14<br />

later on. The project system also told us<br />

to move some projects around within <strong>the</strong><br />

time schedule to optimise <strong>the</strong> use of manpower.<br />

If we did not finish in time, <strong>the</strong><br />

system would always tell us (in red).<br />

5 Dismantling<br />

Before we had finished <strong>the</strong> construction,<br />

we also had to start planning <strong>the</strong> dismantling.<br />

The construction plans included an<br />

after-use part, <strong>and</strong> we also started discussions<br />

with <strong>the</strong> owner of <strong>the</strong> venues to get<br />

an agreement for <strong>Norwegian</strong> <strong>Telecom</strong> to<br />

have some installations left after <strong>the</strong><br />

<strong>Games</strong>.<br />

We made detailed plans in 1993 for <strong>the</strong><br />

dismantling <strong>and</strong> started dismantling<br />

meetings in January 1994. The dismantling<br />

period started in March 1994 <strong>and</strong><br />

was closed in August 1994. It was a very<br />

short dismantling period <strong>and</strong> it was very<br />

important not to damage any part of <strong>the</strong><br />

equipment because of <strong>the</strong> re-use of it.<br />

And ano<strong>the</strong>r challenge was to disconnect<br />

all <strong>the</strong> customer lines nationally <strong>and</strong><br />

internationally, <strong>and</strong> to normalise all <strong>the</strong><br />

computer supporting systems.<br />

6 Logistics (Material<br />

administration)<br />

It was very important to have good logistics<br />

system. This system should cover <strong>the</strong><br />

installation period, <strong>the</strong> period for packing<br />

<strong>and</strong> delivering of hired equipment to our<br />

customer <strong>and</strong> also to h<strong>and</strong>le all equipment<br />

after <strong>the</strong> <strong>Olympic</strong>s.<br />

For this purpose we had two storehouses<br />

– one in Hamar <strong>and</strong> one in Lillehammer,<br />

<strong>and</strong> we also had small storerooms at<br />

nearly all <strong>the</strong> venues.<br />

All equipment had to be registered in <strong>the</strong><br />

storehouses before installation, making it<br />

possible to follow up if some equipment<br />

was missing.<br />

Equipment for installation came from<br />

different countries <strong>and</strong> companies, as<br />

shown in section 2.2 <strong>and</strong> involved a lot<br />

of meetings with <strong>the</strong> central administration<br />

of <strong>Norwegian</strong> <strong>Telecom</strong> <strong>and</strong> with<br />

sales companies. These meetings took<br />

place in <strong>the</strong> period 1989 – 1993.<br />

Equipment for our customers was hired<br />

from LOOC <strong>and</strong> TBK. After registration<br />

<strong>and</strong> packing it was brought out to our<br />

customers. Nearly 1,000 such packages<br />

were produced in <strong>the</strong> storehouse in Lillehammer.<br />

To ensure that we had sufficient spare<br />

equipment, TOP had established an<br />

agreement with <strong>the</strong> most important companies.<br />

In <strong>the</strong> storehouse in Lillehammer<br />

<strong>and</strong> <strong>the</strong> storerooms at each venue, <strong>and</strong><br />

also in some cars, we kept spare equipment.<br />

It was important that spare equipment<br />

was readily available if failure<br />

should occur during <strong>the</strong> <strong>Olympic</strong> period.<br />

7 O<strong>the</strong>r aspects<br />

7.1 Earth connection<br />

An experience from earlier <strong>Olympic</strong>s had<br />

been <strong>the</strong> problems with earth connection<br />

for <strong>the</strong> equipment. As a result of this,<br />

TOP established an agreement with<br />

LOOC <strong>and</strong> NRK ORTO ’94 taking <strong>the</strong><br />

overall responsibility to measure <strong>and</strong><br />

report <strong>the</strong> quality of this issue.<br />

We had meetings with companies which<br />

were responsible at <strong>the</strong> venues for electrical<br />

installations. The importance of<br />

underst<strong>and</strong>ing this issue could not be<br />

stressed enough. Our technical specialist<br />

had to measure several times <strong>and</strong> give<br />

instructions at <strong>the</strong> installation sites before<br />

we could inform LOOC that <strong>the</strong> result<br />

was approved by us.<br />

7.2 Instruments<br />

Because we had to install a lot of new<br />

equipment in a short time, we had to collect<br />

instruments from all parts of <strong>Norwegian</strong><br />

<strong>Telecom</strong> as well as initiate <strong>the</strong> purchase<br />

of instruments. Nearly 80 instruments<br />

were hired from <strong>the</strong> instrumental<br />

bank at Lødingen <strong>and</strong> about 35 instruments<br />

were hired from o<strong>the</strong>r parts of<br />

<strong>Norwegian</strong> <strong>Telecom</strong>. During <strong>the</strong><br />

<strong>Olympic</strong>s all <strong>the</strong> venues had <strong>the</strong>ir own<br />

bank of instruments <strong>and</strong> IBC had an extra<br />

supply of special instruments.<br />

7.3 Static electricity<br />

To avoid having <strong>the</strong> equipment damaged<br />

by static electricity all technical rooms<br />

were marked on <strong>the</strong> floor with a yellow<br />

line, <strong>and</strong> crossing this line without personal<br />

antistatic equipment was not<br />

allowed. All personnel who worked in<br />

technical rooms were equipped with special<br />

antistatic shoes <strong>and</strong> we also bought<br />

some test instruments for control.<br />

Because of all <strong>the</strong> visits we had to buy<br />

some antistatic equipment: a special heel<br />

strap. All visitors who were allowed to<br />

enter <strong>the</strong> technical rooms had to use <strong>the</strong>se<br />

heel straps.<br />

7.4 H<strong>and</strong>book for <strong>the</strong> construction<br />

of technical rooms<br />

The technical rooms at each venue were<br />

delivered to us by LOOC ready for technical<br />

installations. It was <strong>the</strong>refore<br />

important that <strong>the</strong> rooms had a technical<br />

st<strong>and</strong>ard similar to our normal st<strong>and</strong>ard<br />

given in our own technical manuals.<br />

Early in <strong>the</strong> process we produced a special<br />

h<strong>and</strong>book to inform LOOC, <strong>the</strong><br />

Directorate of Public Construction <strong>and</strong><br />

Property (SBED), consulting engineers<br />

<strong>and</strong> all o<strong>the</strong>r contractors, how to construct<br />

<strong>the</strong> rooms to fit our st<strong>and</strong>ard.<br />

7.5 Assembly h<strong>and</strong>book<br />

We early decided to produce an assembly<br />

h<strong>and</strong>book for st<strong>and</strong>ardisation of all <strong>the</strong><br />

technical rooms. We were of <strong>the</strong> opinion<br />

that it was very important during <strong>the</strong><br />

operational period that <strong>the</strong> technicians<br />

were familiar with <strong>the</strong> rooms if <strong>the</strong>y had<br />

to move from one venue to ano<strong>the</strong>r in an<br />

emergency.<br />

As can be seen from Figure 3 we had one<br />

st<strong>and</strong>ard for a large technical room <strong>and</strong><br />

one for a small technical room. That covered<br />

all technical rooms, except small<br />

rooms for cross connection <strong>and</strong> IBC. IBC<br />

was so special <strong>and</strong> so huge that we had to<br />

make a special plan for this.<br />

7.6 Quality assurance<br />

In <strong>the</strong> contract with LOOC it was stated<br />

that we should reach a quality level corresponding<br />

to <strong>the</strong> NS-ISO-9001 st<strong>and</strong>ard.<br />

Since <strong>Norwegian</strong> <strong>Telecom</strong> is not certified<br />

for this st<strong>and</strong>ard we spent a lot of time<br />

proving that all our work was at least as<br />

good as this st<strong>and</strong>ard.