List of GICON References_Biogas Plants - GICON Bioenergie ...
List of GICON References_Biogas Plants - GICON Bioenergie ...
List of GICON References_Biogas Plants - GICON Bioenergie ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Project Name / Description<br />
Filipestii BIO 2 <strong>Biogas</strong> Plant<br />
(Romania)<br />
<strong>GICON</strong> references – last five years (<strong>Bioenergie</strong> excerpt<br />
<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />
<strong>GICON</strong> Lead<br />
Engineer<br />
Mr. Krämer<br />
Mr. Busmann<br />
Malaysia Mr. Springer G-Tech Environmental<br />
Holdings Ltd., Hong Kong<br />
Craon (France) <strong>Biogas</strong><br />
Plant<br />
Losiow (Poland) <strong>Biogas</strong><br />
Plant<br />
Addis Ababa (Ethiopia)<br />
<strong>Biogas</strong> Pilot Plant<br />
Dongtai (China) <strong>Biogas</strong><br />
Plant<br />
Commissioning <strong>of</strong> the<br />
fermentation plant at the<br />
Dresden-Kaditz WWTP<br />
(Germany)<br />
Fonterra Yutian Dairy Farm<br />
(China)<br />
Schlegel (Germany) 250kW<br />
<strong>Biogas</strong> Plant<br />
Hertnik (Slovakia) 998 kW<br />
(el.) <strong>Biogas</strong> Plant<br />
Client Range <strong>of</strong> Services provided<br />
KSB AG Engineering services, construction supervision, commissioning and delivery <strong>of</strong><br />
components<br />
Mr. Krämer France Biogaz Valorisation<br />
Period <strong>of</strong><br />
Performance<br />
<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />
Current as <strong>of</strong> 14.03.2012 - 1 -<br />
2012<br />
Feasibility study for biogas plants in southeast Asia 2012<br />
Design <strong>of</strong> five biogas plants (350-1,000 kW) for waste from the food processing<br />
industry, liquid manure, slaughterhouse wastes, and fats<br />
Mr. Busack Agropol s.j. Project development and design <strong>of</strong> the Losiow biogas plant<br />
2011 - 2014<br />
2011 - 2013<br />
Mr. Busack AT-Verband Design, erection, assembly, commissioning, and operational assistance 2010 - 2013<br />
Mr. Kaplan Jiangsu Hengrun Energy <strong>Biogas</strong> plant feasibility study 2011 - 2012<br />
Mr. Herms<br />
Mr. Hiecke<br />
Mr. Krämer<br />
Mr. Möbius<br />
Stadtentwässerung Dresden<br />
GmbH<br />
YHR Beijing Yingherui<br />
Environmental Engineering<br />
Mr. Busack Agrarbetrieb Schlegel /<br />
Dittersdorf GbR<br />
Mr. Busmann<br />
Mr. Krämer<br />
Mr. Hiecke<br />
Expansion <strong>of</strong> the sludge treatment plant with a fermentation plant – oversight <strong>of</strong><br />
commissioning and support during the test run.<br />
Basic and detail engineering, construction and commissioning supervision for a<br />
biogas plant for 740 m 3 /d liquid cattle manure<br />
Building permit application, detail engineering, award preparation,<br />
construction supervision and assistance, commissioning<br />
E-BioGroup, spol s.r.o. Basic feasibility evaluation, conceptual planning, permit planning, construction<br />
and commissioning supervision<br />
2011 - 2012<br />
2011 - 2012<br />
2011 - 2012<br />
2010 - 2012
Project Name / Description<br />
<strong>Bioenergie</strong> 2021 Mr. Otto<br />
Dr. Hilse<br />
Biowaste treatment<br />
consulting services<br />
<strong>GICON</strong> Lead<br />
Engineer<br />
<strong>GICON</strong> references – last five years (<strong>Bioenergie</strong> excerpt<br />
Client Range <strong>of</strong> Services provided<br />
BMBF-Verbundforschung Further development <strong>of</strong> technologies for fermentation <strong>of</strong> biogenic wastes and<br />
agricultural residues<br />
(Cooperation partners: BTU Cottbus, ATB Bornim, Frankfurt University)<br />
Mr. Springer KVA Adorf Consulting services for the preparation <strong>of</strong> the <strong>GICON</strong> Process dry fermentation<br />
project<br />
Period <strong>of</strong><br />
Performance<br />
2009 - 2012<br />
2010 - 2011<br />
Biowaste fermentation tests Mr. Rebbe Execution <strong>of</strong> fermentation tests for biowaste from residential source separation 2006 - 2007<br />
Biowaste treatment with<br />
two-stage dry-wet<br />
fermentation<br />
Bockelwitz 7 MW (rated<br />
thermal input) Biomethane<br />
Plant (Germany)<br />
Cottbus (Germany) Large-<br />
Scale Research Facility<br />
Expert report on the leaking<br />
gas storage unit at the<br />
Rippien (Germany) <strong>Biogas</strong><br />
Plant<br />
Pilot <strong>Biogas</strong> Plant in Anyang<br />
(China)<br />
Mr. Hiecke Conceptual planning / preliminary planning for biowaste treatment utilizing twostage<br />
dry-wet fermentation<br />
Ms. Domschke Preparation <strong>of</strong> Federal Immission Control Act application documents for a biowaste<br />
fermentation plant<br />
Mr. Hiecke<br />
Mr. Krämer<br />
Mr. Otto<br />
Dr. Hilse<br />
Mr. Hiecke<br />
Mr. Lattke<br />
DREWAG –<br />
Stadtwerke Dresden<br />
GmbH<br />
<strong>GICON</strong> (supported by the<br />
German State <strong>of</strong> Brandenburg)<br />
Project development, technical conceptualization, basic evaluation / preliminary<br />
planning, draft and permit planning, procurement, participation during awarding<br />
phase<br />
Design and construction <strong>of</strong> a large-scale biogas research facility for extensive<br />
research <strong>of</strong> the two-stage <strong>GICON</strong> <strong>Biogas</strong> Process with split hydrolysis<br />
Development <strong>of</strong> a two-stage biogas plant to commercialization<br />
EURONORM Development <strong>of</strong> a biological hydrolysis stage as pre-treatment plant for WWTPs<br />
(alternative to co-fermentation <strong>of</strong> biogenic wastes), incl. potential study<br />
BioConInvest Service<br />
GmbH<br />
Mr. Springer Zhenyuan Group<br />
HENGSHENG ENERGY<br />
CO. LTD<br />
Expert report on leakage <strong>of</strong> the gas storage unit at the Rippien biogas plant and<br />
recommendations for repair and subsequent leakage tests after completion <strong>of</strong><br />
the repair works<br />
Basic and detail engineering for a 150 kW pilot plant utilizing the <strong>GICON</strong> <strong>Biogas</strong><br />
Process<br />
<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />
Current as <strong>of</strong> 14.03.2012 - 2 -<br />
2011<br />
2011 - 2012<br />
2010 - 2011<br />
2007 - 2011<br />
2006 - 2008<br />
2011<br />
since 2010
Project Name / Description<br />
2.8MW el <strong>Biogas</strong> Plant in<br />
London, ON (Canada)<br />
770kW el <strong>Biogas</strong> Plant in<br />
Vancouver, BC (Canada)<br />
<strong>GICON</strong> Lead<br />
Engineer<br />
<strong>GICON</strong> references – last five years (<strong>Bioenergie</strong> excerpt<br />
Mr. Krämer Harvest Power Mustang<br />
Generation Ltd.<br />
Dr. Hilse<br />
Mr. Herms<br />
Client Range <strong>of</strong> Services provided<br />
Fraser Richmond Soil &<br />
Fibre, Ltd.<br />
Period <strong>of</strong><br />
Performance<br />
Owner’s engineer for all project phases since 2010<br />
Preliminary planning, basic and detail engineering, construction and<br />
commissioning supervision for a 770 kW food and yard waste fermentation<br />
plant utilizing the <strong>GICON</strong> <strong>Biogas</strong> Process<br />
Mobile <strong>Biogas</strong> Test Plant Mr. Otto Harvest Power, Inc. Project preparation, approval planning, detailed engineering design and<br />
assembly services and commissioning for a mobile biogas testing facility<br />
utilizing the <strong>GICON</strong> <strong>Biogas</strong> Process<br />
<strong>Biogas</strong>yl<br />
(France) <strong>Biogas</strong> Plant<br />
500 kW <strong>Biogas</strong> Plant at<br />
Dresden-Klotzsche<br />
(Germany)<br />
Project Development for<br />
<strong>Biogas</strong> <strong>Plants</strong> at several<br />
Locations<br />
Project Development for the<br />
Zittau (Germany) <strong>Biogas</strong><br />
Plant<br />
R&D Technology<br />
Development Project<br />
Cottbus (Germany)<br />
Production and Service<br />
Center<br />
Mr. Krämer<br />
Mr. Schwarz<br />
Mr. Hiecke<br />
Mr. Zorn<br />
Ms. Domschke<br />
Dr. Hilse<br />
Mr. Herms<br />
Dr. Hilse<br />
Mr. Zorn<br />
<strong>Biogas</strong>yl France Waste fermentation plant with complete mix fermenter – expansion <strong>of</strong> the <strong>Biogas</strong>yl<br />
plant .<br />
DREWAG –<br />
Stadtwerke Dresden<br />
GmbH<br />
Project preparation and general design services (technical conceptualization,<br />
basic evaluation / preliminary planning, draft and approval planning,<br />
procurement and award support, construction and commissioning supervision)<br />
for a 500 kW biogas plant in Dresden-Klotzsche (incl. research into advent <strong>of</strong><br />
yard waste as feedstock from City <strong>of</strong> Dresden)<br />
Project development for biogas plants at several locations (incl. feedstock<br />
research, site suitability evaluations, technical conceptualization, partial<br />
preliminary planning)<br />
ENSO AG Project development incl. feedstock research, site suitability evaluation, technical<br />
conceptualization, basic evaluation / preliminary planning, partial draft and<br />
approval planning, procurement and award assistance, construction and commissioning<br />
supervision<br />
Dr. Richter <strong>GICON</strong> / BTU Cottbus<br />
(PRO INNO II-Vorhaben)<br />
R&D project for technology development <strong>of</strong> mono-fermentation on raw glycerin<br />
and other fluid organic wastes<br />
Mr. Otto <strong>GICON</strong> 350 kW el biogas plant utilizing the <strong>GICON</strong> <strong>Biogas</strong> Process with connected<br />
service center and production facility for inoculated packing material<br />
since 2010<br />
2010-2012<br />
2009 - 2010<br />
2008 - 2010<br />
2007 - 2009<br />
2008 - 2010<br />
2008 - 2010<br />
since 09/2009<br />
<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />
Current as <strong>of</strong> 14.03.2012 - 3 -
Project Name / Description<br />
RABA Erfurt-East<br />
(Germany)<br />
Execution <strong>of</strong> Pilot Tests with<br />
Biowaste (FORM)<br />
<strong>Biogas</strong> and WWTP gas<br />
CHP Unit, Cottbus<br />
(Germany) Plant<br />
Feasibility study <strong>of</strong> biowaste<br />
fermentation in Wolfen<br />
(Germany)<br />
Pilot Project for <strong>Biogas</strong><br />
Generation from the Basis<br />
<strong>of</strong> Biogenic Wastes<br />
Two-stage <strong>Biogas</strong> Plant in<br />
Schöllnitz (Germany)<br />
<strong>GICON</strong> Lead<br />
Engineer<br />
<strong>GICON</strong> references – last five years (<strong>Bioenergie</strong> excerpt<br />
Client Range <strong>of</strong> Services provided<br />
Mr. Hiecke TUT GmbH Erfurt Design and turn-key erection <strong>of</strong> a percolate fermentation plant utilizing the<br />
<strong>GICON</strong> Process for 16,000 t/a organic waste fraction at the RABA Erfurt East<br />
mechanical and biological treatment facility<br />
Mr. Herms HERA Holding, Barcelona Basic evaluation for the erection <strong>of</strong> a biogas plant utilizing the <strong>GICON</strong> <strong>Biogas</strong><br />
Process as treatment stage for biogenic wastes at ECOPARC V, implementation<br />
<strong>of</strong> large-scale test fermentations at the <strong>GICON</strong> research facility in Cottbus<br />
with original material from Spain<br />
Mr. Sperling LWG<br />
Lausitzer Wasser GmbH<br />
& Co. KG<br />
Mr. Hiecke Anhalt-Bitterfelder<br />
Kreiswerke GmbH<br />
Mr. Zorn<br />
Dr. Hilse<br />
Mr. Hiecke<br />
Dr. Hilse<br />
Bellenberg <strong>Biogas</strong> Plant Mr. Otto<br />
Mr. Hiecke<br />
City <strong>of</strong> Neuruppin (Germany)<br />
Dept. <strong>of</strong> Public<br />
Utilities<br />
Mobile <strong>Biogas</strong> Plant Mr. Otto Universitatea Ovidius<br />
Constanta (Romania)<br />
<strong>Biogas</strong> Plant for Market<br />
Wastes<br />
Lisbon (Portugal) Biowaste<br />
Fermentation Plant<br />
Mr. Hiecke<br />
Dr. Hilse<br />
Planning services – retr<strong>of</strong>itting <strong>of</strong> the existing CHP units with state <strong>of</strong> the art<br />
technology as part <strong>of</strong> energy efficiency improvements <strong>of</strong> the WWTP. Planning<br />
for 2 x WWTP gas CHPs (250 kW and 350 kWel ) incl. peripheral equipment and<br />
1 x biogas CHP at 350 kWel<br />
Evaluation and partial collection <strong>of</strong> generated waste data, layout and technical<br />
concept planning for a fermentation step in the existing compost plant, economic<br />
feasibility calculations<br />
Basic evaluation and concept planning for a pilot project in Neuruppin for biogas<br />
generation on the basis <strong>of</strong> biogenic wastes (incl. observations on generated<br />
waste potential)<br />
Agrar GmbH Altdöbern Design, construction, and commissioning <strong>of</strong> a biogas plant utilizing the <strong>GICON</strong><br />
<strong>Biogas</strong> Process (capacity 250 kW el) in Schöllnitz<br />
Dirk Sprute Expert report on the state <strong>of</strong> technology in the Bellenberg biogas plant and<br />
recommendations for optimization.<br />
Planning and assembly services, detailed engineering, and commissioning <strong>of</strong> a<br />
container biogas plant utilizing the <strong>GICON</strong> <strong>Biogas</strong> Process as pre-treatment for<br />
a fuel cell<br />
CEASA (Brazil) Feasibility study <strong>of</strong> market wastes as biogas plant feedstock for CEASA in Belo<br />
Horizonte, Brazil<br />
Period <strong>of</strong><br />
Performance<br />
2009-2012<br />
since 2009<br />
<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />
Current as <strong>of</strong> 14.03.2012 - 4 -<br />
2009<br />
2009<br />
2008 - 2009<br />
2007 - 2009<br />
Mr. Herms Linde KCA Dresden Commissioning supervision <strong>of</strong> the organic waste treatment plant in Lisbon 2007 - 2008<br />
2008<br />
2008<br />
2008
Project Name / Description<br />
“Renewable Energy”<br />
Concept Study<br />
<strong>GICON</strong> Lead<br />
Engineer<br />
<strong>GICON</strong> references – last five years (<strong>Bioenergie</strong> excerpt<br />
Dr. Hilse City <strong>of</strong> Fürstenberg (Germany)<br />
Client Range <strong>of</strong> Services provided<br />
Period <strong>of</strong><br />
Performance<br />
Concept study entitled “Renewable energy in Fürstenberg / Havel“ 2007 - 2008<br />
Feasibility Study Mr. Herms DREWAG Feasibility study on technologies for upgrading biogas to biomethane quality 2007<br />
<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />
Current as <strong>of</strong> 14.03.2012 - 5 -