MU.,Coo,0O - PDF, 101 mb - usaid
MU.,Coo,0O - PDF, 101 mb - usaid
MU.,Coo,0O - PDF, 101 mb - usaid
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
-25-<br />
The data will be analysed to determine<br />
being Usd<br />
where and how water is<br />
management And misused, the extent<br />
presently<br />
and his attiude of<br />
towards<br />
the farmers<br />
change. knowledge<br />
analyis, finally, in water<br />
improved practAces can<br />
from<br />
be<br />
this<br />
basis. developed<br />
Program and<br />
such<br />
tested<br />
as block<br />
on a<br />
planting,,<br />
pilot<br />
naintenance, i.Proved<br />
city<br />
scheduling<br />
water channel<br />
needs, Of<br />
moe<br />
irrigation<br />
efficimt water<br />
field<br />
to<br />
layout,<br />
met plant<br />
should emrge<br />
and<br />
resulting<br />
less drainage<br />
in improved<br />
from fields<br />
ltivatin<br />
a<br />
Practices.<br />
data ollection Without<br />
process<br />
unlikely<br />
to evaluate thet present situation<br />
It<br />
that it<br />
is therefore<br />
such technologies could is<br />
essential that be<br />
the<br />
satisfactorily<br />
extension division<br />
implemented.<br />
the process<br />
be involved<br />
by ausisting in<br />
with data collection and analysis.<br />
The water<br />
Operators<br />
management<br />
in program<br />
improved will<br />
methods also include tra~ining<br />
and<br />
of seed bed Preparation, machinery<br />
field layout techniques to<br />
land<br />
advance leveling,<br />
water mana.<br />
Initially . technology.<br />
this activity will<br />
to<br />
be<br />
arms<br />
done on<br />
as<br />
the<br />
techniques GIM seed<br />
are<br />
farm<br />
Perfected.<br />
and extended<br />
Project provided equipment<br />
one<br />
for<br />
4-wh"el<br />
the water<br />
drive<br />
management<br />
vehicle for<br />
program<br />
the<br />
include<br />
equipmen technical.<br />
list Annex<br />
specialist<br />
IV, h iit<br />
(ncluded<br />
4. (b) and<br />
in<br />
sive trade tools<br />
an<br />
to<br />
assor<br />
be provided<br />
t of inexpen<br />
upon arrival of the techniian.<br />
(3) Machinery Services<br />
The ProJectE proposes to improve<br />
handle<br />
the<br />
the<br />
GRE<br />
machinery<br />
machinery<br />
requiremen<br />
pool so that<br />
in<br />
it<br />
th<br />
can<br />
pool's primary<br />
Project<br />
responsibility<br />
area. The equipment<br />
will be to<br />
repair<br />
provide<br />
services maintenace<br />
for land<br />
eand<br />
equipment planning,<br />
on-hand as<br />
seed<br />
well<br />
bed<br />
as<br />
preparatio~n<br />
equipment to<br />
and<br />
be<br />
harvesting<br />
Purchased under<br />
Project.<br />
the<br />
Initiall..y the Project will address<br />
and co<strong>mb</strong>ines<br />
the problems<br />
through a<br />
of<br />
;rogram<br />
inoperable<br />
of major<br />
tractors<br />
Parts for existing<br />
overhaul<br />
machines<br />
and repair.<br />
as well<br />
Spare<br />
purchased as a.ll<br />
under<br />
now<br />
the<br />
equimnt<br />
Project.<br />
will be<br />
TheD presently inadequate and<br />
by the<br />
critical<br />
Project<br />
factor<br />
is the<br />
which<br />
establishment<br />
will be addressed<br />
parts inventory, machinery monitoring,<br />
of a system of machinery<br />
timely and<br />
service<br />
spare<br />
and maintenance.- and<br />
This<br />
repair,<br />
wIll involve<br />
procedure<br />
the esablishment<br />
for machines of<br />
and<br />
an<br />
spares<br />
accounting<br />
can be so that maintenance<br />
of<br />
monitored on<br />
and<br />
a a weekly basis. servicing<br />
routine maintenance scheduling It will<br />
and<br />
also<br />
records<br />
involve<br />
keeping<br />
initiation<br />
each piece of equipmt n;<br />
progam<br />
development<br />
for<br />
minr repai-s can<br />
of<br />
be<br />
two<br />
done<br />
field<br />
in<br />
service<br />
the field;<br />
units<br />
establishnnt<br />
so<br />
and repair of<br />
program<br />
a maintenance<br />
for co<strong>mb</strong>ines in the off-season<br />
are so<br />
in<br />
that<br />
good all<br />
running machines<br />
order at the<br />
of<br />
beginning<br />
a machine of<br />
work<br />
each<br />
schedule<br />
harvest;<br />
system development<br />
way which minLmizes travel<br />
to program<br />
time machines<br />
from farm<br />
onto<br />
to<br />
flarm<br />
farm;<br />
in a<br />
and finally an overall