07.02.2013 Views

Arbres locaux pour un monde meilleur | Local trees for a better world

Arbres locaux pour un monde meilleur | Local trees for a better world

Arbres locaux pour un monde meilleur | Local trees for a better world

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7<br />

Comm<strong>un</strong>ity Payments <strong>for</strong> Ecosystem Services in Patako | Plan Vivo PDD 2012<br />

Af<strong>for</strong>estation -­‐<br />

Plantation<br />

Assisted<br />

Natural<br />

Regeneration<br />

Tree<br />

planting<br />

Natural<br />

regeneratio<br />

n through<br />

protection<br />

and<br />

enrichment<br />

planting<br />

protection of crops against wind<br />

Biodiversity conservation<br />

and reduction of pressure on the<br />

<strong>for</strong>est<br />

Natural fruits, berries, firewood<br />

and fodder<br />

Biodiversity conservation<br />

and reduction of pressure on the<br />

<strong>for</strong>est<br />

Natural fruits, berries, firewood<br />

and fodder<br />

4.5. Duration of project activities and crediting period<br />

Forest plantations with a variety of<br />

native species<br />

Assisted natural regeneration to<br />

increase the stocking of valuable<br />

species. It involves enrichment<br />

planting and managing natural<br />

regeneration by fencing off areas to<br />

prevent grazing<br />

This project has a crediting period of 30 years (2012-­‐2042). The payment period is 10 years.<br />

4.6. Carbon benefits of project activities<br />

For each activity, the certifiable carbon benefit has been estimated using a CO2FIX model. The<br />

certifiable carbon benefit is the carbon sequestration of the activity over 30 years. The<br />

sequestration potential is treated over and above the baseline figure of 8tCO2 per ha, and the risk<br />

buffer of 10% (Table 2) is subtracted. Please see the af<strong>for</strong>estation and agro<strong>for</strong>estry technical<br />

specification <strong>for</strong> details.<br />

Table 2: Summary of baseline and project carbon uptake per hectare over crediting period (figures<br />

have been ro<strong>un</strong>ded down)<br />

Systems Carbon<br />

sequestration<br />

(t C/ha)<br />

Carbon dioxide<br />

sequestration<br />

equivalent<br />

(t CO2e/ha)<br />

Baseline<br />

(t CO2/ha)<br />

Risk buffer<br />

(10 %)<br />

Intercropping 11 40 8 4 36<br />

Bo<strong>un</strong>dary<br />

planting<br />

12 44 8 4 40<br />

Plantation 92 337 8 34 303<br />

Assisted<br />

Natural<br />

Regeneration<br />

92 337 8 34 303<br />

4.7. Process and requirements <strong>for</strong> registering plan vivos<br />

Project scenario<br />

(t CO2e/ha)<br />

Plan vivos are land management plans which are designed to generate ecosystem services.<br />

Arlomom has worked with participants to ensure that the participant plan vivos meet the<br />

participant livelihood needs and that the activities outlined in the plan vivo do not endanger food

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!