29.01.2013 Views

injectable medicines project Terms of reference for Steering Group

injectable medicines project Terms of reference for Steering Group

injectable medicines project Terms of reference for Steering Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Purchasing <strong>for</strong> safety: <strong>injectable</strong> <strong>medicines</strong> <strong>project</strong><br />

<strong>Terms</strong> <strong>of</strong> <strong>reference</strong> <strong>for</strong> <strong>Steering</strong> <strong>Group</strong><br />

Membership<br />

Core membership <strong>of</strong> the group is as follows:<br />

Name Position Organisation<br />

Samantha Forrest Head <strong>of</strong> Research NHS PASA<br />

Howard Stokoe Principal Pharmacist NHS PASA<br />

Lara Qatami Project Manager NHS PASA<br />

David Cousins Head <strong>of</strong> Safe Medication Practice NPSA<br />

Beverley Norris Head <strong>of</strong> Design and Human Factors NPSA<br />

Tim Root Specialist Pharmacist, Clinical<br />

Governance and Technical Services<br />

Chelsea & Westminster<br />

Victor Standing Pharmacy Practice Manager<br />

Central Liverpool NHS<br />

Primary Care Trust<br />

Ian Beaumont Director <strong>of</strong> Quality Control, North West Stepping Hill Hospital,<br />

Stockport<br />

Jane Page Principal Pharmacist, Medicines University <strong>of</strong> Leicester<br />

Procurement<br />

Hospitals NHS Trust<br />

Katie Scales* Consultant Nurse Critical Care<br />

Imperial College Healthcare NHS Trust<br />

Representing RCN IV Forum<br />

Janice Gabriel* Nurse Director<br />

Central South Coast Cancer Network<br />

Representing RCN IV Forum<br />

Melanie Evans Development and Innovation Director Re:source Collaborative<br />

Procurement Hub<br />

Nancy McNeilance Clinical Advisor<br />

North West Collaborative<br />

Procurement Hub<br />

John Clarkson Pr<strong>of</strong>essor <strong>of</strong> Engineering Design Cambridge Engineering<br />

Director,<br />

Design Centre<br />

Louise Warwick Business Development Manager Baxter’s<br />

Chris Quinn Patient Safety Advocate Cardinal Health Alaris<br />

Products<br />

Robyn Hughes Director Teva Hospitals Teva UK<br />

Liz Pearson Category Manager, Infusion Devices NHS Supply Chain<br />

Martin Charters Partner Atos Consulting<br />

* RCN IV Forum representation to be shared, with one representative attending the meetings<br />

Others may be co-opted onto the group from time to time as required.<br />

Role and remit <strong>of</strong> group<br />

The <strong>Steering</strong> <strong>Group</strong>’s role is to provide a national overview and strategic direction to the<br />

<strong>project</strong> team, combining the viewpoints, knowledge and expertise <strong>of</strong> multiple<br />

stakeholders. It will act in an advisory capacity to the Project Sponsor and her team,<br />

in<strong>for</strong>ming the work <strong>of</strong> the pilot programme and ensuring a joined-up, system-wide<br />

approach.


Frequency <strong>of</strong> meetings<br />

Meetings will be held approximately quarterly, usually in London. The group will exist <strong>for</strong><br />

the lifetime <strong>of</strong> the <strong>project</strong> only, as defined in the Project Initiation Document, including any<br />

follow-up period.<br />

Timescale<br />

The <strong>project</strong> is scheduled to run <strong>for</strong> 12 months from April 2007. This includes pilot<br />

programme and a post-pilot evaluation. However, as some <strong>of</strong> the actions are likely to<br />

take more than 12 months to implement and <strong>for</strong> the benefits to accrue, further evaluation<br />

may be needed 12 months after the end <strong>of</strong> the pilot programme.<br />

Accountability<br />

The group is accountable, ultimately, to the Minster <strong>of</strong> State <strong>for</strong> Quality.<br />

Conflicts <strong>of</strong> interest<br />

Members are asked to declare any known actual or potential conflicts <strong>of</strong> interest at the<br />

outset. In addition, should any agenda items or discussions that occur at any point during<br />

the <strong>project</strong> give rise to a conflict <strong>of</strong> interest (actual or potential), members are required to<br />

declare this. They will not then be party to the discussion or any resultant advice or<br />

decisions.<br />

S Forrest<br />

April 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!