29.01.2013 Views

Warner Robins Air Logistics Center - WRCOC Aerospace Industry ...

Warner Robins Air Logistics Center - WRCOC Aerospace Industry ...

Warner Robins Air Logistics Center - WRCOC Aerospace Industry ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

WR-ALC Strategic<br />

Business Outlook<br />

People First…Mission Always<br />

18 Nov 09<br />

Mr. Deryl Israel<br />

Executive Director<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong>


People First…Mission Always<br />

Overview<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�<strong>Center</strong> Organization Changes<br />

�Organizational Focus<br />

• FM, PK, EN, XP, SB<br />

�Emerging Trends<br />

• <strong>Air</strong> Force Power Technology Office (APTO)<br />

• Depot Maintenance<br />

�<strong>Robins</strong> AFB of the Future<br />

�Summary<br />

�Final Thoughts<br />

�Questions


EQUAL<br />

OPPORTUNITY<br />

EO<br />

Ms. Marilyn Gantt (YC-02)<br />

CHIEF OF STAFF<br />

CS<br />

Mr. Carl Unholz (YC-03)<br />

Ms. Stephanie Hardin (Dep) (YC-02)<br />

HISTORY<br />

HO<br />

Dr. William Head (YC-02)<br />

330 TH AIRCRAFT<br />

SUSTAINMENT WG<br />

(330 ASW)<br />

Col Tim Freeman, CC<br />

Mr. Greg Stanley, DV (YC-03)<br />

WR-ALC<br />

STAFF OFFICES & WINGS<br />

ANG ADVISOR<br />

CCG<br />

Col Keith Martin<br />

PERSONNEL<br />

DP<br />

Ms. Mary Larralde (YC-03)<br />

Mr. Max Wyche (Dep)<br />

JUDGE ADVOCATE<br />

JA<br />

Col Jeffrey Wilcox<br />

Mr. Lake Holt (Dep) (YC-03)<br />

SMALL BUSINESS<br />

SB<br />

Ms Kathy Cames (YC-03)<br />

542 ND COMBAT<br />

SUSTAINMENT WG<br />

(542 CSW)<br />

Col Tim Freeman, CC<br />

Col David French, CV<br />

WR-ALC COMMAND SECTION<br />

Maj Gen Polly Peyer, CC<br />

Col Robert Stambaugh, CV<br />

Mr. Deryl Israel, CA (SES)<br />

MOBILIZATION<br />

ASSISTANT<br />

CCR<br />

Col Edward Yarish<br />

ENGINEERING<br />

EN<br />

Mr. Kenneth Percell (SES)<br />

Col Jerry Couick (Dep)<br />

MUSEUM<br />

MU<br />

Mr. Ken Emery (YC-03)<br />

Mr. Dudley Bluhm (Dep) (YC-02)<br />

PLANS & PROGRAMS<br />

XP<br />

Ms. Kim Lynn (YC-03)<br />

Mr. Calvin Butts (Dep) (YC-03)<br />

402 ND<br />

MAINTENANCE WG<br />

(402 MXW)<br />

Brig Gen Lee Levy, CC<br />

Ms. Marian Fraley, DV (YC-03)<br />

RESERVE AFFAIRS<br />

DPV<br />

Mr. Kenneth Houck (YA-02)<br />

FINANCIAL MGMT<br />

FM<br />

Mr. Kalwant Smagh (YC-03)<br />

Mr. David Nuchols (Dep) (YC-03)<br />

CONTRACTING<br />

PK<br />

Mr. Steven J Zamparelli (SES)<br />

Col Todd Pospisil (Dep)<br />

78 TH<br />

AIR BASE WG<br />

(78 ABW)<br />

Col Carl Buhler, CC<br />

Col Debra Bean, CV<br />

3


Proposed WR-ALC<br />

Organizational Changes<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�Direction: Product Support realign to <strong>Air</strong>craft Sustainment<br />

Wing (ASW) and Supply Chain Mgmt realign to AFGLSC<br />

IAW AFMC/CC letter, dtd 1 May 09<br />

�542 nd Combat Sustainment Wing (CSW) will be inactivated<br />

& divested into ASW, <strong>Air</strong> Force Global <strong>Logistics</strong> Support<br />

<strong>Center</strong> (AFGLSC) & WR-ALC Engineering Directorate<br />

�330 th <strong>Air</strong>craft Sustainment Wing (ASW) will retain wing<br />

designation; however, subordinate groups and squadrons<br />

will convert to divisions and branches<br />

–Name changes to <strong>Aerospace</strong> Sustainment Wing<br />

�AFGLSC Product Support will realign to ASW<br />

�All initiatives are pending approval by <strong>Air</strong> Force<br />

�Targeted implementation date - 30 June 2010<br />

4


FY09 <strong>Center</strong> Funding<br />

$5.34B<br />

FY10 Funding<br />

�Under CRA through December<br />

�No significant program cuts expected<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

Major Categories<br />

•Strategic <strong>Air</strong>lift (C-5, C-17)<br />

•Surveillance (U-2, JSTARS)<br />

•Tactical <strong>Air</strong>lift (C-130)<br />

•Support Equip & Vehicles<br />

•Electronic Warfare<br />

*Additional $4.6B in Foreign<br />

Military Sales supported at<br />

WR<br />

5


$ In Billions<br />

CONTRACT ACTIONS<br />

Contracts Awarded<br />

includes Central, 78 CONS, and Newark<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

14887 14381 13945 11658 16575 16153 14028 13353 13336 12454 11031 11075<br />

FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09<br />

Increase in Dollars Awarded/Decrease in Contracting Actions<br />

6


Acquisition Challenges<br />

�Scrutiny of Undefinitized Contractual Actions<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

• SAF/AQ Policy Memo - 09-C-01 (Jul 09) rescinded<br />

GWOT 100% funding exception<br />

<strong>Center</strong> OPR: Mr. Steve Zamparelli/PK<br />

�Reduce Use of Time & Material (T&M) Contract Types<br />

• Increased oversight of contracting activities using T&M<br />

for more than 10% of services spend<br />

<strong>Center</strong> OPR: Ms. Crystal Hollifield/PKC<br />

�Additions to the Acquisition Process<br />

• Multi-functional Independent Review Team (MIRT)<br />

• DoD Peer Reviews of Contracts<br />

<strong>Center</strong> OPR: Ms. Theresa Lamb/PK<br />

7


• Energy<br />

WR-ALC Strategic Sustainment<br />

Technology Focus Areas<br />

• Continuous Condition Monitoring<br />

– Integrated Systems Health Monitoring<br />

– <strong>Air</strong>craft Subsystem Diagnostics<br />

– Prognostics based on existing data<br />

• Maintenance Acceleration/Increased Density<br />

– Cost Reduction<br />

– Crack and Corrosion Detection and Prevention<br />

– Depot & Maintenance Shop Improvement<br />

– Supply Chain Enhancements<br />

– Cost-efficient and environmentally conscious<br />

– Small, transportable alternative energy<br />

sources<br />

– Hybrids, renewable, hydrogen, fuel cells,<br />

biofuel, distributive power generation<br />

• Environment<br />

– Lead-free solder<br />

– Hexavalent Chrome replacement<br />

– De-paint and coating removal alternatives<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

• Improved Reliability<br />

–Cost Reduction<br />

–Obsolescence Management<br />

–Higher life-cycle components<br />

–Improved High Power Amplifiers<br />

• Improved Agile Combat Support<br />

–Improve BEAR Technologies<br />

–Improve supply chain methods<br />

<strong>Center</strong> OPR: Frank Zahiri/EN<br />

8


<strong>Center</strong> & GLSC Level Systems<br />

Engineering Plan (SEP)<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

� Engineering Directorate is developing a SEP that<br />

will:<br />

• Document and standardize core processes<br />

• Focus on 10 Life Cycle processes identified in AFMCI<br />

63-1201 and <strong>Air</strong> Force Systems Engineering<br />

Assessment Model<br />

• Configuration Mgmt (CM)<br />

• Decision Analysis (DA)<br />

• Design (D)<br />

• Manufacturing (M)<br />

• Project Planning (PP)<br />

Process Areas<br />

• Requirements (R)<br />

• Risk Mgmt (RM)<br />

• Sustainment (S)<br />

• Tech Mgmt & Ctrl (TMC)<br />

• Verification &Validation (V)<br />

<strong>Center</strong> OPR: Karen Brigance/EN<br />

9


AF Systems Engineering<br />

Assessment Model<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

� AF SEAM<br />

• A single AF-wide tool which can be used for the<br />

assessment and improvement of Systems Engineering<br />

(SE) processes in a program/project<br />

• Assessments are conducted per AFMCI 63-1201 and a<br />

<strong>Center</strong> Technical Authority approved plan and schedule<br />

� The primary purpose of AF SEAM<br />

• To promote the application and use of standard SE<br />

processes across the AF<br />

• To improve the performance of these processes through<br />

Continuous Process Improvement<br />

<strong>Center</strong> OPR: James Jeter/EN<br />

People First…Mission Always 10


AF SEAM Assessment<br />

Process<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

11


Tech Lessons Learned<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�F-15 Longeron Crack, Catastrophic Failure<br />

• Manufacturing tolerances and engineering processes can<br />

have a significant effect on fleet service life models<br />

• Action: On-going teardown inspection and full scale<br />

fatigue test <strong>Center</strong> OPR: James Gaskin/EN<br />

�C-130J <strong>Center</strong> Wing Box, Usage Life<br />

• Changes in use, weight, speed, and altitude can have a<br />

dramatic effect on force structure management and<br />

aircraft availability<br />

• Action: Changing production configuration to an<br />

enhanced service life box and providing oversight to fleet<br />

usage <strong>Center</strong> OPR: James Gaskin/EN<br />

12


Tech Lessons Learned<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�C-5 Bonded Structure, Age Deterioration<br />

• Bonded honeycomb panels driving supply down time<br />

• Action: Developing Material Requirements and<br />

Material Supply strategies and performing preinduction<br />

inspections <strong>Center</strong> OPR: James Gaskin/EN<br />

�Lead Free Solder, Reliability and Safety Issues<br />

• Components have unknown reliability, creeping into<br />

supply system<br />

• Action: Updating Tech Orders and process<br />

specifications, have established an ALC Lead Free<br />

Control Plan, and training maintenance personnel<br />

<strong>Center</strong> OPR: Mark Thomas/EN<br />

13


Emerging Trends…<br />

Technical Data Future Highlights<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�Information Systems-Expeditionary Combat Support System<br />

• Uses COTS Enterprise Resource Planning (Oracle ERP) and Product<br />

Lifecycle Management (Siemens Teamcenter PLM)<br />

• Replaces over 400 Legacy Systems<br />

�Future State Process-Configuration Management II Process<br />

• More disciplined/More integrated<br />

• Product Data (engineering data/TOs) will be tied to Product Structure<br />

(Master Bill of Material)<br />

• Ensures/Enforces Configuration changes are controlled and reflected<br />

in Product Data<br />

�Data Trends-Transition from Paper to Intelligent Digital<br />

• Engineering Data - From Traditional 2D to 3D Models<br />

–Higher Accuracy - Less reverse engineering from 2D data<br />

• Technical Orders – From Paper to Integrated Digital Data<br />

–Electronic data at the point of use - Standard Authoring/Viewing Tools<br />

14


<strong>Center</strong> Business Office<br />

Plans and Programs<br />

Transformation and<br />

Continuous Process<br />

Improvement<br />

Product Support Foreign Military Sales<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

Strategic Planning<br />

Intelligence Support to<br />

Acquisition<br />

15


Emerging Workloads<br />

Status of Transitioning Programs<br />

�28 Transitioning Programs identified<br />

�13 Transition support plans in-work<br />

C-17<br />

C-130J<br />

Sustainment<br />

<strong>Air</strong>borne Signals<br />

Intelligence<br />

Payload (ASIP)<br />

Tactical <strong>Air</strong><br />

Control Party<br />

(TACP-M)<br />

Tactical Data Link<br />

– Joint Range<br />

Extension (JRE)<br />

C-130 AMP<br />

C-5 AMP<br />

Common<br />

Munitions BIT<br />

Reprogramming<br />

Equipment<br />

(CMBRE)<br />

HARM<br />

Targeting Pod<br />

Joint Helmet-<br />

Mounted<br />

Cueing System<br />

(JHMCS)<br />

Green – awaiting TSP initiation<br />

Currently In-Work<br />

LITENING II<br />

Production<br />

MC-130<br />

Modifications<br />

Miniature <strong>Air</strong>borne<br />

GPS Receiver<br />

(MAGR-2K)<br />

Role On/Off Beyond<br />

Line of Sight<br />

Equipment (ROBE)<br />

Global Hawk<br />

Sustainment<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

JSTARS<br />

CV-22 Flight<br />

Pubs<br />

Defense Injection<br />

Reception<br />

Emergency Action<br />

Message (EAM)<br />

Command<br />

Gateway Tactical<br />

Data Links (TDL)<br />

<strong>Air</strong>crew Flight<br />

Equipment<br />

Embedded<br />

GPS/INS (EGI)<br />

Sustainment<br />

SNIPER<br />

Advanced<br />

Targeting<br />

Pod<br />

Panoramic Night<br />

Vision Goggles<br />

(PNVG)<br />

F-15<br />

Modification/<br />

Sustainment<br />

16


People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

Enterprise opportunity for new business development<br />

OO-ALC<br />

CBO<br />

<strong>Center</strong> Business Office<br />

AFMC<br />

Business Integration Office<br />

(A8R)<br />

WR-ALC<br />

CBO<br />

AFGLSC<br />

OC-ALC<br />

CBO<br />

17


CBO…<br />

Key Functions<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�The primary entry-point for industry,<br />

government (federal, state and local) and<br />

community business partners<br />

�The Office of Primary Responsibility (OPR)<br />

for WR-ALC strategic opportunity<br />

awareness, assessment, and business<br />

capture<br />

�Contact: wralc.cbo@robins.af.mil<br />

18


Designated Acquisition Official<br />

(DAO) Responsibilities<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�Overall Responsibility for a Portfolio of Programs<br />

as Milestone Decision Authority (MDA)<br />

�Dedicated Program Management of<br />

• Delegated ACAT II and ACAT III Programs expending<br />

investment dollars<br />

• Applicable Programs listed on the <strong>Air</strong> Force Acquisition<br />

Program Master List (APML)<br />

• Perform all associated responsibilities as defined by<br />

DoDI 5000.2, AFI 63-101 and other DoD and AF Policy<br />

�Provide Monthly Activity Reports to Service<br />

Acquisition Executive (SAE)<br />

19


DAO Vs PEO Vs SDO…<br />

So What’s the Difference?<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�DAOs<br />

• Responsible for ACAT II/III Procurements<br />

• No “Services” responsibilities in DAO capacity<br />

• Reports to SAE<br />

• Authority based on DoDI 5000.02, AFI 63-101<br />

�AFPEO/CM<br />

• Responsible for Services Acquisitions<br />

• Reports to SAE<br />

• Authority based on AFI 63-101<br />

�Services Designated Official (SDO)<br />

• Responsible for Service Acquisitions as delegated<br />

• Reports to AFPEO/CM<br />

• Authority based on Expectations Management Agreement<br />

(EMA) delegations<br />

20


AFMC Delegation via Expectations<br />

Management Agreement (EMA)<br />

�Basic<br />

•Authority:


ACE Lessons Learned<br />

Start Start Acquisition Early –<br />

Be<br />

Be<br />

Event<br />

Event<br />

Driven…<br />

Driven…<br />

Not Schedule Driven<br />

Not Schedule Driven<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

� Pre-Strategy • Pre-Strategy Meetings encouraged Encouraged early Early On<br />

� Acquisition • Acquisition Roadmap located Located onOn ACE ACE Website<br />

� Realistic • Realistic Milestones Milestones taken Taken intoInto consideration<br />

Consideration<br />

CENTER SME: Jamie Bacon/XP-ACE<br />

22


ACE Lessons Learned<br />

Conduct Thorough Market Research<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

� Quarterly ACE Market Research training provided<br />

� ACE review of Market Research Reports as<br />

requested<br />

� Posting of “Good” Market Research Reports as<br />

samples on ACE Website<br />

CENTER SME: Mark Leslein/XP-ACE<br />

23


Small Business Programs<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�Our Small Business partners are vital to<br />

Mission Accomplishment<br />

�Our Small Business Office recently moved<br />

“outside the gate” for better industry access<br />

New SB Facility Bldg 205 Hwy 247 CENTER OPR: Ms. Kathy Cames<br />

People First…Mission Always 24


Small Business Program<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

� FY09 Acquisitions Coordinated with WR-ALC/SB<br />

• 1,485 PRs estimated at $4.1B<br />

– 63% sole source/restricted = $2.3B<br />

– 6% full and open = $319M<br />

– 2% GSA buys = $55M<br />

• Set-Asides = 29% = $1.48B<br />

TYPE PR TOTALS % of $4.1 B % of 1485<br />

PRs<br />

SB 282 = $1.2B 27.9% 19.0%<br />

8(a) 103 = $215M 5.2% 6.9%<br />

HUBZone 16 = $45M 1.1% 1.0%<br />

SDVOSB 36 = $22M 0.5% 2.4%<br />

People First…Mission Always 25


Emerging Trends…<br />

Advanced Power Technology Office<br />

� Bridging an oil-based<br />

economy to a new<br />

energy economy for the<br />

US <strong>Air</strong> Force<br />

�Focusing on getting<br />

new energy technology<br />

out of the laboratories<br />

and showrooms and<br />

into the hands of the<br />

Warfighter<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

APTO<br />

OLD NEW<br />

<strong>Center</strong> OPR: Mr. Robert David<br />

26


�Hybrid/Electrical Drive Systems:<br />

�Electric motors, Inverters, Advanced batteries, and Ultra-<br />

Capacitors<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�Hydrogen Generation:<br />

� Fuel Reformers, Electrolysis, Gasification, and Metal hydrides<br />

�Fuel Cells:<br />

Advanced Power Technology is…<br />

�Renewable Energy:<br />

�Solar, Wind, Ocean, Biomass, and<br />

Waste-to-Energy<br />

�Proton Exchange Membrane (PEM), Solid Oxide and Molten<br />

Carbonate Technologies<br />

�Alternative Fuel:<br />

�Biofuel and Fischer-Tropsch (FT)<br />

�Distributive Power Generation:<br />

�To provide on-site electrical power source;<br />

mobile and stationary fuel cells<br />

27


APTO Focus Areas<br />

�Field multi-task capable equipment<br />

�Reduce airlift and logistic support<br />

requirements<br />

�Meet Environmental and Energy policy<br />

requirements<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�Create Partnerships to advance energy initiatives<br />

�Share/transfer capabilities to Homeland Defense<br />

and other agencies<br />

�Provide dual use capability – Commercial/Military<br />

28


<strong>Air</strong>craft<br />

� Fewer new<br />

systems<br />

� Aging aircraft<br />

� Service life<br />

extensions<br />

� Corrosion<br />

� Metal fatigue<br />

� Over-run of<br />

planned<br />

workload<br />

Emerging Trends…<br />

Depot Maintenance<br />

Commodities<br />

� Composites<br />

� Increased<br />

precision<br />

� Increased<br />

complexity<br />

� Aging<br />

components<br />

� Corrosion<br />

� Metal fatigue<br />

� Delaminations<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

Electronics<br />

� Obsolescence<br />

• Testers<br />

• Systems<br />

• COTS<br />

� Service life<br />

extensions<br />

� New technology<br />

• Complex<br />

Digital<br />

• Fiber/opt<br />

• Enhanced<br />

radars<br />

� Lack of data<br />

Software<br />

� Frequent<br />

Mission<br />

updates<br />

� Non-standard<br />

code<br />

� Multiple<br />

languages<br />

� Increased<br />

rehosts<br />

29


<strong>Air</strong>craft<br />

� Fewer new systems<br />

� Aging aircraft<br />

� Service life extensions<br />

� Corrosion<br />

� Metal Fatigue<br />

� Over-run of planned<br />

workload<br />

� High velocity<br />

maintenance<br />

� Improved<br />

prognostics<br />

� Improved<br />

forecasting<br />

� Flexible<br />

workforce<br />

Depot Maintenance<br />

Initiatives<br />

Commodities<br />

� New Technologies<br />

-Composites<br />

-Increased precision<br />

-More complexity<br />

� Increasing DoD<br />

warfighter support<br />

-DLA/Other Svcs<br />

-Private Sector<br />

-Other<br />

� HVM Support<br />

� Improved<br />

forecasting<br />

� Flexible workforce<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

Electronics<br />

� Obsolescence<br />

• Testers<br />

• Systems<br />

• COTS<br />

� Service life extensions<br />

� New technology<br />

• Complex Digital<br />

• Fiber/opt<br />

• Enhanced radars<br />

� Lack of data<br />

� Reduce<br />

proliferation<br />

� Increase<br />

standardization<br />

� Flexible<br />

workforce<br />

Software<br />

� Frequent mission<br />

updates<br />

� Non-standard code<br />

� Multiple languages<br />

� Increased re-hosts<br />

� OFP CITEs<br />

� Centralize SILs<br />

� TPS style<br />

guides<br />

� Common equip<br />

languages<br />

� Reuseable<br />

modules<br />

30


<strong>Robins</strong> AFB of the Future<br />

�Multi-service installation<br />

• USAF, Army, Marines, Guard, Reserve<br />

• Civilian/contractor<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�Production areas, administrative, field training, clinic,<br />

expanded training missions<br />

�Partners: G-RAMP, Enhanced Use Lease<br />

�Fixed & rotary wing aircraft supportable<br />

31


<strong>Robins</strong> AFB of the Future<br />

People First…Mission Always<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

�Major <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong>, plus<br />

• MAJCOM – HQ AFRC<br />

• J-STARS (116th ACW)<br />

• Flying Missions (339th Flight Test Squadron, 116th,<br />

Marine Corps)<br />

• 5 CCG – 689 CCW<br />

• Central Package Processing Plant (DLA)<br />

�Facility growth slowed – fewer MILCONs<br />

�Greener/leaner base<br />

�EDIMGIAFAD -- Best Community Support in DoD<br />

32


Summary<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

� WR-ALC is a significant Acquisition and<br />

Sustainment provider<br />

�Continuing to balance Organizational Structure<br />

with Roles and Responsibilities of<br />

Wings/Functionals<br />

�Process Discipline and Improvement -- Key to<br />

Future Performance<br />

�IA/SR Processes – Key to better Acquisition and<br />

Sustainment Programs<br />

• Framework to build upon lessons learned<br />

�Vibrant Future – Technology, Programs &<br />

Maintenance<br />

People First…Mission Always 33


Final Thoughts…<br />

� If you’re NOT Working To:<br />

• Improve <strong>Air</strong>craft Availability<br />

• Lower Costs<br />

• Provide Capability<br />

<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

People First…Mission Always 34


<strong>Warner</strong> <strong>Robins</strong> <strong>Air</strong> <strong>Logistics</strong> <strong>Center</strong><br />

People First…Mission Always 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!