NAME OF THE WORK:<br />

FORM’C’<br />

RASHTRIYA ISPAT NIGAM LIMITED<br />

VISAKHAPATNAM STEEL PLANT<br />

WORKS CONTRACTS DEPARTMENT<br />

VISAKHAPATNAM – 530031<br />

PHONE NO: (MAX) 22953, TELEFAX NO:0891-2518763<br />

<strong>Clean<strong>in</strong>g</strong> <strong>cum</strong> <strong>spillage</strong> <strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong> & SSP of<br />

S<strong>in</strong>ter Plant<br />

Period of Contract : 12 (Twelve) Months<br />

Defect Liability Period : NIL<br />

Eng<strong>in</strong>eer : AGM (O)/SP<br />

Issued To Sri/ M/s. ___________________________________________________________________<br />

Note: Tenderer has to fill<br />

the data wherever and<br />

whatever required <strong>in</strong> the<br />

tender schedule without fail<br />

and sign all the pages<br />

1. E.M.D. PARTICULARS :<br />

Number of BOQ Pages Alone : 02 (Two) Pages<br />

Total Number of Pages : 18 (Eighteen) Pages<br />

(FOR OFFICE USE ONLY)<br />

2. S.No. : OUT OF TENDERS<br />

3. COVERING LETTER : NO. OF PAGES<br />

4. REBATE OFFERED :<br />

5.RATE WRITTEN IN WORDS :<br />

TENDER NO: 72370-0<br />

6. VALIDITY OF TENDER : 4 MONTHS FROM THE DATE OF OPENING<br />

Signature Of Contract Signature Of F<strong>in</strong>ance<br />

DepartmentRepresentative Department Representative<br />

RINL Vigilance: Toll Free Number: 18004258878<br />

T.No.72370-0<br />

1 of 18 Signature of the Tenderer


RASHTRIYA ISPAT NIGAM LIMITED<br />

VISAKHAPATNAM STEEL PLANT<br />

WORKS CONTRACTS DEPARTMENT, VISAKHAPATNAM– 530031 (A.P.)<br />

TELEFAX: 0891-2518763 TEL NO: 0891-2758705, 2518763<br />

OPEN TENDER NOTICE NO: VSP/WC/SP/72370-0/O/2012-13 dated 08.09.2012<br />

1.0 Sealed <strong>Tenders</strong> along with Earnest Money Deposit (EMD) are <strong>in</strong>vited from the Contractors for the follow<strong>in</strong>g<br />

Work:<br />

TENDER NO. NAME OF THE WORK<br />

72370-0 <strong>Clean<strong>in</strong>g</strong> <strong>cum</strong> <strong>spillage</strong> <strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong> & SSP of SP<br />

Note The work consists of ‘Manual clean<strong>in</strong>g <strong>cum</strong> <strong>spillage</strong> <strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong> & SSP of S<strong>in</strong>ter Plant.’<br />

Tender<br />

Number<br />

Cost of Tender<br />

Do<strong>cum</strong>ent<br />

(Non-<br />

Refundable)<br />

By<br />

Hand/Download<br />

`.<br />

Eligibility/ Experience requirements<br />

Value of S<strong>in</strong>gle Work executed<br />

(`. <strong>in</strong> Lakhs)<br />

Annual Turn over<br />

(`.<strong>in</strong> Lakhs)<br />

T.No.72370-0<br />

Earnest<br />

Money<br />

Deposit<br />

72370-0 800/= 12.86 7.71 37,500/=<br />

2.0 Cost of Tender Do<strong>cum</strong>ent(s) shall be paid <strong>in</strong> the form of Demand Draft/Pay Order/Banker’s Cheque,<br />

obta<strong>in</strong>ed from any Nationalized or Scheduled Bank <strong>in</strong> <strong>India</strong>, draw<strong>in</strong>g <strong>in</strong> favour of RIN Ltd., payable at<br />

Visakhapatnam and shall be valid for a m<strong>in</strong>imum period of one month from the date of open<strong>in</strong>g of<br />

tender i.e., Envelope-1 [Pre-qualification Do<strong>cum</strong>ents].The cost of tender do<strong>cum</strong>ent(s) received along with<br />

tender do<strong>cum</strong>ent will not be refunded under any cir<strong>cum</strong>stances upon receipt of tender.<br />

3.0 The value of S<strong>in</strong>gle Work executed shall be dur<strong>in</strong>g the last 07(Seven) years end<strong>in</strong>g last day of month<br />

previous to Tender Notice date i.e.31.08.2012and Turnover shall be the average Annual F<strong>in</strong>ancial<br />

Turnover dur<strong>in</strong>g the last three years end<strong>in</strong>g 31stMarch of the previous f<strong>in</strong>ancial year i.e.31.03.2012.The<br />

Tender Do<strong>cum</strong>ent shall be accompanied with copies of<br />

a) Work Order, Bill of Quantities, Completion Certificate with details of value of work executed;<br />

b) for Turn Over Audited Balance Sheets certified by Practic<strong>in</strong>g Chartered Accountant <strong>in</strong> case the Annual<br />

Turn-over is more than Rs.40.00 Lakhs (or) <strong>in</strong> case of Turn-Over be<strong>in</strong>g less than Rs.40.00 Lakhs either<br />

Turn-over Certificate <strong>in</strong> the prescribed format of VSP duly signed by a practis<strong>in</strong>g Chartered<br />

Accountant/Cost Accountant or T.D.S. Certificate(s) compris<strong>in</strong>g of the Gross Bill values issued by the<br />

Deductor(s) for the work done;<br />

c) Copy of Registration Letter issued by V.S.P. <strong>in</strong> case of Registered Agencies and <strong>in</strong> case of non-<br />

Registered Agencies, either a copy of Notarized Sole Proprietorship OR a copy of PartnershipDeed OR<br />

a copy of Memorandum of Association & Articles of Association, along with Certificate of Registration<br />

– whichever is applicable. VSP reserves the right to reject the offer <strong>in</strong> case the above Do<strong>cum</strong>ents are<br />

not enclosed along with the offer. The authorized representative of the Tenderer shall sign on all the<br />

copies of the Do<strong>cum</strong>ents submitted along with the Tender Do<strong>cum</strong>ent.<br />

NOTE:<br />

(i) Tenderers shall submit P.F. Registration Certificate if available, if not available successful Tenderer<br />

shall submit P.F.Registration Certificate before commencement of the Contract.<br />

(ii) Tenderers shall submit VAT Registration Certificate under APVAT Act if available, if not available<br />

successful Tenderer shall submit VATRegistration Certificate under APVAT Act, wherever applicable,<br />

before sign<strong>in</strong>g the Work Order/Letter of Acceptance and submit a copy of the same.<br />

4.0 The Tenderers are requested to note that:<br />

4.1 The Offer shall be made <strong>in</strong> 02 (Two) Envelopes.<br />

First Envelope (to be superscribed as Envelope-1 with Name of the Work, Tender No.)should conta<strong>in</strong> the<br />

Cost of the Tender Do<strong>cum</strong>ent (<strong>in</strong> case the Tender is down loaded from the web site), Earnest Money<br />

Deposit (EMD) separately <strong>in</strong> the form of DD/PO/BC etc (Refer to Instruction to Tenderer), Pre-<br />

Qualification Do<strong>cum</strong>ents (Eligibility Criteria/Experience) duly signed / attested by the authorized<br />

Representative of the Company as per Para-1 read with Para-3 above and also Techno-Commercial Bid<br />

with filled-<strong>in</strong> Questionnaire along with details of Experience with support<strong>in</strong>g Do<strong>cum</strong>ents and Terms &<br />

Conditions duly signed by Authorized Signatory with attested copies of Authorization.<br />

The Second Envelope (to be superscribed as Envelope-2, Price-Bid, Name of the Work, Tender No.) shall<br />

conta<strong>in</strong> Price Bid only <strong>in</strong> the Format of VSP.<br />

2 of 18 Signature of the Tenderer<br />

`.


T.No.72370-0<br />

4.2 The first cover shall be opened <strong>in</strong>itially and only on satisfy<strong>in</strong>g the eligibility criteria, adequacy of cost of<br />

Tender Do<strong>cum</strong>ent (<strong>in</strong>case of downloaded Tender) and EMD etc., placed <strong>in</strong> it, the second Envelope<br />

conta<strong>in</strong><strong>in</strong>g the Price Bid shall be opened. The date and time of open<strong>in</strong>g of the Price Bid along with names<br />

of successful Tenderers <strong>in</strong> Pre-Qualification will be subsequently displayed <strong>in</strong> the Notice Board of Works<br />

Contracts only and no <strong>in</strong>dividual communication to Tenderers will be made.<br />

4.3 The Do<strong>cum</strong>ents submitted <strong>in</strong> the first Envelope by the Tenderers <strong>in</strong> respect of Pre-Qualification criteria are<br />

f<strong>in</strong>al and no further correspondence / clarifications / submissions <strong>in</strong> this regard shall be enterta<strong>in</strong>ed.<br />

4.4 Scope of Work, Bill of Quantities (BOQ), Terms & Conditions given <strong>in</strong> the Tender Do<strong>cum</strong>ents (placed <strong>in</strong><br />

the website) are f<strong>in</strong>al. On verification, at any time, whether the Tenderer is successful or not, if any of<br />

the Do<strong>cum</strong>ents submitted by the Tenderer <strong>in</strong>clud<strong>in</strong>g the Do<strong>cum</strong>ents downloaded from our<br />

4.5<br />

website/issued are found tampered/altered/<strong>in</strong>complete, they are liable for actions like rejection of the<br />

Tender, cancellation & term<strong>in</strong>ation of the contract, debarr<strong>in</strong>g etc., as per the Rules of the Company.<br />

It will be presumed that the Tenderers have gone through the General Conditions, Special Conditions &<br />

Instructions to Tenderer etc., of the contract available <strong>in</strong> the website which shall be b<strong>in</strong>d<strong>in</strong>g on him/<br />

them.<br />

4.6 The Tenderer shall download the “TENDER SCHEDULE” available on the website <strong>in</strong> totality and submit<br />

the same duly signed on each page.At any time prior to the deadl<strong>in</strong>e for submission of bids, Works<br />

Contracts Department may, for any reason, modify the tender terms and conditions by way of an<br />

amendment. Such amendments will be notified on RINL’s website at regular <strong>in</strong>tervals.<br />

4.7 <strong>Tenders</strong> submitted aga<strong>in</strong>st the NIT/Tender shall not be returned <strong>in</strong> case the Tender open<strong>in</strong>g date is<br />

extended/postponed. Tenderers desirous to modify their offer/terms may submit their revised/<br />

supplementary offer(s) with<strong>in</strong> the extended TOD, by clearly stat<strong>in</strong>g the extent of updat<strong>in</strong>g done to their<br />

orig<strong>in</strong>al offer and the order of prevalence of revised offer vis-a-vis orig<strong>in</strong>al offer. The Employer reserves<br />

the right to open the orig<strong>in</strong>al offer along with revised offer(s)<br />

5.0 The Tender Do<strong>cum</strong>ents and other details can be downloaded from our web site: www.vizagsteel.comand<br />

the same are to be submitted to the Dy. General Manager (Works Contracts), Visakhapatnam Steel Plant<br />

duly signed on each page by the Tenderer on or before 03.00PM on 25.09.2012.<br />

6.0 Non-transferable Tender Do<strong>cum</strong>ent can also be obta<strong>in</strong>ed from the office of Dy. General Manager (Works<br />

Contracts), VSP on written request on Bidder’s Letter Head on payment of Tender cost <strong>in</strong> the form of<br />

DD/BC/PO dur<strong>in</strong>g work<strong>in</strong>g hours 10 AM to 4.30 PM on or before04.30PM on 24.09.2012.<br />

7.0 <strong>Tenders</strong> will be received <strong>in</strong> the office of Dy. General Manager (Works Contracts), up to03.00 PM on<br />

25.09.2012 and Envelope-1 will be opened immediately thereafter.<br />

8.0 If it comes to the notice of VSP at any stage right from request for Registration/Tender Do<strong>cum</strong>ent that<br />

any of the Certificates /Do<strong>cum</strong>ents submitted by Applicant for Registration or by Bidders are found to be<br />

false/ fake/doctored, the Party will be debarred from participation <strong>in</strong> all VSP <strong>Tenders</strong> for a period of<br />

05(FIVE) years <strong>in</strong>clud<strong>in</strong>g Term<strong>in</strong>ation of Contract, if awarded. E.M.D/Security Deposit etc., if any will be<br />

forfeited. The Contract<strong>in</strong>g Agency <strong>in</strong> such cases shall make good to VSP any loss or damage result<strong>in</strong>g<br />

from such Term<strong>in</strong>ation. Contracts <strong>in</strong> operation anywhere <strong>in</strong> VSP will also be term<strong>in</strong>ated with attendant<br />

fall outs like forfeiture of E.M.D./Security Deposit, if any, and recovery of Risk and Cost charges etc.<br />

Decision of V.S.P Management will be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g.<br />

9.0 The date of open<strong>in</strong>g of the Pre-Qualification cover (Envelope-1) shall be the date of Tender open<strong>in</strong>g <strong>in</strong><br />

respect of both the S<strong>in</strong>gle Bid and Two-Bid (Techno-Commercial and Price-Bid).<br />

10.0 Successful Tenderer should be <strong>in</strong> a position to produce, after open<strong>in</strong>g of the Price Bids, the Orig<strong>in</strong>al<br />

Certificates <strong>in</strong> support of the attested copies of relevant Do<strong>cum</strong>ents submitted along with<br />

TenderDo<strong>cum</strong>ent. Failure to produce the Orig<strong>in</strong>al Certificates at this stage <strong>in</strong> support of the attested<br />

copies of P.F. Registration/ITCC/Electrical Licence/Experience /Qualification/any other Do<strong>cum</strong>ents etc.<br />

submitted earlier would result <strong>in</strong> disqualification and forfeiture of EMD and also liable for debarr<strong>in</strong>g from<br />

participation <strong>in</strong> VSP <strong>Tenders</strong>.<br />

11.0 Tender Do<strong>cum</strong>ents will be issued to Tenderers based on their request and on payment of Tender cost or<br />

same can be downloaded from our web site by submitt<strong>in</strong>g the cost of Tender along with their Offer.<br />

However, RINL will not be responsible for any delay/loss/any website related problems <strong>in</strong> download<strong>in</strong>g<br />

the Tender Do<strong>cum</strong>ents etc.. RINL reserve the right to (a) issue or Refuse Tender Do<strong>cum</strong>ents without<br />

assign<strong>in</strong>g any reason. (b) Split and award the Work to more than one Agency, (c) reject any or all the<br />

<strong>Tenders</strong> or to accept any tender wholly or <strong>in</strong> part or drop the proposal of receiv<strong>in</strong>g <strong>Tenders</strong> at any time<br />

without assign<strong>in</strong>g any reason there of and without be<strong>in</strong>g liable to refund the cost of Tender Do<strong>cum</strong>ents<br />

thereupon.<br />

12.0 VSP after open<strong>in</strong>g of Tender/Bid Do<strong>cum</strong>ent may seek <strong>in</strong> writ<strong>in</strong>g, Do<strong>cum</strong>ents/Clarifications which are<br />

necessary for evaluation of Tender/Bid Do<strong>cum</strong>ent from the Tenderers/Bidders or issu<strong>in</strong>g authority for<br />

confirmation of eligibility/pre-qualification stipulated <strong>in</strong> the NIT.<br />

For Deputy General Manager (Works Contracts) I/c<br />

3 of 18 Signature of the Tenderer


Ref. Tender No.<br />

FORM – A<br />

Name of the Work: <strong>Clean<strong>in</strong>g</strong> <strong>cum</strong> <strong>spillage</strong> <strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong> & SSP of<br />

SP<br />

To<br />

The Deputy General Manager<br />

Works Contracts Department<br />

Visakhapatnam Steel Plant<br />

Visakhapatnam-530 031.<br />

Sirs,<br />

With reference to the Notice Invit<strong>in</strong>g Tender, I/We have gone through the tender do<strong>cum</strong>ents issued to us. I/We<br />

have also gone through the General Conditions of Contract of VSP available <strong>in</strong> VSP web site and noted the<br />

contents there<strong>in</strong>. I/We hereby confirm that I/We shall abide by Terms and Conditions of General Conditions of<br />

the Contract <strong>in</strong>clud<strong>in</strong>g Form of Tender, Invitation to Tender, Articles of Agreement etc. I/We hereby declare<br />

that, I/We have visited, <strong>in</strong>spected and exam<strong>in</strong>ed the site and its surround<strong>in</strong>gs and satisfied ourselves before<br />

submitt<strong>in</strong>g this tender; obta<strong>in</strong>ed <strong>in</strong>formation about the nature of work, facilities that may be required and<br />

obta<strong>in</strong>ed necessary <strong>in</strong>formation about Work<strong>in</strong>g Conditions, risk cont<strong>in</strong>gencies etc., which may <strong>in</strong>fluence this<br />

tender. We hereby offer to execute & ma<strong>in</strong>ta<strong>in</strong> the work dur<strong>in</strong>g the defect liability period <strong>in</strong> conformity with<br />

the tender conditions at the respective rates quoted by us.<br />

I/We have deposited the EMD, which amount is not to bear any <strong>in</strong>terest and I/We do hereby agree that this<br />

sum shall be forfeited by me/us if I/We revoke/withdraw/cancel my/our tender or if I/We vary any terms <strong>in</strong> our<br />

tender dur<strong>in</strong>g the validity period of the tender without your written consent and/or if <strong>in</strong> the event of<br />

Visakhapatnam Steel Plant accept<strong>in</strong>g my/our tender and I/We fail to deposit the required security money,<br />

execute the Agreement and/start the work with<strong>in</strong><br />

reasonable time (to be determ<strong>in</strong>ed by the Eng<strong>in</strong>eer)<br />

after written acceptance of my/our Tender.<br />

� Status of the firm (mark)<br />

� Proprietary /Partnership/others (Specify)<br />

* Authority to Sign:<br />

a) Proprietor<br />

b) Manag<strong>in</strong>g Partner<br />

c) Power of attorney holder<br />

Name of Partners:<br />

1)<br />

2)<br />

3)<br />

72370-0<br />

Follow<strong>in</strong>g Details are to be furnished by the<br />

tenderer compulsorily (neat & legible) while<br />

submitt<strong>in</strong>g the tender schedule<br />

Income Tax<br />

PAN No.<br />

Status/Reason<br />

for not hav<strong>in</strong>g<br />

PAN No.<br />

OFFICIAL ADDRESS<br />

Phone No:<br />

Cell No :<br />

Fax No.:<br />

e-mail address:<br />

Yours faithfully,<br />

(Signature of Contractor)<br />

T.No.72370-0<br />

Name:…………………………………<br />

4 of 18 Signature of the Tenderer


1) INSTRUCTIONS TO TENDERERS<br />

T.No.72370-0<br />

a) <strong>Tenders</strong> shall be submitted <strong>in</strong> the office of the Deputy General Manager (Works Contracts), Visakhapatnam Steel Plant,<br />

Visakhapatnam – 530 031.<br />

b) <strong>Tenders</strong> shall be submitted <strong>in</strong> the prescribed form issued by VSP. The Tender do<strong>cum</strong>ents issued are not transferable.<br />

Tender do<strong>cum</strong>ents issued/downloaded shall be submitted wholly without detach<strong>in</strong>g any part.<br />

c) The Tenderer shall agree to VSP’s terms and conditions, specifications/scope of work, etc., and quote their<br />

“Total Amount only” accord<strong>in</strong>gly.<br />

d) Tender shall be for the entire scope of work mentioned <strong>in</strong> the tender do<strong>cum</strong>ents.<br />

e) Tenderer “shall quote only the Total Amount <strong>in</strong> figures and <strong>in</strong> words”. Over writ<strong>in</strong>g is not permitted and corrections are to<br />

be essentially <strong>in</strong>itialed. Amount quoted <strong>in</strong> words shall govern <strong>in</strong> case of variance between figures and words.<br />

f) The “Total Amount quoted <strong>in</strong> figures and words shall be tallied” before submission of the tender and all mistakes<br />

corrected and <strong>in</strong>itialed. Quotation shall preferably be type written or written <strong>in</strong> neat and legible handwrit<strong>in</strong>g. All the<br />

pages of tender do<strong>cum</strong>ents shall be signed by the tenderer.<br />

g) If by any reason the tender open<strong>in</strong>g is postponed to any other date, the details will be displayed <strong>in</strong> the notice board of<br />

Works Contract Department. Tenderers shall see the notice board regularly and keep themselves <strong>in</strong>formed <strong>in</strong> this<br />

matter.<br />

h) Before quot<strong>in</strong>g, the tenderer shall necessarily contact the “Eng<strong>in</strong>eer” and fully understand the job, scope of work, unit of<br />

measurement, mode of measurement, scope of supply of materials by VSP if any, work<strong>in</strong>g conditions, shutdown<br />

arrangements, Labour deployment requirements, risk cont<strong>in</strong>gencies and such other factors which may affect their<br />

tender.<br />

i) General Conditions of Contract of VSP for Works Contracts are available <strong>in</strong> the Office of DGM (Works Contracts) and also<br />

<strong>in</strong> VSP’s web site for reference. The tenderers shall study and understand all the relevant provisions before quot<strong>in</strong>g.<br />

j) <strong>Tenders</strong> shall be kept open for acceptance for a period 4 (Four) MONTHS from the date of open<strong>in</strong>g of tender i.e..,<br />

Envelope-1.<br />

k) After open<strong>in</strong>g of tender, the tenderers may be called for negotiations and the details like date, time etc. will be displayed<br />

on the notice board of W.C. Department. The tenderers shall see the notice board regularly and keep themselves<br />

<strong>in</strong>formed <strong>in</strong> this matter and promptly attend negotiations without fail.<br />

l) Purchase Preference will be given to PSU’s where applicable as per DPE guidel<strong>in</strong>es.<br />

m) The local Small Scale Industries as approved by VSP and registered with Works Contracts Department of Visakhapatnam<br />

Steel Plant <strong>in</strong> the category of Industrial Pa<strong>in</strong>t Manufactures for supply and application of <strong>in</strong>dustrial Pa<strong>in</strong>ts to various<br />

structural, equipment pipel<strong>in</strong>es etc., are eligible for Purchase Preference as per the Policy of VSP <strong>in</strong> force from time to<br />

time. The local small-scale <strong>in</strong>dustries, those who are technically and commercially acceptable shall be considered for<br />

extension of Purchase Preference, if the offer is with<strong>in</strong> 15% above L-1 price and upon their match<strong>in</strong>g with L-1 price.<br />

n) The date of open<strong>in</strong>g of pre-qualification envelope-1 shall be the date of tender open<strong>in</strong>g <strong>in</strong> respect of both the SINGLE BID<br />

AND TWO- BID (Techno-commercial and Price bid) tenders.<br />

o) Respective tenderers participat<strong>in</strong>g <strong>in</strong> the tenders due for open<strong>in</strong>g on the scheduled day, can witness the open<strong>in</strong>g of<br />

tenders/Price bid on production of valid identity card/gate pass, or alternately, shall give a duly signed authorization to<br />

their designated representatives who are nom<strong>in</strong>ated if they wish to witness the tender/price bid open<strong>in</strong>g. However if the<br />

tenderer/designated representative participates for other than his tender his gate pass will be cancelled for a period of<br />

01 (One) year.<br />

2) EARNEST MONEY DEPOSIT (EMD)<br />

a) In case of Earnest Money Deposit be<strong>in</strong>g less than or equal to Rs.5 Lakhs, Earnest Money Deposit shall be <strong>in</strong> the form of<br />

Demand Draft/Pay Order/Banker’s Cheque obta<strong>in</strong>ed from any Nationalized or scheduled commercial bank <strong>in</strong> <strong>India</strong>, drawn<br />

<strong>in</strong> favour of RashtriyaIspat Nigam Ltd., Visakhapatnam Steel Plant, payable at Visakhapatnam and shall be valid for a<br />

m<strong>in</strong>imum period of one month from the Envelope-1 (Pre-qualification do<strong>cum</strong>ents) open<strong>in</strong>g date. No other mode of<br />

payment will be accepted. However, <strong>in</strong> case EMD exceeds Rs.5 Lakhs, tenderers have the option to submit the same <strong>in</strong> the<br />

form of Bank Guarantee (In the format as enclosed to the GCC) from any Scheduled Commercial Bank, encashable at<br />

Visakhaptnam. Bank Guarantees shall be valid for a m<strong>in</strong>imum period of 04(Four) months from the date of open<strong>in</strong>g of<br />

Envelope-1 (Pre-Qualification Do<strong>cum</strong>ents). The above shall supersede the Instructions regard<strong>in</strong>g “form of EMD” elsewhere<br />

<strong>in</strong> the Tender Do<strong>cum</strong>ent.<br />

The above shall supersede the <strong>in</strong>structions regard<strong>in</strong>g “Form of EMD” elsewhere <strong>in</strong> the tender do<strong>cum</strong>ent.<br />

b) Public Sector Enterprises State/Central Government Undertak<strong>in</strong>gs are exempted from submission of Earnest Money<br />

Deposit (EMD) provided they submit a letter request<strong>in</strong>g for exemption from submission of EMD along with their Offer.<br />

c) The Small Scale Industries who are registered with Industries Department, Government of Andhra Pradesh or the<br />

National Small Industries Corporation Ltd., (NSIC) are exempted from submission of Earnest Money Deposit and Security<br />

Deposit and shall submit a self-attested copy of the valid registration of their Small Scale Industries along with their<br />

Tender. Such SSI or NSIC shall submit “Performance Guarantee Bond” <strong>in</strong> lieu of Security Deposit. The Small Scale<br />

Industries who are registered for the particular trade/item for which this tender is relevant will be exempted from<br />

submission of Earnest Money Deposit and Security Deposit. Such <strong>in</strong>dustries hav<strong>in</strong>g provisional/temporary registration<br />

or/and not registered for the particular trade/item for which tender is be<strong>in</strong>g <strong>in</strong>vited would not eligible for such exemption<br />

from Earnest Money Deposit and Security Deposit Clauses.<br />

d) EMDs of unsuccessful tenderers will be refunded after reasonable time without <strong>in</strong>terest.<br />

3) MODE OF SUBMISSION OF TENDER<br />

a) Tender shall be submitted <strong>in</strong> two separate sealed covers. In case of s<strong>in</strong>gle bid tender, the first cover shall conta<strong>in</strong> the<br />

D.D. / Pay Order / Banker’s Cheque for Earnest Money Deposit / Cost of Tender Do<strong>cum</strong>ent / EMD exemption do<strong>cum</strong>ents<br />

for PSUs & SSI units, other pre-qualification do<strong>cum</strong>ents etc. and the second cover shall conta<strong>in</strong> the tender.<br />

b) In case of two bid system, the first cover shall conta<strong>in</strong> the techno-commercial bid part of tender, along with the other<br />

Bank Instruments / Do<strong>cum</strong>ents <strong>in</strong>dicated <strong>in</strong> para 3(a) above, and the second cover shall conta<strong>in</strong> only the price bid part of<br />

tender.<br />

5 of 18 Signature of the Tenderer


T.No.72370-0<br />

c) The two sealed covers as mentioned above shall be stapled / tied together and submitted. The first cover will be opened<br />

first and only if the submitted do<strong>cum</strong>ents / <strong>in</strong>struments are found to be as per NIT requirement, will the second cover<br />

conta<strong>in</strong><strong>in</strong>g the price bid be opened.<br />

d) <strong>Tenders</strong> not satisfy<strong>in</strong>g the requirements as per NIT will not be opened.<br />

SPECIAL CONDITIONS OF CONTRACT (SCC)<br />

1. General: The Special Conditions of the Contract (SCC) are complementary to and shall be read <strong>in</strong><br />

conjunction with General Conditions of Contract (GCC) of VSP for Works Contracts. Scope of Work, Bill of<br />

Quantities and other Do<strong>cum</strong>ents form part of the Tender Do<strong>cum</strong>ents. In case of any conflict of mean<strong>in</strong>g<br />

between SCC & GCC, Provisions of SCC shall override the Provisions of GCC.<br />

2. Visakhapatnam Steel Plant reserves the right to accept or reject the lowest or any other Tender without<br />

assign<strong>in</strong>g any reason and the work may be awarded to one of the Tenderers or to more than one<br />

Tenderer.<br />

3. The contract shall be treated as hav<strong>in</strong>g been entered <strong>in</strong>to from the date of issue of the Letter of<br />

Intent/Work Order to the successful Tenderer, unless otherwise specified.<br />

4. WATER, POWER AND COMPRESSED AIR: Unless otherwise specified to the contrary <strong>in</strong> the Tender<br />

Schedule, the Contractor is entitled to use <strong>in</strong> the work such supplies of water, power and compressed air<br />

(Bas<strong>in</strong>g on availability) from VSP’s sources from approved tapp<strong>in</strong>g po<strong>in</strong>ts, free of cost. The Contractor<br />

shall make his own arrangement for draw<strong>in</strong>g the same to the work spot.<br />

5. Immediately on receipt of Work Order, the successful Tenderer shall obta<strong>in</strong> and submit the follow<strong>in</strong>g<br />

Do<strong>cum</strong>ents to the Eng<strong>in</strong>eer with a copy to ZPE/Manager(Pers)/CLC before start of work.<br />

a (i) ESI registration certificate with the contractor’s Code no. cover<strong>in</strong>g all the workmen under ESI<br />

Scheme, which shall be effective from the date of start of contract and cover for the entire period of<br />

contract <strong>in</strong>clud<strong>in</strong>g extended period/defect liability period, if any.<br />

a (ii) Insurance policy for payment of ex-gratia amount of Rs.5,00,000/- (Rupees Five lakhs only) per<br />

head <strong>in</strong> case of fatal accidents while on duty, to the contract labour engaged by him <strong>in</strong> addition to<br />

the coverage under ESI Scheme / Workmen Compensation Insurance Policy whichever is applicable.<br />

As and when a fatal accident takes place while on duty along with benefits under the ESI Scheme /<br />

Workmen Compensation, whichever is applicable, the contractor is required to pay the ex-gratia<br />

amount with<strong>in</strong> 30 days (thirty) days from the date of accident to the legal heir of the deceased. In<br />

case of any delay <strong>in</strong> pay<strong>in</strong>g the ex-gratia amount as above, the Employer has the right to pay such<br />

amount directly to the Legal Heir of the deceased and recover the same from the Contractor’s<br />

runn<strong>in</strong>g / future Bills. This Insurance Policy is to be taken by the Contractor over and above the<br />

Provisions specified under Clause no. 6.13 (Third Party) and 6.14 (ESI Act) of the General Conditions<br />

of Contract.<br />

a (iii) Copy of the Policy for Third Party Insurance as stipulated <strong>in</strong> Clause 6.13 of the GCC.<br />

b) Labour Licence obta<strong>in</strong>ed from Deputy Commissioner of Labour, Government of Andhra Pradesh,<br />

Visakhapatnam as required.<br />

c) PF Registration Certificate issued by PF Authorities<br />

d) Safety clearance from Safety Eng<strong>in</strong>eer<strong>in</strong>g Department of VSP.<br />

6. The Contractor shall submit wage records, work commencement/completion certificate etc. and obta<strong>in</strong><br />

necessary clearance from Contract Labour Cell of VSP for bills clearance.<br />

7. The Contractor shall ensure strict compliance with Provisions of the Employee’s Provident Fund Act, 1952<br />

and the scheme framed thereunder <strong>in</strong> so far as they are applicable to their Establishment and Agencies<br />

engaged by them. The Contractor is also required to <strong>in</strong>demnify the Employer aga<strong>in</strong>st any loss or claim or<br />

penalties or damageswhatsoever result<strong>in</strong>g out of non-compliance on the part of the Contractor with the<br />

Provisions of aforesaid act and the schemes framed thereunder. A copy of the Provident Fund<br />

Membership Certificate/PF CODE Number shall be submitted by the Contractor.<br />

8. The Contractor shall follow the Provisions of <strong>India</strong>n Factories Act and all rules made thereunder from time<br />

to time as applicable and shall <strong>in</strong>demnify the Employer aga<strong>in</strong>st all claims of compensations under the<br />

Provisions of the Act <strong>in</strong> respect of workmen employed by the Contractor <strong>in</strong> carry<strong>in</strong>g out the work aga<strong>in</strong>st<br />

all costs, expenses and penalties that may be <strong>in</strong>curred by the Employer <strong>in</strong> connection therewith.<br />

9. a) Total amount quoted shall be <strong>in</strong>clusive of all Taxes, Levies, Duties, Royalties, Overheads and the like<br />

but exclud<strong>in</strong>g Service Tax prevail<strong>in</strong>g as on the date of submission of Bids.<br />

b) Dur<strong>in</strong>g the operation of the Contract if any new Taxes/Duties/Levies etc. are imposed or rates undergo<br />

changes, as notified by the Government and become applicable to the subject works, the same shall<br />

be reimbursed by VSP on production of Do<strong>cum</strong>entary Evidence <strong>in</strong> respect of the payment of the same.<br />

Similarly benefits accru<strong>in</strong>g to Agency on account of withdrawal/reduction <strong>in</strong> any exist<strong>in</strong>g Taxes and<br />

Duties shall be passed on to VSP.<br />

C) The benefit offered by the Agency (other than Service Tax) will be deducted from each bill on the<br />

offered percentage basis. Amount so recovered shall be released, limit<strong>in</strong>g to the percentage of benefit<br />

offered on the quoted price, only on receipt of credit by VSP.<br />

6 of 18 Signature of the Tenderer


T.No.72370-0<br />

d) The prices are exclusive of Service Tax. RINL-VSP will pay Service Tax as applicable on submission of<br />

Invoices <strong>in</strong> accordance with Rule 4A (1) of Service Tax Rules 1994.The Contractor will be paid Service<br />

Tax by RINL-VSP along with monthly service charge bills for further deposit with Central Excise<br />

Authorities. The Contractor will, <strong>in</strong> turn, submit the Do<strong>cum</strong>entary Evidence <strong>in</strong> support of payment of<br />

Service Tax of each month along with subsequent month RA Bills.<br />

10. ADVANCE: No advance of any sort will be given by VSP.<br />

11. PAYMENT TERMS: Payment will be made monthly on recommendations of the Eng<strong>in</strong>eer bas<strong>in</strong>g on the<br />

quantities executed, at accepted rates.<br />

12. MEASUREMENTS: The contractor shall take measurements jo<strong>in</strong>tly with the Eng<strong>in</strong>eer or his<br />

representative and keep jo<strong>in</strong>t records for the same. Bills shall be prepared and submitted by the<br />

contractor bas<strong>in</strong>g on agreed measurements.<br />

13. INITIAL SECURITY DEPOSIT (ISD): Initial Security Deposit for the work shall be @ 2% of contract price.<br />

Earnest Money Deposited by the successful tenderer shall be adjusted aga<strong>in</strong>st ISD, and the difference<br />

between ISD and EMD shall be deposited <strong>in</strong> the manner mentioned <strong>in</strong> the work order/letter of <strong>in</strong>tent.<br />

14. RETENTION MONEY: Retention Money for contracts up to a value of Rs. 100 lakhs, at the rate of 7.5%of the<br />

bills for works with defective liability period not NIL and at the rate of 5.0% for works with defective liability<br />

period “NIL” will be deducted from each bill until this amount together with the Initial Security Deposit<br />

reach the limit of retention which is 7.5% or 5.0% as the case may be for the value of work. The<br />

Retention Money shall be released after the satisfactory completion of defect liability period after<br />

liquidat<strong>in</strong>g the defects. For contracts of value above Rs.100 Lakhs, the limit of retention money shall be<br />

Rs.7.5 lakhs plus 5% of the value exceed<strong>in</strong>g Rs.100 lakhs.<br />

15. Security Deposit: The Public Sector Enterprises or State/Central Government Undertak<strong>in</strong>gs/SSI units<br />

registered with Govt. of AP/NSIC will not be required to submit Security Deposit, but however they shall<br />

submit “Performance Guarantee Bond” <strong>in</strong> lieu of Security Deposit <strong>in</strong> the prescribed proforma equivalent to<br />

the value of Security Deposit cover<strong>in</strong>g the period of contract + defect liability period + 6months (Claim<br />

period).<br />

16. Recovery of <strong>in</strong>come tax at source will be made from contractor’s bill and deposited with Income Tax<br />

Department as per rules. Recovery of sales tax applicable shall be made from thecontractor’s bills.<br />

17. SAFETY:<br />

a) The contractor and his workers must strictly take all safety precautions and shall supply to his workers<br />

dependable safety appliances like hand gloves, safety boots, safety belt, safety helmets, duster cloth,<br />

dust mask/nostril filter etc. In addition to this, contractor shall also provide additional safety<br />

appliances as per requirement and follow safe work<strong>in</strong>g practices like us<strong>in</strong>g fully <strong>in</strong>sulated electrode<br />

holders etc. He shall also ensure that his workmen <strong>in</strong>telligently use only dependable safety<br />

appliances supplied to them.<br />

b) The contractor shall take adequate safety precaution to prevent accidents at site. The contractor shall<br />

also ensure that his employees observe the statutory safety rules and regulations and also those laid<br />

down by the employer from time to time and promptly submit report of accident and state the<br />

measures taken by him to prevent their recurrence and also keep the employer <strong>in</strong>demnified of all<br />

claims aris<strong>in</strong>g out of such accidents.<br />

c) No Workmen shall be engaged on the work without proper safety <strong>in</strong>duction and without us<strong>in</strong>g required<br />

PPE. Use of safety helmet and shoe is must except<strong>in</strong>g <strong>in</strong> pa<strong>in</strong>t<strong>in</strong>g works where shoe will not be used.<br />

d) All the safety appliances required for safe work<strong>in</strong>g as decided by SED/Contract operat<strong>in</strong>g department<br />

shall be provided by the contractor to his workmen.<br />

e) Clearance to start the job will be obta<strong>in</strong>ed by the contractor <strong>in</strong> form ‘A&B’ before start of work. The<br />

forms may be obta<strong>in</strong>ed from the dept. concerned.<br />

f) Works at height cannot be started without clearance from Zonal Safety Officer. The workers engaged<br />

for work at height shall possess height pass from SED. The names of workmen work<strong>in</strong>g at height or <strong>in</strong><br />

hazardous areas will be written on the body of form “B”.<br />

g) Contravention of any safety regulation of VSP <strong>in</strong> vogue from time to time will result <strong>in</strong>to work<br />

stoppage, levy<strong>in</strong>g penalties and ultimately <strong>in</strong> contract term<strong>in</strong>ation.<br />

h) “The contractor shall ensure that the Welders and Gas Cutters wear cotton dress and leather apron.<br />

They shall not wear nylon/synthetic dress. This is required to avoid any fire accident. This must be<br />

followed strictly”.<br />

18. SHUTDOWNS:<br />

a) Necessary shutdowns will be arranged by VSP to the contractor for carry<strong>in</strong>g out the work based on<br />

requirement. No claims on account of delayed/prolonged shutdown will be enterta<strong>in</strong>ed.<br />

b) The works assigned to the contractor by the Eng<strong>in</strong>eer from time to time shall be completed with<strong>in</strong> the<br />

time schedule fixed by the Eng<strong>in</strong>eer <strong>in</strong> each case, with<strong>in</strong> the approved shut down period.<br />

19. LABOUR DEPLOYMENT:<br />

a) The contractor shall deploy his labour as per requirement and as <strong>in</strong>structed by the Eng<strong>in</strong>eer. It may be<br />

necessary to carry out the work round the clock based on requirement and shutdown provided. The<br />

contractor’s rate shall cover such eventualities.<br />

7 of 18 Signature of the Tenderer


T.No.72370-0<br />

b) Only tra<strong>in</strong>ed, experienced, safety <strong>in</strong>ducted workers acceptable to the Eng<strong>in</strong>eer shall be engaged on<br />

this work, work shall be executed as per specifications to the satisfaction of the Eng<strong>in</strong>eer.<br />

c) As and when need arises <strong>in</strong> the Annual Contract works from time to time either for extra requirement<br />

of work or as a replacement <strong>in</strong> runn<strong>in</strong>g contracts or a contract commenc<strong>in</strong>g for the first time, the<br />

contractor shall ensure that Displaced Persons (DPs) are engaged <strong>in</strong> unskilled category of workers to<br />

the extent of 50% (fifty percent). The contractor shall contact the Eng<strong>in</strong>eer-<strong>in</strong>-charge for this purpose.<br />

20. SECURITY REGULALTIONS: The contractor shall abide by and also observe all security regulations<br />

promulgated from time to time by the employer.<br />

21. STORING/STACKING OF MATERIALS:Stor<strong>in</strong>g/Stack<strong>in</strong>g/Plac<strong>in</strong>g of materials shall be only at the places<br />

designated by the eng<strong>in</strong>eer.<br />

22. The contractor, his supervisors and workmen shall observe entry and exit tim<strong>in</strong>gs strictly.<br />

23. After completion of work activity, the site has to be cleared of all debris, construction material and the<br />

like.<br />

24. The successful tenderer shall start the work immediately after obta<strong>in</strong><strong>in</strong>g gate passes and safety <strong>in</strong>duction<br />

tra<strong>in</strong><strong>in</strong>g and clearance from the Employer.<br />

25. NOTICES: Any notice to be given to the contractor under terms of the contract shall be considered duly<br />

served, if the same has been delivered to, left for or posted by registered post to the contractors pr<strong>in</strong>cipal<br />

place of bus<strong>in</strong>ess (or <strong>in</strong> the event of the contractor be<strong>in</strong>g a company, its registered office), at the site or to<br />

their last known address.<br />

26. DEFAULT BY TENDERERS: The successful tenderer may be debarred at the discretion of the company,<br />

from issue of further tender do<strong>cum</strong>ents, work orders etc., for a specified period to be decided by the<br />

employer <strong>in</strong> case of:<br />

“Undue delay <strong>in</strong> start<strong>in</strong>g and execution of work awarded, poor performance, back<strong>in</strong>g out from the<br />

tender, non-accept<strong>in</strong>g work order/LOI dur<strong>in</strong>g the validity of tender or non-observance of safety rules and<br />

regulations, misappropriation of company’s materials/property, nonpayment of due wages to labour or<br />

such similar defaults”.<br />

27. Successful tenderer should be <strong>in</strong> a position to produce the Orig<strong>in</strong>al Certificate <strong>in</strong> support of the attested<br />

copies of relevant do<strong>cum</strong>ents enclosed along with pre-qualification do<strong>cum</strong>ents or afterwards, after<br />

open<strong>in</strong>g of the Price Bids.<br />

28. Failure to produce the orig<strong>in</strong>al certificates at this stage <strong>in</strong> support of the attested copies of PF<br />

Registration/ITCC/Electrical License/Experience/Qualification any other do<strong>cum</strong>ents etc., submitted earlier<br />

would result <strong>in</strong> disqualification and forfeiture of EMD and also liable for debarr<strong>in</strong>g from participation <strong>in</strong> VSP<br />

tenders.<br />

29. If it comes to the notice of VSP at any stage right from request for registration/tender do<strong>cum</strong>ent that any<br />

of the certificates/do<strong>cum</strong>ents submitted by applicant for registration or by bidders are found to be<br />

false/fake/doctored, the party will be debarred from participation <strong>in</strong> all VSP tenders fora period of<br />

05 (FIVE) YEARS <strong>in</strong>clud<strong>in</strong>g term<strong>in</strong>ation of Contract, if awarded. EMD/Security Deposit etc., if any, will be<br />

forfeited. The Contract<strong>in</strong>g Agency <strong>in</strong> such cases shall make good to VSP any loss or damage result<strong>in</strong>g from<br />

such term<strong>in</strong>ation. Contracts <strong>in</strong> operation anywhere <strong>in</strong> VSP will also be term<strong>in</strong>ated with attendant fall outs<br />

like forfeiture of EMD/Security Deposit, if any, and recovery of risk and cost charges etc. Decision of V.S.P.<br />

Management will be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g.<br />

30. Failure to execute the work after LOA/WORK ORDER is given, will make the party liable for debarr<strong>in</strong>g for a<br />

period of 2 (TWO) YEARS.<br />

31. In case it is found before/after award of work to the person/agency through Limited Tender Enquiry (LTE)<br />

that the same person/agency is proprietor/proprietress/partner of two or more separate agencies and<br />

quoted for the same work, then punitive action to the extent of debarr<strong>in</strong>g up to 02 (Two) years from<br />

participat<strong>in</strong>g <strong>in</strong> VSP tenders will be taken.<br />

32. Contractor shall note that:<br />

i) Time for mobilization after issue of FAX Letter of Acceptance/detailed Letter of Acceptance/Work Order<br />

shall be; a. 03 (Three) days for Capital Repairs<br />

b. 15 days for Civil Works<br />

c. 60 days for pa<strong>in</strong>t<strong>in</strong>g works of Structural Eng<strong>in</strong>eer<strong>in</strong>g Department<br />

d. 07 (Seven) days for Annual Mechanical, Electrical and works of technological<br />

assistance/clean<strong>in</strong>g.<br />

ii) Re-start<strong>in</strong>g the work after disruption shall be with<strong>in</strong> 04 (Four) to 06 (Six) hours after the cause of<br />

disruption is removed as decided by the HOD.<br />

iii) Notice period for Contract Term<strong>in</strong>ation shall be - 03 (Three) hours <strong>in</strong> the event of breakdowns,<br />

02 (Two) days <strong>in</strong> Capital Repairs and<br />

10 days <strong>in</strong> other works.<br />

Failure to adhere to above stipulations may result <strong>in</strong> Term<strong>in</strong>ation of contract at risk & cost and will make the<br />

party liable for debarr<strong>in</strong>g for a period of 2 (Two) years.<br />

8 of 18 Signature of the Tenderer


33. In case the tenderers revoke/withdraw/cancel their tender or they vary any terms of their tender dur<strong>in</strong>g the<br />

validity period of the tender without the written consent of Visakhapatnam Steel Plant (VSP) or <strong>in</strong> the event<br />

of VSP accept<strong>in</strong>g their tender and fail to deposit the required security money, execute the Agreement and<br />

fail to start the work with<strong>in</strong> reasonable time (to be determ<strong>in</strong>ed by the Eng<strong>in</strong>eer) after written acceptance of<br />

their tender – EMD submitted by them will be forfeited by VSP<br />

34. Agencies are required to submit Bank Guarantee for the value as decided by the Eng<strong>in</strong>eer as a Security<br />

while tak<strong>in</strong>g out Equipment/Components/materials of VSP to their workshop situated outside the VSP<br />

premises for carry<strong>in</strong>g out repairs.<br />

35. In case of revision RINL/VSP approved wage rate, consequent to the revision <strong>in</strong> the m<strong>in</strong>imum wages<br />

(either <strong>in</strong> Basic Wage or Liv<strong>in</strong>g Allowances) as notified by the Regional Labour Commissioner (Central),<br />

Hyderabad, Escalation amount to the contract shall be payable as per the follow<strong>in</strong>g formula:<br />

V = L x W x (X – X O )/ X O<br />

Where<br />

V = Escalation Payable;<br />

L = Labour Content as Percentage of Work is 100% (One hundred Percent)<br />

W = Gross Value of work done on the basis of Contract Rates for the period for which variation<br />

is applicable;<br />

X = Revised weighted average of RINL/VSP approved wage rates of Unskilled Worker, Semiskilled<br />

Worker and Skilled Worker based on the M<strong>in</strong>imum Wages as notified by the<br />

Regional Labour Commissioner (Central), Hyderabad, for the period under consideration<br />

for the contract on the basis of actual man days present by different categories of contract<br />

labour dur<strong>in</strong>g the bill<strong>in</strong>g period.<br />

XO = Weighted average of exist<strong>in</strong>g RINL/VSP approved wage rates of Unskilled Worker, Semiskilled<br />

Worker and Skilled Worker considered <strong>in</strong> the Estimate which is <strong>in</strong>dicated <strong>in</strong> the<br />

Quote Sheet-Form-G/BOQ of the Tender Do<strong>cum</strong>ent on the basis of actual man-days<br />

present by different categories of contract labour dur<strong>in</strong>g the bill<strong>in</strong>g period.<br />

Computation of X and XO: X = (a * USR + b * SSR + c * SKR)/ (a + b+ c)<br />

X O<br />

= (a * USR O + b * SSR O + c * SKR O)/ (a + b+ c)<br />

T.No.72370-0<br />

Where<br />

a = man-days present by USW dur<strong>in</strong>g the bill<strong>in</strong>g period<br />

b = man-days present by SSW dur<strong>in</strong>g the bill<strong>in</strong>g period<br />

c = man-days present by SKW dur<strong>in</strong>g the bill<strong>in</strong>g period<br />

USR = Revised RINL / VSP approved wage rate for USW at the time of bill<strong>in</strong>g<br />

SSR = Revised RINL / VSP approved wage rate for SSW at the time of bill<strong>in</strong>g<br />

SKR = Revised RINL / VSP approved wage rate for SKW at the time of bill<strong>in</strong>g<br />

USRO = RINL/VSP estimated wage rates of USW based on which the estimate of work is prepared<br />

SSRO = RINL/VSP estimated wage rates of SSW based on which the estimate of work is prepared<br />

SKRO = RINL/VSP estimated wage rates of SKW based on which the estimate of work is prepared.<br />

36. The contract period can be extended at the discretion of V.S.P. up to 04 (Four) months at the exist<strong>in</strong>g<br />

Rates, Terms and conditions and the Contractor shall be bound to execute the work accord<strong>in</strong>gly and the<br />

offer of the Contractor is deemed to <strong>in</strong>clude this aspect.<br />

37. The tenderers shall note that <strong>in</strong> case of quot<strong>in</strong>g above the Estimated Value of V.S.P. the L-1 party shall<br />

furnish logical/satisfactory explanation which V.S.P. may seek if felt necessary for quot<strong>in</strong>g such high rates.<br />

If the explanation offered by the L-1 party is not acceptable to V.S.P., the L-1 party may be recommended<br />

for disqualification while retender<strong>in</strong>g the work.<br />

38. The contractor should clearly understand and comply with the Factories Act 1948 and relieve the FEMALE<br />

WORKERS from their work site with<strong>in</strong> the restricted work<strong>in</strong>g hours prescribed there<strong>in</strong> under section 66(b).<br />

39. PAYMENT OF MINIMUM WAGES: Wages paid to the Workmen by the Contractor should not be less than the<br />

rates notified by the Regional Labour Commissioner (Central), Hyderabad, from time with regard to<br />

M<strong>in</strong>imum Wages applicable to the respective categories workmen plus the ad-hoc amount at the rate of<br />

`11.54 as per work<strong>in</strong>g day per workman per category. Wages with ad-hoc amount to the workmen should<br />

be on or before the 7thof the subsequent month. If 7th falls on a holiday or a weekly off day, the payment<br />

should be made one day prior to that. Payment of PF for the month, both the employers’ (<strong>in</strong> this case,<br />

contractor) and employees’ (<strong>in</strong> this case, workmen employed by the contractor) contributions should be<br />

deposited <strong>in</strong> the bank <strong>in</strong> the permanent PF Code Number and Challan obta<strong>in</strong>ed before the 15th of the<br />

subsequent month and forwarded to the Eng<strong>in</strong>eer. In case of failure of the Contractor to comply with any<br />

of the above, the follow<strong>in</strong>g action will be taken by VSP:<br />

9 of 18 Signature of the Tenderer


LAPSE ACTION BY VSP<br />

1. a) Payment of wages at rates less<br />

than those notified under the<br />

m<strong>in</strong>imum wages.<br />

b) Non-payment of ad-hoc amount<br />

2. Nonpayment of wages<br />

3. Non Payment of PF<br />

4. Delayed Payment of PF<br />

40. The follow<strong>in</strong>g deductions per workman deployed category-wise shall be made from the bills/ amounts due<br />

to the Contractor as applicable for the work done and such deducted amounts shall be released as<br />

follows:<br />

S.No Component<br />

Recovery amount per labour per<br />

every Work<strong>in</strong>g Day (<strong>in</strong> `.)<br />

UN- SEMI-<br />

SKILLED<br />

SKILLED SKILLED<br />

01 Notice pay 18.19 20.59 24.28<br />

02<br />

Retrenchment<br />

compensation<br />

9.10 10.30 12.14<br />

03<br />

Leave with<br />

wages<br />

11.19 12.67 14.94<br />

Sub-total 38.48 43.56 51.36<br />

04 Bonus 11.55 11.55 11.55<br />

Grand total (To be paid<br />

to the Laborer)<br />

50.03 55.11 62.91<br />

10% towards profit and<br />

overheads of contractor<br />

5.00 5.51 6.29<br />

Total Recovery amount 55.03 60.62 69.20<br />

T.No.72370-0<br />

An amount equivalent to the differential amount between wages to be paid<br />

under m<strong>in</strong>imum wages notification of the Govt. applicable for the period less<br />

actual wages paid shall be recovered from the bills as certified by the<br />

Eng<strong>in</strong>eer.<br />

As amount equivalent to actual payable towards ad-hoc amount to the<br />

workmen engaged for relevant period shall be recovered from the bills as<br />

certified by the Eng<strong>in</strong>eer.<br />

An amount equivalent to wages payable by the contractor applicable for the<br />

relevant period shall be recovered from the bills as certified by the Eng<strong>in</strong>eer.<br />

Recovery of PF amount and an amount equivalent to maximum penalty<br />

leviable by Regional Provident Fund Commissioner for the delayed period<br />

under the provisions of EPF & MP Act and Rules for delayed remittance of PF<br />

contributions (both the employee’s and employer’s contribution), shall be<br />

recovered from the bills of contractor as certified by Eng<strong>in</strong>eer.<br />

An amount equivalent to maximum penalty leviable by Regional provident<br />

Fund Commissioner for the delayed period under the provisions of EPF & MP<br />

Act and rules for delayed remittance of PF contributions (both the<br />

employee’s and employer’s contribution), shall be recovered from the bills of<br />

the contractor as certified by Eng<strong>in</strong>eer.<br />

To be released when<br />

After the Contractor makes payment to<br />

the workmen <strong>in</strong> the presence of<br />

Eng<strong>in</strong>eer I/C and CLC representatives. A<br />

certificate to this effect is to be<br />

enclosed with pre-f<strong>in</strong>al bill. (to be paid<br />

with pre-f<strong>in</strong>al bill)<br />

After the Contractor makes payment to<br />

the workmen <strong>in</strong> the presence of<br />

Eng<strong>in</strong>eer I/c and CLC representatives. A<br />

certificate to this effect is to be<br />

enclosed with RA bill / pre-f<strong>in</strong>al bill. (to<br />

be paid with RA bill / pre-f<strong>in</strong>al bill as and<br />

when paid by the Contractor)<br />

Note:<br />

i) The above recovery rates are effective from 01.10.2011. In case of any statutory revision <strong>in</strong><br />

m<strong>in</strong>imum wages payable to contract workmen as notified by the Regional Labour Commissioner<br />

(Central), Hyderabad from time to time, the above amounts for workmen category-wise will be<br />

revised by RINL/VSP and will be notified accord<strong>in</strong>gly.<br />

ii) Payment aga<strong>in</strong>st the above components is to be made to the workmen based on effective wages of<br />

last drawn pay.<br />

10 of 18 Signature of the Tenderer


T.No.72370-0<br />

41. PAYMENT MODE FOR BILL AMOUNTS:<br />

41.1 Follow<strong>in</strong>g are the options available to the Contractors for avail<strong>in</strong>g e-payments.<br />

41.1.1 EFT System: Under this system Banks offer their customers money Transfer service from account of<br />

any bank branch to any other Bank Branch. The EFT system presently covers all the branches of about<br />

77 banks located at 15 centers <strong>in</strong>dicated below, where clear<strong>in</strong>g houses are managed by RBI i.e.,<br />

i) New Delhi, ii) Chandigarh, iii) Kanpur, iv) Jaipur, v) Ahmedabad, vi) Mumbai, vii) Nagpur, viii)<br />

Hyderabad, ix) Bangalore, x) Chennai, xi) Trivendrum, xii) Kolkata, xiii) Bhubaneswar, xiv) Guwahati,<br />

xv) Patna.<br />

41.1.2 Direct Credit: Suppliers opt<strong>in</strong>g for this system may open Bank accounts with any one of the<br />

follow<strong>in</strong>g banks.<br />

i) State Bank of <strong>India</strong> - Steel Plant Branch<br />

ii) Canara Bank - Steel Plant Branch<br />

iii) Bank of Baroda - Steel Plant Branch<br />

iv) State Bank of Hyderabad - Steel Plant Township Branch<br />

v) Andhra Bank - Steel Plant Township Branch<br />

vi) UCO Bank - Steel Plant Township Branch<br />

vii) IDBI - Visakhapatnam Branch<br />

41.2 The Successful tenderer shall agree that all the payment due and payable <strong>in</strong> terms of the contract will<br />

be paid direct to his bank account and he shall give the bank account number and the address of the<br />

Bank <strong>in</strong> which the money is to be deposited” as per the format given below:<br />

(1) Party Code :<br />

(2) Option : RTGS / EFT<br />

(3) Beneficiary Details<br />

a) Name of Beneficiary (Max.35 characters) :<br />

b) Bank Name (Max. 35 characters) :<br />

c) Branch Name (Max. 35 characters) :<br />

d) Account Number (Max. 35 characters) :<br />

e) Account type (Max. 35 characters) :<br />

(Sav<strong>in</strong>gs / Current / Overdraft) [Mention Code No. also] :<br />

f) Beneficiary Bank’s IFSC Code (Max. 11 characters) :<br />

(For RTGS Mode only)<br />

g) Beneficiary Bank’s MICR Code (Max.09 characters) :<br />

(For EFT Mode only)<br />

(Signature of the Party / Contractor)<br />

Name:<br />

Desgn:<br />

CERTIFICATE<br />

Certified that the above particulars are found to be correct and match<strong>in</strong>g with our records <strong>in</strong> respect of<br />

the above beneficiary.<br />

Sd/-……………<br />

(Signature of Branch Manager)<br />

Name :<br />

Seal of Bank :<br />

41.3 The contractor has to submit their bank account details <strong>in</strong> VSP format duly certified by Concerned<br />

Bank Manager for the purpose of mak<strong>in</strong>g electronic payment before submission of First Runn<strong>in</strong>g<br />

Account Bill, fail<strong>in</strong>g which the bill will not be processed.<br />

41.4. The Successful tenderer is required to give an undertak<strong>in</strong>g to the F<strong>in</strong>ance Department of VSP that the<br />

payment made by RINL/ VSP of any sum due to him by directly remitt<strong>in</strong>g the same <strong>in</strong> his bank, the<br />

address and the number of which is to be furnished, shall be <strong>in</strong> full discharge of the particular bill<br />

raised by him, and that he shall not have any claim <strong>in</strong> respect of the same”.<br />

41.5 In respect of payment made through Electronic Fund Transfer mechanism or Direct Credit to the<br />

supplier’s/contractor’s bank account, the supplier/contractor/receiver should <strong>in</strong>timate discrepancies, if<br />

any, with<strong>in</strong> 10 days from the date of dispatch of <strong>in</strong>timation letter of payment to them to<br />

F<strong>in</strong>ance Department of VSP fail<strong>in</strong>g which it shall be presumed that the funds have reached to their<br />

bank account and that no claims will be enterta<strong>in</strong>ed after the said 10 days.<br />

42. CLAUSES CONCERNING CENVAT AGAINST EXCISE DUTY:<br />

a) The tenderer shall specify the percentage of CENVAT benefit on quoted price for which they shall<br />

furnish the duty pay<strong>in</strong>g do<strong>cum</strong>ents.<br />

b) The successful tenderer shall take necessary steps to comply with the rules and provisions of<br />

central excise and service tax law facilitat<strong>in</strong>g VSP to avail CENVAT credit.<br />

c) The amount of CENVAT benefit declared shall be deducted from the tendered price for the<br />

purpose of tender evaluation i.e. the evaluation shall be on the net of CENVAT benefit.<br />

11 of 18 Signature of the Tenderer


d) The <strong>in</strong>voice raised by the Contractor should clearly mention VSP as the consignee (Consignee:<br />

RINL, VSP, A/c: Name of the contractor). It should be ensured that material has been delivered<br />

along with the duplicate for transporter copy of the <strong>in</strong>voice, based on which CENVAT credit is to be<br />

claimed.<br />

e) The duty pay<strong>in</strong>g do<strong>cum</strong>ents shall be submitted as soon as the material is procured by the agency<br />

for <strong>in</strong>corporation <strong>in</strong> the work. The CENVAT benefit offered by the agency will be deducted from<br />

each bill on the offered percentage basis and will be released to the extent CENVAT benefit could<br />

be availed by VSP. The contractor shall extend all possible help to facilitate VSP to avail CENVAT<br />

benefit. If CENVAT benefit could not be availed by VSP due to reasons attributable to the<br />

contractor, such amount will not be released by VSP.<br />

f) In the event the CENVAT benefit realized by VSP (based on do<strong>cum</strong>ents) is <strong>in</strong> excess of the CENVAT<br />

benefit offered by the agency/contractor, the refund will be restricted to the benefit offered by the<br />

agency. The excess amount realized from Excise Authorities will be to the credit of VSP only.<br />

g) Material once received <strong>in</strong> to the factory would not be allowed to go outside the factory premises<br />

for any reason. Excess/Rejected material will be allowed to be taken back after comply<strong>in</strong>g with<br />

the provisions of CE Act.<br />

43. The successful tenderer shall produce VAT Registration Certificate under APVAT Act, wherever<br />

applicable, before sign<strong>in</strong>g the Work Order/LOA and submit a copy of the same.<br />

44. RINL reserves the right to reject the offers of tenderers whose performance is poor <strong>in</strong> awarded/ongo<strong>in</strong>g<br />

works, if any.<br />

**********<br />

T.No.72370-0<br />

12 of 18 Signature of the Tenderer


Proposal No 329091200200<br />

Work Desc :<br />

Cond No<br />

01<br />

02<br />

03<br />

04<br />

05<br />

06<br />

07<br />

08<br />

09<br />

10<br />

SCOPE OF WORK TENDER NO : 72370<br />

<strong>Clean<strong>in</strong>g</strong> <strong>cum</strong> <strong>spillage</strong> <strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong> and SSP of SInter<br />

Plant<br />

Cond Desc<br />

Scope of work under the Contract shall cover complete clean<strong>in</strong>g of Spillage<br />

material, dust and <strong>arrest<strong>in</strong>g</strong> of m<strong>in</strong>or <strong>spillage</strong> from the equipment,<br />

receiv<strong>in</strong>g and discharge chutes of conveyors, except wet scrubbers and<br />

connected dust sett<strong>in</strong>g chambers, aspirators and pump pits.<br />

<strong>Clean<strong>in</strong>g</strong> of allotted area <strong>in</strong>cludes the follow<strong>in</strong>g:<br />

a. The <strong>in</strong>side dra<strong>in</strong>s of concerned areas.<br />

b. All the floors, stair cases of concerned areas with regular water<br />

wash<strong>in</strong>g.<br />

c. The control rooms of the respective areas.<br />

d. Complete conveyor gallery.<br />

e. Material on deck plates, chutes and return side of conveyor belts.<br />

The tenderer shall <strong>in</strong>spect the areas as mentioned above and assess the<br />

nature of the work and the work<strong>in</strong>g conditions before quot<strong>in</strong>g.<br />

The areas, which are to be cleaned on particular day will be decided by the<br />

concerned Eng<strong>in</strong>eer or his representative. If the Eng<strong>in</strong>eer or his<br />

representative is not satisfied with clean<strong>in</strong>g, the contractor should get<br />

the area cleaned at his own cost with<strong>in</strong> the reasonable time accepted by the<br />

Eng<strong>in</strong>eer or representative, or proportionate amount will be deducted for<br />

the same area not cleaned, at the discretion of the concerned Eng<strong>in</strong>eer.<br />

The contractor or his representative should <strong>in</strong>struct all his workmen<br />

strictly not to touch any runn<strong>in</strong>g equipment, conveyors, pull chords or any<br />

other protective device of equipment unless there is an emergency. In case<br />

of violation of this clause caus<strong>in</strong>g stoppage of operation of plant. The<br />

contractor will be liable for appropriate penal action, which will <strong>in</strong>clude<br />

stoppage of payment for the work done and term<strong>in</strong>ation of the contract.<br />

All tools and tackles and handl<strong>in</strong>g equipment are to the arranged by the<br />

Contractor for clean<strong>in</strong>g and <strong>arrest<strong>in</strong>g</strong> <strong>spillage</strong>.<br />

Man day means 8 hrs work<strong>in</strong>g per day per labor.<br />

T.No.72370-0<br />

Normally 17 unskilled labor, which may vary from 10 to 25 and 4 skilled<br />

labor, which may vary from 2 to 8 and 1 supervisor <strong>in</strong> site are required<br />

per day. The requirement of labor may vary depend<strong>in</strong>g up on the site<br />

conditions prevail<strong>in</strong>g at the po<strong>in</strong>t of time and will be decided by the site<br />

<strong>in</strong>-charge.<br />

The contractor should be able to mobilize the extra manpower as and when<br />

required due to certa<strong>in</strong> unforeseen condition with <strong>in</strong> a notice period of 24<br />

hrs.<br />

The cleaned material should be put on conveyors. It should not be kept on<br />

either side of the conveyors or thrown down on floors. In this regard<br />

<strong>in</strong>struction of the site eng<strong>in</strong>eer is to be followed.<br />

13 of 18 Signature of the Tenderer


Work Desc :<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

SCOPE OF WORK TENDER NO : 72370<br />

<strong>Clean<strong>in</strong>g</strong> <strong>cum</strong> <strong>spillage</strong> <strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong> and SSP of SInter<br />

Plant<br />

T.No.72370-0<br />

The contractor or his representative should report to the Eng<strong>in</strong>eer daily <strong>in</strong><br />

the morn<strong>in</strong>g by 9:00am after deploy<strong>in</strong>g the workmen on work. The work<br />

normally should be carried out <strong>in</strong> G-shift tim<strong>in</strong>gs only. However depend<strong>in</strong>g<br />

upon situation, it has to be cont<strong>in</strong>ued further or a contractor may have to<br />

put laborers <strong>in</strong> A, B & C shifts also as and when required.<br />

While quot<strong>in</strong>g, tenderer must take <strong>in</strong>to account the m<strong>in</strong>imum statutory<br />

payment to be made to the workers.<br />

Contractor has to ensure proper supervision dur<strong>in</strong>g the execution of work.<br />

Safety clauses given <strong>in</strong> Terms & Condtions should be strictly followed by<br />

the contractor.<br />

Day and Night, Sunday and holiday passes are to be kept ready all the time.<br />

As may be necessary dur<strong>in</strong>g the clean<strong>in</strong>g process, as per the <strong>in</strong>structions of<br />

site eng<strong>in</strong>eer, it is required to prepare and replace the skirt rubbers of<br />

conveyors, to remove the damaged carry<strong>in</strong>g and return idlers & fix<strong>in</strong>g new<br />

idlers, to prepare the scrappers and fix<strong>in</strong>g them to the conveyors, to<br />

replace the hang<strong>in</strong>g rubber l<strong>in</strong>ers at conveyor discharge chutes and m<strong>in</strong>or<br />

patch works for the conveyor chutes to arrest the <strong>spillage</strong>s, for which<br />

necessary skilled workers shall be deployed.<br />

14 of 18 Signature of the Tenderer


WORK DESC :<br />

Cond No<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

TERMS AND CONDITIONS TENDER NO : 72370<br />

PROPOSAL NO : 329091200200<br />

<strong>Clean<strong>in</strong>g</strong> <strong>cum</strong> <strong>spillage</strong> <strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong> and SSP of SInter<br />

Plant<br />

Cond Desc<br />

All the required tools and tackles, spanners, and safety appliances<br />

should be arranged by the contractor.<br />

Proper safety precautions should be taken dur<strong>in</strong>g the execution of the<br />

work<br />

The representative must be present dur<strong>in</strong>g the execution of the work.<br />

Proper work permit has to be taken from the concerned eng<strong>in</strong>eer before<br />

start<strong>in</strong>g of work.<br />

Safety of the workman will be the responsibility of the contractor.<br />

Contractor has to arrange proper safety pass for workmen from SED before<br />

deploy<strong>in</strong>g them for work<br />

Sufficient number of height passes are to be arranged whenever required.<br />

The agency may have to work <strong>in</strong> some other area of s<strong>in</strong>ter plant, which is<br />

not covered <strong>in</strong> his scope of the work. Payments for such job will be<br />

made as per the rate <strong>in</strong> bill of quantity for the work done.<br />

As most of the equipment <strong>in</strong> s<strong>in</strong>ter plant is mov<strong>in</strong>g mach<strong>in</strong>ery it will not<br />

be safe for ladies work <strong>in</strong> these areas. No ladies are allowed <strong>in</strong> those<br />

areas.<br />

All the workers of the contractor must wear safety appliances (which are<br />

to be provided by the contractor) on the job such as safety helmets,<br />

safety shoes and safety belt etc.<br />

Contractor should obta<strong>in</strong> proper shut down <strong>in</strong> prescribed format before<br />

start<strong>in</strong>g the job on conveyors and equipment.<br />

Workers should not touch any runn<strong>in</strong>g equipment and also should not cross<br />

underneath the runn<strong>in</strong>g/stopped conveyors.<br />

In case of any accident the contractor should immediately <strong>in</strong>form it to<br />

the concerned area <strong>in</strong>-charge.<br />

Female workers/old men should not be engaged for <strong>jobs</strong> near mov<strong>in</strong>g<br />

conveyors.<br />

While work<strong>in</strong>g at heights safety belt to be use.<br />

T.No.72370-0<br />

Sales tax clause:<br />

The scope of supply of material and consumables <strong>in</strong> the present proposal<br />

are as follows:<br />

a. Material to be supplied by VSP : Nil<br />

b. Consumables to be supplied by VSP : Nil<br />

c. Material to be supplied by Contractor : Nil<br />

d. Consumables to be supplied by Contractor : Nil<br />

The deduction of sales tax shall be done as per the rules prevail<strong>in</strong>g<br />

from time to time.<br />

15 of 18 Signature of the Tenderer


WORK DESC :<br />

Cond No<br />

15<br />

16<br />

TERMS AND CONDITIONS TENDER NO : 72370<br />

PROPOSAL NO : 329091200200<br />

T.No.72370-0<br />

<strong>Clean<strong>in</strong>g</strong> <strong>cum</strong> <strong>spillage</strong> <strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong> and SSP of SInter<br />

Plant<br />

Cond Desc<br />

The contractor shall ensure usage of ISI marked regulators, hoses,<br />

nozzles, cutt<strong>in</strong>g torches, weld<strong>in</strong>g holders and cables for the cutt<strong>in</strong>g and<br />

weld<strong>in</strong>g works if required. This must be adhered to strictly.<br />

The contractor should have his own tools & tackles such as shovels,<br />

pok<strong>in</strong>g rods, crow bars, hammers, gammelas, safety belt and rope ladder.<br />

16 of 18 Signature of the Tenderer


REPORT ID:<br />

RASHTRIYA ISPAT NIGAM LIMITED<br />

VISAKHAPATNAM STEEL PLANT<br />

BOQ REPORT<br />

TENDER NO : 72370<br />

Page 1 of 1 T.No.72370-0<br />

-----------------------------------------------------------------------------------------<br />

1<br />

2<br />

3<br />

DEPT NAME : SP ENGG DIVN : OPERATIONS<br />

PROPOSAL NO : 329091200200<br />

Work Desc :<br />

Item<br />

No.<br />

Item Description<br />

<strong>Clean<strong>in</strong>g</strong> and <strong>spillage</strong><br />

<strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong><br />

and SSP - Unskilled<br />

labour<br />

<strong>Clean<strong>in</strong>g</strong> and <strong>spillage</strong><br />

<strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong><br />

and SSP - Skilled labour<br />

Deployment of supervisor<br />

for clean<strong>in</strong>g <strong>jobs</strong> <strong>in</strong><br />

<strong>SMPP</strong> and SSP..<br />

RESP CODE :<br />

320101<br />

<strong>Clean<strong>in</strong>g</strong> <strong>cum</strong> <strong>spillage</strong> <strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong> and SSP of SInter<br />

Plant<br />

The BOQs are prepared on the basis of follow<strong>in</strong>g rates.<br />

M<strong>in</strong>.Wage Rate VSP Rate<br />

UnSkilled<br />

212.00 359.40<br />

SemiSkilled<br />

240.00 402.75<br />

Skilled<br />

283.00 464.25<br />

Unit<br />

Desc.<br />

MAN DAY<br />

MAN DAY<br />

MAN DAY<br />

Quantity<br />

5185.000<br />

1220.000<br />

305.000<br />

Rate<br />

(Rs.)<br />

359.40<br />

464.25<br />

464.25<br />

Amount<br />

(Rs.)<br />

1863489.00<br />

Rupees Three hundred fifty-n<strong>in</strong>e and paise<br />

forty Only<br />

566385.00<br />

Rupees Four hundred sixty-four and paise<br />

twenty-five Only<br />

141596.25<br />

Rupees Four hundred sixty-four and paise<br />

twenty-five Only<br />

2571470.25<br />

Rupees Twenty-five lakh seventy-one thousand<br />

four hundred seventy and paise twenty-five<br />

Only<br />

Signature of I/C Signature of HOD<br />

17 of 18 Signature of the Tenderer


’Form-G’<br />

RASHTRIYA ISPAT NIGAM LIMITED<br />

VISAKHAPATNAM STEEL PLANT<br />

WORKS CONTRACTS DEPARTMENT<br />

BILL OF QUANTITIES (BOQ)<br />

NAME OF THE WORK:<br />

<strong>Clean<strong>in</strong>g</strong> <strong>cum</strong> <strong>spillage</strong> <strong>arrest<strong>in</strong>g</strong> <strong>jobs</strong> <strong>in</strong> <strong>SMPP</strong> & SSP of SP<br />

1. The quantities <strong>in</strong>dicated are approximate and may vary to a wide range. Payment shall be<br />

made as per the actual work carried out at correspond<strong>in</strong>g accepted rate.<br />

2. Wherever old items are replaced for fix<strong>in</strong>g new items, all related connections are to be made<br />

good for proper function<strong>in</strong>g of new items. Dismantled / old items are to be handed over to the<br />

stores.<br />

3. The Estimate of this Tender is based on the RINL/VSP approved Wages rates,<br />

consequent to the m<strong>in</strong>imum wage of Contract worker as notified by the Regional<br />

Labour Commissioner (Central), Hyderabad, which is given below. In case revision <strong>in</strong><br />

the m<strong>in</strong>imum wages of contract labour takes place, Escalation due to this shall be<br />

payable to the contract as per Escalation Formula <strong>in</strong>dicated <strong>in</strong> the Special Conditions<br />

of Contract :<br />

Unskilled Worker<br />

(USW)<br />

Semi-Skilled<br />

Worker (SSW)<br />

Skilled Worker<br />

(SKW)<br />

RINL/VSP approved Rate, ` 359.40 402.75 464.25<br />

M<strong>in</strong>imum Wages as notified by<br />

the RLC (Central), Hyderabad, ` 212.00 240.00 283.00<br />

No. DESCRIPTION UNIT QTY. RATE (`) AMOUNT (`)<br />

AS PER THE BILL OF<br />

QUANTITIES ENCLOSED<br />

Estimated Value<br />

(Rupees Twenty five lakhs<br />

seventy one thousand four<br />

hundred seventy and paise<br />

twenty five Only)<br />

Total Amount Quoted In Figures: ` ___________________________<br />

T.No.72370-0<br />

Tender No: 72370-0<br />

25,71,470=25<br />

Total Amount Quoted In Words: `________________________________________________<br />

____________________________________________________________ __________________________ only.<br />

Note: 1. Tenderer shall write their quoted offer both <strong>in</strong> WORDS and FIGURES. The quoted offer <strong>in</strong><br />

WORDS shall be <strong>in</strong> CAPITAL / BLOCK letters.<br />

Date:<br />

2. If there is discrepancy between the amount mentioned <strong>in</strong> FIGURES and the amount<br />

mentioned <strong>in</strong> WORDS, the amount as mentioned <strong>in</strong> WORDS only shall be taken as<br />

the quotation of the Tenderer.<br />

18 of 18 Signature of the Tenderer