Annual Repor t and Financial Statements 2009 11<br />
OpERaTIONS REVIEw 2009 (CONTINuED)<br />
Dunboyne Line<br />
Track laying, station and car park works are continuing on<br />
the new Dunboyne line. The project is still on target to<br />
enable commuter services from the M3 Parkway station<br />
to commence in September 2010, with intermediate<br />
stations at Hansfield and Dunboyne.<br />
Cork Commuter service<br />
Glounthaune/Midleton was opened for service in July<br />
2009 with 9 miles of track laid, 2 stations completed, 9<br />
level crossings closed and 3 level crossings automated.<br />
The new Glanmire road bridge to facilitate the closure of<br />
the Woodhill level crossing was opened to traffic in<br />
October, 2009.<br />
Other works<br />
n Accessibility works were completed at 12 stations.<br />
n 1,360 car parking spaces (in 10 locations) were added<br />
in 2009 to the car parking pool.<br />
n Ticket Validation machines were installed at 4 stations<br />
(including Heuston and Bray) during the year.<br />
n Rosslare Berth 2 linkspan replacement was completed<br />
and is fully operational.<br />
City Centre Re-Signalling – Implementation Phase<br />
Installation is substantially complete on the Howth branch.<br />
Installation of cable route and construction of supporting<br />
structures for signals & location cases is ongoing on the<br />
mainline between Howth Junction and Clongriffin Station.<br />
Construction of SET buildings is complete at 8 DART<br />
stations.<br />
Level Crossing Automation<br />
An automation programme to remotely monitor road<br />
crossings progressed during 2009. 59 crossings are being<br />
monitored to date at the Mallow and Athlone centres and<br />
this number is expected to rise to 75 at end 2010.<br />
Rolling stock<br />
Acceptance into service of all the remaining InterCity<br />
railcars was completed with the introduction into service<br />
in November of set 45 (the last high density 6-car). There<br />
are twenty nine 3-car and fifteen 6-car sets now in service<br />
with replacements for sets 10 and 11, damaged at sea<br />
during delivery, due in 2011. Production for the 51 vehicle<br />
order commences in April 2010 with deliveries planned for<br />
2011.<br />
The reliability of the rolling stock fleets have been<br />
improved significantly over the last two years with the<br />
number of incidents causing delay more than halved. The<br />
improved rolling stock reliability has directly supported the<br />
improved reliability of services.<br />
The resolution of several system and component issues<br />
related to the DART Class 8100 refurbishment project has<br />
been completed. In particular, the Class 8100 floors were<br />
poorly installed during the original refurbishment project<br />
and are being refitted under warranty.<br />
The manufacturers (CAF of Spain) of the MkIV carriages<br />
operating on Dublin Cork route and the Class 29000 DMU<br />
operating commuter services into Dublin are being<br />
pursued under the contracts to rectify known technical<br />
deficiencies with their products. Remedy of these issues<br />
will improve reliability and passenger comfort.<br />
Significant improvements in productivity and operational<br />
control of the Mechanical Engineering Workshops and<br />
Depots have been achieved over the last three years.