Route 30: Gateway Enhancement Plan - Lancaster County Website
Route 30: Gateway Enhancement Plan - Lancaster County Website
Route 30: Gateway Enhancement Plan - Lancaster County Website
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Route</strong> <strong>30</strong>: <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
The Team<br />
•<br />
•<br />
•<br />
Kise Straw & Kolodner<br />
Doug Robbins<br />
John Gibbons<br />
Michelle Barbieri<br />
Elizabeth Lankenau<br />
Urban Partners<br />
Jim Hartling<br />
Chris Lankenau<br />
IBI Group<br />
Martin Hull<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Timeline<br />
Study Area Definition<br />
Project Kick Off<br />
Public Meeting<br />
We are here<br />
Existing Conditions<br />
Best Practices<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Design Guidelines<br />
and Strategy<br />
Transportation<br />
Improvements<br />
Signage and<br />
Wayfinding<br />
Organization<br />
Funding Sources<br />
Pilot Projects<br />
Final Report<br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Task List<br />
Task 1: Project Kick Off<br />
Task 2: Study Area Definition<br />
Task 3: Existing Conditions and Trends Analysis<br />
Task 4: Best Practice Analysis and Case Studies<br />
Task 5: Public Outreach<br />
Task 6: Economic Development Strategy<br />
Task 7: Brand Identity Assessment and Conceptual <strong>Plan</strong><br />
Task 8: Design Guidelines and Strategy<br />
Task 9: Signage and Wayfinding Strategy<br />
Task 10: Transportation Improvements<br />
Task 11: Organizational Structure and Funding Strategy<br />
Task 12: Pilot Project Implementation <strong>Plan</strong>s<br />
Task 13: Final <strong>Plan</strong><br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Study Area Definition<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Study Area Definition<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Task List<br />
Task 1: Project Kick Off<br />
Task 2: Study Area Definition<br />
Task 3: Existing Conditions and Trends Analysis<br />
Task 4: Best Practice Analysis and Case Studies<br />
Task 5: Public Outreach<br />
Task 6: Economic Development Strategy<br />
Task 7: Brand Identity Assessment and Conceptual <strong>Plan</strong><br />
Task 8: Design Guidelines and Strategy<br />
Task 9: Signage and Wayfinding Strategy<br />
Task 10: Transportation Improvements<br />
Task 11: Organizational Structure and Funding Strategy<br />
Task 12: Pilot Project Implementation <strong>Plan</strong>s<br />
Task 13: Final <strong>Plan</strong><br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
First Impressions<br />
Series of Dichotomies<br />
Rural and Big Box<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
First Impressions<br />
Series of Dichotomies<br />
Local and Chain<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
First Impressions<br />
Series of Dichotomies<br />
Slow and Fast<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
First Impressions<br />
Series of Dichotomies<br />
Plain and Busy<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
First Impressions<br />
Series of Dichotomies<br />
Residents and Tourists<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
First Impressions<br />
...sort of<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Physical Design<br />
Pedestrians<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Physical Design<br />
Pedestrians<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Physical Design<br />
Bicycles<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Physical Design<br />
Transit<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Physical Design<br />
Trucks<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Physical Design<br />
Automobiles<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Business Inventory<br />
Hotels/Motels<br />
•<br />
•<br />
•<br />
10 Economy – 796 rooms<br />
8 Middle Quality – 663 rooms<br />
2 Upscale – 392 rooms<br />
Outlets<br />
•<br />
•<br />
Rockvale – 100+ stores<br />
Tanger – 60+ stores<br />
Entertainment<br />
•<br />
•<br />
•<br />
Dutch Wonderland<br />
American Music Theater<br />
Sight & Sound Theater<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Business Inventory<br />
Independent Tourist - Related Businesses<br />
•<br />
•<br />
•<br />
•<br />
Restaurants<br />
Gifts<br />
Antiques/Furniture<br />
Art/Crafts<br />
Big Box Community-Serving Retail<br />
•<br />
•<br />
•<br />
•<br />
Target<br />
Petsmart<br />
Other Chain Stores with Target<br />
Dollar Tree<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Stakeholder Interviews<br />
Business Trends<br />
Seasonality of Visitation<br />
Visitor Demographics<br />
Condition of Older/Smaller Properties<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Stakeholder Interviews<br />
Tourism Industry in <strong>Lancaster</strong> Co.<br />
•<br />
•<br />
•<br />
Amish theme vs. others (shopping, entertainment, arts)<br />
Promotion/advertising<br />
Creating new interest/venues/attractions<br />
<strong>Route</strong> <strong>30</strong> Corridor<br />
•<br />
•<br />
•<br />
•<br />
New development<br />
Signage<br />
Aesthetics<br />
Truck traffic<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - Zoning<br />
C-2 Commercial<br />
• Impervious coverage 70%. Or 75% if half of<br />
your parking is behind front building line<br />
•<br />
A wide range of uses is permitted<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - Zoning<br />
R-2 Residential<br />
• Everything in R-1 allowed<br />
• Single family detached allowed<br />
•<br />
Apartments allowed<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - Zoning<br />
R-3 Residential<br />
• Everything in R-1 and R-2 allowed<br />
• Townhomes allowed<br />
•<br />
PUDs allowed<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - Zoning<br />
Rural<br />
• Outside of <strong>County</strong> growth area<br />
• Any use that involves earthmoving activities<br />
or commercial harvesting of trees must<br />
provide a conservation plan.<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - Zoning<br />
Conservation<br />
• Protects areas for preservation and<br />
conservation of the natural environment<br />
• 200’ from each side of the centerline of such<br />
streams, creeks, and drainage ways is the<br />
established boundary of these districts.<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - Zoning<br />
Institutional<br />
• Not in study area<br />
•<br />
All north of Old Philadelphia Pike<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - Ordinances<br />
Building Signs<br />
•<br />
•<br />
Area: 1.5 SF per linear foot of facade,<br />
max 200 SF<br />
Number of Signs: NO LIMIT<br />
Freestanding Signs<br />
•<br />
•<br />
•<br />
•<br />
Area: max 80 SF<br />
Height: 20’<br />
Setback from ROW: 10’<br />
Number of Signs: 1 per street<br />
frontage (a structure with<br />
multiple stores may not have<br />
their own freestanding signs)<br />
Signage<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - Ordinances<br />
The ordinance ensures that<br />
adequate off-street parking and<br />
loading facilities are provided for<br />
each use of land based on the<br />
demand created by each use.<br />
Loading spaces, and interior<br />
drives, must be provided for any<br />
use that involves the receipt<br />
or distribution of materials or<br />
merchandise by motor vehicle;<br />
they may not be sited between<br />
the building and an adjoining<br />
street right-of-way.<br />
Parking<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - Ordinances<br />
In Commercial Districts, there is<br />
a minimum 10’ wide greenbelt<br />
required between all lot lines and<br />
parking areas, driveways, and<br />
vehicular access ways within the<br />
lot—except where the lot is adjacent<br />
to a Residential or Rural District,<br />
in which case the width of the<br />
greenbelt should be equal to the<br />
width of the required side yard or<br />
rear yard of the lot.<br />
Greenbelt area must be planted in<br />
grass, shrubbery, trees, or other<br />
types of plant material; impervious<br />
or semi-pervious surfaces are not<br />
permitted.<br />
Buffers<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - <strong>Plan</strong>s<br />
Conestoga Valley Region Strategic Comprehensive <strong>Plan</strong> (2003)<br />
•<br />
•<br />
Commercial development will be better coordinated with access managed,<br />
improved signage, underground utilities where feasible, and limiting the size and<br />
type of activity to appropriate areas.<br />
Reducing billboard and signage clutter creating an area of transition between<br />
farming activities and areas of growth and development<br />
Design Guidelines for <strong>Route</strong> <strong>30</strong><br />
•<br />
•<br />
•<br />
Recommends targeting areas along the corridor in need of redevelopment and<br />
inclusion of missing features such as landscaping, lighting, or sidewalks.<br />
Recommends turning buildings inward, away from the roadway, and locating<br />
transit stops on site rather than along the roadway.<br />
Recommends reviewing land use ordinances to ensure that the recommended<br />
design elements are requirements, not guidelines.<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - Transportation<br />
•<br />
Suburban Arterial – 2 1/3 miles<br />
• 5 lanes in most locations with short sections of 6 or 7 lanes at either end of<br />
the corridor<br />
• Left turn lanes marked at Oak View Road, Harvest Road, Outlet City Drive,<br />
the entrance to the restaurant complex, the Music Center entrance,<br />
Willowdale Drive and Eastbrook Road<br />
• Sidewalks exist along most of the corridor, but are discontinuous and close<br />
to heavy traffic in many places<br />
• Crosswalks are located only at the same seven intersections as left turn<br />
lanes, an average of every .4 miles<br />
• Bus service is provided by Rose Transit line 14 providing service every<br />
35 minutes during the day, until 9:<strong>30</strong> p.m. Mon-Sat and Sunday service.<br />
Some trips continue to Kinzers.<br />
•<br />
Frequent curb cuts<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Traffic – Average Daily Traffic in Both<br />
Directions<br />
Existing Conditions - Transportation<br />
<strong>Route</strong> 462<br />
12,629<br />
443<br />
All Traffic – 0,000<br />
Trucks – 000<br />
<strong>Route</strong> <strong>30</strong> West of Corridor<br />
32,464<br />
6,022<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
<strong>Route</strong> <strong>30</strong> Mid-Corridor<br />
41,329<br />
5,160<br />
<strong>Route</strong> 896<br />
11,579<br />
751<br />
<strong>Route</strong> <strong>30</strong> East<br />
of Corridor<br />
22,9<strong>30</strong><br />
4,371<br />
Average Daily Traffic in Both Directions<br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Existing Conditions - Transportation<br />
•<br />
Perception of high truck traffic along corridor<br />
• Volumes of both auto and truck traffic are higher than typical arterials in<br />
<strong>Lancaster</strong> <strong>County</strong><br />
•<br />
Proportion of truck traffic is typical of this type of arterial<br />
• Much truck traffic is flowing from the Port of Wilmington to Harrisburg area<br />
distribution centers<br />
• Options for rail freight are problematic – too short a haul for efficient<br />
transloading<br />
•<br />
•<br />
New highway options are also challenging – environmental issues<br />
Most promising solutions are design improvements along existing roads<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Task List<br />
Task 1: Project Kick Off<br />
Task 2: Study Area Definition<br />
Task 3: Existing Conditions and Trends Analysis<br />
Task 4: Best Practice Analysis and Case Studies<br />
Task 5: Public Outreach<br />
Task 6: Economic Development Strategy<br />
Task 7: Brand Identity Assessment and Conceptual <strong>Plan</strong><br />
Task 8: Design Guidelines and Strategy<br />
Task 9: Signage and Wayfinding Strategy<br />
Task 10: Transportation Improvements<br />
Task 11: Organizational Structure and Funding Strategy<br />
Task 12: Pilot Project Implementation <strong>Plan</strong>s<br />
Task 13: Final <strong>Plan</strong><br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Best Practices<br />
Wolf Road in Albany, New York<br />
• Retrofitted from standard four lane<br />
arterial<br />
• Received sidewalks, new crosswalks,<br />
improved bus shelters<br />
• Mature trees define and soften this<br />
busy shopping corridor<br />
South Broadway in Saratoga<br />
Springs. New York<br />
• Retrofitted from standard four lane<br />
arterial<br />
• Received sidewalks, new crosswalks,<br />
planted median<br />
• Mature trees and pedestrian scaled<br />
lighting define and soften this busy<br />
tourism corridor<br />
Suburban Commercial Arterials<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Best Practices<br />
Whittier Boulevard in Montebello, CA (Los Angeles Area)<br />
• Added on-street parking<br />
• Widened sidewalks at intersections makes crossing easier<br />
• Maintained mature trees<br />
• New lamps and sidewalk paving define and soften this busy tourism<br />
corridor<br />
Suburban Commercial Arterials<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Best Practices<br />
Boulevards – Octavio<br />
Boulevard in San Francisco<br />
• Creates separate space for<br />
through vehicles, especially trucks,<br />
and local vehicles and pedestrians<br />
• Separated by trees, plantings, and<br />
paving<br />
• Provides buffer to noise and<br />
perceived danger of speeding<br />
traffic<br />
• Allows more flexible use of<br />
adjacent property by making<br />
building close to the street more<br />
attractive<br />
• Encourages people to walk from<br />
business to business, especially<br />
important where a combination<br />
of attractions, lodging and<br />
restaurants are located<br />
Suburban Commercial Arterials<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Best Practices<br />
Suburban Commercial Arterials<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Best Practices<br />
• Older malls ready for redevelopment<br />
• Structured Parking<br />
• Suburban and rural context<br />
• Integration with surrounding streets and<br />
development<br />
• Mixed use, retail, office, residential<br />
Shopping Mall Retrofits<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Best Practices<br />
Mashpee Commons in Mashpee, Massachusetts<br />
• Converted from shopping center located at rural crossroads<br />
• Located in suburban/rural location on Cape Cod<br />
• Mixed use including town center shopping district with public services like a post<br />
office and planned churches, fire station, and library.<br />
• Includes residential over shops and new residential neighborhoods directly adjacent.<br />
• Diverse residential types are included to attract a diverse population<br />
• New street network was created<br />
to structure the design of and<br />
development of buildings, which face<br />
the new streets<br />
• Mostly surface parking hidden from<br />
Shopping Mall Retrofits<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Best Practices<br />
Mizner Park in Boca Raton Florida<br />
• Former shopping center built in 1974 and in economic decline<br />
• Mixed use including businesses, residential and community institutions like a Center for<br />
the Arts.<br />
• 40 shops<br />
• Street network reestablished through site<br />
• Buildings are oriented to the street<br />
• 2,500 parking spaces on new streets and in structures<br />
Shopping Mall Retrofits<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Best Practices<br />
Winter Park Village in Winter Park, Florida<br />
•<br />
•<br />
•<br />
•<br />
•<br />
Former 500,000 sf shopping center in decline<br />
Mixed use<br />
Integrated with surrounding streets<br />
Buildings are oriented to street<br />
Uses traditional Winter Park architecture<br />
Shopping Mall Retrofits<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Best Practices<br />
Belmar in Lakewood, Colorado<br />
•<br />
•<br />
•<br />
•<br />
•<br />
Former shopping center built in 1970’s<br />
Mixed use – 3.3 million square feet total<br />
Street network extended through development<br />
Buildings are orient to street<br />
Structured and surface parking<br />
Shopping Mall Retrofits<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Best Practices<br />
Parallel: Shopping/Entertainment/Cultural Tourism<br />
•<br />
•<br />
Pigeon Forge, TN<br />
Branson, MO<br />
Potential: Green Technology Tourism<br />
•<br />
•<br />
•<br />
•<br />
New Technology Expositions/Attractions/Activities/Products<br />
Farming/Agriculture<br />
Travel, Eco-Tourism<br />
Sustainable Lifestyles<br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group
Task List - Next Steps<br />
Task 1: Project Management<br />
Task 2: Study Area Definition and Mapping<br />
Task 3: Existing Conditions and Trends Analysis<br />
Task 4: Best Practice Analysis and Case Studies<br />
Task 5: Public Outreach<br />
Task 6: Economic Development Strategy<br />
Task 7: Brand Identity Assessment and Conceptual <strong>Plan</strong><br />
Task 8: Design Guidelines and Strategy<br />
Task 9: Signage and Wayfinding Strategy<br />
Task 10: Transportation Improvements<br />
Task 11: Organizational Structure and Funding Strategy<br />
Task 12: Pilot Project Implementation <strong>Plan</strong>s<br />
Task 13: Final <strong>Plan</strong><br />
<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />
Kise Straw & Kolodner • Urban Partners • IBI Group