2008 but could not be passed during the tenure<br />
<strong>of</strong> the 14th Lok Sabha to its dissolution. �e<br />
LPAI Bill was re-introduced on August 7, 2009<br />
and was referred to Department Related<br />
Parliamentary Standing Committee for its<br />
consideration.<br />
3.29 Five meetings <strong>of</strong> the Parliamentary<br />
Standing Committee were held on 3rd & 13th<br />
November 3 & 13 and December 1, 16 & 30,<br />
2009. Clause-by-clause examination has been<br />
concluded. �e DRPSC report is awaited.<br />
COASTAL SECURITY<br />
3.30 A supplemental scheme called ‘Coastal<br />
Security Scheme’ is under implementation in the<br />
9 coastal States and 4 coastal Union Territories<br />
(UTs) since 2005 for strengthening<br />
infrastructure for coastal patrolling and<br />
surveillance. Under the scheme, assistance has<br />
been/is being given to all the coastal States <strong>of</strong><br />
Gujarat, Maharashtra, Goa, Karnataka, Kerala,<br />
Tamil Nadu, Andhra Pradesh, Orissa and West<br />
Bengal and the Union Territories <strong>of</strong> Daman &<br />
Diu, Lakshadweep, Puducherry and Andaman<br />
& Nicobar Islands to set up 73 coastal police<br />
stations, 97 check posts, 58 outposts, and 30<br />
operational barracks and to equip them with 204<br />
boats, 153 jeeps and 312 motorcycles for<br />
mobility on the coast and in close coastal waters.<br />
A lump-sum assistance <strong>of</strong> Rs.10 lakh per police<br />
station is also given for equipment, computers<br />
and furniture.<br />
3.31 �e approved outlay <strong>of</strong> the scheme is<br />
Rs.400 crore for non-recurring expenditure and<br />
Rs.151 crore for recurring expenditure for 5<br />
years on fuel, repair and maintenance <strong>of</strong> boats<br />
and training <strong>of</strong> manpower, which is provided, by<br />
the States and UTs.<br />
Progress <strong>of</strong> implementation<br />
3.32 64 out <strong>of</strong> 73 coastal police stations<br />
Chapter-III<br />
proposed have been made operational in<br />
Gujarat (10), Andhra Pradesh (6), West Bengal<br />
(4), Goa (3), Tamil Nadu (12), Kerala (1),<br />
Maharashtra (12), Karnataka (5), Orissa (5),<br />
Puducherry (1), Lakshadweep (4) and Daman<br />
& Diu (1).<br />
3.33 �e implementation <strong>of</strong> this scheme is<br />
being done by the State Governments/UT<br />
Administrations concerned. A statement <strong>of</strong><br />
physical and financial progress under the<br />
scheme, as on November 30, 2009, is at<br />
Annexure-VI.<br />
Procurement <strong>of</strong> boats<br />
3.34 �e procurement <strong>of</strong> the interceptor<br />
boats is being done centrally through Public<br />
Sector Undertakings (PSUs) viz. M/s Goa<br />
Shipyard Limited (GSL), Goa and M/s Garden<br />
Reach Shipbuilders and Engineers Limited<br />
(GRSE), Kolkata. MHA has signed a contract in<br />
March 2008 with these vendors for supply <strong>of</strong> 84<br />
(5 Ton) boats and 110 (12 Ton) boats. So far,<br />
funds to the tune <strong>of</strong> Rs.91.75 crore for stage<br />
payments for the boats and Rs.13.57 crore for<br />
reimbursement <strong>of</strong> Custom Duty for the<br />
imported items <strong>of</strong> these boats have been paid to<br />
the two shipyards.<br />
3.35 As per the contract mentioned above,<br />
the original delivery <strong>of</strong> the boats was scheduled<br />
to commence from April 2009 and complete by<br />
April, 2011. However, a need was felt, in the<br />
wake <strong>of</strong> Mumbai incidents, for expeditious<br />
supply <strong>of</strong> boats to the States/UTs. Accordingly,<br />
the delivery schedule <strong>of</strong> the boats has been<br />
compressed by six month and delivery <strong>of</strong> all the<br />
boats will now be completed by October, 2010.<br />
3.36 �e State/UT-wise distribution <strong>of</strong><br />
interceptor boats, approved under the scheme<br />
and being manufactured by GSL, Goa and<br />
GRSE, Kolkata is as under :<br />