55 Madhu Irritech, Sector 40,<br />
<strong>Chandigarh</strong><br />
56 Microyans Flocks Pvt. Limited,<br />
Handesara Road, Lalru Distt<br />
57<br />
58<br />
59<br />
Patiala (Pb).<br />
Modi Sugar Limited, Modi<br />
Nagar, Distt. Gaziabad ( UP).<br />
Morgardshammer India Ltd<br />
Meerut (UP)<br />
MHB Filters India Pvt Ltd<br />
Nalagarh (HP)<br />
60 Northern Aromatic Limited,<br />
Village Billanwali, Baddi, Distt.<br />
Solan (HP)<br />
61 Nibber Casting Pvt. Limited,<br />
Behind Focal Point, Dera Bassi<br />
(Pb).<br />
62 Niranjan Decoflocks Pvt.<br />
Limited, Handesara Road,<br />
Lalru, Distt. Patiala (Pb).<br />
63 Nectar Lifesciences Limited,<br />
Bataulikala Baddi HP.<br />
64 Pamwi Tissues Limited<br />
Barotiwala Distt Solan (HP).<br />
65 Parabolic Drugs Limited Village<br />
Sudran Via Mubarkpur, Dera<br />
Bassi (Pb)<br />
Parabolic Drugs Limited Village<br />
Sudran Via Mubarkpur, Dera<br />
Bassi (Pb)<br />
66 Punjab Tractors Limited<br />
(Swaraj Foundary Division)<br />
Village Sialbamajri, Distt Ropar<br />
67 Punjab Tractors Limited<br />
(Swaraj Combine Division)<br />
Village Chapparchiri, Distt<br />
Ropar (Pb).<br />
68 Punjab Tractor Limited (Swaraj<br />
Tractor Division) Industrial<br />
Phase IV, S.A.S. Nagar (Pb).<br />
69 Punjab Scooter Limited, Nabha<br />
Distt Patiala (Pb).<br />
70 Punwire Paging Services<br />
Limited, Industrial Phase VII,<br />
S.A.S. Nagar (Pb)<br />
71 Purolator India Limited,<br />
Parwanoo, Distt Solan (HP).<br />
72 Pritika Industries Limited, C94,<br />
Industial Phase VII, S.A.S.<br />
Nagar, Mohali (Pb)<br />
Jan-00 Till date 10.00 Supply & Commissioning of<br />
Irrigation system starters for<br />
motors. (All Landscaping<br />
Fountain <strong>Panel</strong>s for sites<br />
Region North)<br />
Mar-01 Jun-01 2.00 Complete Electrification of<br />
Project, Designing to<br />
Aug-99<br />
Sept-07<br />
May-09<br />
Sep-08<br />
Dec-07<br />
Aug-09<br />
263.61<br />
18.00<br />
40.00<br />
commissioning.<br />
Supply & Commissioning of<br />
distribution boards (for<br />
every project after 1999<br />
which includes the 2MW<br />
TG, 2MW-C TG, 3.1MW<br />
TG, Candi Plant, Mill<br />
upgradation Repeat<br />
orders every year)<br />
Supply & Commissioning of<br />
L.T. <strong>Panel</strong>s.<br />
Complete Electrification of<br />
Project.<br />
Jan-98 Sep-98 14.91 Supply & Commissioning of<br />
Main distribution boards for<br />
Perfumery.<br />
Sep-97 Feb-98 11.09 Complete Electrification of<br />
Project, Designing to<br />
commissioning.<br />
Mar-01 Jan-01 21.50 Complete Electrification of<br />
Project, Designing to<br />
commissioning.<br />
Mar-06 May-06 4.25 11KV VCB <strong>Panel</strong><br />
Aug-96 Dec-96 1.70 Modification of some<br />
electrical power system<br />
(Main <strong>Panel</strong> L&T<br />
Feb-97<br />
Jun-04<br />
Dec-97<br />
Dec-04<br />
5.50<br />
7.40<br />
overhauling)<br />
Complete Electrification of<br />
Project, Designing to<br />
commissioning.<br />
Complete Electrification of<br />
Project, Designing to<br />
commissioning.<br />
Feb-97 Feb-98 4.40 Supply & Commissioning of<br />
Casting line distribution<br />
boards.<br />
Apr-96 Jul-98 58.76 Supply & Commissioning of<br />
complete electrical power<br />
Wiring for new tractor<br />
project.<br />
Apr-96 Jul-03 35.00 Supply & Commissioning of<br />
complete electrical power<br />
Wiring (Every Project on<br />
repeat order for<br />
upgradatin of entire<br />
machine shop)<br />
Jun-96 Jul-96 0.50 Supply & Commissioning of<br />
New chair Line DB.<br />
Oct-96 Aug-97 5.14 Supply & Commissioning of<br />
complete electrical power<br />
Wiring for paging stations at<br />
various places in India.<br />
Apr-96 Aug-06 65.00 Complete Electrification of<br />
Project & up gradation,<br />
Designing to<br />
commissioning. For all<br />
expansions.<br />
Dec-98 Jan-99 3.33 Complete Electrification of<br />
Project, Designing to<br />
commissioning.