16.01.2013 Views

New Afton, A Project Update - Kamloops Exploration Group

New Afton, A Project Update - Kamloops Exploration Group

New Afton, A Project Update - Kamloops Exploration Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A <strong>Project</strong> <strong>Update</strong> for the <strong>New</strong> <strong>Afton</strong> Mine<br />

Prepared for: 2012 KEG Conference<br />

Tuesday, April 3


5/22/2012<br />

Acknowledgements<br />

Eric Strom and his Team<br />

Technical Services Superintendent<br />

Bob Tolden and his Team<br />

Technical Services Superintendent<br />

Brian Bower<br />

Geologist – Blackwater, formerly <strong>New</strong> <strong>Afton</strong><br />

(but still NEWGOLD!)<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

2<br />

2


<strong>New</strong> <strong>Afton</strong> Location<br />

JUST 8 MILES WEST OF KAMLOOPS!<br />

5/22/2012 <strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation 3<br />

3


<strong>Project</strong> Overview – Isometric View<br />

5/22/2012<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

4<br />

4


1898<br />

Property History<br />

<strong>Project</strong> History<br />

• <strong>New</strong>gold - A history of accretive growth<br />

5/22/2012<br />

1951-1972 property undergoes a<br />

succession of owners:<br />

Another<br />

Sporadic<br />

succession<br />

Mining<br />

mining<br />

of<br />

in the area<br />

activity<br />

ownership:<br />

The<br />

2001 DEVELOPMENT<br />

1978 “<strong>Afton</strong>”<br />

study – 1997 released<br />

property Teck<br />

• Kennco continues 1970<br />

commences<br />

between<br />

in 1898<br />

1903<br />

organized OF (Kennecott) indicating<br />

Discovery hole for<br />

• Duvall takes THE control in NEW the<br />

1949<br />

• Graham-Bousquet underground and pit drilled 1927 Gold Mines<br />

• Quintana AFTON MINE!<br />

potential<br />

• Noranda<br />

• Canex Placer (Placer Dome)<br />

• <strong>New</strong> Jersey Zinc<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

5<br />

Today<br />

5


Company History<br />

Company History<br />

• June 2008 – Completed business combination of <strong>New</strong> Gold,<br />

Peak Gold and Metallica Resources - Peak and Cerro San<br />

Pedro<br />

• June 2009 – Completed business combination of <strong>New</strong> Gold<br />

and Western Goldfields - Mesquite property<br />

• June 2011 – Completed acquisition of Richfield Ventures -<br />

Blackwater<br />

• December 2011 – Completed acquisitions of Silver Quest<br />

Resources and Geo Minerals - Blackwater<br />

March 1, 2012 <strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation 6<br />

6


Operational Overview<br />

5/22/2012<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

7<br />

7


Operational Overview<br />

• 11,000 tonne per day underground block<br />

cave mine and flotation concentrator<br />

• Life-of-mine average annual production (1)<br />

– ~85,000 ounces gold<br />

– ~75 million pounds copper<br />

• ~4 months from mill start up<br />

• ~6 months to commercial production (2)<br />

Additional exploration potential!<br />

Notes: 1. Based on average of 11 full production years.<br />

2. Throughput of 60% of 11,000 tonnes per day or 6,600 tonnes per day.<br />

First muck off conveyor<br />

Loading blast holes<br />

Mill building<br />

5/22/2012 <strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation 9<br />

9


Workforce<br />

Site Personnel<br />

5/22/2012<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

13<br />

13


Production Start Strategy<br />

Tonnes per day<br />

15,000<br />

12,500<br />

10,000<br />

7,500<br />

5,000<br />

2,500<br />

-<br />

January March May July September November January March<br />

5/22/2012<br />

Mine Rate vs. Mill Rate During Production Start<br />

Mill reaches 11,000<br />

tpd<br />

Mill starts in June and reaches<br />

6,600 tpd commercial rate in<br />

August<br />

2012 2013<br />

Mine tpd Mill feed tpd<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

Period of drawdown<br />

of stockpile inventory<br />

Mining/milling rate<br />

reach 11,000 tpd runrate<br />

level<br />

16<br />

16


<strong>Project</strong> Present Mine Layout<br />

5/22/2012<br />

Current Cave<br />

Area<br />

Conveyor Drift<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

Access Decline<br />

18<br />

18


Mine Planning - Mine Design<br />

5/22/2012<br />

2<br />

1<br />

Undercutting<br />

Direction<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

EXTRACTION LEVEL<br />

20<br />

20


Mine Planning - Mine Design<br />

5/22/2012<br />

Viewing WSW<br />

1<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation 21<br />

2<br />

21


Geotechnical - Cave Management<br />

Seismic System<br />

Production<br />

Management<br />

5/22/2012<br />

Subsidence Monitoring<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

Direct Cave Measurement<br />

Convergence<br />

Monitoring<br />

24<br />

24


ng Wall Fault<br />

te<br />

ortal<br />

Geology at <strong>New</strong> <strong>Afton</strong><br />

Footwall Fault<br />

Phyllic Altered<br />

Pyrite Halo<br />

5/22/2012 <strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation 36<br />

<strong>Kamloops</strong> <strong>Group</strong>


Regional Setting of Alkalic Porhyry Deposits in BC<br />

5/22/2012 <strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation 37


Resources and Reserves<br />

Resources M&I<br />

COMODITY K-TONNES GRADE METAL<br />

GOLD 69.8 0.78 gpt 1,742 Koz<br />

SILVER 69.8 2.40 gpt 5,470 Koz<br />

COPPER 69.8 1.03% 1,546 Mlbs<br />

Reserves<br />

As Part of the Shown Resource Totals<br />

GOLD 47.9 0.64 gpt 986 Koz<br />

SILVER 47.9 2.00 gpt 3,080 Koz<br />

COPPER 47.9 0.90%<br />

954 Mlbs<br />

March 1, 2012 <strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation 41<br />

41


Regional Geologic Map<br />

<strong>New</strong> <strong>Afton</strong> Mine<br />

• Iron Mask<br />

Batholith<br />

• Picrite<br />

• <strong>Kamloops</strong> <strong>Group</strong><br />

5/22/2012<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

42<br />

42


Enrichment Zones - Ore Mineralogy<br />

• Supergene<br />

- Native Copper, Chalcocite, minor Bornite<br />

• Mesogene/ Transition Zone<br />

- Bornite, Chalcocite, Chalcopyrite, Tennantite<br />

• Hypogene<br />

- Chalcopyrite, Bornite<br />

• Gold and Silver associated with Copper Mineralization<br />

• Common Gangue Mineralogy<br />

- Pyrite, Epidote, Biotite, K-Spar, Albite, Calcite, Ankerite, Hematite,<br />

Magnetite, Chlorite, Amphibole, Kaolinite, Montmorillinite, Anhydrite<br />

5/22/2012 <strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation 43<br />

43


<strong>Afton</strong> Pit Geologic Map<br />

B<br />

A<br />

A’<br />

5/22/2012 <strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

44<br />

B’<br />

44


<strong>New</strong> <strong>Afton</strong> Cross Section A-A’<br />

5/22/2012<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation 45<br />

45


<strong>New</strong> <strong>Afton</strong> Long Section B-B’<br />

-Over $5M for 2012<br />

drilling<br />

-Total program is over<br />

$11M including 40 Km<br />

of drilling over 18<br />

months<br />

5/22/2012<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

46<br />

46


Questions??<br />

5/22/2012<br />

<strong>Kamloops</strong> <strong>Exploration</strong> <strong>Group</strong> Presentation<br />

47<br />

47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!