28.01.2013 Views

Overview & Sample Analysis - VMware ROI TCO Calculator

Overview & Sample Analysis - VMware ROI TCO Calculator

Overview & Sample Analysis - VMware ROI TCO Calculator

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>VMware</strong> <strong>ROI</strong> <strong>TCO</strong> <strong>Calculator</strong>:<br />

<strong>Overview</strong> & <strong>Sample</strong> <strong>Analysis</strong><br />

© 2011 <strong>VMware</strong> Inc. All rights reserved


Table of Contents<br />

� <strong>Calculator</strong> <strong>Overview</strong><br />

� <strong>Sample</strong> analysis:<br />

• Expected <strong>ROI</strong>/<strong>TCO</strong> analysis (forward looking)<br />

• Realized <strong>ROI</strong>/<strong>TCO</strong> analysis (backward looking)<br />

• Hybrid <strong>ROI</strong>/<strong>TCO</strong> analysis (mix of backward & forward)<br />

� Addi Additional i l Resources<br />

R<br />

2


<strong>VMware</strong> products covered<br />

Journey &<br />

Products<br />

3<br />

2<br />

1<br />

Cloud Services vCloud<br />

Delivery<br />

Desktop<br />

Vi t li ti<br />

SSavings i CapEx OpEx Business Agility<br />

Server HW Storage HW Networking<br />

HW<br />

Infrastructure<br />

Admin<br />

Productivity<br />

Power &<br />

Cooling<br />

Rack Space<br />

& Office<br />

Space<br />

Planned<br />

Downtime<br />

Unplanned<br />

Downtime<br />

Business<br />

Downtime<br />

Director $ $ $ $ $ $ $<br />

Chargeback<br />

View<br />

$ $ $ $ $<br />

Virtualization $ $ $ $<br />

Business<br />

Continuity &<br />

Disaster<br />

Recovery<br />

Operations<br />

Management,<br />

Security &<br />

Compliance<br />

Server<br />

Virtualization<br />

Site<br />

Recovery<br />

Manager $ $ $<br />

CapacityIQ<br />

AppSpeed<br />

vShield App<br />

$ $ $ $ $<br />

$ $<br />

& Edge $ $ $<br />

vSphere &<br />

vCenter<br />

Server<br />

$ $ $ $ $ $ $ $ $<br />

� “$” represents possible savings<br />

• Supported by succinct modules within calculator to help users evaluate<br />

3


Methodology<br />

4<br />

Total Cost<br />

Before<br />

minus<br />

Total Cost<br />

After<br />

equals Savings<br />

� There are two main outputs for this calculator:<br />

• Return on Investment<br />

• Equals Savings / Investment<br />

• …where investment represents the sum of incremental investment<br />

in transition from physical to virtual (new servers, shared storage,<br />

<strong>VMware</strong> licenses, services and training, etc.)<br />

• Total Cost of Ownership<br />

• Inclusive of IT Administration and downtime costs


Design & Scope<br />

� DDesign i<br />

• We are striking a balance between simplicity and credibility<br />

Simplicity<br />

Too complex, and the<br />

analysis becomes difficult<br />

to explain and repeat<br />

Too Simple and<br />

customers will not find Credibility<br />

outputs credible<br />

• Cash basis: no depreciation, amortization, time value discounting<br />

• Standardized time horizon: 5 year analysis<br />

� Scope<br />

5<br />

• <strong>ROI</strong> <strong>TCO</strong> <strong>Calculator</strong> is not meant to generate a definitive bill of goods<br />

• Our goal is to provide a credible understanding of cost and benefits<br />

• Users may need to engage additional resources (sales / finance) for transactions that<br />

require more custom models


Return on Investment (<strong>ROI</strong>)<br />

� % return t on iinvestment t t required i d to t transition t iti to t virtualized i t li d<br />

infrastructure<br />

6<br />

Total Savings<br />

• CapEx<br />

• OpEx<br />

• Downtime<br />

…reference slide 3 for more detail<br />

Total Investment<br />

• New Servers, Storage,<br />

Network Switches<br />

• <strong>VMware</strong> License & Support<br />

• Services & Training<br />

1


Total Cost of Ownership (<strong>TCO</strong>)<br />

� CCosts t associated i t d with ith operation ti of f datacenter<br />

d t t<br />

7<br />

CapEx p<br />

• Servers<br />

• Storage<br />

• Network Switches<br />

OpEx<br />

• Power & Cooling<br />

• IT Administration Labor<br />

• Rack Space<br />

Business us ess Agility g ty<br />

• Planned Downtime<br />

• Unplanned Downtime<br />

• Business Downtime


Workflow: Server Virtualization<br />

Start / Login<br />

MMy A<strong>Analysis</strong> l i<br />

(create or open prior<br />

analysis)<br />

8<br />

Server<br />

Virtualization<br />

1) Server<br />

Configuration<br />

2) Server<br />

Consolidation<br />

3) Product<br />

Selection<br />

4) Beyond Server<br />

Consolidation<br />

5) <strong>ROI</strong><br />

Define configurations of<br />

physical servers, count of<br />

workloads, and consolidation<br />

ratio<br />

Modules for 5 basic datacenter<br />

elements: Server HW, Power &<br />

Cooling, Storage, Networking,<br />

Rack Space<br />

Select edition of vSphere /<br />

vCenter Server, and define<br />

level of SnS, discounts, input<br />

historical or ELA data<br />

Based on edition of vSphere p<br />

selected, calculator provides<br />

additional modules to review<br />

benefits of advanced features<br />

Summary of vSphere & vCenter<br />

Server Investment, Savings,<br />

<strong>ROI</strong> and estimated Payback<br />

Period over 3 years and 5 years<br />

�<br />

�<br />

�<br />

�<br />

�<br />

Capacity IQ<br />

AppSpeed<br />

vShield App &<br />

Edge<br />

Site Recovery<br />

Manager<br />

vCloud Director<br />

& Chargeback<br />

Choose to include additional<br />

management products. Product<br />

calculations leverage prior inputs<br />

and provides incremental <strong>ROI</strong>/<strong>TCO</strong><br />

End / <strong>Analysis</strong><br />

Summary<br />

(charts, tables, export)


Workflow: Desktop Virtualization<br />

Start / Login<br />

MMy A<strong>Analysis</strong> l i<br />

(create or open prior<br />

analysis)<br />

9<br />

Desktop<br />

Virtualization<br />

1) Desktop<br />

Configuration<br />

2) Desktop<br />

Virtualization<br />

3) Product<br />

Selection<br />

4) Premier Edition<br />

Advanced<br />

Features<br />

5) <strong>ROI</strong><br />

Define configurations of<br />

physical servers, count of<br />

workloads, and consolidation<br />

ratio<br />

Modules for 5 basic datacenter<br />

elements: Server HW, Power &<br />

Cooling, Storage, Networking,<br />

Rack Space<br />

Select edition of vSphere /<br />

vCenter Server, and define<br />

level of SnS, discounts, input<br />

historical or ELA data<br />

Based on edition of vSphere p<br />

selected, calculator provides<br />

additional modules to review<br />

benefits of advanced features<br />

Summary of vSphere & vCenter<br />

Server Investment, Savings,<br />

<strong>ROI</strong> and estimated Payback<br />

Period over 3 years and 5 years<br />

*Please Note:<br />

• Desktop Virtualization must be<br />

selected during New <strong>Analysis</strong><br />

Creation<br />

• UUsers will ill not t be b able bl tto add dd<br />

Desktop Virtualization to an<br />

existing Server Virtualization only<br />

analysis later<br />

End / <strong>Analysis</strong><br />

Summary<br />

(charts, tables, export)


Module Elements<br />

Example: Server Virtualization > Power & Cooling 1 Summary table, with key metrics,<br />

updates as users make changes and<br />

completes each module<br />

10<br />

3<br />

4<br />

5<br />

6<br />

8<br />

7<br />

1<br />

2<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

Key assumptions for each module are<br />

distilled and grouped together in<br />

hidden assumptions tab—click to<br />

unhide<br />

Scenario A represents extension of<br />

environment without benefit of<br />

vSphere<br />

Scenario B represents environment as<br />

users transition workloads to<br />

virtualized infrastructure<br />

(A – B) is the variance in Costs<br />

calculated in two scenarios, and<br />

represents savings for module<br />

Each module has a text box at the<br />

bottom to provide some context to<br />

module module analysis and or assumptions<br />

Links along the bottom direct users to<br />

additional resources<br />

Go to <strong>Analysis</strong> Summary for<br />

supporting charts and tables, including<br />

Green Savings, and Cost per App<br />

comparison to competing platforms.<br />

Users will also find document export<br />

functions here


Table of Contents<br />

� <strong>Calculator</strong> <strong>Overview</strong><br />

� <strong>Sample</strong> analysis:<br />

• Expected <strong>ROI</strong>/<strong>TCO</strong> analysis (forward looking)<br />

• Realized <strong>ROI</strong>/<strong>TCO</strong> analysis (backward looking)<br />

• Hybrid <strong>ROI</strong>/<strong>TCO</strong> analysis (mix of backward & forward)<br />

� Addi Additional i l Resources<br />

R<br />

11


Server Virtualization<br />

1) Server Configuration<br />

12<br />

1<br />

2<br />

3<br />

4<br />

1<br />

2<br />

3<br />

4<br />

Define number of workloads and<br />

configuration of host servers assuming<br />

no virtualization (Year 0)<br />

Define number of workloads and<br />

configuration of host servers assuming<br />

100% virtualized<br />

Max Consolidation Ratio is a key part<br />

of this analysis…<br />

…Open assumptions tab and adjust<br />

VM’s per Core variable to refine.<br />

There is also an option here to change<br />

analysis to one based on leased<br />

servers (avg price per server then<br />

represents the annual lease cost)


Server Virtualization<br />

2) Server Consolidation > Server Hardware (part 1)<br />

13<br />

1<br />

3<br />

1<br />

Number of workloads defined in<br />

previous module is the starting number<br />

in this module. Refine number of<br />

workloads thru Year 5 in Assumptions<br />

tab:<br />

• Change annual growth rate (linear)<br />

• For non-linear growth, locate switch<br />

for “manually adjust count of<br />

workloads”, change to “yes”, close<br />

tab tab, and input values into module<br />

2 By default, analysis assumes 100%<br />

refresh based on average useful life<br />

and average age assumptions. Define<br />

a staggered refresh if necessary in<br />

2 Assumptions tab:<br />

3<br />

• Locate switch for “manually adjust<br />

count of servers retired”, change to<br />

“yes”, close tab, and input values<br />

into module<br />

By default, analysis assumes 100% of<br />

workloads are migrated to virtualized<br />

infrastructure in Year 1. Adjust %<br />

virtualized to define a different<br />

schedule for migration


Server Virtualization<br />

2) Server Consolidation > Server Hardware (part 2)<br />

14<br />

2<br />

1<br />

3<br />

1<br />

2<br />

3<br />

Manually adjust count of workloads<br />

• By default, calculator assumes a<br />

linear workload growth rate—first<br />

assumption at the top of<br />

assumptions tab<br />

• For non-linear growth, locate switch<br />

for “manually adjust count of<br />

workloads”, change to “yes”, close<br />

tab, and input values into module<br />

Manually adjust count of host servers?<br />

• By default, calculator assumes a<br />

constant consolidation ratio each<br />

year, post-virtualization<br />

• To define a changing consolidation<br />

ratio each year, change to “yes”,<br />

close tab, and input values into<br />

module<br />

Manually adjust host servers retired?<br />

Caution: enabling all three functions adds<br />

great deal of flexibility to customize analysis,<br />

• By default and for simplicity,<br />

calculator uses useful life and<br />

average age assumptions to<br />

determine 100% refresh of servers<br />

but calculator may not be able to guarantee<br />

• TTo define d fi a staggered t d refresh f h (eg. (<br />

logic in module is correct under all scenarios.<br />

1/3 of starting count of servers,<br />

Users will be required to review to ensure<br />

spread out over three years),<br />

changes lead to desired results.<br />

change to “yes”, close tab, and input<br />

values into module


Server Virtualization<br />

2) Server Consolidation > Server Storage (part 1)<br />

15<br />

1<br />

1<br />

1<br />

2<br />

1<br />

2<br />

In addition to the GB’s of data store,<br />

this section also incorporates<br />

additional hardware required for<br />

different protocols of storage:<br />

• Fibre Fibre-Channel Channel SAN requires server<br />

HBA’s and SAN Switches<br />

• iSCSI SAN requires server TOE<br />

cards<br />

• NAS will not require additional HW<br />

Financial impact of GB’s of data store<br />

are calculated toward the bottom of<br />

each scenario


Server Virtualization<br />

2) Server Consolidation > Server Storage (part 2)<br />

16<br />

2<br />

1<br />

3<br />

2<br />

1<br />

1<br />

2<br />

3<br />

Users can define the transition to and<br />

increased shared storage<br />

environment. Many of vSphere’s<br />

advanced features such as vMotion<br />

and Distributed Resources Scheduler<br />

are enabled by and require shared<br />

storage. Depending on whether the<br />

environment in this analysis starts with<br />

no shared storage or already has<br />

shared storage, the transition to a<br />

virtualized infrastructure with 100%<br />

shared storage, may require significant<br />

investment in additional hardware (FC<br />

SAN and iSCSI SAN). Two areas for<br />

users to define if there will be shared<br />

storage, and the degree of the<br />

transition<br />

Next, users can select applicable<br />

shared storage protocols, and define<br />

the mix (input box(es) for %’s) to the<br />

right<br />

Important for users to specify the<br />

average size of workloads in the<br />

lower-left corner of assumptions tab.<br />

Here too, users can choose to include<br />

storage savings from Thin Provisioning<br />

ffeature t within ithi vSphere S h (zero ( out t if not t<br />

applicable, or leveraging at the storage<br />

array level)


Server Virtualization<br />

3) Product Selection > vSphere edition selection (part 1)<br />

17<br />

1<br />

1<br />

Cycling through each vSphere edition<br />

in the list box, users will be able to see<br />

which advanced features are included<br />

below


Server Virtualization<br />

3) Product Selection > vSphere edition selection (part 2)<br />

18<br />

3<br />

1<br />

2<br />

1 2<br />

1<br />

2<br />

Select the level of Support &<br />

Subscription and define number of<br />

years<br />

Define any applicable discounts<br />

(standard discounts available for<br />

government agencies and academic<br />

institutions) for license and SnS<br />

For Enterprise License Agreements<br />

(ELA’s), enable checkboxes above to<br />

input contract amounts into input<br />

boxes below.<br />

• For a $200,000 three year ELA,<br />

enable checkboxes above Years 1<br />

to 3, and input $200,000 into Year 1<br />

• Based on growth of workloads<br />

defined in Server HW section,<br />

calculator will then estimate<br />

additional licenses and SnS required<br />

for Years 4 and 5<br />

• To exclude calculator estimates for<br />

Years 4 and 5, enable checkboxes<br />

for those years--the default value for<br />

input boxes once enabled is zero


Server Virtualization<br />

3) Product Selection > vSphere edition selection (part 3)<br />

19<br />

2<br />

2<br />

3<br />

1<br />

1<br />

Unhide assumptions tab to<br />

select/deselect and or adjust cost of<br />

services and training through Planning<br />

and Design<br />

2 For annual services such as P2V<br />

Acceleration and Health Checks, users<br />

will be able to adjust cost per server to<br />

derive total cost for each year with<br />

input boxes in main module<br />

3<br />

If PSO credits are applicable, applicable enabling<br />

input boxes at the bottom of main<br />

module will over-ride itemized costs<br />

calculated above


Server Virtualization<br />

4) Beyond Server Consolidation > Server Provisioning Labor<br />

20<br />

2<br />

3<br />

1<br />

1<br />

2<br />

3<br />

Unhide assumptions tab to adjust<br />

assumptions regarding labor savings<br />

from faster provisioning<br />

Labor savings, calculated as the<br />

difference between labor required with<br />

and without vSphere virtualization, is<br />

the first value calculated<br />

Faster provisioning translates into a<br />

reduction in end-user wait time. This<br />

is the value of Business Agility Agility.<br />

Default assumption is that 40% of<br />

reduction in time spent on provisioning<br />

is returned to the business


Server Virtualization<br />

4) Beyond Server Consolidation > vMotion<br />

21<br />

2<br />

1<br />

1<br />

Unhide assumptions tab to adjust<br />

assumptions regarding downtime<br />

savings from planned server<br />

maintenance events<br />

2 Planned Downtime savings, savings calculated<br />

as the difference between downtime<br />

required with and without vSphere<br />

virtualization, is the value calculated


Server Virtualization<br />

4) Beyond Server Consolidation > Storage vMotion<br />

22<br />

2<br />

1<br />

1<br />

Unhide assumptions tab to adjust<br />

assumptions regarding downtime<br />

savings from planned storage array<br />

maintenance events<br />

2 Planned Downtime savings, savings calculated<br />

as the difference between downtime<br />

required with and without vSphere<br />

virtualization, is the value calculated


Server Virtualization<br />

4) Beyond Server Consolidation > High Availability & Fault Tolerance<br />

23<br />

3<br />

2<br />

4<br />

1<br />

1<br />

2<br />

Unhide assumptions tab to adjust<br />

assumptions regarding downtime<br />

savings from unplanned events<br />

• High Availability does not require<br />

any additional capital expenditures<br />

expenditures,<br />

and helps to automatically restart<br />

servers due to OS or HW failures<br />

• Downtime savings from virtualization<br />

and High Availability are not always<br />

positive due to consolidation ratios ratios—<br />

when a virtualized host server fails,<br />

it will bring down multiple workloads<br />

which may not be completely offset<br />

by ability to restart VM’s faster<br />

3 • This downtime can be fully mitigated<br />

with Fault Tolerance (FT) for<br />

mission critical workloads, but<br />

requires additional servers to host<br />

live shadow VM’s for failover—<br />

additional capital expenditures are<br />

calculated when FT is enabled in<br />

assumptions tab<br />

4<br />

Application downtime mitigated<br />

translates into a reduction in end-user<br />

wait time. This is the value of<br />

Business Agility. Default assumption<br />

is that 40% of reduction in downtime<br />

savings is returned to the business


Server Virtualization<br />

4) Beyond Server Consolidation > Distributed Power Mgmt<br />

24<br />

2<br />

1<br />

1<br />

2<br />

Unhide assumptions tab to adjust<br />

assumptions applicability of distributed<br />

power management to further<br />

consolidate inactive workloads and<br />

power down excess servers during<br />

nights and weekends<br />

Incremental Power & Cooling savings<br />

calculated here


Server Virtualization<br />

4) Beyond Server Consolidation > Server Admin Labor (part 1)<br />

25<br />

2<br />

3<br />

1<br />

1<br />

Unhide assumptions tab to adjust<br />

assumptions regarding labor savings<br />

from advanced management features<br />

in vSphere<br />

2 Labor savings savings, calculated as the<br />

difference between labor required with<br />

and without vSphere virtualization, is<br />

the first value calculated<br />

3<br />

Faster administration translates into a<br />

reduction in end end-user user wait time time. This<br />

is the value of Business Agility.<br />

Default assumption is that 40% of<br />

reduction in time spent on<br />

administration is returned to the<br />

business


Server Virtualization<br />

4) Beyond Server Consolidation > Server Admin Labor (part 2)<br />

26<br />

2<br />

3<br />

1<br />

1<br />

2<br />

3<br />

The number of Workloads per FTE<br />

Administrator, regardless of silo<br />

(server, storage, network, application,<br />

etc.), is the measure of administration<br />

productivity here. Most <strong>VMware</strong><br />

customers have already virtualized a<br />

portion of their datacenters, and can<br />

readily speak to the difference<br />

productivity—input values here.<br />

For users who are new to<br />

virtualization, we have surveyed<br />

customers and <strong>VMware</strong>’s own IT<br />

Administrators, and have provided a<br />

way to calculate incremental added<br />

productivity from various advanced<br />

management features available in<br />

vSphere Enterprise+. Enter the<br />

“Existing – unvirtualized” metric in<br />

section 1, and adjust values in section<br />

2 to derive metric for “New –<br />

virtualized.”<br />

Faster administration translates into a<br />

reduction in end-user wait time. This<br />

is the value of Business Agility.<br />

Default assumption is that 40% of<br />

reduction in time spent on<br />

administration d i i t ti iis returned t d tto th the<br />

business


Server Virtualization<br />

5) <strong>ROI</strong> (part 1)<br />

27<br />

2<br />

1<br />

3<br />

1<br />

2<br />

3<br />

The final module in Server<br />

Virtualization provides details into the<br />

<strong>ROI</strong> starting with required Investments<br />

at the top. For <strong>VMware</strong> Software<br />

License & Support in this example,<br />

$ $129K of spend is required in Year 1.<br />

Then depending on time horizon (3<br />

Years vs. 5 Years), users can see<br />

additional spend required for Years 2<br />

and beyond, due to workload growth<br />

defined in Server Hardware module.<br />

Users will find input boxes for Other<br />

Investments not accounted for in the<br />

calculator. Also, should there be any<br />

sales tax considerations, tax rates can<br />

be adjusted here.<br />

Click on this button to bring up menu<br />

of additional server virtualization<br />

management products to add to<br />

analysis:<br />

• CapacityIQ<br />

• AppSpeed<br />

• Site Recovery Manager<br />

• vShield Edge<br />

• vShield Endpoint<br />

• Chargeback<br />

• vCloud Director


Server Virtualization<br />

5) <strong>ROI</strong> (part 2)<br />

28<br />

1<br />

2<br />

3<br />

1<br />

2<br />

3<br />

Towards the bottom half of this<br />

module, users will find detail on<br />

Savings calculated<br />

Users will also find input boxes for<br />

Other Savings not accounted for in the<br />

calculator<br />

Finally, Investment and Savings<br />

enable for the calculation of <strong>ROI</strong> as<br />

well as Payback Period


Server Virtualization<br />

<strong>Analysis</strong> Summary<br />

29<br />

1<br />

2<br />

1<br />

2<br />

<strong>Analysis</strong> Summary provides additional<br />

charts and tables to collect and<br />

present results of all products<br />

reviewed<br />

• Cumulative Investment Investment, Savings &<br />

<strong>ROI</strong> provides a view into results,<br />

each year, over the 5 year analysis<br />

horizon<br />

• Distribution of Savings: 5 Year Total<br />

provides a quick snapshot of where<br />

users can expect to savings<br />

• Distribution of Investment: 5 Year<br />

Total provides a quick snapshot of<br />

where users will need to invest<br />

• Total Cost of Ownership: 5 Year<br />

Total (1) compares CapEx, OpEx,<br />

and Other (downtime, tax, other<br />

user-defined costs) expenses<br />

between a fully Physical datacenter<br />

and one with the benefits of<br />

Virtualization<br />

• Total Cost of Ownership: 5 Year<br />

Total (2) again compares CapEx,<br />

OpEx and Other expenses, but with<br />

expanded d dgranularity l it<br />

Charts Data provides all back-up data<br />

behind charts


Table of Contents<br />

� <strong>Calculator</strong> <strong>Overview</strong><br />

� <strong>Sample</strong> analysis:<br />

• Expected <strong>ROI</strong>/<strong>TCO</strong> analysis (forward looking)<br />

• Realized <strong>ROI</strong>/<strong>TCO</strong> analysis (backward looking)<br />

• Hybrid <strong>ROI</strong>/<strong>TCO</strong> analysis (mix of backward & forward)<br />

� Addi Additional i l Resources<br />

R<br />

30


Server Virtualization<br />

2) Server Consolidation > Server Hardware (part 1)<br />

31<br />

1<br />

1<br />

For a Realized <strong>ROI</strong> analysis a key<br />

assumption is the virtualization<br />

schedule that defines how many<br />

physical workloads are transitioned to<br />

virtual machines each year<br />

Adjust percentages until count of<br />

workloads matches known history


Server Virtualization<br />

2) Server Consolidation > Server Hardware (part 2)<br />

32<br />

2<br />

1<br />

3<br />

1<br />

2<br />

3<br />

Manually adjust count of workloads<br />

• By default, calculator assumes a<br />

linear workload growth rate—first<br />

assumption at the top of<br />

assumptions tab<br />

• For non-linear growth, locate<br />

switch for “manually adjust count of<br />

workloads”, change to “yes”, close<br />

tab, and input values into module<br />

Manually adjust count of host servers?<br />

• By default, calculator assumes a<br />

constant consolidation ratio each<br />

year, post-virtualization<br />

• To define a changing<br />

consolidation ratio each year,<br />

change to “yes”, close tab, and input<br />

values into module<br />

Manually adjust host servers retired?<br />

Caution: enabling all three functions adds<br />

great deal of flexibility to customize analysis,<br />

• By default and for simplicity,<br />

calculator uses useful life and<br />

average age assumptions to<br />

determine 100% refresh of servers<br />

but calculator may not be able to guarantee<br />

• TTo define d fi a staggered t d refresh f h ( (eg.<br />

logic in module is correct under all scenarios.<br />

1/3 of starting count of servers,<br />

Users will be required to review to ensure<br />

spread out over three years),<br />

changes lead to desired results.<br />

change to “yes”, close tab, and input<br />

values into module


Server Virtualization<br />

3) Product Selection > vSphere edition selection (part 1)<br />

33<br />

1<br />

1<br />

To input historical spend for <strong>VMware</strong><br />

Software + SnS, toggle check boxes to<br />

enable applicable input boxes<br />

• For a three years of history with<br />

$50 $50,000 000 in spend each year year, enable<br />

checkboxes above Years 1 to 3, and<br />

input $50,000 into Years 1, 2 and 3<br />

• To exclude calculator estimates for<br />

Years 4 and 5, enable checkboxes<br />

for those years years--the the default value for<br />

input boxes once enabled is zero<br />

• If analysis is expanded to include<br />

server management products,<br />

include historical costs of those<br />

products here and set discounts to<br />

100% in respective management<br />

product modules to zero out<br />

additional calculator spend<br />

estimates


Server Virtualization<br />

3) Product Selection > vSphere edition selection (part 2)<br />

34<br />

1<br />

1<br />

To input historical spend of Services +<br />

Training, toggle check boxes to enable<br />

applicable input boxes<br />

• For a three years of history with<br />

$10 $10,000 000 in spend each year year, enable<br />

checkboxes above Years 1 to 3, and<br />

input $10,000 into Years 1, 2 and 3<br />

• To exclude calculator estimates for<br />

Years 4 and 5, enable checkboxes<br />

for those years years--the the default value for<br />

input boxes once enabled is zero


Server Virtualization<br />

<strong>Analysis</strong> Summary (part 1)<br />

35<br />

1<br />

1<br />

In <strong>Analysis</strong> Summary > Charts Data ><br />

Distribution of Investments, users can<br />

verify that inputs of historical spend for<br />

<strong>VMware</strong> Software + SnS and Services<br />

+ Training have been aggregated<br />

accurately by the calculator


Server Virtualization<br />

<strong>Analysis</strong> Summary (part 2)<br />

36<br />

1<br />

2<br />

1<br />

In <strong>Analysis</strong> Summary > Charts > Chart<br />

1, Realized results (Investment,<br />

Savings, <strong>ROI</strong>) for Years 1, 2 and 3 are<br />

graphed<br />

2 Cumulative results for three years of<br />

history can also be found in small<br />

upper-right table, in the Over 3 yrs.<br />

column


Table of Contents<br />

� <strong>Calculator</strong> <strong>Overview</strong><br />

� <strong>Sample</strong> analysis:<br />

• Expected <strong>ROI</strong>/<strong>TCO</strong> analysis (forward looking)<br />

• Realized <strong>ROI</strong>/<strong>TCO</strong> analysis (backward looking)<br />

• Hybrid <strong>ROI</strong>/<strong>TCO</strong> analysis (mix of backward & forward)<br />

� Addi Additional i l Resources<br />

R<br />

37


Server Virtualization<br />

3) Product Selection > vSphere edition selection (part 1)<br />

38<br />

1 2<br />

3<br />

1<br />

2<br />

3<br />

To input historical spend for <strong>VMware</strong><br />

Software + SnS, toggle check boxes to<br />

enable applicable input boxes<br />

• For a three years of history with<br />

$50 $50,000 000 in spend each year year, enable<br />

checkboxes above Years 1 to 3, and<br />

input $50,000 into Years 1, 2 and 3<br />

Leaving Years 4 and 5 unchecked will<br />

enable the calculator to estimate<br />

additional cost of vSphere and vCenter<br />

Server required for those years based<br />

on workload growth and virtualization<br />

schedule defined in Server Hardware<br />

Be sure to define any applicable<br />

discounts for Years 4 and 5 or<br />

calculator will estimate costs at list<br />

price


Server Virtualization<br />

3) Product Selection > vSphere edition selection (part 2)<br />

39<br />

1 2<br />

$ 92,324<br />

1<br />

2<br />

To input historical spend of Services +<br />

Training, toggle check boxes to enable<br />

applicable input boxes<br />

• For a three years of history with<br />

$10 $10,000 000 in spend each year year, enable<br />

checkboxes above Years 1 to 3, and<br />

input $10,000 into Years 1, 2 and 3<br />

Leaving Years 4 and 5 unchecked will<br />

enable the calculator to estimate<br />

additional cost of services required<br />

based on selections defined in<br />

Assumptions Tab (unhide to adjust)<br />

In this case, the annual vSphere<br />

Health Check was selected, and<br />

incremental costs of $62 $62,324 324 have<br />

been added to the original $30,000


Server Virtualization<br />

<strong>Analysis</strong> Summary (part 1)<br />

40<br />

1<br />

1<br />

In <strong>Analysis</strong> Summary > Charts Data ><br />

Distribution of Investments, users can<br />

verify that inputs of historical spend<br />

and calculator estimates for <strong>VMware</strong><br />

Software + SnS and Services +<br />

Training have been aggregated<br />

accurately by the calculator


Server Virtualization<br />

<strong>Analysis</strong> Summary (part 2)<br />

41<br />

1<br />

2<br />

1<br />

2<br />

In <strong>Analysis</strong> Summary > Charts > Chart<br />

1, Realized results (Investment,<br />

Savings, <strong>ROI</strong>) for Years 1, 2 and 3 are<br />

graphed.<br />

Results for Years 4 and 5 include<br />

projections of additional investments<br />

and savings<br />

Cumulative results over 3 years and<br />

over 5 years can also be found in<br />

small upper-right upper right table


Table of Contents<br />

� <strong>Calculator</strong> <strong>Overview</strong><br />

� <strong>Sample</strong> analysis:<br />

• Expected <strong>ROI</strong>/<strong>TCO</strong> analysis (forward looking)<br />

• Realized <strong>ROI</strong>/<strong>TCO</strong> analysis (backward looking)<br />

• Hybrid <strong>ROI</strong>/<strong>TCO</strong> analysis (mix of backward & forward)<br />

� Addi Additional i l Resources<br />

R<br />

42


Additional Resources<br />

� <strong>ROI</strong> <strong>TCO</strong> <strong>Calculator</strong> Website: roitco.vmware.com<br />

� Frequently Asked Questions: FAQ document<br />

� Feedback & Questions: roitco.vmware.com/vmw/account/FeedbackQuestions<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!