20.01.2013 Views

Vaillant Group at a glance

Vaillant Group at a glance

Vaillant Group at a glance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Vaillant</strong> <strong>Group</strong><br />

Corpor<strong>at</strong>e present<strong>at</strong>ion<br />

06.11.2008


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

<strong>Vaillant</strong> <strong>Group</strong> <strong>at</strong> a <strong>glance</strong><br />

– <strong>Vaillant</strong> <strong>Group</strong> is an intern<strong>at</strong>ionally successful<br />

company focusing on he<strong>at</strong>ing and air-conditioning<br />

technologies<br />

– As one of the world's market and technology leaders,<br />

the company develops and produces tailor-made<br />

products, systems and services for he<strong>at</strong>ing, cooling<br />

and hot w<strong>at</strong>er<br />

– In 2007 the <strong>Group</strong> achieved sales of about €2.4 billion<br />

with 12,400 employees<br />

– Since its founding 1874, <strong>Vaillant</strong> <strong>Group</strong> has been a<br />

family-owned company<br />

2


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

Development of sales 2003 – 2007<br />

billion Euro<br />

3.000<br />

2.500<br />

2.000<br />

1.500<br />

1.000<br />

500<br />

0<br />

1.571<br />

1.627<br />

1.791<br />

1.997<br />

Continuous sales growth<br />

2.388<br />

2003 2004 2005 2006 2007<br />

3.000<br />

2.500<br />

2.000<br />

1.500<br />

1.000<br />

500<br />

0<br />

3


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

<strong>Vaillant</strong> <strong>Group</strong>: employees in 2007 by country/region<br />

Italy<br />

Spain<br />

4%<br />

10%<br />

17%<br />

10%<br />

UK<br />

Rest of world<br />

Rest of Europe 2%<br />

Emloyees 2007<br />

12,387<br />

13%<br />

France<br />

Germany<br />

28%<br />

16%<br />

Turkey<br />

2006 2007 Change<br />

Employees<br />

Germany 3,365* 3,453 88<br />

Gre<strong>at</strong> Britain 1,175 1,291 116<br />

France 985 1.624 638<br />

Italy 508 479 (29)<br />

Spain 1,126 1,201 75<br />

Turkey 426 2,000 1,574<br />

Others 2,182 2,339 157<br />

10,055 12,387 2,333<br />

* pro forma<br />

At end-2007 <strong>Vaillant</strong> <strong>Group</strong> had 12,387 employees. Th<strong>at</strong> was 2,332<br />

(23%) more than <strong>at</strong> the end of 2006.<br />

4


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

Intern<strong>at</strong>ional presence – production sites (1)<br />

Site Number of Production<br />

employees*<br />

Remscheid (D)<br />

Headquarters<br />

* Number of employees (manufacturing units, R&D, Purchasing) as <strong>at</strong> 31 December 2007<br />

1,257<br />

Wall-hung boilers,<br />

hydraulic pipes,<br />

he<strong>at</strong> exchanger,<br />

burner, electronics<br />

Nantes (F) 636 Wall-hung boilers<br />

and gas w<strong>at</strong>er<br />

he<strong>at</strong>ers<br />

5


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

Intern<strong>at</strong>ional presence – production sites (2)<br />

Site Number of Production<br />

employees*<br />

Skalica (SK) 362<br />

Belper (UK)<br />

Gelsenkirchen (D)<br />

* Number of employees (manufacturing units, R&D, Purchasing) as <strong>at</strong> 31 December 2007<br />

Wall-hung and<br />

floor-standing<br />

boilers, electric<br />

w<strong>at</strong>er he<strong>at</strong>ers<br />

367 Wall-hung boilers<br />

(condensing)<br />

168 Renewable energy<br />

appliances, spare<br />

parts<br />

6


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

Intern<strong>at</strong>ional presence – production sites (3)<br />

Site Number of Production<br />

employees*<br />

Bergheim (D)<br />

Trenčin (SK)<br />

Bad Kreuznach (D)<br />

* Number of employees (manufacturing units, R&D, Purchasing) as <strong>at</strong> 31 December 2007<br />

205 Storage units,<br />

floor-standing oil<br />

boilers<br />

380 Modules<br />

- He<strong>at</strong> engine condensing<br />

- Hydraulics<br />

- Jigs<br />

73 Electric w<strong>at</strong>er<br />

he<strong>at</strong>ers and<br />

storage units<br />

7


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

Intern<strong>at</strong>ional presence – production sites (4)<br />

Site Number of Production<br />

employees*<br />

Roding (D)<br />

Vitoria (ES)<br />

Wuxi (CN)<br />

* Number of employees (manufacturing units, R&D, Purchasing) as <strong>at</strong> 31 December 2007<br />

340 Brass components<br />

(gas valves)<br />

137 Air-conditioning<br />

units<br />

He<strong>at</strong> pumps<br />

96 Wall-hung boilers<br />

8


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

Intern<strong>at</strong>ional presence – production sites (5)<br />

Site Number of Production<br />

employees*<br />

Bozüyük (TR)<br />

Orgiano (IT)<br />

Pontenure (IT)<br />

* Number of employees (manufacturing units, R&D, Purchasing) as <strong>at</strong> 31 December 2007<br />

1,474<br />

140<br />

<strong>Vaillant</strong> <strong>Group</strong> Flues<br />

159<br />

Hermann, Gesamtzahl: 219<br />

Gas w<strong>at</strong>er he<strong>at</strong>ers,<br />

electrical storages<br />

w<strong>at</strong>er he<strong>at</strong>ers,<br />

radi<strong>at</strong>ors, he<strong>at</strong> pump<br />

systems, combi boilers,<br />

air-conditioners (as<br />

from 1 May 2008)<br />

Flues systems<br />

Wall-hung he<strong>at</strong>ing<br />

appliances<br />

9


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

Established brands – brand portfolio<br />

He<strong>at</strong>ing and air-conditioning Household products<br />

Sales: €2,348 million<br />

Employees: 12,152<br />

€40 million<br />

With its eight he<strong>at</strong>ing and air-conditioning technology brands <strong>Vaillant</strong> <strong>Group</strong><br />

is one of the leading intern<strong>at</strong>ional suppliers of products and services in this<br />

sector.<br />

235<br />

10


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

Short introduction: GE facts and figures<br />

Utilised area: 35.000 m²<br />

Total production area: 27.800 m²<br />

Found<strong>at</strong>ion d<strong>at</strong>e: 1987<br />

Divisions/units on site:<br />

Series production: 150 empl.<br />

Spares production: 50 empl.<br />

Call center tecbytel: 70 empl.<br />

plus external enterprises/lessees<br />

GE plants development: from GWH production to WHB products<br />

to Renewables...<br />

11


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

Short introduction: current product portfolio<br />

Condensing<br />

boilers<br />

He<strong>at</strong> pump geoTHERM<br />

B 2008: 10 k pcs.<br />

WHB ecoTEC exclusive FSB ecoCRAFT<br />

B 2008: 24 k pcs. B 2008: 2 k pcs.<br />

Airventil<strong>at</strong>ion recoVAIR/<br />

Airmaster<br />

Solar fl<strong>at</strong> collector<br />

Broad product portfolio with different technologies/<br />

production techniques.<br />

Renewables<br />

products<br />

Start of production:<br />

April 2008<br />

B 2008: 4 k pcs. B 2008: 45 k pcs. (own production)<br />

12


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

Layout Gelsenkirchen plant 2008:<br />

Solar<br />

assembly<br />

Solar absorber<br />

production<br />

Powder<br />

co<strong>at</strong>ing<br />

Spare parts<br />

production<br />

Pipe production<br />

Gas<br />

cond.<br />

WHB<br />

Showroom<br />

He<strong>at</strong> pumps<br />

Logistics/Warehouse<br />

Airventil<strong>at</strong>ion<br />

Gas<br />

cond.<br />

FSB<br />

Maintenance<br />

Spare parts<br />

production<br />

13


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

Solar Thermal Collector Production<br />

Pipe system Absorber welding Collector assembly<br />

Vertical Horizontal Drainback<br />

• Bending of three<br />

serpentine types<br />

• Brazing of collector pipes<br />

• Testing of pipe system<br />

• Fix<strong>at</strong>ion of pipe system<br />

onto absorber sheet<br />

The production concept is structured into three main processes.<br />

Title of Present<strong>at</strong>ion<br />

⎮Structure ⎮ Manufacturing Process Pipe System ⎮ Manufacturing Process Absorber<br />

| Manufacturing Process Assembly ⎮ Lay out | Back up<br />

⎮20-O ct-04 ⎮Title of P res ent<strong>at</strong>ion<br />

Assembly Process “Packaging”<br />

⎮Struct ure ⎮ Manuf ac turing Proc ess P ipe Sy stem ⎮ Manuf act uring Process Absorber<br />

| Manuf ac turing Proc ess A ssem bl y ⎮ Lay out | Back up<br />

Assemb ly Process “Fram e”<br />

1 2<br />

1. P ress 2 corner fittings in the short, black anodised aluminium profiles<br />

2. P lace all profiles into frame press and press the frame<br />

3. A pply type sticker on frame for identific<strong>at</strong>ion in line<br />

The anodised aluminium profiles are connected with corner fittings and<br />

compressed in a frame press<br />

⎮Struct ure ⎮ Manuf ac turing Proc ess P ipe Sy stem ⎮ Manuf act uring Process Absorber<br />

| Manuf ac turing Proc ess A ssem bl y ⎮ Lay out | Back up<br />

⎮20-O ct -04 ⎮Title of Pres ent<strong>at</strong>ion<br />

Assemb ly P rocess “Ab so rber”<br />

Standard Collector Drainback - Collector<br />

For mounting the absorber the two<br />

For mounting the absorber the Ø10mm-pipe ends are manually<br />

collector pipe ends are clicked slotted through the grommets and<br />

manually in the couplings<br />

placed on the insul<strong>at</strong>ion – further<br />

fix<strong>at</strong>ion might be needed<br />

The absorber is m anually clicked in the couplings for the standard collector, and<br />

slotted through gr ommets for the drainback collector<br />

17<br />

3<br />

1<br />

⎮Structure ⎮ Manufact uring Process Pipe Sys tem ⎮ Manufacturing Proc es s A bs orber<br />

| Manufact uring Process Ass em bly ⎮ Lay out | Back up<br />

⎮20-O ct-04 ⎮Title of P res ent<strong>at</strong>ion<br />

Assemb ly P rocess “ Back Pl<strong>at</strong>e”<br />

Primer Plasma<br />

Adhesive<br />

1 2<br />

Prepa r<strong>at</strong>ion of<br />

fram e<br />

Applic <strong>at</strong>ion of<br />

adhesive<br />

3<br />

F ix <strong>at</strong>i on of bac k<br />

pl<strong>at</strong>e<br />

Befor e the back pl<strong>at</strong>e can be fixed, the frame must be cleaned – depending on<br />

the feasibility, a plasma tre<strong>at</strong>ment is pr efer red over primer as it is much ne<strong>at</strong>er<br />

14<br />

⎮Structure ⎮ Manufact uring Process Pipe Sys tem ⎮ Manufacturing Proc es s A bs orber<br />

| Manufact uring Process Ass em bly ⎮ Lay out | Back up<br />

⎮20-O ct -04 ⎮Title of Pres ent<strong>at</strong>ion<br />

Assemb ly P rocess “ G lass”<br />

1<br />

A B<br />

• Glass to be i nspected for damages<br />

• Prepare area for adhesive on glass if needed<br />

• Option A: 1. Place glass on frame<br />

2. Fill space with adhesive<br />

• Option B: 1. Apply adhesive on frame<br />

2. Place glass in adhesive and press<br />

Befor e the glass process is started, the covering foil on the absorber sheet is<br />

peeled off and the pipe system is tested for tightness<br />

18<br />

⎮St ructure ⎮ Manufact uring Process Pipe Sys tem ⎮ Manufacturing Proc es s A bs orber<br />

| Manufact uring Process Ass em bly ⎮ Lay out | Back up<br />

⎮20-O ct-04 ⎮Title of P res ent<strong>at</strong>ion<br />

Assemb ly P rocess “ In su l<strong>at</strong>ion”<br />

Bottom insul<strong>at</strong>ion<br />

i nto casing<br />

Opti on<br />

• One insul<strong>at</strong>ion<br />

As the insul<strong>at</strong>ion layer is lamin<strong>at</strong>ed w ith a black fleece m<strong>at</strong>erial, test w ill show , if<br />

the handling of a one-piece-layer is feasible<br />

⎮St ructure ⎮ Manufact uring Process Pipe Sys tem ⎮ Manufacturing Proc es s A bs orber<br />

| Manufact uring Process Ass em bly ⎮ Lay out | Back up<br />

⎮20-O ct -04 ⎮Title of Pres ent<strong>at</strong>ion<br />

Assemb ly P rocess “ F inishing”<br />

– Quality check of adhesive edge<br />

– Manually finishing if needed<br />

– Applic<strong>at</strong>ion of clamps for defined<br />

pressure on glass corners<br />

– Hardening of adhesive in shelf system<br />

Example for shelf system<br />

Example for p<strong>at</strong>ernoster<br />

A quality check is made before the hardening of the adhesive<br />

15<br />

Rework necessary<br />

19<br />

⎮St ructure ⎮ Manufact uring Process Pipe Sys tem ⎮ Manufacturing Proc es s A bs orber<br />

| Manufact uring Process Ass em bly ⎮ Lay out | Back up<br />

Option<br />

Assemb ly P rocess “Absor ber P repar <strong>at</strong>ion”<br />

• A ir duc ts integr<strong>at</strong>ed in<br />

coupling<br />

⎮20-O ct-04 ⎮Title of P res ent<strong>at</strong>ion<br />

⎮20-O ct -04 ⎮Title of Pres ent<strong>at</strong>ion<br />

Standard Collector Drainback - Collector<br />

• Press in 4 couplings<br />

• Fix with 2 rivets each<br />

• Press in airing ducts<br />

• Press in 3 grommets<br />

• Press in airing ducts<br />

Befor e the absorber is p laced couplings and airing ducts are inser ted manually<br />

Frame Backpl<strong>at</strong>e Insul<strong>at</strong>ion Fixings<br />

⎮S truc ture ⎮ Manufact uri ng P rocess Pipe S ystem ⎮ Manuf ac turing Proc es s Absorber<br />

| Manufacturing P roc ess Assembly ⎮ Lay out | Back up<br />

Assem bly Pr ocess “P ackaging”<br />

• Foil on glass*<br />

• Pr otection against dirt<br />

• Pr otection of collector after<br />

install<strong>at</strong>ion but befor e sys tem<br />

oper<strong>at</strong>ion<br />

• Plac ement of handling and<br />

install<strong>at</strong>ion ins tr uctions<br />

• Cardboard end pieces<br />

• Collector strapped<br />

• Pallet stretched in order to secure<br />

collector pile<br />

* F oi l al ready applie d by gl ass suppl ier<br />

The glass is covered by multi-functional foil, but still noticeable, so th<strong>at</strong> the<br />

collector is handled car efully in w arehouses and on construction sites<br />

Absorber Glass Hardening Packaging<br />

• Assembling of frame<br />

• Fix<strong>at</strong>ion of back pl<strong>at</strong>e,<br />

insul<strong>at</strong>ion and absorber<br />

• Fix<strong>at</strong>ion of glass<br />

• Hardening of adhesive<br />

• Packaging of collector<br />

16<br />

20<br />

14


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

3D layout of the Assembly Line<br />

Framing cell<br />

Manual work<br />

st<strong>at</strong>ions<br />

Gluing cell<br />

Assembly is divided into 5 major areas:<br />

frame pre-assembly, manual st<strong>at</strong>ions, glueing, hardening, packaging.<br />

Hardening<br />

buffer<br />

15


⎮Corpor<strong>at</strong>e Present<strong>at</strong>ion <strong>Vaillant</strong> <strong>Group</strong><br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!