Process and sites diagram - US Environmental Protection Agency
Process and sites diagram - US Environmental Protection Agency
Process and sites diagram - US Environmental Protection Agency
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Fadaral g^gistar / Vol. 5S. No. IS / Tuecday. Jannary 23. 1990 / Rules Md Rqg^aliuDS<br />
PART 282--STANOAROS APPLICABLE<br />
TO GENERATORS OF HAZARDO<strong>US</strong><br />
WASTE<br />
5. The audutrity citetkwlor Part 2S2<br />
contteues to reed as fallaws:<br />
Authority: 42 VS.C OOIM, 681Z 6922. 6023.<br />
6924, 6025. aod 6037.<br />
8. Section 282^ is amended by<br />
adding paragraph (ej to read aa fodows:<br />
S262.23 tteaoltttaoMOileat.<br />
(e) For shipments of hazardous waste<br />
to a designated facility m an auteorized<br />
State which has not yet obtamed<br />
authorixatian to regulate teat particular<br />
waste OS bsxankitis, the geaerator must<br />
assure teat tee designated faciUty<br />
agrees te aigm <strong>and</strong> retara the manifest to<br />
tee generator, <strong>and</strong> teet any out-of-state<br />
transporter eigRS <strong>and</strong> fbnvards the<br />
m<strong>and</strong>est to tbe designated faciUty.<br />
[FR Tioc. 90-1402 Filed 1-2Z-96: 8:45 am]<br />
BKUimcaDC esse-se