20.01.2013 Views

residential building permit checklist - Forsyth County Government

residential building permit checklist - Forsyth County Government

residential building permit checklist - Forsyth County Government

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RESIDENTIAL<br />

SWIMMING<br />

POOL<br />

PERMIT<br />

PACKET


CHECKLIST<br />

Please complete the entire application package, including:<br />

□ Permit Details Form<br />

□ Property Owner Authorization Form or signed copy of Sales Contract<br />

□ Affidavits<br />

1. Georgia State Energy Code affidavit.<br />

2. Contractor Affidavits – Required. (must be signed and submitted prior to applying for<br />

<strong>building</strong> <strong>permit</strong>)<br />

� Electrical affidavit/ Temp to Perm.<br />

� Mechanical affidavit.<br />

� Plumbing affidavit.<br />

3. Self Work Affidavit (if applicable – will be signed at <strong>building</strong> <strong>permit</strong> submittal)<br />

4. Pool Drain Discharge Location Affidavit.<br />

□ Georgia Erosion & Sediment Control Certification Card – attach copy of card<br />

□ Temporary Toilet / Exemption Form – Required by <strong>Forsyth</strong> <strong>County</strong> Health Department (will<br />

be signed at <strong>building</strong> <strong>permit</strong> submittal)<br />

□ Septic Tank Permit – Required if on septic. Obtain at <strong>Forsyth</strong> <strong>County</strong> Health Department<br />

(770-781-6909) prior to applying for <strong>building</strong> <strong>permit</strong>.<br />

□ Site Plan – Scale drawing 2 copies 8 ½ x 11 see page 3 for additional requirements<br />

□ Individual lot <strong>permit</strong> – if applicable<br />

□ Fees – See Fee Schedule. Impact fees are required for all new finished space.<br />

□ Inspection process see page 8<br />

FORSYTH COUNTY, GA – RESIDENTIAL SWIMMING POOL PERMIT APPLICATION -Page 1 -


GENERAL INFORMATION<br />

**All site plans and <strong>permit</strong> cards are to remain onsite<br />

until a Certificate of Completion has been obtained **<br />

RESIDENTIAL SITE PLAN REQUIREMENTS<br />

A site plan is required for any proposed <strong>residential</strong> <strong>building</strong> or structures, any proposed addition to an<br />

existing <strong>residential</strong> <strong>building</strong> or structure, any proposed <strong>residential</strong> accessory <strong>building</strong> or structure,<br />

including swimming pools and retaining walls. The following information is required to be on site plan.<br />

a. Property lines with dimensions<br />

b. Location and names of all abutting streets and rights of way<br />

c. Minimum required front, side and rear <strong>building</strong> setback lines with dimensions<br />

d. The approximate outline of all proposed and existing <strong>building</strong>s and structures including<br />

projections such as fireplaces, bay windows, porches, patio’s and deck’s.<br />

e. The approximated outline of all driveways, walkways, swimming pools, retaining walls, and<br />

other improvements proposed or existing.<br />

f. Outline of roof overhangs need not be shown however dimensions of overhangs must be<br />

listed.<br />

g. Dimensions of <strong>building</strong> and distances between all structures and the nearest property lines.<br />

Dimensions of all projections including bay windows, fireplaces, porches, decks, and eaves.<br />

h. Location and dimension of all floodplain limits, buffer requirements, and all drainage or any<br />

other easements.<br />

i. Subdivision name, lot number, street address and zoning.<br />

j. Required zoning conditions for separation between <strong>building</strong>s on adjacent lots specifying where<br />

measurement is taken from wall to wall, foundation to foundation, eave to eave, roof overhang<br />

to roof overhang.<br />

k. Any and all other zoning requirements of the zoning approval square footage requirements,<br />

garage single double etc.<br />

**The issuance of a <strong>building</strong> <strong>permit</strong> does not assure that the <strong>building</strong> setbacks<br />

have been met or that the structure does not encroach on any easement, or<br />

buffer. The owner and/or <strong>permit</strong> holder have the sole responsibility of<br />

determining compliance with setbacks and non-encroachment of easements and<br />

buffers. **<br />

FORSYTH COUNTY, GA – RESIDENTIAL SWIMMING POOL PERMIT APPLICATION -Page 2 -


Building Permit # ___________________________<br />

PERMIT DETAILS FORM<br />

Address: __________________________________________ City/State/Zip: _______________________<br />

Directions to job site:<br />

________________________________________________________________________________________<br />

________________________________________________________________________________________<br />

Subdivision Name: _______________________________________________________ Lot # _______<br />

CONTRACTOR INFORMATION<br />

<strong>Forsyth</strong> <strong>County</strong> Business License / Registration # ________________________________________________<br />

Business Name: ______________________________________________ Phone # ____________________<br />

Address: _____________________________________________City/State/Zip: _______________________<br />

Onsite Contact Person: Name: __________________________________________ Phone #:_____________<br />

Email: __________________________________________________________________________________<br />

OWNER INFORMATION<br />

Last Name: _______________________ First Name: _________________________ Phone #_____________<br />

Address: _________________________________________City/State/Zip: ___________________________<br />

PROJECT INFORMATION<br />

Description of work: _______________________________________________________________________<br />

Class Work: New Re<strong>permit</strong> (if re<strong>permit</strong> old <strong>permit</strong> number)__________________________<br />

Construction Type: On- Site<br />

Sewer System: Septic: (<strong>Forsyth</strong> <strong>County</strong> Health Dept. Permit #___________)<br />

Sewer: <strong>County</strong> City Private<br />

Pool Type: Gunite Liner Fiberglass Above ground<br />

Square footage of Swimming Pool: ________________<br />

FORSYTH COUNTY, GA – RESIDENTIAL SWIMMING POOL PERMIT APPLICATION -Page 3 -


Total disturbed acreage associated with this <strong>permit</strong> and the disturbed acreage for any adjacent <strong>permit</strong>s<br />

that will be disturbed at the same time:<br />

Total Acreage: ___________________ Disturbed Acreage: _______________________<br />

Current use of Property: Vacant Residential Agricultural Other ________________<br />

Other <strong>building</strong>s on property: Home Storage Buildings Other ____________________________<br />

Will pool be heated? Yes No<br />

Will electric underground be needed? Yes No<br />

Will underground gas line inspection be needed? Yes No<br />

Pool Heater Size: __________BTU<br />

NO STRUCTURES OF ANY TYPE SHALL BE INSTALLED OR CONSTRUCTED WITHIN ANY EASEMENT<br />

I, ______________________________________________, hereby certify that the above information<br />

is true and correct.<br />

________________________________________________<br />

Property Owner Signature<br />

________________________________________________ ________________<br />

Notary Public Signature and Stamp Date<br />

GSWCC CERTIFICATION<br />

I am aware that a Georgia Soil & Water Conservation Commission Card Holder must be on site during any<br />

land disturbance activity. (Copy of Card must be presented with <strong>permit</strong> application)<br />

__________________________________________________<br />

GSWCC Certification Card Holder Signature<br />

Certification # ______________________________________<br />

________________________________________________ ________________<br />

Notary Public Signature and Stamp Date<br />

FORSYTH COUNTY, GA – RESIDENTIAL SWIMMING POOL PERMIT APPLICATION -Page 4 -


PROPERTY OWNER AUTHORIZATION FORM<br />

Property Location: _________________________________________________________________<br />

Self Work: I will seek to obtain my own <strong>permit</strong> and ag ree to fill out a Self Work Affidavit at time of<br />

<strong>building</strong> <strong>permit</strong> submittal.<br />

Contractor: I hereby authorize the person named in the Authorized Agent section to both obtain a<br />

<strong>building</strong> <strong>permit</strong> for my property and complete construction.<br />

Combination: I will seek to obtain a <strong>permit</strong> for contractor as authorized in the Contractor Authorization<br />

section. Construction will be completed by the contractor.<br />

AUTHORIZED AGENT<br />

Name: ___________________________________________________________________________<br />

Address: _________________________________________________________________________<br />

City/State/Zip: _____________________________________________________________________<br />

Phone # ______________________Email Address: _______________________________________<br />

NOTARIZATION<br />

I, ______________________________________________, hereby certify that the above information<br />

is true and correct.<br />

________________________________________________<br />

Property Owner Signature<br />

________________________________________________ ________________<br />

Notary Public Signature and Stamp Date<br />

CONTRACTOR AUTHORIZATION<br />

I, the contractor, authorize the property owner to pursue a <strong>building</strong> <strong>permit</strong> under my business license<br />

name and number.<br />

_______________________________________________ ________________<br />

Contractor Signature Date<br />

_______________________________________________<br />

<strong>Forsyth</strong> <strong>County</strong> Business License / Registration #<br />

FORSYTH COUNTY, GA – RESIDENTIAL SWIMMING POOL PERMIT APPLICATION -Page 5 -


SWIMMING POOL DRAIN DISCHARGE<br />

LOCATION AFFIDAVIT<br />

Article III, Section 82-63<br />

No person shall discharge or cause to be discharged any storm water, surface water, groundwater,<br />

roof runoff, swimming pool backwash or drain, subsurface drainage, uncontaminated cooling water,<br />

or unpolluted industrial process waters to any sanitary sewer, and wastewaters shall not be<br />

discharged to a sanitary sewer, except in accordance with all applicable laws, regulations and <strong>permit</strong>s<br />

(including without limitation, NPDES <strong>permit</strong>s requiring treatment prior to discharge.<br />

The penalty for violation:<br />

Section: 82-98 civil penalties.<br />

(a) Any user or person who has violated, or continues to violate, any provision of this ordinance, a<br />

wastewater discharge <strong>permit</strong>, or order issued hereunder, or any other pretreatment standard or<br />

requirement shall be liable to the county for a maximum civil penalty of $1,000.00 per violation<br />

per day. In the case of monthly or other long-term average discharge limit violations, penalties<br />

shall accrue for each day during the period of the violation. Notwithstanding the foregoing, civil<br />

penalties may be in addition to, but shall not be duplicative of, administrative fines assessed<br />

under section 82-91, and the county is authorized to bring an action for civil penalties<br />

regardless of whether such administrative fines have been assessed.<br />

By signing this affidavit I state that my swimming pool is not connected in any way to the <strong>County</strong><br />

sanitary sewer system.<br />

Signature<br />

Address<br />

Subdivision<br />

Notary Public<br />

FORSYTH COUNTY, GA – RESIDENTIAL SWIMMING POOL PERMIT APPLICATION -Page 7 -<br />

Date


Inspection Process<br />

Inspections<br />

The following information is provided to assist homeowners and contractors with the inspection process once<br />

all necessary <strong>permit</strong>s have been obtained. The Inspection Department conducts trade specific inspections.<br />

1. Pool Location Inspection: The purpose of this inspection is to verify pool location on the lot, as well as<br />

set back requirements. This requires a minimum a painted outline of the below ground pool walls. You<br />

may also request this inspection after excavation. (Before pool walls are in place). The approved site<br />

plan must be posted on site available for inspectors to review at all times throughout the inspection<br />

process. Pool setbacks are measured to the closest point of the structure above or below grade. In most<br />

cases this is the outer edge of the pool walls (not water’s edge). It is the <strong>permit</strong> applicant’s<br />

responsibility to ensure all property lines are clearly marked, preferably by string in order for the<br />

setbacks to be measured accurately. In cases where the setback measurement cannot be accurately<br />

verified or where the structure is one foot or less from the required setback, a registered survey may be<br />

required.<br />

2. Pool steel in Ground: This is an electrical inspection of the steel basket and bonding of the light niche.<br />

(prior to basket pour)<br />

3. Rough piping Inspection: This inspection includes a vacuum entrapment hazard inspection using one<br />

of the following: Appendix G, 2006 International Residential Code or APSP/ANSI 7 standard. This<br />

inspection must be done prior to basket pour and includes all circulation piping. Piping must be<br />

suitably visible to ensure compliance. Copies of these standards are available through the <strong>permit</strong> office.<br />

The “pool steel in ground” and “the piping inspection” can be requested simultaneously, however<br />

piping inspections are conducted by plumbing inspectors so two different inspectors will be coming out<br />

to your job.<br />

4. Deck steel inspection: This is to ensure proper grounding of steel under the deck area that surrounds the<br />

pool, and also grounding of any equipment. (prior to deck pour)<br />

o An additional underground inspection may be needed if you have underground wiring or gas<br />

pipe that is not in place at the time of the deck steel inspection.<br />

5. Final Plumbing: This will be an inspection of listed outlet covers, any plumbing requirements for<br />

makeup water, as well as inspection of SVRS when required. Inspection should be requested after all<br />

systems are installed and functioning.<br />

6. Final Inspections: This is the last inspection on pools. Pools should be complete and ready for use<br />

before requesting this inspection. All equipment is installed and functioning. The pool barriers as well as<br />

any required door alarms are installed. The inspector will need access into the dwelling to verify alarms.<br />

FORSYTH COUNTY, GA – RESIDENTIAL SWIMMING POOL PERMIT APPLICATION -Page 8 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!