Project Name / Description<br />

Filipestii BIO 2 <strong>Biogas</strong> Plant<br />

(Romania)<br />

<strong>GICON</strong> references – last five years (<strong>Bioenergie</strong> excerpt<br />

<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />

<strong>GICON</strong> Lead<br />

Engineer<br />

Mr. Krämer<br />

Mr. Busmann<br />

Malaysia Mr. Springer G-Tech Environmental<br />

Holdings Ltd., Hong Kong<br />

Craon (France) <strong>Biogas</strong><br />

Plant<br />

Losiow (Poland) <strong>Biogas</strong><br />

Plant<br />

Addis Ababa (Ethiopia)<br />

<strong>Biogas</strong> Pilot Plant<br />

Dongtai (China) <strong>Biogas</strong><br />

Plant<br />

Commissioning <strong>of</strong> the<br />

fermentation plant at the<br />

Dresden-Kaditz WWTP<br />

(Germany)<br />

Fonterra Yutian Dairy Farm<br />

(China)<br />

Schlegel (Germany) 250kW<br />

<strong>Biogas</strong> Plant<br />

Hertnik (Slovakia) 998 kW<br />

(el.) <strong>Biogas</strong> Plant<br />

Client Range <strong>of</strong> Services provided<br />

KSB AG Engineering services, construction supervision, commissioning and delivery <strong>of</strong><br />

components<br />

Mr. Krämer France Biogaz Valorisation<br />

Period <strong>of</strong><br />

Performance<br />

<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />

Current as <strong>of</strong> 14.03.2012 - 1 -<br />

2012<br />

Feasibility study for biogas plants in southeast Asia 2012<br />

Design <strong>of</strong> five biogas plants (350-1,000 kW) for waste from the food processing<br />

industry, liquid manure, slaughterhouse wastes, and fats<br />

Mr. Busack Agropol s.j. Project development and design <strong>of</strong> the Losiow biogas plant<br />

2011 - 2014<br />

2011 - 2013<br />

Mr. Busack AT-Verband Design, erection, assembly, commissioning, and operational assistance 2010 - 2013<br />

Mr. Kaplan Jiangsu Hengrun Energy <strong>Biogas</strong> plant feasibility study 2011 - 2012<br />

Mr. Herms<br />

Mr. Hiecke<br />

Mr. Krämer<br />

Mr. Möbius<br />

Stadtentwässerung Dresden<br />

GmbH<br />

YHR Beijing Yingherui<br />

Environmental Engineering<br />

Mr. Busack Agrarbetrieb Schlegel /<br />

Dittersdorf GbR<br />

Mr. Busmann<br />

Mr. Krämer<br />

Mr. Hiecke<br />

Expansion <strong>of</strong> the sludge treatment plant with a fermentation plant – oversight <strong>of</strong><br />

commissioning and support during the test run.<br />

Basic and detail engineering, construction and commissioning supervision for a<br />

biogas plant for 740 m 3 /d liquid cattle manure<br />

Building permit application, detail engineering, award preparation,<br />

construction supervision and assistance, commissioning<br />

E-BioGroup, spol s.r.o. Basic feasibility evaluation, conceptual planning, permit planning, construction<br />

and commissioning supervision<br />

2011 - 2012<br />

2011 - 2012<br />

2011 - 2012<br />

2010 - 2012


Project Name / Description<br />

<strong>Bioenergie</strong> 2021 Mr. Otto<br />

Dr. Hilse<br />

Biowaste treatment<br />

consulting services<br />

<strong>GICON</strong> Lead<br />

Engineer<br />

<strong>GICON</strong> references – last five years (<strong>Bioenergie</strong> excerpt<br />

Client Range <strong>of</strong> Services provided<br />

BMBF-Verbundforschung Further development <strong>of</strong> technologies for fermentation <strong>of</strong> biogenic wastes and<br />

agricultural residues<br />

(Cooperation partners: BTU Cottbus, ATB Bornim, Frankfurt University)<br />

Mr. Springer KVA Adorf Consulting services for the preparation <strong>of</strong> the <strong>GICON</strong> Process dry fermentation<br />

project<br />

Period <strong>of</strong><br />

Performance<br />

2009 - 2012<br />

2010 - 2011<br />

Biowaste fermentation tests Mr. Rebbe Execution <strong>of</strong> fermentation tests for biowaste from residential source separation 2006 - 2007<br />

Biowaste treatment with<br />

two-stage dry-wet<br />

fermentation<br />

Bockelwitz 7 MW (rated<br />

thermal input) Biomethane<br />

Plant (Germany)<br />

Cottbus (Germany) Large-<br />

Scale Research Facility<br />

Expert report on the leaking<br />

gas storage unit at the<br />

Rippien (Germany) <strong>Biogas</strong><br />

Plant<br />

Pilot <strong>Biogas</strong> Plant in Anyang<br />

(China)<br />

Mr. Hiecke Conceptual planning / preliminary planning for biowaste treatment utilizing twostage<br />

dry-wet fermentation<br />

Ms. Domschke Preparation <strong>of</strong> Federal Immission Control Act application documents for a biowaste<br />

fermentation plant<br />

Mr. Hiecke<br />

Mr. Krämer<br />

Mr. Otto<br />

Dr. Hilse<br />

Mr. Hiecke<br />

Mr. Lattke<br />

DREWAG –<br />

Stadtwerke Dresden<br />

GmbH<br />

<strong>GICON</strong> (supported by the<br />

German State <strong>of</strong> Brandenburg)<br />

Project development, technical conceptualization, basic evaluation / preliminary<br />

planning, draft and permit planning, procurement, participation during awarding<br />

phase<br />

Design and construction <strong>of</strong> a large-scale biogas research facility for extensive<br />

research <strong>of</strong> the two-stage <strong>GICON</strong> <strong>Biogas</strong> Process with split hydrolysis<br />

Development <strong>of</strong> a two-stage biogas plant to commercialization<br />

EURONORM Development <strong>of</strong> a biological hydrolysis stage as pre-treatment plant for WWTPs<br />

(alternative to co-fermentation <strong>of</strong> biogenic wastes), incl. potential study<br />

BioConInvest Service<br />

GmbH<br />

Mr. Springer Zhenyuan Group<br />

HENGSHENG ENERGY<br />

CO. LTD<br />

Expert report on leakage <strong>of</strong> the gas storage unit at the Rippien biogas plant and<br />

recommendations for repair and subsequent leakage tests after completion <strong>of</strong><br />

the repair works<br />

Basic and detail engineering for a 150 kW pilot plant utilizing the <strong>GICON</strong> <strong>Biogas</strong><br />

Process<br />

<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />

Current as <strong>of</strong> 14.03.2012 - 2 -<br />

2011<br />

2011 - 2012<br />

2010 - 2011<br />

2007 - 2011<br />

2006 - 2008<br />

2011<br />

since 2010


Project Name / Description<br />

2.8MW el <strong>Biogas</strong> Plant in<br />

London, ON (Canada)<br />

770kW el <strong>Biogas</strong> Plant in<br />

Vancouver, BC (Canada)<br />

<strong>GICON</strong> Lead<br />

Engineer<br />

<strong>GICON</strong> references – last five years (<strong>Bioenergie</strong> excerpt<br />

Mr. Krämer Harvest Power Mustang<br />

Generation Ltd.<br />

Dr. Hilse<br />

Mr. Herms<br />

Client Range <strong>of</strong> Services provided<br />

Fraser Richmond Soil &<br />

Fibre, Ltd.<br />

Period <strong>of</strong><br />

Performance<br />

Owner’s engineer for all project phases since 2010<br />

Preliminary planning, basic and detail engineering, construction and<br />

commissioning supervision for a 770 kW food and yard waste fermentation<br />

plant utilizing the <strong>GICON</strong> <strong>Biogas</strong> Process<br />

Mobile <strong>Biogas</strong> Test Plant Mr. Otto Harvest Power, Inc. Project preparation, approval planning, detailed engineering design and<br />

assembly services and commissioning for a mobile biogas testing facility<br />

utilizing the <strong>GICON</strong> <strong>Biogas</strong> Process<br />

<strong>Biogas</strong>yl<br />

(France) <strong>Biogas</strong> Plant<br />

500 kW <strong>Biogas</strong> Plant at<br />

Dresden-Klotzsche<br />

(Germany)<br />

Project Development for<br />

<strong>Biogas</strong> <strong>Plants</strong> at several<br />

Locations<br />

Project Development for the<br />

Zittau (Germany) <strong>Biogas</strong><br />

Plant<br />

R&D Technology<br />

Development Project<br />

Cottbus (Germany)<br />

Production and Service<br />

Center<br />

Mr. Krämer<br />

Mr. Schwarz<br />

Mr. Hiecke<br />

Mr. Zorn<br />

Ms. Domschke<br />

Dr. Hilse<br />

Mr. Herms<br />

Dr. Hilse<br />

Mr. Zorn<br />

<strong>Biogas</strong>yl France Waste fermentation plant with complete mix fermenter – expansion <strong>of</strong> the <strong>Biogas</strong>yl<br />

plant .<br />

DREWAG –<br />

Stadtwerke Dresden<br />

GmbH<br />

Project preparation and general design services (technical conceptualization,<br />

basic evaluation / preliminary planning, draft and approval planning,<br />

procurement and award support, construction and commissioning supervision)<br />

for a 500 kW biogas plant in Dresden-Klotzsche (incl. research into advent <strong>of</strong><br />

yard waste as feedstock from City <strong>of</strong> Dresden)<br />

Project development for biogas plants at several locations (incl. feedstock<br />

research, site suitability evaluations, technical conceptualization, partial<br />

preliminary planning)<br />

ENSO AG Project development incl. feedstock research, site suitability evaluation, technical<br />

conceptualization, basic evaluation / preliminary planning, partial draft and<br />

approval planning, procurement and award assistance, construction and commissioning<br />

supervision<br />

Dr. Richter <strong>GICON</strong> / BTU Cottbus<br />

(PRO INNO II-Vorhaben)<br />

R&D project for technology development <strong>of</strong> mono-fermentation on raw glycerin<br />

and other fluid organic wastes<br />

Mr. Otto <strong>GICON</strong> 350 kW el biogas plant utilizing the <strong>GICON</strong> <strong>Biogas</strong> Process with connected<br />

service center and production facility for inoculated packing material<br />

since 2010<br />

2010-2012<br />

2009 - 2010<br />

2008 - 2010<br />

2007 - 2009<br />

2008 - 2010<br />

2008 - 2010<br />

since 09/2009<br />

<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />

Current as <strong>of</strong> 14.03.2012 - 3 -


Project Name / Description<br />

RABA Erfurt-East<br />

(Germany)<br />

Execution <strong>of</strong> Pilot Tests with<br />

Biowaste (FORM)<br />

<strong>Biogas</strong> and WWTP gas<br />

CHP Unit, Cottbus<br />

(Germany) Plant<br />

Feasibility study <strong>of</strong> biowaste<br />

fermentation in Wolfen<br />

(Germany)<br />

Pilot Project for <strong>Biogas</strong><br />

Generation from the Basis<br />

<strong>of</strong> Biogenic Wastes<br />

Two-stage <strong>Biogas</strong> Plant in<br />

Schöllnitz (Germany)<br />

<strong>GICON</strong> Lead<br />

Engineer<br />

<strong>GICON</strong> references – last five years (<strong>Bioenergie</strong> excerpt<br />

Client Range <strong>of</strong> Services provided<br />

Mr. Hiecke TUT GmbH Erfurt Design and turn-key erection <strong>of</strong> a percolate fermentation plant utilizing the<br />

<strong>GICON</strong> Process for 16,000 t/a organic waste fraction at the RABA Erfurt East<br />

mechanical and biological treatment facility<br />

Mr. Herms HERA Holding, Barcelona Basic evaluation for the erection <strong>of</strong> a biogas plant utilizing the <strong>GICON</strong> <strong>Biogas</strong><br />

Process as treatment stage for biogenic wastes at ECOPARC V, implementation<br />

<strong>of</strong> large-scale test fermentations at the <strong>GICON</strong> research facility in Cottbus<br />

with original material from Spain<br />

Mr. Sperling LWG<br />

Lausitzer Wasser GmbH<br />

& Co. KG<br />

Mr. Hiecke Anhalt-Bitterfelder<br />

Kreiswerke GmbH<br />

Mr. Zorn<br />

Dr. Hilse<br />

Mr. Hiecke<br />

Dr. Hilse<br />

Bellenberg <strong>Biogas</strong> Plant Mr. Otto<br />

Mr. Hiecke<br />

City <strong>of</strong> Neuruppin (Germany)<br />

Dept. <strong>of</strong> Public<br />

Utilities<br />

Mobile <strong>Biogas</strong> Plant Mr. Otto Universitatea Ovidius<br />

Constanta (Romania)<br />

<strong>Biogas</strong> Plant for Market<br />

Wastes<br />

Lisbon (Portugal) Biowaste<br />

Fermentation Plant<br />

Mr. Hiecke<br />

Dr. Hilse<br />

Planning services – retr<strong>of</strong>itting <strong>of</strong> the existing CHP units with state <strong>of</strong> the art<br />

technology as part <strong>of</strong> energy efficiency improvements <strong>of</strong> the WWTP. Planning<br />

for 2 x WWTP gas CHPs (250 kW and 350 kWel ) incl. peripheral equipment and<br />

1 x biogas CHP at 350 kWel<br />

Evaluation and partial collection <strong>of</strong> generated waste data, layout and technical<br />

concept planning for a fermentation step in the existing compost plant, economic<br />

feasibility calculations<br />

Basic evaluation and concept planning for a pilot project in Neuruppin for biogas<br />

generation on the basis <strong>of</strong> biogenic wastes (incl. observations on generated<br />

waste potential)<br />

Agrar GmbH Altdöbern Design, construction, and commissioning <strong>of</strong> a biogas plant utilizing the <strong>GICON</strong><br />

<strong>Biogas</strong> Process (capacity 250 kW el) in Schöllnitz<br />

Dirk Sprute Expert report on the state <strong>of</strong> technology in the Bellenberg biogas plant and<br />

recommendations for optimization.<br />

Planning and assembly services, detailed engineering, and commissioning <strong>of</strong> a<br />

container biogas plant utilizing the <strong>GICON</strong> <strong>Biogas</strong> Process as pre-treatment for<br />

a fuel cell<br />

CEASA (Brazil) Feasibility study <strong>of</strong> market wastes as biogas plant feedstock for CEASA in Belo<br />

Horizonte, Brazil<br />

Period <strong>of</strong><br />

Performance<br />

2009-2012<br />

since 2009<br />

<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />

Current as <strong>of</strong> 14.03.2012 - 4 -<br />

2009<br />

2009<br />

2008 - 2009<br />

2007 - 2009<br />

Mr. Herms Linde KCA Dresden Commissioning supervision <strong>of</strong> the organic waste treatment plant in Lisbon 2007 - 2008<br />

2008<br />

2008<br />

2008


Project Name / Description<br />

“Renewable Energy”<br />

Concept Study<br />

<strong>GICON</strong> Lead<br />

Engineer<br />

<strong>GICON</strong> references – last five years (<strong>Bioenergie</strong> excerpt<br />

Dr. Hilse City <strong>of</strong> Fürstenberg (Germany)<br />

Client Range <strong>of</strong> Services provided<br />

Period <strong>of</strong><br />

Performance<br />

Concept study entitled “Renewable energy in Fürstenberg / Havel“ 2007 - 2008<br />

Feasibility Study Mr. Herms DREWAG Feasibility study on technologies for upgrading biogas to biomethane quality 2007<br />

<strong>GICON</strong> Reference <strong>List</strong> for Planning / Construction <strong>of</strong> <strong>Biogas</strong> <strong>Plants</strong> (last five years)<br />

Current as <strong>of</strong> 14.03.2012 - 5 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!