Tunnel safety concept for the new railway line Divača - Koper - DRC

Tunnel safety concept for the new railway line Divača - Koper - DRC

Tunnel safety concept for the new railway line Divača - Koper - DRC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bopp, R., Žigon, A., Žibert, M.:<br />

<strong>Tunnel</strong> <strong>safety</strong> <strong>concept</strong> <strong>for</strong> <strong>the</strong> <strong>new</strong> <strong>railway</strong> <strong>line</strong> Diva a - <strong>Koper</strong><br />

supply and telecommunication cabling is<br />

provided.<br />

The track structure is designed as a slab<br />

track system sitting on tunnel invert concrete.<br />

Table 2: Overview of traffic characteristics<br />

2.3 Operation of <strong>the</strong> <strong>new</strong> <strong>line</strong><br />

The <strong>railway</strong> <strong>line</strong> will be used mainly by<br />

freight trains climbing <strong>the</strong> ascent from <strong>the</strong><br />

port of <strong>Koper</strong> towards Diva a. Never<strong>the</strong>less<br />

<strong>the</strong> <strong>railway</strong> <strong>line</strong> is designed <strong>for</strong> both freight<br />

and passenger trains (see Table 2) in both<br />

directions driving in bundles of 3 to 5 trains.<br />

Type Number Length of train<br />

(max./average)<br />

Vmax Notes<br />

IC/EC 3 pairs of trains/day 400 m/250 m 160 km/h<br />

Pendolino 2 pairs of trains/day 82 m/82 m 160 km/h<br />

Freight trains direction 45 (fully loaded) or 750 m/500 m 120 km/h Ro-La<br />

to <strong>Koper</strong><br />

57 (dynamic ut. )<br />

Freight trains direction 50 (fully loaded) or 750 m/500 m 80 km/h Ro-La<br />

to Diva a 63 (dynamic ut. )<br />

In accordance with TSI RST HS only<br />

trains category B shall be used in passenger<br />

traffic on <strong>the</strong> <strong>new</strong> <strong>railway</strong> <strong>line</strong>. This category<br />

demands that in case of fire <strong>the</strong> train is capable<br />

of driving at least 80km/h <strong>for</strong> next 15<br />

minutes ignoring emergency brakes and<br />

maintaining means of communication.<br />

Currently a 3kV DC (direct current) supply<br />

catenary system is planned. In future a<br />

25kV 50Hz AC system is <strong>for</strong>eseen.<br />

Figure 4: Typical NATM tunnel cross section<br />

3 Guide<strong>line</strong>s<br />

3.1 European and national<br />

guide<strong>line</strong>s<br />

The main risks in <strong>railway</strong> tunnels are<br />

fire, collision and derailment. As a fire in a<br />

passenger train is a major and specific hazard<br />

in tunnels with potentially catastrophic consequences,<br />

discussions about tunnel <strong>safety</strong><br />