11.01.2013 Views

Company Profile.pdf - Control Panel Manufacturer Chandigarh

Company Profile.pdf - Control Panel Manufacturer Chandigarh

Company Profile.pdf - Control Panel Manufacturer Chandigarh

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

73 Punjab University Sector 14, Dec-02 Jan-03 2.00 Supply & Installation of<br />

<strong>Chandigarh</strong><br />

<strong>Panel</strong>s<br />

74 Purewal & Associates Limited, Feb-04 Mar-04 2.50 Supply & Commissioning of<br />

Dharampur (HP)<br />

complete panel for new<br />

project<br />

75 Panacea Biotech Limited, Jan-05 Mar-05 20.00 Supply & Commissioning of<br />

Baddi (HP)<br />

complete HT 11kV panels<br />

for new project<br />

76 Quark Media House (I) Pvt. Sep-98 Dec-98 5.88 Supply & Commissioning of<br />

Ltd.-Chd.<br />

complete electrical power &<br />

Lighting Wiring<br />

77 Quality Machines Parwanoo Apr-00 Oct-02 4.50 Machine control <strong>Panel</strong>s<br />

78 Ranbaxy Laboratories Limited,<br />

Industrial Phase IX, Mohali<br />

(Pb), Paonta Sahib, Gurgaun.<br />

Ranbaxy SEZ, Mohali<br />

79 Ranbro Brakes India Limited,<br />

Ambala <strong>Chandigarh</strong> Road,<br />

Lalru, Distt. Patiala (Pb).<br />

80 Research & Development<br />

Centre SASE Plot No. 1 Sector<br />

37A <strong>Chandigarh</strong>.<br />

81 SBEC Sugar Limited, Village<br />

Loyian Malakpur Loyian,<br />

Barout, Distt Bhagpat (UP)<br />

82 SI-AL SBEC Bioenergy Limited<br />

Village Loyian Malakpur, Tehsil<br />

Barout, Distt Bhagpat (UP)<br />

83 Siel Chemical Complex, Siel<br />

Complex, Rajpura Distt Patiala<br />

(Pb).<br />

84 Steel Strips Limited, Sab Mall,<br />

Noida, (UP).<br />

85 Surya Medicare Limited,<br />

Barwala Road, Dera Bassi<br />

Distt. Patiala (Pb).<br />

86 Surya Pharmaceuticals Limited,<br />

Panchkula (Hr), & Baddi (HP).<br />

87 SUS Engineering College<br />

Tangori Distt Ropar (Pb)<br />

88 Swaraj Engine Limited,<br />

Industrial Phase IX, Mohali.<br />

(Pb).<br />

89 Swaraj Mazda Limited, Village<br />

Asron Ropar (Pb).<br />

90<br />

91<br />

92<br />

Spray Engineering Devices Ltd.<br />

HPSIDC Industrial Area, Baddi<br />

(HP).<br />

Spray Engineering Devices Ltd.<br />

C-82, Industrial Phase VII,<br />

S.A.S. Nagar, Mohali Pb.<br />

Shoghi Communication Limited,<br />

Indstrial Area, Shoghi Shimla<br />

Apr-96<br />

Apr-08<br />

Sep-02<br />

July-08<br />

108.00<br />

7.65<br />

Supply & Commissioning of<br />

11kV <strong>Panel</strong>s, MCC panels<br />

& distribution boards for<br />

Bulk drug plants, Admn,<br />

R&D Centre. (Repeat<br />

orders for all projects)<br />

Supply of 11kV VCB <strong>Panel</strong>s<br />

Sep-96 Oct-96 10.80 Supply & Commissioning of<br />

Project distribution boards.<br />

Oct-00 Dec-00 4.90 Complete Electrification of<br />

UPS wiring, Designing to<br />

commissioning.<br />

Sep-97 Aug 07 146.85 Supply & Commissioning of<br />

distribution boards for<br />

Sugar Plant & Turbines.<br />

(Repeat orders for all<br />

projects)<br />

Jan-01 Feb-04 69.40 Supply & Commissioning of<br />

distribution boards for 2MW<br />

Co Generation Power Plant.<br />

(Repeat orders for all<br />

projects)<br />

Mar-98 Dec-99 10.70 Supply & Commissioning of<br />

Auto Change Over panels<br />

for Alkali Project<br />

Jul-99 Jul-01 10.50 Supply & Commissioning of<br />

SAB Mall Noida distribution<br />

boards.<br />

Sep-96 Dec-99 9.76 Complete Electrification of<br />

Bulk drug Project,<br />

Designing to<br />

commissioning. (Repeat<br />

orders for all projects)<br />

Apr-96 Dec-97 11.90 Complete Electrification of<br />

Bulk drug Project,<br />

Designing to<br />

commissioning.<br />

Jul-02 Sep-02 3.25 Designing, Manufacturing,<br />

Erection of <strong>Panel</strong>s for Sub<br />

Station & college electrical<br />

distribution.<br />

Dec-96 Jan-98 20.12 Supply & Commissioning of<br />

complete electrical power<br />

Wiring for Engine Project.<br />

Jul-97 Jan-98 1.78 Supply & Commissioning of<br />

complete electrical power<br />

Jan-02<br />

Jan-08<br />

Jan-01<br />

Apr-08<br />

Dec-08<br />

Jan-03<br />

135.00<br />

140.00<br />

2.05<br />

Wiring<br />

Supply of <strong>Panel</strong>s & Cable<br />

Trays & Plant electrification<br />

of unit-III.<br />

Complete Electrification of<br />

Project, Designing to<br />

commissioning.<br />

Supply of <strong>Panel</strong> boards.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!