20.01.2013 Views

Route 30: Gateway Enhancement Plan - Lancaster County Website

Route 30: Gateway Enhancement Plan - Lancaster County Website

Route 30: Gateway Enhancement Plan - Lancaster County Website

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Route</strong> <strong>30</strong>: <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


The Team<br />

•<br />

•<br />

•<br />

Kise Straw & Kolodner<br />

Doug Robbins<br />

John Gibbons<br />

Michelle Barbieri<br />

Elizabeth Lankenau<br />

Urban Partners<br />

Jim Hartling<br />

Chris Lankenau<br />

IBI Group<br />

Martin Hull<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Timeline<br />

Study Area Definition<br />

Project Kick Off<br />

Public Meeting<br />

We are here<br />

Existing Conditions<br />

Best Practices<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Design Guidelines<br />

and Strategy<br />

Transportation<br />

Improvements<br />

Signage and<br />

Wayfinding<br />

Organization<br />

Funding Sources<br />

Pilot Projects<br />

Final Report<br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Task List<br />

Task 1: Project Kick Off<br />

Task 2: Study Area Definition<br />

Task 3: Existing Conditions and Trends Analysis<br />

Task 4: Best Practice Analysis and Case Studies<br />

Task 5: Public Outreach<br />

Task 6: Economic Development Strategy<br />

Task 7: Brand Identity Assessment and Conceptual <strong>Plan</strong><br />

Task 8: Design Guidelines and Strategy<br />

Task 9: Signage and Wayfinding Strategy<br />

Task 10: Transportation Improvements<br />

Task 11: Organizational Structure and Funding Strategy<br />

Task 12: Pilot Project Implementation <strong>Plan</strong>s<br />

Task 13: Final <strong>Plan</strong><br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Study Area Definition<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Study Area Definition<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Task List<br />

Task 1: Project Kick Off<br />

Task 2: Study Area Definition<br />

Task 3: Existing Conditions and Trends Analysis<br />

Task 4: Best Practice Analysis and Case Studies<br />

Task 5: Public Outreach<br />

Task 6: Economic Development Strategy<br />

Task 7: Brand Identity Assessment and Conceptual <strong>Plan</strong><br />

Task 8: Design Guidelines and Strategy<br />

Task 9: Signage and Wayfinding Strategy<br />

Task 10: Transportation Improvements<br />

Task 11: Organizational Structure and Funding Strategy<br />

Task 12: Pilot Project Implementation <strong>Plan</strong>s<br />

Task 13: Final <strong>Plan</strong><br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


First Impressions<br />

Series of Dichotomies<br />

Rural and Big Box<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


First Impressions<br />

Series of Dichotomies<br />

Local and Chain<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


First Impressions<br />

Series of Dichotomies<br />

Slow and Fast<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


First Impressions<br />

Series of Dichotomies<br />

Plain and Busy<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


First Impressions<br />

Series of Dichotomies<br />

Residents and Tourists<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


First Impressions<br />

...sort of<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Physical Design<br />

Pedestrians<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Physical Design<br />

Pedestrians<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Physical Design<br />

Bicycles<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Physical Design<br />

Transit<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Physical Design<br />

Trucks<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Physical Design<br />

Automobiles<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Business Inventory<br />

Hotels/Motels<br />

•<br />

•<br />

•<br />

10 Economy – 796 rooms<br />

8 Middle Quality – 663 rooms<br />

2 Upscale – 392 rooms<br />

Outlets<br />

•<br />

•<br />

Rockvale – 100+ stores<br />

Tanger – 60+ stores<br />

Entertainment<br />

•<br />

•<br />

•<br />

Dutch Wonderland<br />

American Music Theater<br />

Sight & Sound Theater<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Business Inventory<br />

Independent Tourist - Related Businesses<br />

•<br />

•<br />

•<br />

•<br />

Restaurants<br />

Gifts<br />

Antiques/Furniture<br />

Art/Crafts<br />

Big Box Community-Serving Retail<br />

•<br />

•<br />

•<br />

•<br />

Target<br />

Petsmart<br />

Other Chain Stores with Target<br />

Dollar Tree<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Stakeholder Interviews<br />

Business Trends<br />

Seasonality of Visitation<br />

Visitor Demographics<br />

Condition of Older/Smaller Properties<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Stakeholder Interviews<br />

Tourism Industry in <strong>Lancaster</strong> Co.<br />

•<br />

•<br />

•<br />

Amish theme vs. others (shopping, entertainment, arts)<br />

Promotion/advertising<br />

Creating new interest/venues/attractions<br />

<strong>Route</strong> <strong>30</strong> Corridor<br />

•<br />

•<br />

•<br />

•<br />

New development<br />

Signage<br />

Aesthetics<br />

Truck traffic<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - Zoning<br />

C-2 Commercial<br />

• Impervious coverage 70%. Or 75% if half of<br />

your parking is behind front building line<br />

•<br />

A wide range of uses is permitted<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - Zoning<br />

R-2 Residential<br />

• Everything in R-1 allowed<br />

• Single family detached allowed<br />

•<br />

Apartments allowed<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - Zoning<br />

R-3 Residential<br />

• Everything in R-1 and R-2 allowed<br />

• Townhomes allowed<br />

•<br />

PUDs allowed<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - Zoning<br />

Rural<br />

• Outside of <strong>County</strong> growth area<br />

• Any use that involves earthmoving activities<br />

or commercial harvesting of trees must<br />

provide a conservation plan.<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - Zoning<br />

Conservation<br />

• Protects areas for preservation and<br />

conservation of the natural environment<br />

• 200’ from each side of the centerline of such<br />

streams, creeks, and drainage ways is the<br />

established boundary of these districts.<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - Zoning<br />

Institutional<br />

• Not in study area<br />

•<br />

All north of Old Philadelphia Pike<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - Ordinances<br />

Building Signs<br />

•<br />

•<br />

Area: 1.5 SF per linear foot of facade,<br />

max 200 SF<br />

Number of Signs: NO LIMIT<br />

Freestanding Signs<br />

•<br />

•<br />

•<br />

•<br />

Area: max 80 SF<br />

Height: 20’<br />

Setback from ROW: 10’<br />

Number of Signs: 1 per street<br />

frontage (a structure with<br />

multiple stores may not have<br />

their own freestanding signs)<br />

Signage<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - Ordinances<br />

The ordinance ensures that<br />

adequate off-street parking and<br />

loading facilities are provided for<br />

each use of land based on the<br />

demand created by each use.<br />

Loading spaces, and interior<br />

drives, must be provided for any<br />

use that involves the receipt<br />

or distribution of materials or<br />

merchandise by motor vehicle;<br />

they may not be sited between<br />

the building and an adjoining<br />

street right-of-way.<br />

Parking<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - Ordinances<br />

In Commercial Districts, there is<br />

a minimum 10’ wide greenbelt<br />

required between all lot lines and<br />

parking areas, driveways, and<br />

vehicular access ways within the<br />

lot—except where the lot is adjacent<br />

to a Residential or Rural District,<br />

in which case the width of the<br />

greenbelt should be equal to the<br />

width of the required side yard or<br />

rear yard of the lot.<br />

Greenbelt area must be planted in<br />

grass, shrubbery, trees, or other<br />

types of plant material; impervious<br />

or semi-pervious surfaces are not<br />

permitted.<br />

Buffers<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - <strong>Plan</strong>s<br />

Conestoga Valley Region Strategic Comprehensive <strong>Plan</strong> (2003)<br />

•<br />

•<br />

Commercial development will be better coordinated with access managed,<br />

improved signage, underground utilities where feasible, and limiting the size and<br />

type of activity to appropriate areas.<br />

Reducing billboard and signage clutter creating an area of transition between<br />

farming activities and areas of growth and development<br />

Design Guidelines for <strong>Route</strong> <strong>30</strong><br />

•<br />

•<br />

•<br />

Recommends targeting areas along the corridor in need of redevelopment and<br />

inclusion of missing features such as landscaping, lighting, or sidewalks.<br />

Recommends turning buildings inward, away from the roadway, and locating<br />

transit stops on site rather than along the roadway.<br />

Recommends reviewing land use ordinances to ensure that the recommended<br />

design elements are requirements, not guidelines.<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - Transportation<br />

•<br />

Suburban Arterial – 2 1/3 miles<br />

• 5 lanes in most locations with short sections of 6 or 7 lanes at either end of<br />

the corridor<br />

• Left turn lanes marked at Oak View Road, Harvest Road, Outlet City Drive,<br />

the entrance to the restaurant complex, the Music Center entrance,<br />

Willowdale Drive and Eastbrook Road<br />

• Sidewalks exist along most of the corridor, but are discontinuous and close<br />

to heavy traffic in many places<br />

• Crosswalks are located only at the same seven intersections as left turn<br />

lanes, an average of every .4 miles<br />

• Bus service is provided by Rose Transit line 14 providing service every<br />

35 minutes during the day, until 9:<strong>30</strong> p.m. Mon-Sat and Sunday service.<br />

Some trips continue to Kinzers.<br />

•<br />

Frequent curb cuts<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Traffic – Average Daily Traffic in Both<br />

Directions<br />

Existing Conditions - Transportation<br />

<strong>Route</strong> 462<br />

12,629<br />

443<br />

All Traffic – 0,000<br />

Trucks – 000<br />

<strong>Route</strong> <strong>30</strong> West of Corridor<br />

32,464<br />

6,022<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

<strong>Route</strong> <strong>30</strong> Mid-Corridor<br />

41,329<br />

5,160<br />

<strong>Route</strong> 896<br />

11,579<br />

751<br />

<strong>Route</strong> <strong>30</strong> East<br />

of Corridor<br />

22,9<strong>30</strong><br />

4,371<br />

Average Daily Traffic in Both Directions<br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Existing Conditions - Transportation<br />

•<br />

Perception of high truck traffic along corridor<br />

• Volumes of both auto and truck traffic are higher than typical arterials in<br />

<strong>Lancaster</strong> <strong>County</strong><br />

•<br />

Proportion of truck traffic is typical of this type of arterial<br />

• Much truck traffic is flowing from the Port of Wilmington to Harrisburg area<br />

distribution centers<br />

• Options for rail freight are problematic – too short a haul for efficient<br />

transloading<br />

•<br />

•<br />

New highway options are also challenging – environmental issues<br />

Most promising solutions are design improvements along existing roads<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Task List<br />

Task 1: Project Kick Off<br />

Task 2: Study Area Definition<br />

Task 3: Existing Conditions and Trends Analysis<br />

Task 4: Best Practice Analysis and Case Studies<br />

Task 5: Public Outreach<br />

Task 6: Economic Development Strategy<br />

Task 7: Brand Identity Assessment and Conceptual <strong>Plan</strong><br />

Task 8: Design Guidelines and Strategy<br />

Task 9: Signage and Wayfinding Strategy<br />

Task 10: Transportation Improvements<br />

Task 11: Organizational Structure and Funding Strategy<br />

Task 12: Pilot Project Implementation <strong>Plan</strong>s<br />

Task 13: Final <strong>Plan</strong><br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Best Practices<br />

Wolf Road in Albany, New York<br />

• Retrofitted from standard four lane<br />

arterial<br />

• Received sidewalks, new crosswalks,<br />

improved bus shelters<br />

• Mature trees define and soften this<br />

busy shopping corridor<br />

South Broadway in Saratoga<br />

Springs. New York<br />

• Retrofitted from standard four lane<br />

arterial<br />

• Received sidewalks, new crosswalks,<br />

planted median<br />

• Mature trees and pedestrian scaled<br />

lighting define and soften this busy<br />

tourism corridor<br />

Suburban Commercial Arterials<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Best Practices<br />

Whittier Boulevard in Montebello, CA (Los Angeles Area)<br />

• Added on-street parking<br />

• Widened sidewalks at intersections makes crossing easier<br />

• Maintained mature trees<br />

• New lamps and sidewalk paving define and soften this busy tourism<br />

corridor<br />

Suburban Commercial Arterials<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Best Practices<br />

Boulevards – Octavio<br />

Boulevard in San Francisco<br />

• Creates separate space for<br />

through vehicles, especially trucks,<br />

and local vehicles and pedestrians<br />

• Separated by trees, plantings, and<br />

paving<br />

• Provides buffer to noise and<br />

perceived danger of speeding<br />

traffic<br />

• Allows more flexible use of<br />

adjacent property by making<br />

building close to the street more<br />

attractive<br />

• Encourages people to walk from<br />

business to business, especially<br />

important where a combination<br />

of attractions, lodging and<br />

restaurants are located<br />

Suburban Commercial Arterials<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Best Practices<br />

Suburban Commercial Arterials<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Best Practices<br />

• Older malls ready for redevelopment<br />

• Structured Parking<br />

• Suburban and rural context<br />

• Integration with surrounding streets and<br />

development<br />

• Mixed use, retail, office, residential<br />

Shopping Mall Retrofits<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Best Practices<br />

Mashpee Commons in Mashpee, Massachusetts<br />

• Converted from shopping center located at rural crossroads<br />

• Located in suburban/rural location on Cape Cod<br />

• Mixed use including town center shopping district with public services like a post<br />

office and planned churches, fire station, and library.<br />

• Includes residential over shops and new residential neighborhoods directly adjacent.<br />

• Diverse residential types are included to attract a diverse population<br />

• New street network was created<br />

to structure the design of and<br />

development of buildings, which face<br />

the new streets<br />

• Mostly surface parking hidden from<br />

Shopping Mall Retrofits<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Best Practices<br />

Mizner Park in Boca Raton Florida<br />

• Former shopping center built in 1974 and in economic decline<br />

• Mixed use including businesses, residential and community institutions like a Center for<br />

the Arts.<br />

• 40 shops<br />

• Street network reestablished through site<br />

• Buildings are oriented to the street<br />

• 2,500 parking spaces on new streets and in structures<br />

Shopping Mall Retrofits<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Best Practices<br />

Winter Park Village in Winter Park, Florida<br />

•<br />

•<br />

•<br />

•<br />

•<br />

Former 500,000 sf shopping center in decline<br />

Mixed use<br />

Integrated with surrounding streets<br />

Buildings are oriented to street<br />

Uses traditional Winter Park architecture<br />

Shopping Mall Retrofits<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Best Practices<br />

Belmar in Lakewood, Colorado<br />

•<br />

•<br />

•<br />

•<br />

•<br />

Former shopping center built in 1970’s<br />

Mixed use – 3.3 million square feet total<br />

Street network extended through development<br />

Buildings are orient to street<br />

Structured and surface parking<br />

Shopping Mall Retrofits<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Best Practices<br />

Parallel: Shopping/Entertainment/Cultural Tourism<br />

•<br />

•<br />

Pigeon Forge, TN<br />

Branson, MO<br />

Potential: Green Technology Tourism<br />

•<br />

•<br />

•<br />

•<br />

New Technology Expositions/Attractions/Activities/Products<br />

Farming/Agriculture<br />

Travel, Eco-Tourism<br />

Sustainable Lifestyles<br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group


Task List - Next Steps<br />

Task 1: Project Management<br />

Task 2: Study Area Definition and Mapping<br />

Task 3: Existing Conditions and Trends Analysis<br />

Task 4: Best Practice Analysis and Case Studies<br />

Task 5: Public Outreach<br />

Task 6: Economic Development Strategy<br />

Task 7: Brand Identity Assessment and Conceptual <strong>Plan</strong><br />

Task 8: Design Guidelines and Strategy<br />

Task 9: Signage and Wayfinding Strategy<br />

Task 10: Transportation Improvements<br />

Task 11: Organizational Structure and Funding Strategy<br />

Task 12: Pilot Project Implementation <strong>Plan</strong>s<br />

Task 13: Final <strong>Plan</strong><br />

<strong>Route</strong> <strong>30</strong> <strong>Gateway</strong> <strong>Enhancement</strong> <strong>Plan</strong><br />

Kise Straw & Kolodner • Urban Partners • IBI Group

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!