Bopp, R., Žigon, A., Žibert, M.:<br />
<strong>Tunnel</strong> <strong>safety</strong> <strong>concept</strong> <strong>for</strong> <strong>the</strong> <strong>new</strong> <strong>railway</strong> <strong>line</strong> Diva a - <strong>Koper</strong><br />
supply and telecommunication cabling is<br />
provided.<br />
The track structure is designed as a slab<br />
track system sitting on tunnel invert concrete.<br />
Table 2: Overview of traffic characteristics<br />
2.3 Operation of <strong>the</strong> <strong>new</strong> <strong>line</strong><br />
The <strong>railway</strong> <strong>line</strong> will be used mainly by<br />
freight trains climbing <strong>the</strong> ascent from <strong>the</strong><br />
port of <strong>Koper</strong> towards Diva a. Never<strong>the</strong>less<br />
<strong>the</strong> <strong>railway</strong> <strong>line</strong> is designed <strong>for</strong> both freight<br />
and passenger trains (see Table 2) in both<br />
directions driving in bundles of 3 to 5 trains.<br />
Type Number Length of train<br />
(max./average)<br />
Vmax Notes<br />
IC/EC 3 pairs of trains/day 400 m/250 m 160 km/h<br />
Pendolino 2 pairs of trains/day 82 m/82 m 160 km/h<br />
Freight trains direction 45 (fully loaded) or 750 m/500 m 120 km/h Ro-La<br />
to <strong>Koper</strong><br />
57 (dynamic ut. )<br />
Freight trains direction 50 (fully loaded) or 750 m/500 m 80 km/h Ro-La<br />
to Diva a 63 (dynamic ut. )<br />
In accordance with TSI RST HS only<br />
trains category B shall be used in passenger<br />
traffic on <strong>the</strong> <strong>new</strong> <strong>railway</strong> <strong>line</strong>. This category<br />
demands that in case of fire <strong>the</strong> train is capable<br />
of driving at least 80km/h <strong>for</strong> next 15<br />
minutes ignoring emergency brakes and<br />
maintaining means of communication.<br />
Currently a 3kV DC (direct current) supply<br />
catenary system is planned. In future a<br />
25kV 50Hz AC system is <strong>for</strong>eseen.<br />
Figure 4: Typical NATM tunnel cross section<br />
3 Guide<strong>line</strong>s<br />
3.1 European and national<br />
guide<strong>line</strong>s<br />
The main risks in <strong>railway</strong> tunnels are<br />
fire, collision and derailment. As a fire in a<br />
passenger train is a major and specific hazard<br />
in tunnels with potentially catastrophic consequences,<br />
discussions about tunnel <strong>safety</strong><br />
10. SLOVENSKI KONGRES O CESTAH IN PROMETU, Portorož, 20. – 22. oktobra 2010