s<br />

Simartech Projects &<br />

Services Limited & Simartech<br />

<strong>Control</strong>s<br />

Simartech Projects &<br />

Services Limited & Simartech<br />

<strong>Control</strong>s<br />

Simartech Projects &<br />

Services Limited & Simartech<br />

<strong>Control</strong>s<br />

<strong>Chandigarh</strong> Electro <strong>Control</strong>s<br />

& Simartech <strong>Control</strong>s<br />

200 Lakh<br />

85 Lakh<br />

125 Lakh<br />

45 Lakh<br />

18 Lakh<br />

Simartech <strong>Control</strong>s 15 Lakh<br />

Simartech Projects &<br />

Services Limited<br />

Simartech Projects &<br />

Services Limited, <strong>Chandigarh</strong><br />

Electro <strong>Control</strong>s & Simartech<br />

<strong>Control</strong>s<br />

Simartech Projects &<br />

Services Limited & Simartech<br />

<strong>Control</strong>s<br />

Simartech Projects &<br />

Services Limited, <strong>Chandigarh</strong><br />

Electro <strong>Control</strong>s & Simartech<br />

<strong>Control</strong>s<br />

Simartech Projects &<br />

Services Limited & Simartech<br />

<strong>Control</strong>s<br />

Mr. Arvind (9888018414) Simartech Projects &<br />

Services Limited.<br />

Mr. Raghunathan<br />

(9443325071) & Mr<br />

Sanjeev Jaiswal<br />

(9219544404)<br />

Simartech Projects &<br />

Services Limited, <strong>Chandigarh</strong><br />

Electro <strong>Control</strong>s & Simartech<br />

<strong>Control</strong>s<br />

35 Lakh<br />

300 Lakh<br />

68 Lakh<br />

200 Lakh<br />

+<br />

105 Lakh<br />

40 Lakh<br />

140 Lakh


Organization Chart<br />

Director-1 : Charanjit Singh, Engineer having experience 21 years in projects with complete<br />

knowledge of designing to commissioning.<br />

Director-2 : Raminder Kaur, MA, looking after business at office.<br />

Director-3 : Harpreet Singh, B-Tech Electrical having experience of 2 years.<br />

Director-4 : Gurmukh Singh, B-Tech Electrical having experience of 35 years in projects and<br />

maintenance of industries.<br />

Director-5 : Ajay Patil, B-Tech Electrical having experience in project designing more than 15<br />

years.<br />

Director-6 : Mr. S.K. Thakral (GM-Technical), looking after over all activities.<br />

Director-7 : Jasjot Singh, B-Tech ECE, Presently in USA for higher study, joining back after<br />

one year, will look after all IT Business.<br />

Business Partner : Mr Raj Kumar Soni, Mechanical Engineer, with experience 25 years<br />

remains at high posts in various organizations looking after complete project head,<br />

independently handling complete projects up to 100 Crores, Now looking after our business in<br />

NCR Delhi.<br />

Accounts : 4<br />

ADMN Asstt. : 3<br />

Factory Manager : 1 (Looking after Baddi Factory)<br />

Service Engineer : 2<br />

Site Engineer : 5<br />

Foreman : 6<br />

Welder : 6<br />

Fitter : 6<br />

Electrician : 15<br />

Helper : 20<br />

Part time man power : 30


Manufacturing facility at Baddi<br />

State of art manufacturing facility at beautiful Industrial Area in the heart of Baddi, nearby<br />

factories are Timax, P&G, Godrej, Gillette, Sukam, Vardhman and many more<br />

Plot No. 9G, Apparel Park Cum Industrial Area, Katha, Baddi (HP)<br />

Plot Area: 1000 M²<br />

Covered Area: 12500 Ft²<br />

Complete set up for manufacturing of Electric <strong>Control</strong> <strong>Panel</strong> up to 11kV, going to add 33kV<br />

Indoor panels, DG Sets up to 45kVA, Compact sub stations.<br />

Main Machinery: NC Sheering, Bending, Power Presses, Inverter based welding machines,<br />

Seven Tank pre treatment process, Powder Coating plant, Dust free assembly hall completely<br />

isolated from fabrication & painting on first floor, with most advance tool kits, Pneumatic tools<br />

for complete assembly using dry air from Chicago Compressor. Testing facility for panels<br />

complete as per IS Requirements. CPRI Type tests, 50kA 415V <strong>Panel</strong>, IP55 <strong>Panel</strong>,<br />

Temperature Rise Test, 26.3kA 11kV <strong>Panel</strong> and 40kA 11kV <strong>Panel</strong>. ISO 9001:2000 Certified<br />

from KBS Certification Services Pvt. Limited.


Office at <strong>Chandigarh</strong><br />

Managing Director & other Director Area<br />

Staff Area


Design Area, In house designing department, with one Sr. Electrical Engineer for Designing of<br />

Circuits, Sr. Mechanical Engineer for Fabrication Designs. Colored plotting up to A0 size,<br />

complete records of documentation, pre design post design, as built, instruction manuals,<br />

safety instruction, preventive maintenance schedules. Records are available for years and<br />

years.<br />

Reception Area + Conference Room


Projects Executed<br />

12MW Co-Gen Plant of Wahid Sandhar Sugars Limited at Phagwara Punjab, All <strong>Panel</strong>s<br />

installed at 12 Meter height. (Site Erection time view)<br />

<strong>Panel</strong>s for Karan Polypack Nalagarh


For Dantal Hydraulics Manesar Gurgaun (Hr)<br />

Assembly hall for manufacturing of panels


11kV <strong>Panel</strong>s<br />

Visitor seeing manufacturing facilities at our factory


At assembly hall<br />

33kV Switchyard for Asian Cements - Nalagarh


Cable Tray, Cabling & Light installation at a project