Arbres locaux pour un monde meilleur | Local trees for a better world
Arbres locaux pour un monde meilleur | Local trees for a better world
Arbres locaux pour un monde meilleur | Local trees for a better world
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7<br />
Comm<strong>un</strong>ity Payments <strong>for</strong> Ecosystem Services in Patako | Plan Vivo PDD 2012<br />
Af<strong>for</strong>estation -‐<br />
Plantation<br />
Assisted<br />
Natural<br />
Regeneration<br />
Tree<br />
planting<br />
Natural<br />
regeneratio<br />
n through<br />
protection<br />
and<br />
enrichment<br />
planting<br />
protection of crops against wind<br />
Biodiversity conservation<br />
and reduction of pressure on the<br />
<strong>for</strong>est<br />
Natural fruits, berries, firewood<br />
and fodder<br />
Biodiversity conservation<br />
and reduction of pressure on the<br />
<strong>for</strong>est<br />
Natural fruits, berries, firewood<br />
and fodder<br />
4.5. Duration of project activities and crediting period<br />
Forest plantations with a variety of<br />
native species<br />
Assisted natural regeneration to<br />
increase the stocking of valuable<br />
species. It involves enrichment<br />
planting and managing natural<br />
regeneration by fencing off areas to<br />
prevent grazing<br />
This project has a crediting period of 30 years (2012-‐2042). The payment period is 10 years.<br />
4.6. Carbon benefits of project activities<br />
For each activity, the certifiable carbon benefit has been estimated using a CO2FIX model. The<br />
certifiable carbon benefit is the carbon sequestration of the activity over 30 years. The<br />
sequestration potential is treated over and above the baseline figure of 8tCO2 per ha, and the risk<br />
buffer of 10% (Table 2) is subtracted. Please see the af<strong>for</strong>estation and agro<strong>for</strong>estry technical<br />
specification <strong>for</strong> details.<br />
Table 2: Summary of baseline and project carbon uptake per hectare over crediting period (figures<br />
have been ro<strong>un</strong>ded down)<br />
Systems Carbon<br />
sequestration<br />
(t C/ha)<br />
Carbon dioxide<br />
sequestration<br />
equivalent<br />
(t CO2e/ha)<br />
Baseline<br />
(t CO2/ha)<br />
Risk buffer<br />
(10 %)<br />
Intercropping 11 40 8 4 36<br />
Bo<strong>un</strong>dary<br />
planting<br />
12 44 8 4 40<br />
Plantation 92 337 8 34 303<br />
Assisted<br />
Natural<br />
Regeneration<br />
92 337 8 34 303<br />
4.7. Process and requirements <strong>for</strong> registering plan vivos<br />
Project scenario<br />
(t CO2e/ha)<br />
Plan vivos are land management plans which are designed to generate ecosystem services.<br />
Arlomom has worked with participants to ensure that the participant plan vivos meet the<br />
participant livelihood needs and that the activities outlined in the plan vivo do not endanger food