18 Carnation Auto India (P) Ltd.,<br />

Sector 127, IHDP,<br />

Noida (UP).<br />

19 <strong>Chandigarh</strong> Distillers & Bottlers<br />

Limited Banur Distt. Patiala<br />

(Punjab)<br />

<strong>Chandigarh</strong> Distillers & Bottlers<br />

Limited Banur Distt. Patiala<br />

(Punjab)<br />

<strong>Chandigarh</strong> Distillers & Bottlers<br />

Limited Banur Distt. Patiala<br />

(Punjab)<br />

<strong>Chandigarh</strong> Distillers & Bolttlers<br />

Ltd., Banur (Pb).<br />

20 Chandika Press Limited 126,<br />

Industrial Area, Phase I,<br />

<strong>Chandigarh</strong>.<br />

21 Dabur India Limited, 109<br />

Industrial Area, HPSIDC Baddi<br />

Distt Solan (HP).<br />

22 DCM Engineering Products<br />

Village Asron Ropar (Pb).<br />

23 Doaba Amusements (P)<br />

Limited Village Sohara,<br />

Landran, Mohali Punjab<br />

24 Dantal Hydraulics (P) Limited<br />

Plot No. 50, Sector 3 IMT<br />

Manesar Haryana<br />

25 Effluent Equipment, Focal<br />

Point, Rajpura (Pb).<br />

26<br />

27<br />

Essar Engineers, Sector 40,<br />

<strong>Chandigarh</strong><br />

Esys Information Technologies<br />

Ltd. U/O from Consort Builders<br />

Nalagarh (HP)<br />

28 Fortis Healthcare Limited,<br />

Sector 62, Mohali (Pb).<br />

29 Gabriel India Limited<br />

Parwanoo, Distt Solan (HP).<br />

30 Global Knitfab Limited, Barwala<br />

Road, Dera Bassi Distt. Patiala<br />

(Pb).<br />

31 Green Valley Products India<br />

Private Limited, HPSIDC,<br />

Baddi, Distt Solan (HP)<br />

32 Gujrat Ambuja Cement Limited,<br />

Sector 9, Madhya Marg,<br />

<strong>Chandigarh</strong>.<br />

33 Groz Beckert Asia Limited,<br />

Industrial Area, Phase I,<br />

<strong>Chandigarh</strong>.<br />

Jan-09 Aug-09 100.00 Complete electrification of<br />

Car Repair Solution hubs of<br />

Noida – 2 Nos, Amritsar – 1<br />

Apr-96<br />

Apr-04<br />

Apr-06<br />

Feb-09<br />

Aug-97<br />

Mar-05<br />

Mar-07<br />

Mar-09<br />

41.00<br />

70.85<br />

100.00<br />

65.00<br />

No. & Gurgaun – 1 No. Site.<br />

Supply & Commissioning of<br />

distribution boards.<br />

Complete electrification of<br />

2x1000kva Sub Station<br />

Supply & Commissioning of<br />

distribution boards.<br />

Complete electrification of<br />

plants, 3.1MW TG Set.<br />

Supply & Commissioning of<br />

distribution boards.<br />

Complete electrification of<br />

plants, 8.25MW TG Set,<br />

66kV Sub Station 10 MVA &<br />

3.15 MVA<br />

Complete panels for Grain<br />

Mill Plant<br />

Feb-96 May-96 4.90 Supply & Commissioning of<br />

complete electrical wiring<br />

for printing press.<br />

Sep-96 Feb-98 37.76 Supply & Commissioning of<br />

distribution boards for<br />

Sofgel project.<br />

Oct-96 Jan-98 13.55 Supply & Commissioning of<br />

distribution boards for Al<br />

casting.<br />

Mar-02 Apr-02 5.00 Complete designing,<br />

manufacturing &<br />

commissioning of panels for<br />

project.<br />

Oct-05 May-06 65.00 Complete electrification of<br />

New project from designing<br />

to commissioning on<br />

turnkey basis.<br />

Aug-96 Dec-97 7.26 Supply & Commissioning of<br />

distribution boards for ETP<br />

project.<br />

Aug-00 Till date 25.00 Supply of panels and<br />

boards for ups distribution<br />

system. (Regular<br />

customer for each<br />

installations)<br />

Feb-09 In hands 125.00 Complete electrification of<br />

plant.<br />

Feb-00 Feb-00 11.50 Supply & Commissioning of<br />

UPS distribution boards.<br />

Jan-96 Sep-96 3.80 Supply & Commissioning of<br />

complete electrical power<br />

wiring for bearing line<br />

Apr-96 Oct-96 8.70 Supply & Commissioning of<br />

distribution boards for<br />

knitting project<br />

Feb-01 Mar-01 3.57 Supply & Commissioning of<br />

Lal Dant Manjan distribution<br />

boards.<br />

Mar-99 Sep-99 1.05 Modification of some<br />

electrical power system for<br />

<strong>Chandigarh</strong> office.<br />

Jan-99 Mar-99 31.35 Supply & Commissioning of<br />

distribution boards (Sub<br />

Station restructuring).