Investing in a constructive future - Zuidberg Transmissions
Investing in a constructive future - Zuidberg Transmissions
Investing in a constructive future - Zuidberg Transmissions
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
TrANSmISSIoNNEwS<br />
A publicATiON Of ZuiDbERG TRANSMiSSiONS NR. 3, DEcEMbER 2012<br />
<strong>Transmissions</strong> for mulch<strong>in</strong>g mach<strong>in</strong>e<br />
New test bench up to 400 HP<br />
LEAN-gearbox manufactur<strong>in</strong>g<br />
<strong>Invest<strong>in</strong>g</strong> <strong>in</strong> a <strong>constructive</strong> <strong>future</strong><br />
Dear <strong>Zuidberg</strong> customer,<br />
The last quarter was a very busy one at <strong>Zuidberg</strong>. The first pile has now been erected at the new<br />
<strong>Zuidberg</strong> StaalService site and <strong>Zuidberg</strong> <strong>Transmissions</strong> successfully attended the Industrial<br />
Automation & Drives show.<br />
On Thursday 11 October, our eldest daughter proudly drove <strong>in</strong> the first pile for the new <strong>Zuidberg</strong><br />
StaalService development, to loud applause from family, Alderman Schutte from the municipality of<br />
Noordoostpolder, <strong>in</strong>vited guests and more than 200 colleagues from the various <strong>Zuidberg</strong> companies.<br />
2<br />
3<br />
5<br />
In this edition:<br />
[1] <strong>in</strong>vest<strong>in</strong>g <strong>in</strong> a <strong>constructive</strong> <strong>future</strong>...<br />
[2] A switchable transmission for a<br />
mulch<strong>in</strong>g mach<strong>in</strong>e...<br />
[3] New test bench is capable of test<strong>in</strong>g<br />
outputs up to 400 Hp...<br />
[4] Daughter drives <strong>in</strong><br />
first pile...<br />
[5] Gearbox manufacture <strong>in</strong><br />
accordance with lEAN...<br />
1
cont<strong>in</strong>uation <strong>Invest<strong>in</strong>g</strong> <strong>in</strong> a constuctive <strong>future</strong><br />
With the new <strong>Zuidberg</strong> StaalService development, we are <strong>in</strong>vest<strong>in</strong>g <strong>in</strong> a <strong>constructive</strong> <strong>future</strong>. As well as a completely new<br />
site and mach<strong>in</strong>ery, the development is also an <strong>in</strong>vestment <strong>in</strong> the regional community, because it will create more jobs <strong>in</strong> the<br />
<strong>future</strong>.<br />
As with the other <strong>Zuidberg</strong> companies, the new development is very much about efficiency, susta<strong>in</strong>ability and safety. To give<br />
one example - the fact that, from the end of next year, all the metal structures will be developed, produced and assembled<br />
<strong>in</strong>-house will greatly reduce the need for transport. As well as energy-efficient production, reduc<strong>in</strong>g waste materials and heat<br />
recovery dur<strong>in</strong>g production, the office premises will be fitted with an underground thermal storage system - all with the aim<br />
of actively <strong>in</strong>corporat<strong>in</strong>g efficiency, susta<strong>in</strong>ability and safety <strong>in</strong> the design and production process.<br />
Among the items featured <strong>in</strong> this issue of fRONTliNE NEWS are the launch of EcO TWiN pTO on the Dutch market, the<br />
production of gears accord<strong>in</strong>g to the lEAN pr<strong>in</strong>ciple, and our new range of weights.<br />
f<strong>in</strong>ally on behalf of the management and all employees of the <strong>Zuidberg</strong> companies i wish you Merry christmas and a<br />
Happy New Year.<br />
A switchable transmission for a mulch<strong>in</strong>g mach<strong>in</strong>e<br />
ZuiDbERG TRANSMiSSiONS TrANSmISSIoNNEwS<br />
– Jeroen <strong>Zuidberg</strong>, Manag<strong>in</strong>g Director<br />
A switchable transmission for a mulch<strong>in</strong>g<br />
mach<strong>in</strong>e<br />
The Mitsubishi lD 1000c crawler, owned by Arto Vesteri from pudasjärvi <strong>in</strong> f<strong>in</strong>land, drives a mulch<strong>in</strong>g mach<strong>in</strong>e us<strong>in</strong>g a<br />
switchable transmission developed and produced by <strong>Zuidberg</strong> <strong>Transmissions</strong>.<br />
A number of adjustments were made to the transmission: the clutch pressure was <strong>in</strong>creased, and it was fitted with an<br />
adapted pump and a 1 ¾” 20 spl<strong>in</strong>e output shaft. This comb<strong>in</strong>ation is ideal for the mechanical shredd<strong>in</strong>g of organic<br />
materials.<br />
The customer is very satisfied with his transmission, that fully meets his expectations. Especially when full eng<strong>in</strong>e power is<br />
required. “We are very satisfied with the way <strong>in</strong> which <strong>Zuidberg</strong> <strong>Transmissions</strong> advises and support us <strong>in</strong> the area of drive<br />
solutions.”<br />
2
New test bench is<br />
capable of test<strong>in</strong>g<br />
outputs up to 400 HP<br />
we began us<strong>in</strong>g a second test bench at the start of<br />
September. This newly-designed test bench enables<br />
<strong>Zuidberg</strong> to <strong>in</strong>crease its test capacity and can be used to<br />
test higher power outputs.<br />
The new test bench is capable of test<strong>in</strong>g outputs of up to 400<br />
hp maximum. Accord<strong>in</strong>g to Test Eng<strong>in</strong>eer Richard lemmen,<br />
this new test bench is <strong>in</strong>f<strong>in</strong>itely easier to use.<br />
ZuiDbERG TRANSMiSSiONS TrANSmISSIoNNEwS<br />
“With the new test bench, we can assemble and dismantle<br />
the test products faster and more easily, which means we<br />
can work more efficiently and effectively. The state-of-the-art<br />
controls m<strong>in</strong>imize the likelihood of errors. All the test data is<br />
available <strong>in</strong>stantly, <strong>in</strong> digital form, for report<strong>in</strong>g to the R&D<br />
department.”<br />
our own test cab<strong>in</strong><br />
The entire system has been <strong>in</strong>stalled <strong>in</strong> <strong>Zuidberg</strong>’s speciallydesigned<br />
test cab<strong>in</strong>. like the new test bench, this test cab<strong>in</strong><br />
was also developed <strong>in</strong>-house. The test cab<strong>in</strong> is not susceptible<br />
to external <strong>in</strong>fluences, because the space is fully <strong>in</strong>sulated, has<br />
climate control and can be electronically monitored 24/7.<br />
The new test bench is capable of test<strong>in</strong>g outputs of up to 400 hp<br />
3
Daughter<br />
drives <strong>in</strong><br />
first pile<br />
on Thursday 11 october, daughter<br />
Julie, assisted by her father<br />
Jeroen <strong>Zuidberg</strong>, proudly drove <strong>in</strong><br />
the first pile of the new <strong>Zuidberg</strong><br />
StaalService development. The<br />
three-year-old “third generation” had<br />
little difficulty gett<strong>in</strong>g the 11-metre<br />
tall pile <strong>in</strong>to the ground, to loud<br />
applause from family, Alderman<br />
Schutte from the municipality of<br />
Noordoostpolder, <strong>in</strong>vited guests<br />
and more than 200 colleagues from<br />
the various <strong>Zuidberg</strong> companies. A<br />
total of 2200 piles will be set <strong>in</strong> the<br />
ground for the new site, which will<br />
covers a surface area of 10,000 m 2 .<br />
ZuiDbERG TRANSMiSSiONS TrANSmISSIoNNEwS<br />
Dur<strong>in</strong>g the presentation on 11<br />
october, also the new logo of Zuiderg<br />
StaalService was presented.<br />
from July 2013 laser, plasma and autogenous cutt<strong>in</strong>g<br />
activities will move <strong>in</strong>to the new 10,000 m² premises <strong>in</strong> Ens.<br />
<strong>Zuidberg</strong> StaalService specializes <strong>in</strong> produc<strong>in</strong>g, assembl<strong>in</strong>g<br />
and co-eng<strong>in</strong>eer<strong>in</strong>g metal structures. <strong>in</strong> addition to steel<br />
cutt<strong>in</strong>g, our customers can also have components welded,<br />
assembled, coated, turned, milled etc. us<strong>in</strong>g high quality<br />
production means. This makes <strong>Zuidberg</strong> StaalService a<br />
fully-fledged, one-stop-shopp<strong>in</strong>g partner with a high level of<br />
added value for its customers.<br />
4
Gearbox manufacture <strong>in</strong><br />
accordance with LEAN<br />
The gearboxes are produced on an assembly l<strong>in</strong>e, designed <strong>in</strong> accordance<br />
with the LEAN pr<strong>in</strong>ciple. This pr<strong>in</strong>ciple states that a m<strong>in</strong>imum supply of<br />
items and a m<strong>in</strong>imum number of end products are worked with. Assembly<br />
only takes place per piece <strong>in</strong> an assembly l<strong>in</strong>e with m<strong>in</strong>imum equipment and<br />
m<strong>in</strong>imum logistical movements. All of this takes place with the aim of be<strong>in</strong>g<br />
able to carry out the manufactur<strong>in</strong>g process <strong>in</strong> a more flexible manner with<br />
fewer costs <strong>in</strong> terms of supplies and a faster delivery time.<br />
The last step is test<strong>in</strong>g the gearbox. Two test <strong>in</strong>stallations designed specially for<br />
and by <strong>Zuidberg</strong> are <strong>in</strong>cluded <strong>in</strong> both l<strong>in</strong>es here. After enter<strong>in</strong>g the hous<strong>in</strong>g type,<br />
these test <strong>in</strong>stallations fill the gearbox with the correct quantity of oil, test the<br />
pressure of the oil pump at different rpms and pressure values and filter the oil<br />
dur<strong>in</strong>g the test cycle. The aforementioned is also a physical test on the rotat<strong>in</strong>g<br />
parts. Once the test is complete (this takes approximately ten m<strong>in</strong>utes), an<br />
<strong>in</strong>dication is given as to whether the gearbox has passed or failed the test. The<br />
gearbox, after be<strong>in</strong>g assembled on the lEAN l<strong>in</strong>e, is adapted for a specific tractor<br />
by fitt<strong>in</strong>g items such as a flange, mount<strong>in</strong>g plate and/or <strong>in</strong>termediate shaft. All<br />
details are logged for traceability purposes.<br />
Click on the button and see the<br />
manufactur<strong>in</strong>g of the transmission on our<br />
YouTube channel.<br />
for more <strong>in</strong>formation about<br />
the subjects <strong>in</strong> this publication<br />
please contact:<br />
Mart<strong>in</strong> Kalter bEng<br />
- Sales Eng<strong>in</strong>eer -<br />
T 0031 527 247 005<br />
M 0031 6 22 561895<br />
E kalter@zuidbergtransmissions.nl<br />
ZuiDbERG TRANSMiSSiONS TrANSmISSIoNNEwS<br />
Colophon<br />
All rights reserved for all parts of this<br />
publication (enclosures <strong>in</strong>cluded). Reproduc<strong>in</strong>g<br />
or publish<strong>in</strong>g parts of the newsletter only with<br />
permission of the redaction.<br />
TRANSMiSSiON NEWS is a quarterly<br />
publication of <strong>Zuidberg</strong> Tra, and is sent free<br />
to all customers. Would you also receive this<br />
newsletter <strong>in</strong> the <strong>future</strong>? Send an email to<br />
market<strong>in</strong>g@zuidberg.nl.<br />
redaction:<br />
Jelmer de Vries<br />
Matthijs pol<br />
Wichert van Norel<br />
Composition and production:<br />
<strong>Zuidberg</strong> <strong>Transmissions</strong><br />
<strong>Zuidberg</strong> <strong>Transmissions</strong><br />
buitenveld 5<br />
8307 DE ENS<br />
The Netherlands<br />
T 0031 527 24 70 05<br />
f 0031 527 65 64 49<br />
i www.zuidbergtransmissions.com<br />
E <strong>in</strong>fo@zuidbergtransmissions.nl
Management and employees of the <strong>Zuidberg</strong> companies wishes you<br />
Merry Christmas and a<br />
Happy New Year!