08.02.2013 Views

List of Priority Projects in Greece co-funded by the Structural Funds ...

List of Priority Projects in Greece co-funded by the Structural Funds ...

List of Priority Projects in Greece co-funded by the Structural Funds ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Special Secretariat NSRF JANUARY 2011<br />

1<br />

2<br />

NG Compression Station at Nea<br />

Mesimvria (Thessaloniki)<br />

NG High Pressure Pipel<strong>in</strong>e<br />

towards Aliveri<br />

3 Energopolis -Kozani<br />

4<br />

5<br />

6<br />

7<br />

8<br />

Cogeneration Plant Electricity and<br />

<strong>the</strong> 2nd upgrad<strong>in</strong>g <strong>of</strong> <strong>the</strong><br />

Term<strong>in</strong>al station <strong>of</strong> LNG <strong>of</strong><br />

Revythousa Island (3rd tank)<br />

Central Macedonia / OP<br />

Competitiveness &<br />

Enterpreneurship<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Competitiveness &<br />

Enterpreneurship<br />

West Macedonia / OP<br />

Macedonia & Thrace<br />

Attica / OP<br />

Competitiveness &<br />

Enterpreneurship<br />

Pilot exploitation <strong>of</strong> geo<strong>the</strong>rmal Eastern Macedonia -<br />

field Erate<strong>in</strong>ou <strong>of</strong> <strong>the</strong> municipality Thrace / OP Macedonia<br />

<strong>of</strong> Nestos<br />

& Thrace<br />

NG High Pressure Pipel<strong>in</strong>e from<br />

Agioi Theodoroi towards<br />

Megalopoli<br />

Cyclades Islands Energy Inter<strong>co</strong>nnexion<br />

with <strong>co</strong>nt<strong>in</strong>ental highvoltage<br />

grid<br />

Operation "Sav<strong>in</strong>g Energy at<br />

Hous<strong>in</strong>g"<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

LOCATION /<br />

PROGRAMME<br />

Attica, Peloponese / OP<br />

Competitiveness &<br />

Enterpreneurship<br />

Cyclades Islands;<br />

Peloponese / OP<br />

Competitiveness &<br />

Enterpreneurship<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Competitiveness &<br />

Enterpreneurship<br />

TOTAL COST<br />

(CO-FINANCED)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

Contribution to <strong>the</strong> energy security <strong>of</strong> supply;<br />

23.098.741<br />

TEN-E project (Decision (EC)1364/2006)<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

3 1 309 3 End 2012<br />

24.681.926 Contribution to <strong>the</strong> energy security <strong>of</strong> supply; 3 1 267 4 End 2013<br />

20.000.000<br />

Integrated project permit<strong>in</strong>g <strong>the</strong> transition<br />

from <strong>co</strong>nventional to green energy<br />

M<strong>in</strong>istry <strong>of</strong> Environment,<br />

Climate Change and<br />

Energy; General Secretary<br />

for Energy/ Vice -<br />

President DESFA<br />

M<strong>in</strong>istry <strong>of</strong> Environment,<br />

Climate Change and<br />

Energy; General Secretary<br />

for Energy/ Vice -<br />

President DESFA<br />

1 1 158 20 March 2014 Mayor <strong>of</strong> Kozani<br />

54.962.757 Contribution to <strong>the</strong> energy security <strong>of</strong> supply 1 1 1.380 4 Oct. 2014<br />

5.000.000<br />

Pilot action for <strong>the</strong> exploitation <strong>of</strong> <strong>the</strong><br />

geo<strong>the</strong>rmic field <strong>of</strong> <strong>the</strong> Region<br />

M<strong>in</strong>istry <strong>of</strong> Environment,<br />

Climate Change and<br />

Energy; General Secretary<br />

for Energy/ Vice -<br />

President DESFA<br />

1 1 35 25 100 End 2014 Mayor <strong>of</strong> Nestos<br />

44.670.162 Contribution to <strong>the</strong> energy security <strong>of</strong> supply 2 1 638 25 End 2015<br />

127.119.047<br />

396.000.000<br />

CRITERIA (1)<br />

Contribution to future deployment <strong>of</strong><br />

Renewable Energy Sources; EU 2020<br />

objective <strong>of</strong> 20/20/20<br />

Contribution to promotion <strong>of</strong> energy<br />

efficiency <strong>in</strong> private dwell<strong>in</strong>gs<br />

1 2<br />

Cannot be<br />

estimated<br />

JOB CREATION<br />

ENERGY: Integrate and modernize <strong>the</strong> <strong>co</strong>untry’s electricity network <strong>in</strong> particular reduce <strong>the</strong> oil dependence <strong>of</strong> <strong>Greece</strong> <strong>in</strong> an environmentally-friendly manner, re<strong>in</strong>force and meet <strong>the</strong> EU<br />

targets on <strong>the</strong> use <strong>of</strong> renewables so that <strong>the</strong> Country has a secure energy supply, and ensure and improve its energy efficiency patterns (<strong>Projects</strong> 1-7); Improve energy efficiency decisive<br />

for <strong>co</strong>mpetitiveness (Project 8), security <strong>of</strong> supply and for climate change purposes (<strong>Projects</strong> 1-4, 6,7) (<strong>the</strong> MOU refers to energy as a policy area where serious delays have occurred).<br />

<strong>Projects</strong> have been selected because <strong>of</strong> <strong>the</strong>ir maturity, size and high social and e<strong>co</strong>nomic impact.<br />

3 2 909 0<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

10 End 2015<br />

RESPONSIBLE<br />

M<strong>in</strong>istry <strong>of</strong> Environment,<br />

Climate Change and<br />

Energy; General Secretary<br />

for Energy/ Vice -<br />

President DESFA<br />

M<strong>in</strong>istry <strong>of</strong> Environment,<br />

Climate Change and<br />

Energy; General Secretary<br />

for Energy/ Vice -<br />

President DEH<br />

M<strong>in</strong>istry <strong>of</strong> Environment,<br />

Up to full use <strong>of</strong> Climate Change and<br />

<strong>the</strong> available Energy; General Secretary<br />

allocation <strong>of</strong> funds for Energy/ President<br />

ETEAN<br />

1/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

LOCATION /<br />

PROGRAMME<br />

TOTAL COST<br />

(CO-FINANCED)<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

TOTAL 690.532.633 3.696 25 166<br />

COMPETITIVENESS: <strong>Projects</strong> have been selected because <strong>of</strong> <strong>the</strong>ir maturity, size and high social and e<strong>co</strong>nomic impact.<br />

9<br />

Construction <strong>of</strong> <strong>the</strong> build<strong>in</strong>g<br />

"Artificial Intelligence" for <strong>the</strong><br />

Technology Institute<br />

10 Digi Content<br />

11 Digi Retail<br />

12<br />

New Build<strong>in</strong>gs <strong>of</strong> technological<br />

<strong>in</strong>stitute <strong>of</strong> Patra<br />

13 "New Knowledge" for Epirus<br />

14 Astronomy Park <strong>of</strong> Orliakas<br />

15 New Innovative Entrepreneurship<br />

16<br />

17<br />

Crete / OP Crete &<br />

Aegean islands<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Digital Convergence<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Digital Convergence<br />

Patras / OP Western<br />

<strong>Greece</strong>-Pelopennese-<br />

Ionian islands<br />

Epirus / OP Thessally-<br />

Cont<strong>in</strong>ental <strong>Greece</strong>-<br />

Epirus<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

3.059.923 Mature project <strong>in</strong> <strong>in</strong>novative sector 3 1 34 0 June 2012<br />

Support<strong>in</strong>g actions towards 250 <strong>co</strong>mpanies <strong>in</strong><br />

20.000.000<br />

<strong>the</strong> publication sector<br />

100.000.000<br />

Support<strong>in</strong>g actions towards 2.200 <strong>co</strong>mpanies<br />

<strong>in</strong> <strong>the</strong> retail sector.<br />

The project <strong>in</strong>volves <strong>the</strong> <strong>co</strong>nstruction <strong>of</strong> two<br />

modern build<strong>in</strong>gs fully equipped to house and<br />

9.657.025 support <strong>the</strong> research <strong>in</strong>frastructure <strong>of</strong> <strong>the</strong><br />

<strong>in</strong>stitute for scientific and technological<br />

excellence.<br />

3.500.000<br />

R&D projects focused to <strong>the</strong> specific needs <strong>of</strong><br />

Epirus<br />

3 1 not available not available not available End 2012<br />

3 1 not available not available not available End 2013<br />

1 1 10 0 End 2015<br />

RESPONSIBLE<br />

INNOVATION AND RTD: Promote <strong>in</strong>novation and transfer <strong>of</strong> know-how and technology (<strong>Projects</strong> 9-14) pr<strong>in</strong>cipally to SMEs through research and technological development (Project<br />

15-18)<br />

Corallia (micro-electronics<br />

clusters)<br />

Cooperation - Acte I and II; 1st<br />

call, 2009<br />

West Macedonia / OP<br />

Macedonia & Thrace<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Competitiveness &<br />

Enterpreneurship<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Competitiveness &<br />

Enterpreneurship<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Competitiveness &<br />

Enterpreneurship<br />

6.000.000 Education & Tourism 1 1<br />

30.000.000<br />

37.700.000<br />

93.620.000<br />

Boost <strong>in</strong>novative entrepreneurship and<br />

improve <strong>co</strong>mpetitiv<strong>in</strong>ess <strong>of</strong> <strong>the</strong> Greek<br />

e<strong>co</strong>nomy<br />

Boost <strong>in</strong>novation and <strong>co</strong>mpetitiveness <strong>of</strong><br />

entreprises and employment <strong>in</strong> cutt<strong>in</strong>gedge<br />

technology sectors; patents<br />

Boost <strong>in</strong>novation supported <strong>by</strong> RTD through<br />

<strong>co</strong>operation <strong>of</strong> entreprises and Research<br />

Institutes; development <strong>of</strong> new <strong>in</strong>novative<br />

products; boost employment <strong>in</strong> cutt<strong>in</strong>g-edge<br />

and medium technology sectors; boost<br />

<strong>co</strong>mpetitiveness <strong>of</strong> entreprises<br />

Secretary General for<br />

Research and Technology<br />

M<strong>in</strong>istry <strong>of</strong> development -<br />

digital aid s.a<br />

M<strong>in</strong>istry <strong>of</strong> development -<br />

digital aid s.a<br />

Secretary General <strong>of</strong><br />

Research and<br />

Development<br />

3 1 146 0 End 2015 Governor <strong>of</strong> <strong>the</strong> Region<br />

Not known.Not<br />

submitted yet<br />

Not<br />

known.Not<br />

submitted yet<br />

1 2 200 400 500<br />

3 2 300 300 500<br />

3 2 600 80 160<br />

End 2015<br />

Mayor <strong>of</strong> Grevena- Denn<br />

<strong>of</strong> Thessaloniki University<br />

24 months from General Secretary <strong>of</strong><br />

<strong>the</strong> approval date Industry<br />

12-36 months<br />

from <strong>the</strong><br />

<strong>co</strong>ntract<strong>in</strong>g<br />

President <strong>of</strong> Research<br />

Centre ATHINA<br />

Up to 5 years from General Secretary for<br />

<strong>the</strong> approval date Research & Technology<br />

2/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

18<br />

19<br />

20<br />

21<br />

22<br />

Cooperation 2011 - Clusters<br />

between productive sector and<br />

research <strong>in</strong>stitutes<br />

LOCATION /<br />

PROGRAMME<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Competitiveness &<br />

Enterpreneurship<br />

TOTAL COST<br />

(CO-FINANCED)<br />

68.320.000<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

Boost <strong>in</strong>novation supported <strong>by</strong> RTD through<br />

<strong>co</strong>operation <strong>of</strong> entreprises and Research<br />

Institutes; boost <strong>co</strong>mpetitiveness <strong>of</strong><br />

entreprises <strong>in</strong> "Green growth" sectors, boost<br />

employment <strong>in</strong> cutt<strong>in</strong>g-edge and medium<br />

technology sectors;<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

3 2 440 60 120<br />

TOTAL 371.856.948 1.730 840 1.280<br />

Implementation <strong>of</strong> F<strong>in</strong>ancial<br />

Eng<strong>in</strong>eer<strong>in</strong>g Instrument to<br />

support SMEs (ETEAN 460M +<br />

JEREMIE 250M)<br />

Outturn-Competitiveness <strong>of</strong><br />

Entreprises<br />

Manufactur<strong>in</strong>g under new<br />

<strong>co</strong>nditions<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Competitiveness &<br />

Enterpreneurship<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Competitiveness &<br />

Enterpreneurship<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Competitiveness<br />

710.000.000<br />

Boost <strong>in</strong>novative entrepreneurship and<br />

improve <strong>co</strong>mpetitiv<strong>in</strong>ess <strong>of</strong> <strong>the</strong> Greek<br />

e<strong>co</strong>nomy<br />

3 2<br />

Cannot be<br />

estimated<br />

Cannot be<br />

estimated<br />

Cannot be<br />

estimated<br />

30.000.000 Outturn <strong>of</strong> <strong>the</strong> Greek e<strong>co</strong>nomy 2 2 250 200 300<br />

184.313.675<br />

Modernisation <strong>of</strong> SME productive base,<br />

development <strong>of</strong> new products and processes,<br />

outturn, boost<strong>in</strong>g <strong>of</strong> employment<br />

3 1 600 300 500<br />

TOTAL 924.313.675 850 500 800<br />

Development <strong>of</strong> a National<br />

System <strong>of</strong> Electronic Public<br />

Procurement - (ΕΣΗ∆Π) (eprocurement)<br />

23 Digital School<br />

24 NATIONAL REGISTRY<br />

25<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Digital Convergence<br />

9.630.422<br />

Requested <strong>by</strong> MOU-Important for <strong>the</strong><br />

modernisation <strong>of</strong> Public adm<strong>in</strong>istration<br />

3 3 111<br />

Not available<br />

yet<br />

Not available<br />

yet<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

RESPONSIBLE<br />

24-36 months<br />

General Secretary for<br />

from <strong>the</strong> approval<br />

Research & Technology<br />

date<br />

ENTERPRENEURSHIP FOR SMEs: Boost <strong>in</strong>novative entrepreneurship and improve <strong>co</strong>mpetitiveness <strong>of</strong> <strong>the</strong> Greek e<strong>co</strong>nomy (Project 19); Improve <strong>the</strong> outturn <strong>of</strong> <strong>the</strong> Greek e<strong>co</strong>nomy<br />

(Project 20-21)<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Digital Convergence<br />

152.630.000<br />

It is <strong>co</strong>nsidered as a political priority for <strong>the</strong><br />

ICTs <strong>in</strong> its doma<strong>in</strong><br />

End 2015 President ETEAN<br />

24 months from General Secretary <strong>of</strong><br />

<strong>the</strong> approval date Industry<br />

24 months from General Secretary <strong>of</strong><br />

<strong>the</strong> approval date Industry<br />

PUBLIC ADMINISTRTION AND PRODUCTIVITY THROUGH THE USE OF ICT: Improv<strong>in</strong>g public adm<strong>in</strong>istration (<strong>Projects</strong> 22-28) and productivity through <strong>the</strong> use <strong>of</strong> ICT <strong>in</strong>frastructure<br />

(<strong>Projects</strong> 29-32)<br />

Integrated Informatics System<br />

for <strong>the</strong> (Tax) Control Services -<br />

(ELENXIS)<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Digital Convergence<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Digital Convergence<br />

44.860.000 Modernisation <strong>of</strong> Public Adm<strong>in</strong>istration 1 1 432<br />

22.826.681 Modernisation <strong>of</strong> Public Adm<strong>in</strong>istration 3 2 88<br />

End 2015<br />

1 1 558 0 0 End 2013<br />

Not available<br />

yet<br />

Not available<br />

yet<br />

Not available<br />

yet<br />

Not available<br />

yet<br />

End 2015<br />

End 2013<br />

General Secretary <strong>of</strong><br />

Commerce<br />

Secretary General <strong>of</strong><br />

M<strong>in</strong>istry <strong>of</strong> Education<br />

CEO <strong>of</strong> Information<br />

Society S.Α.<br />

CEO <strong>of</strong> Information<br />

Society S.Α.<br />

3/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

26<br />

27<br />

Development <strong>of</strong> services and<br />

<strong>in</strong>frastructure on spatial data for<br />

<strong>the</strong> protection <strong>of</strong> forests and<br />

forest lands<br />

Development <strong>of</strong> an electronic<br />

prescrib<strong>in</strong>g system and relevant<br />

support<strong>in</strong>g services (eprescription)<br />

28 CADASTRE<br />

29<br />

Integrated Informatics System<br />

for <strong>the</strong> Manager <strong>of</strong> <strong>the</strong> Greek<br />

Electrical Grid (∆ΕΣΜΗΕ)<br />

30 Rural broadband<br />

31 e-ticket (OASA)<br />

32<br />

Central ERP for <strong>the</strong> central state<br />

ac<strong>co</strong>unt department<br />

LOCATION /<br />

PROGRAMME<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Digital Convergence<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Digital Convergence<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Digital Convergence<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Digital Convergence<br />

Rural Areas / OP Digital<br />

Convergence<br />

Attica / OP Digital<br />

Convergence<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Digital Convergence<br />

TOTAL COST<br />

(CO-FINANCED)<br />

39.000.000<br />

25.000.010<br />

130.000.000<br />

40.631.000<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

Modernisation <strong>of</strong> Public Adm<strong>in</strong>istration-Land<br />

Registry<br />

Important for <strong>the</strong> modernisation <strong>of</strong> Public<br />

adm<strong>in</strong>istration<br />

It is <strong>co</strong>nsidered as a political priority for <strong>the</strong><br />

ICTs <strong>in</strong> its doma<strong>in</strong><br />

It is <strong>co</strong>nsidered as a political priority for <strong>the</strong><br />

ICTs <strong>in</strong> its doma<strong>in</strong><br />

It is <strong>co</strong>nsidered as a political priority for <strong>the</strong><br />

140.000.000 ICTs <strong>in</strong> its doma<strong>in</strong> ; It <strong>co</strong>mpletes <strong>the</strong> MAN for<br />

<strong>the</strong> Rural Areas<br />

34.758.000<br />

9.009.201<br />

It is <strong>co</strong>nsidered as a political priority for <strong>the</strong><br />

ICTs <strong>in</strong> its doma<strong>in</strong><br />

Project <strong>of</strong> priority importance regard<strong>in</strong>g <strong>the</strong><br />

follow up <strong>of</strong> <strong>the</strong> state budget <strong>by</strong> <strong>the</strong>central<br />

state ac<strong>co</strong>unt department ( <strong>the</strong> m<strong>in</strong>istry <strong>of</strong><br />

f<strong>in</strong>ance)<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

2 1 425<br />

1 3 287<br />

1 3 1.287<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

Non<br />

applicable<br />

Not available<br />

yet<br />

Not available<br />

yet<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

RESPONSIBLE<br />

Non applicable End 2013 CEO <strong>of</strong> Cadastre S.A.<br />

Not available<br />

yet<br />

Not available<br />

yet<br />

End 2014<br />

General Secretary <strong>of</strong><br />

Social Welfare<br />

End 2015 CEO <strong>of</strong> Cadastre S.A.<br />

1 1 443 47 47 End 2015 Secretary General Energy<br />

1 2 880<br />

Not available<br />

yet<br />

Not available<br />

yet<br />

End 2015<br />

CEO <strong>of</strong> Information<br />

Society S.Α.<br />

1 1 652 44 344 End 2015 CEO <strong>of</strong> OASA<br />

3 1<br />

Not available<br />

yet<br />

Not available<br />

yet<br />

TOTAL 648.345.314 5.163 91 391<br />

Not available<br />

yet<br />

End 2015<br />

M<strong>in</strong>istry <strong>of</strong> public<br />

adm<strong>in</strong>stration reform -<br />

<strong>in</strong>formation society s.a.<br />

TRANSPORT: Tackl<strong>in</strong>g <strong>in</strong><strong>co</strong>nsistencies <strong>in</strong> <strong>the</strong> Trans-European networks; Develop<strong>in</strong>g <strong>co</strong>mb<strong>in</strong>ed transport and re<strong>in</strong>forc<strong>in</strong>g <strong>the</strong> <strong>in</strong>termodality <strong>of</strong> <strong>the</strong> transport system; Connect<strong>in</strong>g <strong>the</strong> various<br />

regions <strong>of</strong> <strong>Greece</strong> with <strong>the</strong> trans-European transport networks; Develop<strong>in</strong>g and expand<strong>in</strong>g urban transport; Upgrad<strong>in</strong>g <strong>in</strong>frastructure; Promot<strong>in</strong>g <strong>in</strong>stitutional and organisational<br />

<strong>in</strong>terventions.<br />

<strong>Projects</strong> have been selected because <strong>of</strong> <strong>the</strong>ir maturity, size and high social and e<strong>co</strong>nomic impact.<br />

CONCESSION ROAD PROJECTS: Concession projects that target to <strong>co</strong>nnect Central, South <strong>Greece</strong> and <strong>the</strong> Peloponnese to <strong>the</strong> Egnatia axis. (<strong>Projects</strong> 33-37)<br />

4/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

33<br />

34<br />

35<br />

Construction <strong>of</strong> OLYMPIA ODOS<br />

motorway (Elefs<strong>in</strong>a - Kor<strong>in</strong>thos -<br />

Patra - Pyrgos - Tsakona)<br />

Construction <strong>of</strong> <strong>the</strong> MOREAS<br />

ODOS motorway (Kor<strong>in</strong>thos -<br />

Tripoli - Kalamata and Lefktro-<br />

Sparti branch)<br />

Construction <strong>of</strong> <strong>the</strong> Central<br />

<strong>Greece</strong> (E65) motorway<br />

LOCATION /<br />

PROGRAMME<br />

North Peloponese / OP<br />

Accessibility<br />

Central Peloponese /<br />

OP Accessibility<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Accessibility<br />

TOTAL COST<br />

(CO-FINANCED)<br />

511.399.757<br />

296.657.714<br />

455.637.672<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

The project belongs to <strong>the</strong> TEN-T and aims at<br />

<strong>co</strong>nnect<strong>in</strong>g <strong>the</strong> <strong>co</strong>untry with <strong>the</strong> <strong>co</strong>untries <strong>of</strong><br />

<strong>the</strong> rest <strong>of</strong> Europe while creat<strong>in</strong>g <strong>the</strong><br />

fundamental axes <strong>of</strong> <strong>the</strong> <strong>co</strong>untry. It is <strong>of</strong><br />

utmost importance to <strong>the</strong> facilitation <strong>of</strong> <strong>the</strong><br />

<strong>co</strong>untry's transportations. Its <strong>co</strong>mpletion will<br />

<strong>co</strong>ntribute <strong>in</strong> <strong>the</strong> Regional Development <strong>of</strong><br />

<strong>the</strong> areas it serves. It is expected to have an<br />

improvement on <strong>the</strong> level <strong>of</strong> road safety and<br />

big ga<strong>in</strong>s from <strong>the</strong> part <strong>of</strong> <strong>the</strong> users due to<br />

<strong>the</strong> reduction <strong>of</strong> <strong>the</strong> transportation time and<br />

<strong>the</strong> <strong>in</strong>crease <strong>of</strong> road safety.<br />

(estimated total <strong>co</strong>-f<strong>in</strong>anc<strong>in</strong>g<br />

<strong>co</strong>st:421.501.427euros).<br />

The project aims at <strong>co</strong>nnect<strong>in</strong>g <strong>the</strong> <strong>co</strong>untry<br />

with <strong>the</strong> <strong>co</strong>untries <strong>of</strong> <strong>the</strong> rest <strong>of</strong> Europe while<br />

creat<strong>in</strong>g <strong>the</strong> fundamental axes <strong>of</strong> <strong>the</strong><br />

<strong>co</strong>untry. It is <strong>of</strong> utmost importance to <strong>the</strong><br />

facilitation <strong>of</strong> <strong>the</strong> <strong>co</strong>untry's transportations.<br />

Its <strong>co</strong>mpletion will <strong>co</strong>ntribute <strong>in</strong> <strong>the</strong> Regional<br />

Development <strong>of</strong> <strong>the</strong> areas it serves. It is<br />

expected to have an improvement on <strong>the</strong><br />

level <strong>of</strong> road safety and big ga<strong>in</strong>s from <strong>the</strong><br />

part <strong>of</strong> <strong>the</strong> users due to <strong>the</strong> reduction <strong>of</strong> <strong>the</strong><br />

transportation time and <strong>the</strong> <strong>in</strong>crease <strong>of</strong> road<br />

safety.<br />

(estimated total <strong>co</strong>-f<strong>in</strong>anc<strong>in</strong>g<br />

<strong>co</strong>st:249.095.991euros).<br />

The project aims <strong>in</strong> one hand at <strong>co</strong>nnect<strong>in</strong>g<br />

<strong>the</strong> <strong>co</strong>untry with <strong>the</strong> <strong>co</strong>untries <strong>of</strong> <strong>the</strong> rest <strong>of</strong><br />

Europe while creat<strong>in</strong>g <strong>the</strong> fundamental axes<br />

<strong>of</strong> <strong>the</strong> <strong>co</strong>untry. It is <strong>of</strong> utmost importance to<br />

<strong>the</strong> facilitation <strong>of</strong> <strong>the</strong> <strong>co</strong>untry's<br />

transportations. Its <strong>co</strong>mpletion will <strong>co</strong>ntribute<br />

<strong>in</strong> <strong>the</strong> Regional Development <strong>of</strong> <strong>the</strong> areas it<br />

serves. It is expected to have an<br />

improvement on <strong>the</strong> level <strong>of</strong> road safety and<br />

big ga<strong>in</strong>s from <strong>the</strong> part <strong>of</strong> <strong>the</strong> users due to<br />

<strong>the</strong> reduction <strong>of</strong> <strong>the</strong> transportation time and<br />

<strong>the</strong> <strong>in</strong>crease <strong>of</strong> road safety.<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

3 2 21.636 322 403 End 2015<br />

3 2 6.076 132 165 End 2015<br />

3 2 13.770 126 157 End 2015<br />

RESPONSIBLE<br />

Secretary General <strong>of</strong><br />

C<strong>of</strong><strong>in</strong>anced Works /<br />

YPYMEDI<br />

Secretary General <strong>of</strong><br />

C<strong>of</strong><strong>in</strong>anced Works /<br />

YPYMEDI<br />

Secretary General <strong>of</strong><br />

C<strong>of</strong><strong>in</strong>anced Works /<br />

YPYMEDI<br />

5/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

36 Construction <strong>of</strong> Ionia odos<br />

37<br />

38<br />

39<br />

40<br />

41<br />

42<br />

Construction <strong>of</strong> <strong>the</strong> Maliakos -<br />

Kleidi motorway<br />

LOCATION /<br />

PROGRAMME<br />

Epirus and western<br />

<strong>Greece</strong> as well as South-<br />

East <strong>co</strong>nt<strong>in</strong>ental <strong>Greece</strong><br />

/ OP Accessibility<br />

North East Cont<strong>in</strong>ental<br />

<strong>Greece</strong> / OP<br />

Accessibility<br />

TOTAL COST<br />

(CO-FINANCED)<br />

183.970.114<br />

149.545.685<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

The project belongs to <strong>the</strong> TEN-T and aims at<br />

<strong>co</strong>nnect<strong>in</strong>g <strong>the</strong> <strong>co</strong>untry with <strong>the</strong> <strong>co</strong>untries <strong>of</strong><br />

<strong>the</strong> rest <strong>of</strong> Europe while creat<strong>in</strong>g <strong>the</strong><br />

fundamental axes <strong>of</strong> <strong>the</strong> <strong>co</strong>untry. It is <strong>of</strong><br />

utmost importance to <strong>the</strong> facilitation <strong>of</strong> <strong>the</strong><br />

<strong>co</strong>untry's transportations. Its <strong>co</strong>mpletion will<br />

<strong>co</strong>ntribute <strong>in</strong> <strong>the</strong> Regional Development <strong>of</strong><br />

<strong>the</strong> areas it serves. It is expected to have an<br />

improvement on <strong>the</strong> level <strong>of</strong> road safety and<br />

big ga<strong>in</strong>s from <strong>the</strong> part <strong>of</strong> <strong>the</strong> users due to<br />

<strong>the</strong> reduction <strong>of</strong> <strong>the</strong> transportation time and<br />

<strong>the</strong> <strong>in</strong>crease <strong>of</strong> road safety.<br />

The project belongs to <strong>the</strong> TEN-T and aims at<br />

<strong>co</strong>nnect<strong>in</strong>g <strong>the</strong> <strong>co</strong>untry with <strong>the</strong> <strong>co</strong>untries <strong>of</strong><br />

<strong>the</strong> rest <strong>of</strong> Europe while creat<strong>in</strong>g <strong>the</strong><br />

fundamental axes <strong>of</strong> <strong>the</strong> <strong>co</strong>untry. It is <strong>of</strong><br />

utmost importance to <strong>the</strong> facilitation <strong>of</strong> <strong>the</strong><br />

<strong>co</strong>untry's transportations. Its <strong>co</strong>mpletion will<br />

<strong>co</strong>ntribute <strong>in</strong> <strong>the</strong> Regional Development <strong>of</strong><br />

<strong>the</strong> areas it serves. It is expected to have an<br />

improvement on <strong>the</strong> level <strong>of</strong> road safety and<br />

big ga<strong>in</strong>s from <strong>the</strong> part <strong>of</strong> <strong>the</strong> users due to<br />

<strong>the</strong> reduction <strong>of</strong> <strong>the</strong> transportation time and<br />

<strong>the</strong> <strong>in</strong>crease <strong>of</strong> road safety.<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

3 2 5.716 327 409 End 2015<br />

3 2<br />

Unknown,<br />

not submitted<br />

yet<br />

Unknown,<br />

not<br />

submitted<br />

yet<br />

Unknown, not<br />

submitted yet<br />

TOTAL 1.597.210.942 47.198 907 1.134<br />

R<strong>in</strong>g <strong>of</strong> Vathy Samos (bridgeproject<br />

CSF III)<br />

Improvements <strong>in</strong> <strong>the</strong> national<br />

road <strong>of</strong> Chios Cardamila<br />

Local road Kampi - Havouna-<br />

Kato Meria <strong>in</strong> Kea<br />

North Aegean / OP<br />

Aegean - Crete<br />

North Aegean / OP<br />

Aegean - Crete<br />

South Aegean / OP<br />

Aegean - Crete<br />

End 2015<br />

RESPONSIBLE<br />

Secretary General <strong>of</strong><br />

C<strong>of</strong><strong>in</strong>anced Works /<br />

YPYMEDI<br />

Secretary General <strong>of</strong><br />

C<strong>of</strong><strong>in</strong>anced Works /<br />

YPYMEDI<br />

ROADS: Roads improvements <strong>in</strong> several Regions; F<strong>in</strong>alisation <strong>of</strong> 5 vertical axes <strong>of</strong> Egnatia Odos (<strong>Projects</strong> 50, 61, 62, 63, 72); F<strong>in</strong>alisation <strong>of</strong> parts <strong>of</strong> PATHE (Project 70), Aktio (Project 71), as well<br />

as <strong>the</strong> North and south axis <strong>of</strong> Kriti (Project 68, 69), safety netwotk (76).<br />

Paraionia Road - Tunnel Junction<br />

St Ilia<br />

Completion <strong>of</strong> local road Larissa-<br />

Karditsa<br />

Western <strong>Greece</strong> / OP<br />

Western <strong>Greece</strong> &<br />

Ionian islands<br />

Thessaly / OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

14.006.224 Re<strong>in</strong>forcement <strong>of</strong> accessibility 3 1 50 June 2012 Governor <strong>of</strong> North Aegean<br />

10.985.000 Re<strong>in</strong>forcement <strong>of</strong> accessibility 3 1 30 June 2012 Governor <strong>of</strong> North Aegean<br />

3.377.565<br />

7.234.646<br />

Improve <strong>co</strong>nditions <strong>of</strong> road transport <strong>in</strong><br />

tourist areas<br />

Re<strong>in</strong>forcement <strong>of</strong> <strong>co</strong>mpetitiveness <strong>of</strong> <strong>the</strong><br />

Region Western <strong>Greece</strong><br />

3 1 40 0 End 2012 Governor <strong>of</strong> South Aegean<br />

3 1 60 0 End 2012<br />

23.000.000 Improve <strong>co</strong>nditions <strong>of</strong> road transport 3 1 144 0 0 End 2012<br />

M<strong>in</strong>istry <strong>of</strong> Infrastructure,<br />

Transport and Networks<br />

Regional Governor <strong>of</strong><br />

Thessaly<br />

6/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

43<br />

44<br />

Improvement <strong>of</strong> <strong>the</strong> local road 40<br />

Paiania - Spata - Loutsa<br />

National Road Thiva-Livadeia km<br />

position 9+000 to 11+ 600<br />

45 Road Atalanti- Section E<br />

46<br />

47<br />

48<br />

49<br />

50<br />

51<br />

52<br />

Upgrade <strong>of</strong> road sections:<br />

<strong>in</strong>terchange Anatoli with Egnatia<br />

odos <strong>of</strong> national road Ioann<strong>in</strong>a-<br />

Arta<br />

Road project "Raptaioi Road-<br />

New Styra- Styra"<br />

Upgrade- tar <strong>co</strong>verage from<br />

<strong>in</strong>terchange Ell<strong>in</strong>iko to Kalentzi<br />

Improvement <strong>of</strong> Kylliki Road -<br />

National Road Patra - Pyrgos<br />

F<strong>in</strong>alisation <strong>of</strong> Egnatia Vertical<br />

Axis, Komot<strong>in</strong>i - Nymfea - Greek-<br />

Bulgarian borders<br />

Completion - improvement <strong>of</strong> <strong>the</strong><br />

national road Rodos - L<strong>in</strong>dos<br />

Improvement <strong>of</strong> local road Ag.<br />

Isidoros - Laerma <strong>of</strong> Rodos<br />

LOCATION /<br />

PROGRAMME<br />

TOTAL COST<br />

(CO-FINANCED)<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

RESPONSIBLE<br />

Attica / OP Attica 13.090.000 Improve <strong>co</strong>nditions <strong>of</strong> road transport 3 1 End 2012 Governor <strong>of</strong> Attica<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

Epirus / OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Thessally-<br />

Cont<strong>in</strong>ental <strong>Greece</strong>-<br />

Epirus<br />

Epirus / OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

Western <strong>Greece</strong> / OP<br />

Western <strong>Greece</strong> &<br />

Ionian islands<br />

East Macedonia and<br />

Thrace / OP<br />

Accessibility<br />

South Aegean / OP<br />

Crete & Aegean islands<br />

South Aegean / OP<br />

Aegean - Crete<br />

7.880.000 Improv<strong>in</strong>g accessibility 3 1 29 0 0 March 2013<br />

10.000.000 Improv<strong>in</strong>g accessibility 3 1 35 0 0 March 2013<br />

14.540.855 Re<strong>in</strong>forcement <strong>of</strong> accessibility 3 1 91 0 0 June 2012<br />

19.077.120<br />

Connection <strong>of</strong> South- Central Evoia & Road<br />

safety<br />

Governor <strong>of</strong> <strong>the</strong> region <strong>of</strong><br />

Cont<strong>in</strong>ental <strong>Greece</strong><br />

Governor <strong>of</strong> <strong>the</strong> region <strong>of</strong><br />

Cont<strong>in</strong>ental <strong>Greece</strong><br />

Regional Governor <strong>of</strong><br />

Epirus<br />

3 1 166 0 Sept. 2013 Governor <strong>of</strong> <strong>the</strong> Region<br />

9.800.000 Re<strong>in</strong>forcement <strong>of</strong> accessibility 3 1 110 0 0 End 2013<br />

7.796.920<br />

38.722.853<br />

13.000.000<br />

Re<strong>in</strong>forcement <strong>of</strong> <strong>co</strong>mpetitiveness <strong>of</strong> <strong>the</strong><br />

Region Western <strong>Greece</strong><br />

The vertical axes <strong>of</strong> Egnatia are a part <strong>of</strong> <strong>the</strong><br />

Transeuropean Transport Network and an<br />

end <strong>of</strong> <strong>the</strong> Paneuropean Corridors. The<br />

<strong>co</strong>mpletion <strong>of</strong> <strong>the</strong> works will have direct and<br />

<strong>in</strong>direct <strong>co</strong>nsequences on <strong>the</strong> social and<br />

f<strong>in</strong>ancial upgrade <strong>of</strong> Nor<strong>the</strong>rn <strong>Greece</strong>. It will<br />

<strong>co</strong>ntribute to <strong>the</strong> national policy on road<br />

transport, on <strong>the</strong> doma<strong>in</strong> <strong>of</strong> trans-frontier<br />

<strong>co</strong>nnections and <strong>the</strong> re<strong>in</strong>forcement <strong>of</strong> <strong>the</strong><br />

local e<strong>co</strong>nomy and <strong>the</strong> additional<br />

development <strong>of</strong> <strong>the</strong> prefectures it runs<br />

through.<br />

L<strong>in</strong>k to <strong>the</strong> major archaeological site <strong>of</strong><br />

L<strong>in</strong>dos - Help to <strong>in</strong>crease <strong>the</strong> tourist<br />

attractiveness <strong>of</strong> <strong>the</strong> island <strong>of</strong> Rodos<br />

3 1 100 0 End 2013<br />

3 2 834 12 15 End 2013<br />

3 1 81 1 End 2013<br />

Regional Governor <strong>of</strong><br />

Epirus<br />

Governor <strong>of</strong> <strong>the</strong> Region <strong>of</strong><br />

Western <strong>Greece</strong><br />

President <strong>of</strong> Egnatia ΑΕ -<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

Director for Road projects<br />

<strong>in</strong> <strong>the</strong> M<strong>in</strong>istry <strong>of</strong><br />

Infrastructures<br />

4.180.305 Improve <strong>co</strong>nditions <strong>of</strong> road transport 3 1 61 0 End 2013 Governor <strong>of</strong> South Aegean<br />

7/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

53<br />

54<br />

New roadsection <strong>of</strong> Potamos dam<br />

Pantanassa<br />

Completion <strong>of</strong> western regional<br />

road <strong>of</strong> Egaleo and side networks<br />

55 15th local road <strong>of</strong> Kaloni-Eressos<br />

56<br />

57<br />

Road project "Construction <strong>of</strong><br />

Kanavari road- Thespia-<br />

Domvrena- Thisvi- Prodromos-<br />

Crossroad (Domvra<strong>in</strong>a <strong>by</strong>-pass)<br />

Construction <strong>of</strong> road Igoumenitsa-<br />

Preveza: sections' upgrade,<br />

subsection 4: Karteri-Gerakari-<br />

Parga from km position 0+000 to<br />

14+937.20<br />

58 Road Axis Serres - Amfipoli<br />

59<br />

60<br />

61<br />

Round-about <strong>of</strong> airport from ΧΘ<br />

0+000 to ΧΘ 0+500<br />

Improvement <strong>of</strong> <strong>the</strong> access road<br />

to <strong>the</strong> landfill <strong>of</strong> <strong>the</strong> 2nd<br />

Geographical unity <strong>of</strong> <strong>the</strong><br />

Perfecture <strong>of</strong> AitoloAkarnania<br />

Egnatia Vertical Axis,<br />

Thessaloniki (Derveni) - Serres -<br />

Promach<strong>in</strong>, f<strong>in</strong>alisation <strong>of</strong> parts<br />

Lachanas - Α/Κ Christou & Κ.<br />

Ampela –Α/Κ Petritsiou<br />

LOCATION /<br />

PROGRAMME<br />

Crete / OP Aegean -<br />

Crete<br />

TOTAL COST<br />

(CO-FINANCED)<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

RESPONSIBLE<br />

7.535.000 Improve <strong>co</strong>nditions <strong>of</strong> road transport 2 1 49 End 2013 Region <strong>of</strong> Crete<br />

Attica / OP Attica 17.000.000 Improve <strong>co</strong>nditions <strong>of</strong> road transport 3 1 End 2013 Governor <strong>of</strong> Attica<br />

North Aegean / OP<br />

Aegean - Crete<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Thessally-<br />

Cont<strong>in</strong>ental <strong>Greece</strong>-<br />

Epirus<br />

Epirus / OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

Central Macedonia / OP<br />

Macedonia & Thrace<br />

Ionian Islands / OP<br />

Western <strong>Greece</strong> -<br />

Peloponessus - Ionian<br />

Islands<br />

Western <strong>Greece</strong> / OP<br />

Western <strong>Greece</strong>-<br />

Peloponessus-Ionian<br />

islands<br />

Central Macedonia / OP<br />

Accessibility<br />

5.363.000 Re<strong>in</strong>forcement <strong>of</strong> accessibility 3 1 15 June 2014 Governor<br />

35.106.274 Tourism & Access to/from <strong>in</strong>dustrial zones 2 1 206 0 July 2014 Governor <strong>of</strong> <strong>the</strong> Region<br />

45.000.000 Re<strong>in</strong>forcement <strong>of</strong> accessibility 3 1 300 0 0 End 2014<br />

21.400.000<br />

Re<strong>in</strong>forcement <strong>of</strong> <strong>co</strong>mpetitiveness <strong>of</strong> Central<br />

Macedonia<br />

3 1 310 End 2014<br />

M<strong>in</strong>istry <strong>of</strong> Infrastructure,<br />

Transport and Networks<br />

Governor <strong>of</strong> Central<br />

Macedonia<br />

2.162.639 Improvement <strong>of</strong> <strong>the</strong> accessibility <strong>of</strong> <strong>the</strong> town 3 1 16 End 2014 Municipality <strong>of</strong> Corfou<br />

11.350.000<br />

103.077.754<br />

Access to <strong>the</strong> landfill is currently via an<br />

exist<strong>in</strong>g road which although improved, does<br />

not meet <strong>the</strong> necessary requirements<br />

(narrow, steep slopes, etc). The project is<br />

necessary for <strong>the</strong> operation <strong>of</strong> <strong>the</strong> landfill and<br />

to <strong>co</strong>mplete <strong>the</strong> management<br />

The vertical axes <strong>of</strong> Egnatia are a part <strong>of</strong> <strong>the</strong><br />

Transeuropean Transport Network and an<br />

end <strong>of</strong> <strong>the</strong> Paneuropean Corridors. The<br />

<strong>co</strong>mpletion <strong>of</strong> <strong>the</strong> works will have direct and<br />

<strong>in</strong>direct <strong>co</strong>nsequences on <strong>the</strong> social and<br />

f<strong>in</strong>ancial upgrade <strong>of</strong> Nor<strong>the</strong>rn <strong>Greece</strong>. It will<br />

<strong>co</strong>ntribute to <strong>the</strong> national policy on road<br />

transport, on <strong>the</strong> doma<strong>in</strong> <strong>of</strong> trans-frontier<br />

<strong>co</strong>nnections and <strong>the</strong> re<strong>in</strong>forcement <strong>of</strong> <strong>the</strong><br />

local e<strong>co</strong>nomy and <strong>the</strong> additional<br />

development <strong>of</strong> <strong>the</strong> prefectures it runs<br />

through.<br />

2 1 157 0 End 2014 Governor <strong>of</strong> <strong>the</strong> Region<br />

3 2 1.419 17 21 End 2014<br />

President <strong>of</strong> Egnatia ΑΕ -<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

8/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

62<br />

63<br />

Egnatia Vertical Axis, part<br />

Koromilia - Ieropigi -<br />

Krystallopigi<br />

Egnatia Vertical Axis, part Flor<strong>in</strong>a<br />

- Niki<br />

64 Larissa <strong>by</strong>-pass<br />

65<br />

66<br />

67<br />

68<br />

69<br />

Construction <strong>of</strong> road network<br />

Airport - Fira - Vourvoulio - Oia<br />

Road Axis - Section: Potidaia -<br />

Cassandreia <strong>in</strong> Cassandra<br />

(Chalkidiki)<br />

Improvement <strong>of</strong> road Gythio-<br />

Areopoli-Gerolimenas (<strong>in</strong><br />

sections)<br />

NOAK: F<strong>in</strong>alisation <strong>of</strong> <strong>the</strong><br />

<strong>co</strong>nstruction <strong>of</strong> <strong>the</strong> part Ag.<br />

Varvara - Ag. Deka (Kastelli)<br />

(pos. 22+170 - pos. 37+900) <strong>of</strong><br />

<strong>the</strong> verical road axis Irakleio -<br />

Messara<br />

BOAK: F<strong>in</strong>alisation <strong>of</strong> <strong>the</strong><br />

<strong>co</strong>nstruction and upgradee <strong>of</strong> <strong>the</strong><br />

Cretan Nor<strong>the</strong>rn Road Axis<br />

(BOAK)<br />

LOCATION /<br />

PROGRAMME<br />

West Macedonia / OP<br />

Accessibility<br />

West Macedonia / OP<br />

Accessibility<br />

Thessaly / OP Thessally-<br />

Cont<strong>in</strong>ental <strong>Greece</strong>-<br />

Epirus<br />

South Aegean / OP<br />

Aegean - Crete<br />

Central Macedonia / OP<br />

Macedonia & Thrace<br />

Peloponessus / OP<br />

Western <strong>Greece</strong>-<br />

Peloponessus-Ionian<br />

islands<br />

TOTAL COST<br />

(CO-FINANCED)<br />

131.901.159<br />

69.000.000<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

The vertical axes <strong>of</strong> Egnatia are a part <strong>of</strong> <strong>the</strong><br />

Transeuropean Transport Network and an<br />

end <strong>of</strong> <strong>the</strong> Paneuropean Corridors. The<br />

<strong>co</strong>mpletion <strong>of</strong> <strong>the</strong> works will have direct and<br />

<strong>in</strong>direct <strong>co</strong>nsequences on <strong>the</strong> social and<br />

f<strong>in</strong>ancial upgrade <strong>of</strong> Nor<strong>the</strong>rn <strong>Greece</strong>. It will<br />

<strong>co</strong>ntribute to <strong>the</strong> national policy on road<br />

transport, on <strong>the</strong> doma<strong>in</strong> <strong>of</strong> trans-frontier<br />

<strong>co</strong>nnections and <strong>the</strong> re<strong>in</strong>forcement <strong>of</strong> <strong>the</strong><br />

local e<strong>co</strong>nomy and <strong>the</strong> additional<br />

development <strong>of</strong> <strong>the</strong> prefectures it runs<br />

through.<br />

The vertical axes <strong>of</strong> Egnatia are a part <strong>of</strong> <strong>the</strong><br />

Transeuropean Transport Network and an<br />

end <strong>of</strong> <strong>the</strong> Paneuropean Corridors. The<br />

<strong>co</strong>mpletion <strong>of</strong> <strong>the</strong> works will have direct and<br />

<strong>in</strong>direct <strong>co</strong>nsequences on <strong>the</strong> social and<br />

f<strong>in</strong>ancial upgrade <strong>of</strong> Nor<strong>the</strong>rn <strong>Greece</strong>. It will<br />

<strong>co</strong>ntribute to <strong>the</strong> national policy on road<br />

transport, on <strong>the</strong> doma<strong>in</strong> <strong>of</strong> trans-frontier<br />

<strong>co</strong>nnections and <strong>the</strong> re<strong>in</strong>forcement <strong>of</strong> <strong>the</strong><br />

local e<strong>co</strong>nomy and <strong>the</strong> additional<br />

development <strong>of</strong> <strong>the</strong> prefectures it runs<br />

through.<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

2 3 1.053 End 2014<br />

2 3 854 6 7 End 2014<br />

RESPONSIBLE<br />

President <strong>of</strong> Egnatia ΑΕ -<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

President <strong>of</strong> Egnatia ΑΕ -<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

21.602.000 De<strong>co</strong>ngestion <strong>of</strong> <strong>the</strong> city <strong>of</strong> Larissa 2 1 85 0 End 2014 Governor <strong>of</strong> <strong>the</strong> Region<br />

16.500.000 Reduce traffic <strong>of</strong> settlements <strong>of</strong> Fira and Oia 2 1 245 0 End 2014 Egnatia Road SA<br />

64.300.000 Tourism; road safety 3 3 402 0 March 2015<br />

13.203.000<br />

L<strong>in</strong>k to Gythion port - Social (road safety)<br />

and e<strong>co</strong>nomic impact (facilitat<strong>in</strong>g trade<br />

transport)<br />

Department <strong>of</strong> Public<br />

Works - Central<br />

Macedonia<br />

1 1 81 0 End 2015 Governor <strong>of</strong> <strong>the</strong> Region<br />

Crete / OP Accessibility 52.146.437 Completion <strong>of</strong> <strong>the</strong> vertical axis <strong>of</strong> Kriti 3 3 464 End 2015<br />

Crete / OP Accessibility 72.222.120 Completion <strong>of</strong> <strong>the</strong> BOAK axis <strong>of</strong> Kriti 3 3 441 End 2015<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

9/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

70<br />

71<br />

72<br />

73<br />

Completion <strong>of</strong> <strong>the</strong> <strong>co</strong>nnections <strong>of</strong><br />

<strong>the</strong> PATHE motorway with <strong>the</strong><br />

port and <strong>the</strong> city <strong>of</strong> Patra<br />

Construction <strong>of</strong> road <strong>co</strong>nnection<br />

<strong>of</strong> <strong>the</strong> area <strong>of</strong> Aktio with <strong>the</strong><br />

Western Axis <strong>of</strong> North-South<br />

Vertical Axis <strong>of</strong> Egnatia Ardanio -<br />

Ormenio: Sections Ardanio -<br />

Mandra & Mandra -Psathades<br />

Road Axis Veria - Naoussa -<br />

Skydra : <strong>co</strong>mpletion <strong>of</strong> <strong>the</strong><br />

section Patrida - Naoussa<br />

74 Narional Road Larissa-Trikala<br />

75<br />

Improvement and widen<strong>in</strong>g <strong>of</strong><br />

<strong>the</strong> local road Belo - Stimagka -<br />

Nemea<br />

76 Safety <strong>of</strong> road network<br />

LOCATION /<br />

PROGRAMME<br />

Western Peloponessus /<br />

OP Accessibility<br />

TOTAL COST<br />

(CO-FINANCED)<br />

85.877.311<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

F<strong>in</strong>alisation <strong>of</strong> <strong>the</strong> port facilities <strong>of</strong> <strong>the</strong> Patra<br />

port <strong>in</strong> order to receive a higher number <strong>of</strong><br />

boats notably from Italy (TEN-T)<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

3 3 543 End 2015<br />

Epirus / OP Accessibility 212.832.896 Vertical axis on <strong>the</strong> Ionia Odos 3 3 1.079 2 2 End 2015<br />

East Macedonia &<br />

Thrace / OP East<br />

Macedonia &Thrace<br />

Central Macedonia / OP<br />

Macedonia & Thrace<br />

Thessaly / OP Thessally-<br />

Cont<strong>in</strong>ental <strong>Greece</strong>-<br />

Epirus<br />

Peloponessus / OP<br />

Peloponessus & Ionian<br />

Islands<br />

Crete / OP Aegean -<br />

Crete<br />

105.369.105<br />

19.250.000<br />

49.312.648<br />

7.000.000<br />

Completion <strong>of</strong> <strong>the</strong> vertical axis Ardanio-<br />

Ormenion for <strong>the</strong> valorisation <strong>of</strong> <strong>the</strong><br />

geographic position <strong>of</strong> <strong>the</strong> region which<br />

<strong>co</strong>nstitutes <strong>the</strong> development target <strong>of</strong> <strong>the</strong><br />

region (<strong>in</strong>cluded <strong>in</strong> <strong>the</strong> TEN 9IX)<br />

Bridge project- De<strong>co</strong>ngestion <strong>of</strong> traffic<br />

(transportation <strong>of</strong> agricultutal production)<br />

The road axis Larissa Trikala is <strong>the</strong> basic road<br />

axis for Thessaly's <strong>in</strong>tra and <strong>in</strong>terregional<br />

traffic- Road safety- Ga<strong>in</strong> <strong>of</strong> time- Major<br />

project divided <strong>in</strong> 2 stages<br />

Re<strong>in</strong>forcement <strong>of</strong> <strong>co</strong>mpetitiveness <strong>of</strong> <strong>the</strong><br />

Region <strong>of</strong> Peloponnesus<br />

3 3 1.488 0 21 End 2015<br />

3 3 122 0 End 2015<br />

RESPONSIBLE<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

President <strong>of</strong> Egnatia ΑΕ -<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

Department <strong>of</strong> Public<br />

Works - Central<br />

Macedonia<br />

3, 2 3 300 0 End 2015 Governor <strong>of</strong> <strong>the</strong> Region<br />

0 1 77 End 2015<br />

Governor <strong>of</strong> <strong>the</strong> Region <strong>of</strong><br />

Peloponnesus<br />

35.000.000 Road safety 0 1 End 2015 Governor <strong>of</strong> Creta<br />

TOTAL 1.400.202.831 11.537 37 67<br />

CLEAN URBAN TRANSPORT: Modernisation <strong>of</strong> <strong>the</strong> urban transports <strong>of</strong> Attica and Thessaloniki; Improve <strong>the</strong> quality <strong>of</strong> life <strong>of</strong> citizens, reduce pollution and <strong>in</strong>crease rapidity <strong>of</strong> transportation;<br />

(<strong>Projects</strong> 77-82)<br />

10/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

77<br />

78<br />

79<br />

Renovation <strong>of</strong> under and over<br />

structure <strong>of</strong> <strong>the</strong> ISAP l<strong>in</strong>es and<br />

Omonoia tunnel<br />

A<strong>the</strong>ns metro, extension <strong>of</strong> l<strong>in</strong>e<br />

3, section "Egaleo-Haidari",<br />

depot "Eleonas", transfer station<br />

"Xaidari, transfer station<br />

"Keramikos"<br />

Extension <strong>of</strong> l<strong>in</strong>e 3 <strong>of</strong> <strong>the</strong> A<strong>the</strong>ns<br />

Metro, part Chaidari - Pireas<br />

LOCATION /<br />

PROGRAMME<br />

TOTAL COST<br />

(CO-FINANCED)<br />

Attica / OP Accessibility 53.090.542<br />

Attica / OP<br />

Environment<br />

54.837.993<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

The project will br<strong>in</strong>g about <strong>the</strong> <strong>the</strong> upgrade<br />

<strong>of</strong> <strong>the</strong> network ac<strong>co</strong>rd<strong>in</strong>g to <strong>the</strong><br />

<strong>co</strong>ntemporary technology demands. The<br />

project's <strong>co</strong>mpletion will have as a result <strong>the</strong><br />

improvement <strong>of</strong> <strong>the</strong> services provided<br />

towards <strong>the</strong> passengers through <strong>the</strong> <strong>in</strong>crease<br />

<strong>of</strong> <strong>the</strong> average speed <strong>of</strong> <strong>the</strong> tra<strong>in</strong>s and <strong>the</strong><br />

safer transportation, <strong>the</strong> <strong>co</strong>mfort as well as<br />

<strong>the</strong> improvement <strong>of</strong> <strong>the</strong> neighbor<strong>in</strong>g areas <strong>of</strong><br />

<strong>the</strong> network <strong>in</strong> terms <strong>of</strong> noise and vibrations.<br />

The upgrad<strong>in</strong>g <strong>of</strong> <strong>the</strong> l<strong>in</strong>e will <strong>co</strong>ntribute to<br />

<strong>the</strong> <strong>in</strong>crease <strong>of</strong> <strong>the</strong> number <strong>of</strong> passengers<br />

with an additional reduction <strong>of</strong> car usage,<br />

someth<strong>in</strong>g that will <strong>co</strong>ntribute to <strong>the</strong><br />

reduction <strong>of</strong> atmospheric pollution <strong>in</strong> <strong>the</strong><br />

Attiki bas<strong>in</strong>.<br />

Maturity & rapid visibility; Environmental<br />

impact: clean transport<br />

The project will <strong>co</strong>ntribute to <strong>the</strong> upgrade <strong>of</strong><br />

<strong>the</strong> structure and <strong>the</strong> traffic <strong>co</strong>nditions and <strong>in</strong><br />

<strong>the</strong> reduction <strong>of</strong> bottlenecks <strong>in</strong> <strong>the</strong> Attiki<br />

Attica / OP Accessibility 414.217.350 bas<strong>in</strong> which faces a sharp traffic problem. In<br />

addition, pollution from <strong>the</strong> road traffic will<br />

be reduced while quality <strong>of</strong> life will be<br />

improved.<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

3 3 1.278 0 End 2012<br />

3 3 3.300 End 2013<br />

3 3 5.169 End 2015<br />

80 New ETHEL buses Attica / OP Accessibility 42.066.205 Renewal <strong>of</strong> <strong>the</strong> A<strong>the</strong>ns bus fleet 3 3 0 0 End 2015<br />

81 Metro <strong>of</strong> Thessaloniki<br />

82<br />

Westward extension <strong>of</strong> tram to<br />

Piraeus<br />

Central Macedonia /<br />

OP Macedonia & Thrace<br />

A<strong>the</strong>ns/Piraeus / OP<br />

Attica<br />

323.000.000 Maturity, rapid visibility, green transport 3 3 End 2015<br />

120.884.500 Green Transport 2 3 940 98 End 2015<br />

TOTAL 1.008.096.590 10.687 0 98<br />

PORTS: Modernisation <strong>of</strong> ports; Improve <strong>the</strong> capacity and quality <strong>of</strong> services for cargo and passengers (<strong>Projects</strong> 83-93)<br />

RESPONSIBLE<br />

President and Manag<strong>in</strong>g<br />

Director <strong>of</strong> StasyΑ.Ε.<br />

M<strong>in</strong>istry <strong>of</strong> Infrastructure,<br />

Transport &<br />

Networks/General<br />

Secretary <strong>of</strong> Public Works<br />

/ YPYMEDI<br />

President <strong>of</strong> Μetro ΑΕ. -<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

Secretary General <strong>of</strong><br />

Transport / YPYMEDI<br />

President <strong>of</strong> Μetro ΑΕ. -<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

President and Councillor <strong>of</strong><br />

TRAM AE<br />

11/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

83<br />

84<br />

Transformation and<br />

modernisation <strong>of</strong> Kymi port<br />

Upgrade and extension <strong>of</strong><br />

Mantoudi port<br />

85 Construction <strong>of</strong> pier <strong>in</strong> Symi port<br />

86<br />

87<br />

88<br />

Infrastructure works for <strong>the</strong><br />

protection <strong>of</strong> <strong>the</strong> sea-side <strong>of</strong> <strong>the</strong><br />

port <strong>of</strong> Astrous<br />

New port <strong>of</strong> Patra. 3rd part,<br />

phase A<br />

New port <strong>of</strong> Igoumenitsa, phase<br />

C<br />

89 Katakolon port<br />

LOCATION /<br />

PROGRAMME<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Thessally-<br />

Cont<strong>in</strong>ental <strong>Greece</strong>-<br />

Epirus<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

South Aegean / OP<br />

Aegean - Crete<br />

Peloponessus / OP<br />

Western <strong>Greece</strong> -<br />

Peloponessus - Ionian<br />

Islands<br />

Western Peloponessus /<br />

OP Accessibility<br />

TOTAL COST<br />

(CO-FINANCED)<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

RESPONSIBLE<br />

8.979.000 Tourism; Accessibility to Eastern Evoia 2 1 66 0 Sept. 2012 Governor <strong>of</strong> <strong>the</strong> Region<br />

8.100.000<br />

5.500.000<br />

5.340.000<br />

55.406.655<br />

Epirus / OP Accessibility 53.722.500<br />

Peloponessus / OP<br />

Western <strong>Greece</strong>-<br />

Peloponessus-Ionian<br />

islands<br />

20.000.000<br />

Upgrad<strong>in</strong>g transport <strong>in</strong>frastructure and<br />

adequate port facilities<br />

Upgrad<strong>in</strong>g transport <strong>in</strong>frastructure and<br />

adequate port facilities<br />

Re<strong>in</strong>forcement <strong>of</strong> <strong>co</strong>mpetitiveness <strong>of</strong> <strong>the</strong><br />

Region <strong>of</strong> Peloponnesus<br />

Its <strong>co</strong>mpletion will br<strong>in</strong>g about positive<br />

<strong>co</strong>nsequences <strong>in</strong> <strong>the</strong> restructur<strong>in</strong>g and <strong>the</strong><br />

upgrad<strong>in</strong>g <strong>of</strong> shipp<strong>in</strong>g, <strong>in</strong> regional<br />

development and <strong>the</strong> re<strong>in</strong>forcement <strong>of</strong><br />

touristic development through <strong>the</strong><br />

improvement <strong>of</strong> <strong>the</strong> <strong>in</strong>frastructure and <strong>the</strong><br />

operability <strong>of</strong> <strong>the</strong> ports. The ports are <strong>the</strong><br />

<strong>in</strong>ternational gates <strong>of</strong> <strong>the</strong> <strong>co</strong>untry (western<br />

entry) and service a significant part <strong>of</strong><br />

passenger and cargo shipp<strong>in</strong>g.<br />

Its <strong>co</strong>mpletion will br<strong>in</strong>g about positive<br />

<strong>co</strong>nsequences <strong>in</strong> <strong>the</strong> restructur<strong>in</strong>g and <strong>the</strong><br />

upgrad<strong>in</strong>g <strong>of</strong> shipp<strong>in</strong>g, <strong>in</strong> regional<br />

development and <strong>the</strong> re<strong>in</strong>forcement <strong>of</strong><br />

touristic development through <strong>the</strong><br />

improvement <strong>of</strong> <strong>the</strong> <strong>in</strong>frastructure and <strong>the</strong><br />

operability <strong>of</strong> <strong>the</strong> ports. The ports are <strong>the</strong><br />

<strong>in</strong>ternational gates <strong>of</strong> <strong>the</strong> <strong>co</strong>untry (western<br />

entry) and service a significant part <strong>of</strong><br />

passenger and cargo shipp<strong>in</strong>g.<br />

It is a brand new project and <strong>the</strong> proposal is<br />

still under formation. However <strong>the</strong> project is<br />

paramount <strong>in</strong>portant for <strong>the</strong> development <strong>of</strong><br />

tourism <strong>in</strong> <strong>the</strong> region <strong>of</strong> Western <strong>Greece</strong>. The<br />

project <strong>co</strong>ncerns <strong>the</strong> re<strong>in</strong>forcement <strong>of</strong> cruises<br />

and <strong>co</strong>nnection with acient Olympia. The<br />

project <strong>in</strong>cludes several actions as:<br />

improvement <strong>of</strong> port <strong>in</strong>frastructures, road<br />

<strong>co</strong>nnection with <strong>the</strong> natioal road as well as<br />

improvement <strong>of</strong> <strong>the</strong> already operational<br />

railway network.<br />

3 1 32 0 0 End 2012<br />

2 1 54 0 0 End 2013<br />

1 1 39 End 2013<br />

2 3 567 End 2015<br />

3 3 1.082 34 42 End 2015<br />

0 1<br />

Unknown. Not<br />

submitted yet<br />

End 2015<br />

Governor <strong>of</strong> <strong>the</strong> region <strong>of</strong><br />

Cont<strong>in</strong>ental <strong>Greece</strong><br />

Municipal Port Fund <strong>of</strong><br />

South Dodecannesus<br />

Municipality <strong>of</strong> North<br />

Kynouria<br />

Director <strong>of</strong> EYDE MEDE -<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

Director <strong>of</strong> EYDE MEDE -<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

Deputy Governor <strong>of</strong> <strong>the</strong><br />

Region <strong>of</strong> Western <strong>Greece</strong><br />

12/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

90<br />

Gythion Port (Commercial and<br />

Cruise)<br />

91 Port <strong>of</strong> Mytil<strong>in</strong>i<br />

92 Port <strong>of</strong> Lavrio<br />

93<br />

Sou<strong>the</strong>rn pier Port <strong>of</strong> Piraeus -<br />

services for cruise ships (1st<br />

part)<br />

LOCATION /<br />

PROGRAMME<br />

Gythio / OP Western<br />

<strong>Greece</strong>-Pelopennese-<br />

Ionian islands<br />

North Aegean / OP<br />

Crete & Aegean islands<br />

Eastern Attica / OP<br />

Attica<br />

TOTAL COST<br />

(CO-FINANCED)<br />

22.150.000<br />

8.000.000<br />

37.000.000<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

E<strong>co</strong>nomic impact (re<strong>in</strong>forcement <strong>of</strong><br />

<strong>co</strong>mmerce <strong>in</strong> Peloponnesus) and beneficial to<br />

<strong>the</strong> touristic development<br />

Help to <strong>in</strong>crease <strong>the</strong> tourist attractiveness <strong>of</strong><br />

<strong>the</strong> island <strong>of</strong> Lesvos<br />

Important port <strong>in</strong>frastructure. Completes CF<br />

project.<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

1 1 163 0 End 2015<br />

3 1 59 0 End 2015<br />

1 1<br />

West Attica / OP Attica 6.000.000 Beneficial to tourism and employment sector 3 3<br />

Unknown. Not<br />

submitted yet<br />

Unknown. Not<br />

submitted yet<br />

TOTAL 230.198.155 2.062 34 42<br />

94 Completion <strong>of</strong> Makedonia Airport<br />

95<br />

AIRPORTS: Modernisation <strong>of</strong> airports; Create additional capacity and <strong>the</strong> possibility <strong>of</strong> hav<strong>in</strong>g trans<strong>co</strong>nt<strong>in</strong>ental flights (Project 94)<br />

Central Macedonia / OP<br />

Accessibility<br />

72.421.368<br />

By expand<strong>in</strong>g <strong>co</strong>rridor 10-28 for take<strong>of</strong>f/land<strong>in</strong>gs<br />

and <strong>the</strong> parallel road <strong>by</strong> 1000<br />

metres towards <strong>the</strong> sea, transatlantic flights<br />

will be possible to land. The project<br />

<strong>co</strong>ncludes a series <strong>of</strong> <strong>in</strong>terventions aim<strong>in</strong>g<br />

towards improv<strong>in</strong>g security, <strong>in</strong>creas<strong>in</strong>g<br />

passenger traffic, improv<strong>in</strong>g <strong>the</strong> level <strong>of</strong><br />

service and showcas<strong>in</strong>g Thessaloniki as a<br />

base <strong>of</strong> air transport.<br />

End 2015<br />

End 2015<br />

3 3 1.169 100 End 2015<br />

TOTAL 72.421.368 1.169 0 100<br />

F<strong>in</strong>alisation <strong>of</strong> electrification <strong>of</strong><br />

double railway l<strong>in</strong>e <strong>in</strong> <strong>the</strong> part <strong>of</strong><br />

Ska - Kiato<br />

Attica, Peloponessus /<br />

OP Accessibility<br />

27.084.540<br />

The project foresees <strong>the</strong> <strong>co</strong>mpletion <strong>of</strong> <strong>the</strong><br />

electrification <strong>of</strong> 105,4 km <strong>of</strong> <strong>the</strong> like Ska –<br />

Kiato which began <strong>in</strong> OP Rails, Airports,<br />

Urban Transport (bridge project). The<br />

suggested project is a part <strong>of</strong> <strong>the</strong> broader<br />

programme <strong>of</strong> renew<strong>in</strong>g <strong>the</strong> PATHEP railway<br />

axis and <strong>in</strong> particular <strong>the</strong> l<strong>in</strong>e Ska – Kiato<br />

which is an important suburban project. It<br />

<strong>co</strong>ntributes <strong>in</strong> a big way <strong>in</strong> <strong>the</strong> <strong>co</strong>mpletion <strong>of</strong><br />

<strong>the</strong> elim<strong>in</strong>ation <strong>of</strong> network <strong>in</strong><strong>co</strong>nsistencies, <strong>in</strong><br />

<strong>the</strong> reduction <strong>of</strong> <strong>the</strong> time and <strong>co</strong>st <strong>of</strong><br />

transportation and <strong>in</strong> secur<strong>in</strong>g<br />

<strong>in</strong>teroperability and <strong>in</strong>termodality.<br />

3 3 3.075<br />

Not available<br />

yet<br />

End 2013<br />

RESPONSIBLE<br />

Region <strong>of</strong> Peloponnesus/<br />

∆ΤΕ Lakonia<br />

Manag<strong>in</strong>g Director <strong>of</strong><br />

Egnatia SA<br />

Secretary General <strong>of</strong><br />

Public Works / YPYMEDI<br />

Regional Governor <strong>of</strong><br />

Attica, President and<br />

Councillor <strong>of</strong> OLP<br />

Director <strong>of</strong> EYDE <strong>of</strong><br />

Nor<strong>the</strong>rn <strong>Greece</strong><br />

RAILWAY: Construction, f<strong>in</strong>alisation and signalisation <strong>of</strong> parts <strong>of</strong> PATHE-P; Improve <strong>the</strong> desirability <strong>of</strong> railways as a <strong>co</strong>mpetitive means <strong>of</strong> transportation for both passengers and cargo; Reduce<br />

travell<strong>in</strong>g time.<br />

President and Manag<strong>in</strong>g<br />

Director <strong>of</strong> Ergose Α.Ε.<br />

13/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

96<br />

97<br />

98<br />

Construction <strong>of</strong> <strong>the</strong> new double<br />

railway l<strong>in</strong>e Rododafni - Rio and<br />

electrification <strong>of</strong> section Kiato-<br />

Rododafni<br />

Completion <strong>of</strong> <strong>the</strong> new double<br />

highspeed railway l<strong>in</strong>e Tithorea-<br />

Lianokladi - Domokos<br />

F<strong>in</strong>alisation <strong>of</strong> suburban railway<br />

<strong>of</strong> Attiki, part: SKA-Treis Gefyres<br />

LOCATION /<br />

PROGRAMME<br />

North Peloponessus /<br />

OP Accessibility<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Accessibility<br />

A<strong>the</strong>ns / OP<br />

Accessibility<br />

TOTAL COST<br />

(CO-FINANCED)<br />

429.356.400<br />

474.099.000<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

The project is about <strong>the</strong> <strong>co</strong>nstruction <strong>of</strong> a<br />

new double electrified l<strong>in</strong>e <strong>of</strong> 28 km <strong>in</strong> <strong>the</strong><br />

part <strong>of</strong> Rododafni-Rio with signalization and<br />

tele<strong>co</strong>mmand, as well as <strong>the</strong> <strong>in</strong>stallation <strong>of</strong><br />

an electrification system <strong>in</strong> <strong>the</strong> part <strong>of</strong> Kiato-<br />

Rododafni (71 km). The project is<br />

<strong>in</strong>dispensable for <strong>the</strong> <strong>co</strong>mpletion <strong>of</strong> <strong>the</strong><br />

railway <strong>co</strong>nnection <strong>of</strong> Patra and Western<br />

<strong>Greece</strong> to <strong>the</strong> rest <strong>of</strong> <strong>the</strong> <strong>co</strong>untry; to that<br />

extent <strong>Greece</strong> has been bound towards <strong>the</strong><br />

EU. The Patra port is a gate <strong>of</strong> entry <strong>of</strong> both<br />

passengers and cargo to <strong>the</strong> <strong>co</strong>untry.<br />

Additionally <strong>the</strong> l<strong>in</strong>e will operate <strong>in</strong> a big art<br />

<strong>of</strong> its length as a suburban rail towards<br />

A<strong>the</strong>ns (it already operates like this until<br />

Kiato). The <strong>co</strong>mpletion <strong>of</strong> <strong>the</strong> l<strong>in</strong>e to Patra is<br />

a strategic part <strong>of</strong> <strong>the</strong> Programme, thus <strong>the</strong><br />

<strong>co</strong>mpletion <strong>of</strong> this part is essential.<br />

The project is a first priority for <strong>the</strong><br />

<strong>co</strong>mpletion <strong>of</strong> <strong>the</strong> <strong>co</strong>untry's railway axis. It is<br />

part <strong>of</strong> PP22 (TEN-T) and with its <strong>co</strong>mpletion<br />

<strong>the</strong> l<strong>in</strong>e <strong>in</strong> <strong>the</strong> whole length <strong>of</strong> Ath<strong>in</strong>a –<br />

Thessaloniki will be double and will have<br />

been additionally upgraded so as to<br />

significantly reduce travell<strong>in</strong>g times (<strong>the</strong><br />

reduction <strong>in</strong> this particular part only is<br />

expected to be 50 m<strong>in</strong>utes, while <strong>the</strong> time<br />

for <strong>the</strong> total trip Ath<strong>in</strong>a –Thessaloniki is<br />

expected to 3,5 hours). With <strong>the</strong> <strong>co</strong>mpletion<br />

<strong>of</strong> this part <strong>the</strong> transfer <strong>of</strong> passengers as well<br />

as cargo is facilitated from and to areas on<br />

<strong>the</strong> length <strong>of</strong> <strong>the</strong> Ath<strong>in</strong>a – Thessaloniki l<strong>in</strong>e.<br />

The project <strong>co</strong>ntributes towards <strong>the</strong> follow<strong>in</strong>g<br />

targets: elim<strong>in</strong>ation <strong>of</strong> <strong>the</strong> railway network<br />

<strong>in</strong><strong>co</strong>nsistencies, security improvement,<br />

reduction <strong>of</strong> <strong>the</strong> time and <strong>co</strong>st <strong>of</strong><br />

transportation, <strong>the</strong> elim<strong>in</strong>ation <strong>of</strong> bottleneck<br />

po<strong>in</strong>ts, <strong>the</strong> reduction <strong>of</strong> environmental<br />

<strong>co</strong>nsequences, energy sav<strong>in</strong>gs, secur<strong>in</strong>g<br />

<strong>in</strong>teroperability and <strong>in</strong>termodality,<br />

improvement <strong>of</strong> <strong>the</strong> service level.<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

1 3 5.344<br />

3 3 7.619<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

Not available<br />

yet.<br />

Not available<br />

yet<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

End 2015<br />

End 2015<br />

74.883.659 F<strong>in</strong>alisation <strong>of</strong> <strong>the</strong> Suburban Railway 3 3 932 End 2015<br />

RESPONSIBLE<br />

President and Manag<strong>in</strong>g<br />

Director <strong>of</strong> Ergose Α.Ε.<br />

President and Manag<strong>in</strong>g<br />

Director <strong>of</strong> Ergose Α.Ε.<br />

Secretary General <strong>of</strong><br />

Transport<br />

14/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

99<br />

100<br />

101<br />

102<br />

103<br />

104<br />

F<strong>in</strong>alisation <strong>of</strong> <strong>in</strong>stallation <strong>of</strong><br />

modern signalisation,<br />

tele<strong>co</strong>mmand and<br />

tele<strong>co</strong>mmunications on <strong>the</strong><br />

PATHEP axis<br />

Construction <strong>of</strong> <strong>the</strong> new double<br />

railway l<strong>in</strong>e A<strong>the</strong>ns (SKA) -<br />

Patras <strong>in</strong> <strong>the</strong> section Diakopto -<br />

Rododafni<br />

Construction <strong>of</strong> <strong>the</strong> Railway l<strong>in</strong>e<br />

<strong>of</strong> Thessaloniki - Eidomeni, <strong>in</strong><br />

Polykastro (Phase B)<br />

Construction <strong>of</strong> <strong>the</strong> se<strong>co</strong>nd<br />

operat<strong>in</strong>g phase <strong>of</strong> Thriassio<br />

Pedio and <strong>co</strong>ntruction <strong>of</strong> Zefirou<br />

railway station<br />

Suburban tra<strong>in</strong> section Piraeus-3<br />

Gefyres<br />

Upgrade <strong>of</strong> <strong>the</strong> railway l<strong>in</strong>e<br />

Alexandroupolis-Ormenion,<br />

between Didimoteicho & Marasion<br />

LOCATION /<br />

PROGRAMME<br />

North-East Cont<strong>in</strong>ental<br />

<strong>Greece</strong> / OP<br />

Accessibility<br />

North Peloponessus /<br />

OP Accessibility<br />

Central Macedonia / OP<br />

Macedonia & Thrace<br />

Western Attica / OP<br />

Attica<br />

A<strong>the</strong>ns/Piraeus / OP<br />

Attica<br />

East Macedonia &<br />

Thrace / OP East<br />

Macedonia &Thrace<br />

TOTAL COST<br />

(CO-FINANCED)<br />

90.000.000<br />

158.850.000<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

The project (with a forecasted budget <strong>of</strong> 90<br />

million euro under plann<strong>in</strong>g) is <strong>in</strong>dispensable<br />

and should be <strong>co</strong>mpleted with<strong>in</strong> <strong>the</strong> NSRF<br />

framework s<strong>in</strong>ce through it <strong>the</strong> ERTMS<br />

system will be deployed, thus ensur<strong>in</strong>g <strong>the</strong><br />

<strong>in</strong>teroperability <strong>of</strong> <strong>the</strong> Greek railway network<br />

with <strong>the</strong> o<strong>the</strong>r European ones. The<br />

<strong>in</strong>teroperability is a <strong>co</strong>ndition for f<strong>in</strong>anc<strong>in</strong>g all<br />

<strong>the</strong> NSRF railway projects and its lack can<br />

cancel <strong>the</strong> <strong>co</strong>-f<strong>in</strong>anc<strong>in</strong>g.<br />

This is a part <strong>of</strong> <strong>the</strong> PATHEP axis, belong<strong>in</strong>g<br />

to DED-M. The project is <strong>in</strong>dispensable for<br />

<strong>the</strong> <strong>co</strong>mpletion <strong>of</strong> <strong>the</strong> railway <strong>co</strong>nnection <strong>of</strong><br />

Patra and Western <strong>Greece</strong> with <strong>the</strong> rest <strong>of</strong><br />

<strong>the</strong> <strong>co</strong>untry; to that extent <strong>Greece</strong> has been<br />

bound towards <strong>the</strong> EU. The Patra port is a<br />

gate <strong>of</strong> entry <strong>of</strong> both passengers and cargo<br />

to <strong>the</strong> <strong>co</strong>untry. The <strong>co</strong>mpletion <strong>of</strong> <strong>the</strong> l<strong>in</strong>e to<br />

Patra is a strategic part <strong>of</strong> <strong>the</strong> Programme.<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

3 3<br />

3 3<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

Unknown,<br />

not submitted<br />

yet<br />

Unknown,<br />

not submitted<br />

yet<br />

68.841.600 Bridge project- part PATHEP railway axis 3 YES (MP) 812<br />

78.302.200 Phase B <strong>of</strong> <strong>the</strong> CF project 2 3 1.170<br />

70.000.000 Green Transport 1 3 932<br />

12.986.732<br />

Accessibility & Competitiveness (Connection<br />

<strong>of</strong> Alexandroupolis with <strong>the</strong> Nor<strong>the</strong>rn Part <strong>of</strong><br />

<strong>the</strong> Region)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

Not available<br />

yet<br />

Not available<br />

yet<br />

Not available<br />

yet<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

End 2015<br />

End 2015<br />

End 2015<br />

End 2015<br />

End 2015<br />

3 239 0 0 End 2015<br />

TOTAL 1.484.404.131 20.123 0 0<br />

RESPONSIBLE<br />

President and Manag<strong>in</strong>g<br />

Director <strong>of</strong> Ergose Α.Ε.<br />

President and Manag<strong>in</strong>g<br />

Director <strong>of</strong> Ergose Α.Ε.<br />

Department <strong>of</strong> Public<br />

Works - Central<br />

Macedonia<br />

President and Manag<strong>in</strong>g<br />

Director <strong>of</strong> Ergose Α.Ε.<br />

President and Manag<strong>in</strong>g<br />

Director <strong>of</strong> Ergose Α.Ε.<br />

President and Manag<strong>in</strong>g<br />

Director <strong>of</strong> Ergose Α.Ε.<br />

ENVIRONMENT: Contribution to <strong>the</strong> <strong>co</strong>nvergence to <strong>the</strong> "acquis <strong>co</strong>mmunautaire" <strong>in</strong> terms <strong>of</strong> environmental protection has also been decisive and led to <strong>the</strong> selection <strong>of</strong> projects on solid<br />

waste (Project 111, 113, 130, 132) and waste water management (<strong>Projects</strong> 109, 115, 118, 120, 122, 123, 128, 129), even if <strong>the</strong>y are less advanced <strong>in</strong> <strong>the</strong>ir implementation than <strong>the</strong><br />

o<strong>the</strong>rs. Contibution to <strong>the</strong> natural environment and dr<strong>in</strong>k<strong>in</strong>g water supply (<strong>Projects</strong> 105, 108, 110, 112, 125, 126); Rehabilitation measures (Project 106, 107, 114, 117, 124, 127, 131,<br />

133); Urban development (Project 119).<br />

<strong>Projects</strong> have been selected because <strong>of</strong> <strong>the</strong>ir maturity, size and high environmental, social and e<strong>co</strong>nomic impact.<br />

15/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

105<br />

106<br />

107<br />

108<br />

109<br />

110<br />

111<br />

112<br />

113<br />

114<br />

Supply & <strong>in</strong>stallation <strong>of</strong> remote<br />

<strong>co</strong>ntrol system - management <strong>of</strong><br />

dr<strong>in</strong>k<strong>in</strong>g water Municipal<br />

Company for Water supply and<br />

sewage- Lamia<br />

Rehabilitation towards <strong>the</strong> sea <strong>of</strong><br />

Krausidona river (ra<strong>in</strong> water)<br />

Rehabilitations <strong>in</strong> different parts<br />

<strong>of</strong> P<strong>in</strong>eios river<br />

Water supply network <strong>in</strong> Kozani<br />

municipality<br />

Construction <strong>of</strong> sewage network<br />

& extension <strong>of</strong> urban plann<strong>in</strong>g <strong>of</strong><br />

Drosia area <strong>in</strong> Preveza<br />

Municiplaity<br />

Replacement - Extension <strong>of</strong> water<br />

supply network <strong>of</strong> <strong>the</strong> sou<strong>the</strong>astern<br />

part <strong>of</strong> Patras<br />

Closure and rehabilitation <strong>of</strong><br />

rema<strong>in</strong><strong>in</strong>g illegal landfills<br />

Construction <strong>of</strong> new tele-<strong>co</strong>ntrol<br />

/tele-remote stations <strong>of</strong> water<br />

supply <strong>of</strong> <strong>the</strong> Municipality <strong>of</strong><br />

Serres<br />

Waste Management Station <strong>in</strong><br />

<strong>the</strong> Northwest part <strong>of</strong><br />

Thessaloniki<br />

Rehabilitation <strong>of</strong> Eshatia torrent<br />

next to Fleva street<br />

115 Sewage Networks Vatero Kozani<br />

116<br />

Extension and modernisation <strong>of</strong><br />

sewage system <strong>of</strong> <strong>the</strong> lake zone<br />

LOCATION /<br />

PROGRAMME<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

Thessaly / OP<br />

Environment<br />

Thessaly / OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

Western Macedonia /<br />

OP Macedonia & Thrace<br />

Epirus / OP Thessally-<br />

Cont<strong>in</strong>ental <strong>Greece</strong>-<br />

Epirus<br />

Western <strong>Greece</strong> / OP<br />

Western <strong>Greece</strong> -<br />

Peloponessus - Ionian<br />

Islands<br />

All over <strong>Greece</strong> / OP<br />

Environment<br />

Central Macedonia / OP<br />

Macedonia & Thrace<br />

Central Macedonia / OP<br />

Macedonia & Thrace<br />

TOTAL COST<br />

(CO-FINANCED)<br />

3.094.000<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

The susta<strong>in</strong>able management <strong>of</strong> natural and<br />

built environment and natural resources<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

3 1 25 1 1 End 2011<br />

RESPONSIBLE<br />

Municipal Company for<br />

Water supply and sewage-<br />

Lamia<br />

2.891.740 Environmental protection 3 1 27 0 0 End 2011 Region <strong>of</strong> Thessaly<br />

2.584.033 Environmental protection 3 1 48 0 0 March 2012 Region <strong>of</strong> Thessaly<br />

2.025.210 Environment - susta<strong>in</strong>able development 3 3 22 0 0 June 2012 Municipality <strong>of</strong> Kozani<br />

1.255.600 Quality <strong>of</strong> life, Environment & Tourism 2 1 12 0 Sept. 2012 Mayor <strong>of</strong> Preveza<br />

3.000.000 Environment - susta<strong>in</strong>able development 3 1 100 2 End 2012 Patras Municipality<br />

150.000.000<br />

1.980.000<br />

Environmental and positive social impact -<br />

public health<br />

Re<strong>in</strong>forcement <strong>of</strong> <strong>co</strong>mpetitiveness <strong>of</strong> Central<br />

Macedonia<br />

3 1 900 End 2012 Municipalities-Regions<br />

3 1 27 End 2012 Municipality <strong>of</strong> Serres<br />

12.213.215 Environment-Quality <strong>of</strong> life 3 1 45 95 End 2012 Technical Services - OTA<br />

Attica / OP Attica 9.550.000 Environmental protection 3 1 End 2012<br />

Western Macedonia /<br />

OP Macedonia & Thrace<br />

Epirus / OP Thessally-<br />

Cont<strong>in</strong>ental <strong>Greece</strong>-<br />

Epirus<br />

M<strong>in</strong>istry <strong>of</strong> Infrastructure -<br />

Sectretary general for<br />

public works (D10)<br />

3.319.328 Environment- Quality <strong>of</strong> Life 3 1 30 0 0 Jan. 2013 Municipality <strong>of</strong> Kozani<br />

4.500.000 Quality <strong>of</strong> life, Environment & Tourism 1 1 41 0 March 2013 Mayor <strong>of</strong> Ioann<strong>in</strong>a<br />

16/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

117<br />

118<br />

119<br />

120<br />

121<br />

122<br />

Urgent anti-flood works <strong>of</strong> Xiria<br />

river<br />

Sewage network <strong>in</strong> <strong>the</strong><br />

municipality <strong>of</strong> Kozani<br />

Regeneration <strong>of</strong> <strong>the</strong> nea sea-side<br />

<strong>of</strong> Thessaloniki - Section from<br />

Vassiliko Theatre to Sea Sport<br />

Club<br />

Sewage system <strong>in</strong> Plaka -<br />

Elounda<br />

Construction <strong>of</strong> ra<strong>in</strong>water<br />

pipel<strong>in</strong>es <strong>of</strong> Paiania<br />

Completion <strong>of</strong> <strong>the</strong> <strong>in</strong>tra sewage<br />

network <strong>of</strong> <strong>the</strong> municipality<br />

Leukanion - Pirgiotikon - Exosi<br />

123 Sewage <strong>of</strong> Igoumenitsa<br />

124 Rehabilitation <strong>of</strong> River Soulou<br />

125<br />

126<br />

Replacement <strong>of</strong> <strong>the</strong> central water<br />

supply pipel<strong>in</strong>e <strong>in</strong> Zakynthos<br />

Completion <strong>of</strong> water supply <strong>in</strong><br />

Nafplion<br />

127 Rehabilitation <strong>of</strong> Karla lake<br />

128<br />

Efficient management <strong>of</strong> waste<br />

water <strong>in</strong> 120 small<br />

agglomerations, priority C (2.000<br />

- 15.000 <strong>in</strong>habitants)<br />

LOCATION /<br />

PROGRAMME<br />

Thessaly / OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

Western Macedonia /<br />

OP Macedonia & Thrace<br />

Central Macedonia / OP<br />

Macedonia & Thrace<br />

Crete / OP Crete &<br />

Aegean islands<br />

Attica / OP<br />

Environment<br />

Peloponessus / OP<br />

Western <strong>Greece</strong> -<br />

Peloponessus - Ionian<br />

Islands<br />

Epirus / OP Thessally-<br />

Cont<strong>in</strong>ental <strong>Greece</strong>-<br />

Epirus<br />

West Macedonia / OP<br />

Macedonia & Thrace<br />

Zakynthos island / OP<br />

Western <strong>Greece</strong>-<br />

Pelopennese-Ionian<br />

Islands<br />

Peloponessus / OP<br />

Western <strong>Greece</strong> -<br />

Peloponessus - Ionian<br />

Islands<br />

Thessaly / OP<br />

Environment<br />

All over <strong>Greece</strong> / OP<br />

Environment<br />

TOTAL COST<br />

(CO-FINANCED)<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

RESPONSIBLE<br />

17.460.000 Environmental protection 3 1 109 0 0 June 2013 Region <strong>of</strong> Thessaly<br />

5.869.328 Environment - Quality <strong>of</strong> Life 3 1 54 1 2 June 2013 Municipality <strong>of</strong> Kozani<br />

Urban project- Attractiveness <strong>of</strong> Thessaloniki-<br />

44.100.000 Quality <strong>of</strong> life- Started <strong>in</strong> <strong>the</strong> previous<br />

programm<strong>in</strong>g period<br />

2.589.150<br />

Improvement <strong>of</strong> environment <strong>in</strong> one <strong>of</strong> <strong>the</strong><br />

major tourist centres <strong>of</strong> <strong>Greece</strong><br />

3 1 745 20 End 2013<br />

1 1 24 0 End 2013<br />

Head <strong>of</strong> Unit - Department<br />

<strong>of</strong> Architectural <strong>Projects</strong> -<br />

Municipality <strong>of</strong><br />

Thessaloniki<br />

President <strong>of</strong> DEYA Ag.<br />

Nikolaos<br />

22.150.000 Environmental protection 3 1 End 2013 Region <strong>of</strong> Attica<br />

1.700.000<br />

Re<strong>in</strong>forcement <strong>of</strong> <strong>co</strong>mpetitiveness <strong>of</strong> <strong>the</strong><br />

Region <strong>of</strong> Peloponnesus<br />

1 1 23 End 2013 Municipality <strong>of</strong> Nafplion<br />

4.500.000 Quality <strong>of</strong> life, Environment & Tourism 3 1 41 0 March 2014 Mayor <strong>of</strong> Igoumenitsa<br />

36.000.000<br />

8.500.000<br />

3.500.000<br />

50.000.000<br />

1.050.000.000<br />

Environmental protection, adduction <strong>of</strong> water<br />

to Thessaloniki, tourim<br />

E<strong>co</strong>nomic and social impact and beneficial to<br />

environmental and tourism sector.<br />

Re<strong>in</strong>forcement <strong>of</strong> <strong>co</strong>mpetitiveness <strong>of</strong> <strong>the</strong><br />

Region <strong>of</strong> Peloponnesus<br />

Maturity & rapid visibility, environmental<br />

impact (protected area), e<strong>co</strong>nomic and social<br />

impact (dr<strong>in</strong>k<strong>in</strong>g water for Volos)<br />

Important job creation, social impact, public<br />

health and environmental impact<br />

1 1 260 15 End 2014 Mayor <strong>of</strong> Eordaia<br />

0 1<br />

Unknown. Not<br />

submitted yet<br />

End 2014<br />

Public <strong>co</strong>rporation for<br />

water supply and sewage<br />

<strong>in</strong> Zakynthos<br />

1 1 47 End 2014 Municipality <strong>of</strong> Nafplion<br />

3 3 450 End 2015<br />

M<strong>in</strong>istry <strong>of</strong> Infrastructure,<br />

Transport &<br />

Networks/General<br />

Secretariat <strong>of</strong> Public<br />

Works<br />

1, 2, 3 3 12.500 End 2015 Municipalities-Regions<br />

17/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

129<br />

Collection, transfer, treatment<br />

and disposal <strong>of</strong> waste water <strong>in</strong><br />

Koropi-Peania<br />

LOCATION /<br />

PROGRAMME<br />

Eastern Attica / OP<br />

Attica<br />

TOTAL COST<br />

(CO-FINANCED)<br />

130 Solid waste managment facilities Attica / OP Attica 120.000.000<br />

131 Valorisation <strong>of</strong> Polyphytos lake<br />

132<br />

133<br />

Equipment for pre-treatment and<br />

recycl<strong>in</strong>g <strong>of</strong> urban solid waste for<br />

<strong>the</strong> Region <strong>of</strong> Eastern Macedonia -<br />

Thrace<br />

Works for <strong>the</strong> protection <strong>of</strong><br />

Kastoria lake<br />

West Macedonia / OP<br />

Macedonia & Thrace<br />

Eastern Macedonia -<br />

Thrace / OP Macedonia<br />

& Thrace<br />

West Macedonia / OP<br />

Macedonia & Thrace<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

124.890.213 Quality <strong>of</strong> life 2 3 1.540 10 20 End 2015<br />

Good territorial spread s<strong>in</strong>ce located <strong>in</strong> all<br />

parts <strong>of</strong> <strong>the</strong> region<br />

1 1 2.000<br />

Not available<br />

yet<br />

End 2015<br />

35.000.000 Environmental protection and tourism 1 1 276 40 End 2015<br />

The pre-treatment and recycl<strong>in</strong>g <strong>of</strong> urban<br />

12.000.000 solid waste <strong>co</strong>ntributes to <strong>the</strong> development <strong>of</strong><br />

<strong>the</strong> Region with jobs creation<br />

1 1 49 69 End 2015<br />

10.000.000 Environmental protection 0 1 92 End 2015<br />

TOTAL 1.744.671.817 19.438 61 264<br />

CULTURE AND TOURISM: (<strong>Projects</strong> 134 -148):<br />

<strong>Projects</strong> have been selected because <strong>of</strong> <strong>the</strong>ir maturity, size and high social and e<strong>co</strong>nomic impact.<br />

134<br />

135<br />

136<br />

137<br />

138<br />

Valorisation and restoration <strong>of</strong><br />

<strong>the</strong> regional archeological<br />

monuments <strong>of</strong> Knossos Palace<br />

Conservation and re<strong>co</strong>nstruction<br />

<strong>of</strong> monuments <strong>of</strong> <strong>the</strong> Acropolis<br />

Widen<strong>in</strong>g <strong>the</strong> <strong>in</strong>ter<strong>co</strong>nnection<br />

channel <strong>in</strong> Lefkada<br />

Rehabilitation <strong>of</strong> monuments <strong>in</strong><br />

Castro Mytil<strong>in</strong>is<br />

Crete / OP Aegean -<br />

Crete<br />

Centre <strong>of</strong> A<strong>the</strong>ns / OP<br />

Attica<br />

Lefkada island / OP<br />

Western <strong>Greece</strong>-<br />

Pelopennese-Ionian<br />

islands<br />

North Aegean / OP<br />

Aegean - Crete<br />

Regeneration - Valorisation <strong>of</strong> <strong>the</strong><br />

Central Macedonia / OP<br />

royal necropolis and <strong>the</strong> palace <strong>of</strong><br />

Macedonia & Thrace<br />

Aigon - Phase IIΙ<br />

139 Theatre <strong>of</strong> Zante<br />

Ionian Islands / OP<br />

Western <strong>Greece</strong> -<br />

Peloponessus - Ionian<br />

Islands<br />

1.400.000<br />

Protection and valorisation <strong>of</strong> cultural<br />

heritage<br />

3 1 31 Oct. 2013<br />

8.000.000 Visible touristic project 3 1 150 45 End 2013<br />

22.631.000<br />

2.300.000<br />

Beneficial to tourism sector (cross<strong>in</strong>g yatches<br />

via <strong>the</strong> channel)<br />

Protection and valorisation <strong>of</strong> cultural<br />

heritage<br />

1 1 135 0 June 2014<br />

3 1 50 June 2014<br />

7.000.000 3 1 160 End 2014<br />

RESPONSIBLE<br />

Regional Governor <strong>of</strong><br />

Attica<br />

Regional Governor <strong>of</strong><br />

Attica<br />

Governor <strong>of</strong> West<br />

Macedonia<br />

Department <strong>of</strong> Public<br />

Works <strong>of</strong> <strong>the</strong> Region<br />

Governor <strong>of</strong> West<br />

Macedonia<br />

M<strong>in</strong>istry <strong>of</strong> Culture and<br />

Tourism<br />

President and Councillor <strong>of</strong><br />

<strong>the</strong> Organisation <strong>of</strong> <strong>the</strong><br />

New Acropolis Museum<br />

Decentralised<br />

Adm<strong>in</strong>istration <strong>of</strong><br />

Peloponnesus, Western<br />

<strong>Greece</strong> and Ionian Islands<br />

Region <strong>of</strong> Nor<strong>the</strong>rn<br />

Aegean<br />

M<strong>in</strong>istry <strong>of</strong> Culture and<br />

Tourism<br />

5.643.286 Creation <strong>of</strong> cultural e<strong>co</strong>nomy 3 1 50 5 8 End 2014 Municipality <strong>of</strong> Zante<br />

18/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

140<br />

141<br />

Rehabilitation <strong>of</strong> <strong>the</strong> former<br />

custom <strong>of</strong>fice <strong>of</strong> Chania and<br />

transformation <strong>in</strong>to a cultural<br />

center<br />

Β΄ Phase <strong>of</strong> organisation and<br />

exhibition <strong>of</strong> pre-historical,<br />

classical and Byzant<strong>in</strong>e f<strong>in</strong>d<strong>in</strong>gs<br />

<strong>in</strong> Thebes Archeological Museum<br />

142 New Verg<strong>in</strong>a Museum<br />

143<br />

144<br />

145<br />

146<br />

147<br />

Construction <strong>of</strong> <strong>the</strong><br />

Archaeological museum <strong>of</strong><br />

Messara<br />

Submar<strong>in</strong>e museums and div<strong>in</strong>g<br />

parks <strong>in</strong> Alonnisos ans Skopelos<br />

Touristic presentation <strong>of</strong> <strong>the</strong><br />

Region <strong>of</strong> Attica 2007-2013<br />

Rehabilitation <strong>of</strong> historic centre <strong>of</strong><br />

A<strong>the</strong>ns and <strong>co</strong>nnection <strong>of</strong><br />

archeological sites<br />

Valorisation works <strong>of</strong> Karyta<strong>in</strong>as<br />

Castle<br />

148 Alternative Tourism<br />

LOCATION /<br />

PROGRAMME<br />

Crete / OP Crete &<br />

Aegean islands<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Thessally-<br />

Cont<strong>in</strong>ental <strong>Greece</strong>-<br />

Epirus<br />

Central Macedonia /<br />

OP Macedonia & Thrace<br />

Crete / OP Crete &<br />

Aegean islands<br />

Thessaly / OP Thessally-<br />

Cont<strong>in</strong>ental <strong>Greece</strong>-<br />

Epirus<br />

TOTAL COST<br />

(CO-FINANCED)<br />

7.600.000<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

Urban rehabilitation project help<strong>in</strong>g to<br />

<strong>in</strong>crease <strong>the</strong> tourist attractiveness <strong>of</strong> Chania<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

1 1 84<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

Not known.<br />

Not submitted<br />

yet<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

4.500.000 Culture & Tourism 3 1 52 0 End 2014<br />

24.000.000<br />

Culture- Tourism- Important archeological<br />

site<br />

1 1<br />

Not known. Not<br />

submitted yet<br />

Not known.<br />

Not submitted<br />

yet<br />

5.861.254 Creation <strong>of</strong> a new tourist pole <strong>in</strong> central Crete 2 1 133 0 End 2015<br />

1.500.000<br />

Susta<strong>in</strong>able tourism; promotion <strong>of</strong><br />

submar<strong>in</strong>e cultural assets<br />

RESPONSIBLE<br />

End 2014 Deputy Mayor <strong>of</strong> Chania<br />

Director <strong>of</strong> <strong>the</strong><br />

Archelogical Service or<br />

M<strong>in</strong>siter <strong>of</strong> Culrture?<br />

End 2015 Head <strong>of</strong> Unit - EPKA<br />

Head <strong>of</strong> <strong>the</strong> Directorate<br />

for Museums and Cultural<br />

build<strong>in</strong>gs <strong>in</strong> <strong>the</strong> M<strong>in</strong>istry <strong>of</strong><br />

Culture<br />

0 1 18 5 End 2015 Governor <strong>of</strong> <strong>the</strong> Region<br />

Attica / OP Attica 8.500.000 Beneficial to tourism and employment sector 3 1 45 End 2015 Governor <strong>of</strong> <strong>the</strong> Region<br />

Attica / OP Attica 20.000.000 Beneficial to tourism and employment sector 0 1<br />

Peloponessus / OP<br />

Western <strong>Greece</strong> -<br />

Peloponessus - Ionian<br />

Islands<br />

All over <strong>the</strong> <strong>co</strong>untry /<br />

OP Competitiveness &<br />

Enterpreneurship<br />

1.300.000<br />

20.000.000<br />

Re<strong>in</strong>forcement <strong>of</strong> <strong>co</strong>mpetitiveness <strong>of</strong> <strong>the</strong><br />

Region <strong>of</strong> Peloponnesus<br />

Modernisation -extension <strong>of</strong> activities for<br />

entreprises actives <strong>in</strong> supply<strong>in</strong>g services <strong>of</strong><br />

alternative tourism<br />

Not known. Not<br />

submitted yet<br />

1 1 33 End 2015<br />

(1)<br />

Call ongo<strong>in</strong>g<br />

2 150 200 300<br />

TOTAL 140.235.540 1.091 205 358<br />

HEALTH AND EDUCATION INFRASTRUCTURE: (<strong>Projects</strong> 149-166):<br />

<strong>Projects</strong> have been selected because <strong>of</strong> <strong>the</strong>ir maturity, size and high social and e<strong>co</strong>nomic impact.<br />

149<br />

Construction <strong>of</strong> a k<strong>in</strong>dergraden <strong>in</strong><br />

St Athanasios area Kozani<br />

Western Macedonia /<br />

OP Macedonia & Thrace<br />

1.215.000 Social solidarity 3 1 13 3 3 End 2011<br />

End 2015 Governor <strong>of</strong> <strong>the</strong> Region<br />

M<strong>in</strong>istry <strong>of</strong> Culture and<br />

Tourism (25th EBA)<br />

18 months from General Secretary for<br />

<strong>the</strong> approval date Culture and Tourism<br />

Region <strong>of</strong> Western<br />

Macedonia<br />

19/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

150<br />

151<br />

152<br />

153<br />

154<br />

Construction <strong>of</strong> primary school <strong>in</strong><br />

Chiliodentri Poria<br />

Construction <strong>of</strong> 15th High School<br />

Larissa<br />

Primary school <strong>in</strong> Kallikrateia<br />

Municipality<br />

Construction <strong>of</strong> a build<strong>in</strong>g for <strong>the</strong><br />

Faculty <strong>of</strong> e<strong>co</strong>logy and<br />

environment <strong>in</strong> Zante<br />

Construction <strong>of</strong> Technical<br />

Pr<strong>of</strong>essional School <strong>of</strong> Thira<br />

155 2nd high school <strong>of</strong> Kos<br />

156<br />

157<br />

158<br />

159<br />

160<br />

161<br />

Construction <strong>of</strong> a new build<strong>in</strong>g<br />

and modernisation <strong>of</strong> exist<strong>in</strong>g<br />

<strong>in</strong>frastructure <strong>of</strong> Chios General<br />

Hospital<br />

School <strong>co</strong>mplex (se<strong>co</strong>ndary<br />

education) <strong>in</strong> Lamia<br />

LOCATION /<br />

PROGRAMME<br />

Western Macedonia /<br />

OP Macedonia & Thrace<br />

Thessaly / OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

Central Macedonia / OP<br />

Macedonia & Thrace<br />

Ionian Islands / OP<br />

Western <strong>Greece</strong> -<br />

Peloponessus - Ionian<br />

Islands<br />

South Aegean / OP<br />

Aegean - Crete<br />

South Aegean / OP<br />

Aegean - Crete<br />

North Aegean / OP<br />

Aegean - Crete<br />

Cont<strong>in</strong>ental <strong>Greece</strong> /<br />

OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

Construction <strong>of</strong> <strong>the</strong> new build<strong>in</strong>g Central Macedonia / OP<br />

<strong>of</strong> <strong>the</strong> General Hospital <strong>of</strong> Edessa Macedonia & Thrace<br />

Technical Univercity <strong>of</strong> Crete.<br />

Environmental Eng<strong>in</strong>eer<strong>in</strong>g dept.<br />

facilities(B Part)<br />

Completion <strong>of</strong> <strong>the</strong> General<br />

Hospital <strong>of</strong> Agr<strong>in</strong>io<br />

Construction & supply -<br />

<strong>in</strong>stallation <strong>of</strong> equipement-<br />

"Hatzikosta" hospital, Ioann<strong>in</strong>a,<br />

Department for al<strong>co</strong>holic and<br />

drug user treatment<br />

Crete / OP Aegean -<br />

Crete<br />

Western <strong>Greece</strong> / OP<br />

Western <strong>Greece</strong> -<br />

Peloponessus - Ionian<br />

Islands<br />

Epirus / OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

TOTAL COST<br />

(CO-FINANCED)<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

2.100.000 Upgrad<strong>in</strong>g <strong>of</strong> <strong>the</strong> educational <strong>co</strong>nditions 3 1 23 6 6 April 2012<br />

RESPONSIBLE<br />

Region <strong>of</strong> Western<br />

Macedonia<br />

3.145.773 Upgrad<strong>in</strong>g <strong>of</strong> <strong>the</strong> educational <strong>co</strong>nditions 3 1 35 0 0 May 2012 Municipality <strong>of</strong> Larissa<br />

3.460.000 Upgrad<strong>in</strong>g <strong>of</strong> <strong>the</strong> educational <strong>co</strong>nditions 3 1 38 End 2012<br />

Region <strong>of</strong> Central<br />

Macedonia<br />

5.222.755 Upgrad<strong>in</strong>g <strong>of</strong> <strong>the</strong> educational <strong>co</strong>nditions 3 1 47 End 2012 M<strong>in</strong>istry <strong>of</strong> Education<br />

4.286.918<br />

2.180.000<br />

Student hous<strong>in</strong>g <strong>in</strong> modern facilities and<br />

improv<strong>in</strong>g social <strong>in</strong>frastructures<br />

Student hous<strong>in</strong>g <strong>in</strong> modern facilities and<br />

improv<strong>in</strong>g social <strong>in</strong>frastructures<br />

3 1 245 30 End 2012 Region <strong>of</strong> South Aegean<br />

3 1 27 2 End 2012 Region <strong>of</strong> South Aegean<br />

8.897.673 Enhancement <strong>of</strong> health <strong>in</strong>frastructure 3 1 90 End 2012 Region <strong>of</strong> Nor<strong>the</strong>n Aegean<br />

10.902.800 The development <strong>of</strong> human resourse 3 1 57 1 1 August 2013<br />

5.082.022 Health - social solidarity 3 1 56 End 2013<br />

7.825.555 Enhancement <strong>of</strong> education <strong>in</strong>frastructure 3 1 86 End 2013<br />

Regional <strong>of</strong> Cont<strong>in</strong>ental<br />

<strong>Greece</strong><br />

Region <strong>of</strong> Central<br />

Macedonia<br />

Technical Univercity <strong>of</strong><br />

Crete<br />

58.560.071 Health - social solidarity 3 1 404 0 End 2013 Depanom A.E<br />

9.316.773 Enhancement <strong>of</strong> health <strong>in</strong>frastructure 3 1 101 0 60 End 2013 Depanom A.E<br />

20/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

162<br />

163<br />

164<br />

165<br />

166<br />

1<br />

Creation <strong>of</strong> a new emergency<br />

Department - General Hospital<br />

Filiata, Igoumenitsa<br />

Rehabilitation <strong>of</strong> <strong>the</strong> build<strong>in</strong>g <strong>of</strong><br />

Aegean University <strong>in</strong> Rodos<br />

Upgrade <strong>of</strong> <strong>the</strong> central build<strong>in</strong>g <strong>of</strong><br />

Patras General Hospital-Agios<br />

Andreas and <strong>the</strong><br />

provision/<strong>in</strong>stallation <strong>of</strong> medical<br />

and hotel equipment<br />

All-day primary school Gennadiou<br />

<strong>in</strong> Rodos<br />

Construction and Equipment <strong>of</strong><br />

Komot<strong>in</strong>i Hospital <strong>in</strong> new build<strong>in</strong>g<br />

with 200 beds<br />

LOCATION /<br />

PROGRAMME<br />

Epirus / OP Thessaly -<br />

Cont<strong>in</strong>ental <strong>Greece</strong> -<br />

Epirus<br />

South Aegean / OP<br />

Aegean - Crete<br />

Western <strong>Greece</strong> / OP<br />

Western <strong>Greece</strong>-<br />

Peloponessus-Ionian<br />

islands<br />

South Aegean / OP<br />

Aegean - Crete<br />

Eastern Macedonia -<br />

Thrace / OP Macedonia<br />

& Thrace<br />

TOTAL COST<br />

(CO-FINANCED)<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

RESPONSIBLE<br />

10.375.770 Enhancement <strong>of</strong> health <strong>in</strong>frastructure 3 1 115 0 60 End 2013 Depanom A.E<br />

9.458.244 Improv<strong>in</strong>g education services 2 1 140 0 End 2013 University <strong>of</strong> Aegean<br />

20.739.217<br />

4.534.000<br />

50.000.000<br />

The project <strong>in</strong>volves <strong>the</strong> f<strong>in</strong>al restoration <strong>of</strong><br />

<strong>the</strong> ma<strong>in</strong> build<strong>in</strong>g <strong>of</strong> <strong>the</strong> General Hopspital <strong>of</strong><br />

Patras "Aghios Andreas" which was struck <strong>by</strong><br />

an earthquake <strong>in</strong> 2008. The implementation<br />

<strong>of</strong> <strong>the</strong> project will de<strong>co</strong>ngest <strong>the</strong> University<br />

Hospital <strong>of</strong> Rio, and will improve <strong>the</strong> service<br />

provided. The project also <strong>co</strong>ncerns <strong>the</strong><br />

supply <strong>of</strong> necessary equipment to over<strong>co</strong>me<br />

<strong>the</strong> short<strong>co</strong>m<strong>in</strong>gs <strong>of</strong> that already <strong>in</strong>tegrated<br />

and <strong>in</strong> use <strong>in</strong> <strong>the</strong> new w<strong>in</strong>g <strong>of</strong> <strong>the</strong> General<br />

Hosiptal <strong>of</strong> Patras "Aghios Andreas" and<br />

essentially <strong>co</strong>mplete <strong>the</strong> <strong>co</strong>nstruction.<br />

Student hous<strong>in</strong>g <strong>in</strong> modern facilities and<br />

improv<strong>in</strong>g social <strong>in</strong>frastructures<br />

The new hospital <strong>of</strong> Komot<strong>in</strong>i is <strong>the</strong> most<br />

important <strong>in</strong>tervention <strong>in</strong> <strong>the</strong> region<br />

2 1 202 0 End 2014 Depanom A.E<br />

2 1 45 2 End 2014 Municipality <strong>of</strong> Rodos<br />

0 3 46 n/a n/a End 2015 Depanom A.E<br />

TOTAL: 217.302.571 1.770 44 130<br />

GRAND TOTAL <strong>co</strong>st (euros):<br />

EUROPEAN SOCIAL FUND<br />

HUMAN RESOURCES DEVELOPMENT OP (ESF)<br />

Upgrad<strong>in</strong>g <strong>of</strong> labour <strong>in</strong>spection<br />

mechanisms to fight undeclared<br />

work, budget<br />

10.529.792.517 TOTAL job creation: 126.514 2.744 4.830<br />

Systemic <strong>in</strong>tervention aim<strong>in</strong>g at<br />

streng<strong>the</strong>n<strong>in</strong>g <strong>the</strong> mechanisms to supervise<br />

All over <strong>the</strong> <strong>co</strong>untry 7.197.231<br />

<strong>the</strong> labour market <strong>in</strong> order among o<strong>the</strong>rs to<br />

ensure a reduction <strong>in</strong> undeclared work<br />

2 3 End 2015<br />

M<strong>in</strong>istry <strong>of</strong> Labour;<br />

General Secretary for<br />

Labour<br />

21/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

LOCATION /<br />

PROGRAMME<br />

TOTAL COST<br />

(CO-FINANCED)<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

2 Re<strong>co</strong>ncil<strong>in</strong>g work and family life All over <strong>the</strong> <strong>co</strong>untry<br />

The already approved and on-go<strong>in</strong>g actions<br />

aim at <strong>in</strong>creas<strong>in</strong>g <strong>the</strong> employability and equal<br />

participation <strong>of</strong> women <strong>in</strong> <strong>the</strong> labour market<br />

through <strong>the</strong> delivery <strong>of</strong> care and<br />

384.660.000<br />

ac<strong>co</strong>mmodation <strong>of</strong> <strong>in</strong>fants, toddlers, children<br />

and adolescents. There<strong>by</strong> achieve a<br />

substantial facility for women to meet <strong>the</strong>ir<br />

<strong>co</strong>mplex and demand<strong>in</strong>g role.<br />

3<br />

4<br />

5<br />

6<br />

Establishment <strong>of</strong> an <strong>in</strong>stitutional,<br />

regulatory, adm<strong>in</strong>istrative and<br />

fiscal framework <strong>in</strong> order to<br />

promote social e<strong>co</strong>nomy and<br />

facilitate <strong>the</strong> establishment and<br />

operation <strong>of</strong> social enterprises<br />

Local employment plans,<br />

adjusted to local labour markets<br />

EDUCATION AND LIFELONG LEARNING OP (ESF)<br />

New school (school <strong>in</strong> <strong>the</strong> 21th<br />

century) - transition phase <strong>in</strong><br />

primary education (creative<br />

activities, <strong>in</strong>tegration <strong>of</strong> pupils<br />

from vulnerable groups)<br />

Development <strong>of</strong> a digital school<br />

platform and digital learn<strong>in</strong>g<br />

materials<br />

Systemic <strong>in</strong>tervention aim<strong>in</strong>g at develop<strong>in</strong>g<br />

social e<strong>co</strong>nomy and more particularly social<br />

enterprises and <strong>co</strong>operatives which can play<br />

a key role <strong>in</strong> social <strong>co</strong>hesion and <strong>in</strong> <strong>the</strong><br />

All over <strong>the</strong> <strong>co</strong>untry 60.000.000<br />

<strong>in</strong>tegration <strong>of</strong> persons from vulnerable<br />

population groups, supplement<strong>in</strong>g <strong>the</strong> basic<br />

policies for e<strong>co</strong>nomic development and<br />

employment<br />

The actions aim at creat<strong>in</strong>g new jobs, based<br />

on local labour market needs and <strong>co</strong>nditions<br />

<strong>of</strong> full employment (multiple employment,<br />

All over <strong>the</strong> <strong>co</strong>untry 140.000.000<br />

additional employment, etc.) especially <strong>in</strong><br />

areas with decl<strong>in</strong><strong>in</strong>g <strong>in</strong>dustries fac<strong>in</strong>g<br />

restructur<strong>in</strong>g problems.<br />

Reform<strong>in</strong>g, modernis<strong>in</strong>g and decentralis<strong>in</strong>g<br />

<strong>the</strong> educational system. The New School<br />

All over <strong>the</strong> <strong>co</strong>untry 69.000.000<br />

serves both social and educational needs<br />

through its new reformed curriculum<br />

Accelerat<strong>in</strong>g <strong>the</strong> rhythm <strong>of</strong> <strong>in</strong>tegrat<strong>in</strong>g new<br />

All over <strong>the</strong> <strong>co</strong>untry 9.000.000 Information and Communication<br />

Technologies (ICTs) <strong>in</strong> <strong>the</strong> education process<br />

7 Se<strong>co</strong>nd Chance Schools All over <strong>the</strong> <strong>co</strong>untry<br />

Enhanc<strong>in</strong>g <strong>the</strong> system and <strong>the</strong> services <strong>of</strong><br />

lifelong education and promot<strong>in</strong>g equal<br />

access.The Se<strong>co</strong>nd Chance Schools are for<br />

those who have not <strong>co</strong>mpleted n<strong>in</strong>e year<br />

<strong>co</strong>mpulsory education, and are <strong>the</strong>refore at<br />

risk <strong>of</strong> social exclusion and marg<strong>in</strong>alisation.<br />

25.000.000<br />

They provide <strong>the</strong>se <strong>in</strong>dividuals with <strong>the</strong><br />

possibility <strong>of</strong> acquir<strong>in</strong>g a lower se<strong>co</strong>ndary<br />

education certificate, <strong>in</strong> order<br />

to <strong>in</strong>tegrate with exist<strong>in</strong>g social, f<strong>in</strong>ancial and<br />

pr<strong>of</strong>essional structures and to <strong>co</strong>nt<strong>in</strong>ue <strong>the</strong>ir<br />

education<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

3 1 83.000 70.000 83.000 End 2015<br />

1 1 End 2015<br />

2 1 36.000 20.000 25.000 End 2015<br />

3 1 2.450 End 2015<br />

3 1 End 2015<br />

3 1 End 2015<br />

RESPONSIBLE<br />

M<strong>in</strong>istry <strong>of</strong> Labour;<br />

General Secretary for<br />

Community & o<strong>the</strong>r <strong>Funds</strong><br />

M<strong>in</strong>istry <strong>of</strong> Labour;<br />

General Secretary for<br />

Labour<br />

M<strong>in</strong>istry <strong>of</strong> Labour;<br />

General Secretary for<br />

Community & o<strong>the</strong>r <strong>Funds</strong><br />

M<strong>in</strong>istry <strong>of</strong> Education;<br />

General Secretary for<br />

Education - Special<br />

Secretary for <strong>the</strong><br />

Education OP<br />

M<strong>in</strong>istry <strong>of</strong> Education;<br />

General Secretary for<br />

Education - Special<br />

Secretary for <strong>the</strong><br />

Education OP -<br />

Pedagogical Institute<br />

M<strong>in</strong>istry <strong>of</strong> Education;<br />

General Secretary for<br />

Education - Special<br />

Secretary for <strong>the</strong><br />

Education OP<br />

22/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

8<br />

9<br />

10<br />

11<br />

Apprenticeship programs <strong>in</strong><br />

Tertiary Education (Universities)<br />

Promotion <strong>of</strong> basic and applied<br />

research (Thales programme)<br />

ADMINISTRATIVE REFORM OP (ESF)<br />

Reorganisation <strong>of</strong> <strong>the</strong> State<br />

towards a more policy oriented<br />

State (Inserted <strong>in</strong> <strong>the</strong> OP <strong>in</strong> 2010<br />

as a project implement<strong>in</strong>g <strong>the</strong><br />

MoU provision on <strong>the</strong> "Functional<br />

Review <strong>of</strong> <strong>the</strong> Central<br />

Government") - Legislation<br />

framework<br />

Reorganisation <strong>of</strong> <strong>the</strong> General<br />

Ac<strong>co</strong>unt<strong>in</strong>g Office <strong>of</strong> <strong>Greece</strong> and<br />

established ERPs <strong>in</strong> all M<strong>in</strong>istries<br />

LOCATION /<br />

PROGRAMME<br />

TOTAL COST<br />

(CO-FINANCED)<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

More effective l<strong>in</strong>ks between <strong>the</strong> educational<br />

system and <strong>the</strong> labour market. Apprentiship<br />

tra<strong>in</strong><strong>in</strong>g for students <strong>of</strong> universities aims at<br />

All over <strong>the</strong> <strong>co</strong>untry 35.000.000<br />

prepar<strong>in</strong>g <strong>the</strong>m and provid<strong>in</strong>g <strong>the</strong>m with<br />

work experience for enter<strong>in</strong>g <strong>the</strong> labour<br />

market<br />

Streng<strong>the</strong>n<strong>in</strong>g <strong>of</strong> human capital for<br />

promotion <strong>of</strong> research and <strong>in</strong>novation aims at<br />

attract<strong>in</strong>g new reasearchers and promot<strong>in</strong>g<br />

All over <strong>the</strong> <strong>co</strong>untry 120.000.000 basic and applied research programmes, so<br />

that <strong>the</strong>y <strong>co</strong>ntribute to generat<strong>in</strong>g and<br />

dissem<strong>in</strong>at<strong>in</strong>g new knowledge with emphasis<br />

on sciences and ICT<br />

The reorganisation <strong>of</strong> <strong>the</strong> state aims at<br />

establish<strong>in</strong>g a more citizen and bus<strong>in</strong>ess<br />

friendly adm<strong>in</strong>istration that will lead to a<br />

more productive and <strong>co</strong>mpetitive e<strong>co</strong>nomy<br />

and promote job creation and social<br />

<strong>in</strong>tegration.<br />

The project <strong>co</strong>ncerns <strong>the</strong> 1st phase <strong>of</strong><br />

reorganisation:<br />

All over <strong>the</strong> <strong>co</strong>untry 1.500.000<br />

-"White Paper" <strong>of</strong> <strong>the</strong> reorganisation <strong>of</strong> <strong>the</strong><br />

state<br />

- Re<strong>co</strong>rd<strong>in</strong>g and evaluat<strong>in</strong>g <strong>the</strong> exist<strong>in</strong>g<br />

situation<br />

-Draft Law for <strong>the</strong> executive State and <strong>the</strong><br />

new governance model<br />

- preparation <strong>the</strong> legislation framework<br />

The reorganisation <strong>of</strong> <strong>the</strong> General Ac<strong>co</strong>unt<strong>in</strong>g<br />

Office <strong>of</strong> <strong>Greece</strong> aims at establish<strong>in</strong>g a<br />

modern, reliable and efficient expenditure<br />

<strong>co</strong>ntrol system <strong>in</strong> l<strong>in</strong>e with <strong>the</strong> ord<strong>in</strong>ary state<br />

budget and <strong>the</strong> multiannual budget <strong>of</strong> l<strong>in</strong>e<br />

m<strong>in</strong>istries and o<strong>the</strong>r entities <strong>of</strong> <strong>the</strong> Greek<br />

All over <strong>the</strong> <strong>co</strong>untry 45.000.000 state, lead<strong>in</strong>g to a more effective use <strong>of</strong><br />

national resources<br />

The establishment, organisation and<br />

operation <strong>of</strong> "Units for Plann<strong>in</strong>g and<br />

Budget<strong>in</strong>g" <strong>in</strong> <strong>the</strong> m<strong>in</strong>istries aims at a more<br />

efficient use <strong>of</strong> resources <strong>by</strong> m<strong>in</strong>istries for<br />

apply<strong>in</strong>g effectively <strong>the</strong>ir policies<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

3 1 End 2015<br />

2 1 3.000 End 2015<br />

1 3 11 End 2012<br />

1 3 321 End 2015<br />

RESPONSIBLE<br />

M<strong>in</strong>istry <strong>of</strong> Education;<br />

General Secretary for<br />

Education - Special<br />

Secretary for <strong>the</strong><br />

Education OP<br />

M<strong>in</strong>istry <strong>of</strong> Education;<br />

General Secretary for<br />

Education - Special<br />

Secretary for <strong>the</strong><br />

Education OP<br />

M<strong>in</strong>istry <strong>of</strong> Adm<strong>in</strong>istrative<br />

Reform; General<br />

Secretary for<br />

Adm<strong>in</strong>istrative Reform -<br />

Special Secretary for <strong>the</strong><br />

AROP<br />

M<strong>in</strong>istry <strong>of</strong> F<strong>in</strong>ance -<br />

M<strong>in</strong>istry <strong>of</strong> Adm<strong>in</strong>istrative<br />

Reform; General<br />

Secretary for<br />

Adm<strong>in</strong>istrative Reform -<br />

Special Secretary for <strong>the</strong><br />

AROP - All M<strong>in</strong>istries<br />

23/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

12<br />

13<br />

14<br />

Consultant for <strong>the</strong><br />

implementation <strong>of</strong> measures<br />

aga<strong>in</strong>st tax evasion and <strong>the</strong><br />

achievement <strong>of</strong> susta<strong>in</strong>able tax<br />

<strong>co</strong>mpliance<br />

Study and proposed new<br />

procedures for <strong>the</strong> reduction <strong>of</strong><br />

adm<strong>in</strong>istrative burdens and <strong>co</strong>sts<br />

<strong>in</strong> five areas<br />

Reform <strong>of</strong> budget<strong>in</strong>g systems,<br />

systems management, ac<strong>co</strong>unt<br />

management (<strong>in</strong>clud<strong>in</strong>g double-<br />

entry ac<strong>co</strong>unt<strong>in</strong>g) and f<strong>in</strong>ancial<br />

management <strong>of</strong> hospitals<br />

CONTINGENCY RESERVE OP (ESF)<br />

LOCATION /<br />

PROGRAMME<br />

TOTAL COST<br />

(CO-FINANCED)<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

The project <strong>co</strong>ncerns <strong>the</strong> creation <strong>of</strong> an ad<br />

hoc structure, <strong>co</strong>mposed <strong>of</strong> members <strong>of</strong><br />

<strong>co</strong>ntactor and <strong>of</strong>ficials <strong>of</strong> <strong>the</strong> M<strong>in</strong>istry. This<br />

will be <strong>in</strong><strong>co</strong>rporated <strong>in</strong> <strong>the</strong> new reorganized<br />

structure <strong>of</strong> <strong>the</strong> M<strong>in</strong>istry.<br />

The project is expected to achieve <strong>the</strong><br />

follow<strong>in</strong>g five priorities <strong>of</strong> <strong>the</strong> Action Plan to<br />

All over <strong>the</strong> <strong>co</strong>untry 2.675.250<br />

fight tax evasion:<br />

1. Implementation <strong>of</strong> Tax Reform<br />

2. Revenue Re<strong>co</strong>very<br />

3. Handl<strong>in</strong>g Large Taxpayers<br />

4. Manag<strong>in</strong>g Great Property & High In<strong>co</strong>me<br />

5. Return withhold<strong>in</strong>g taxes and Tax<br />

Compliance<br />

All over <strong>the</strong> <strong>co</strong>untry<br />

All over <strong>the</strong> <strong>co</strong>untry<br />

6.000.000<br />

7.300.000<br />

The reduction <strong>of</strong> adm<strong>in</strong>istrative burdens and<br />

<strong>co</strong>sts aims at establish<strong>in</strong>g a more bus<strong>in</strong>ess<br />

friendly environment lead<strong>in</strong>g to an <strong>in</strong>crease<br />

<strong>of</strong> productivity and <strong>co</strong>mpetitiveness, as well<br />

as to an attarction foreign <strong>in</strong>vestment <strong>in</strong><br />

<strong>Greece</strong>.<br />

The project <strong>co</strong>ncerns:<br />

- <strong>the</strong> development <strong>of</strong> metholodology for <strong>the</strong><br />

measur<strong>in</strong>g <strong>of</strong> adm<strong>in</strong>istrative burdens and<br />

<strong>co</strong>sts.<br />

-<strong>the</strong> measures <strong>of</strong> adm<strong>in</strong>istrative burdens and<br />

<strong>co</strong>sts <strong>in</strong> five areas (Tourism, Company Law,<br />

Public Procurement, Agricultural Subsidies,<br />

Food Safety)<br />

-proposals to reduction <strong>of</strong> <strong>the</strong> adm<strong>in</strong>istrative<br />

burdens and <strong>co</strong>sts <strong>by</strong> means <strong>of</strong><br />

simplified procedures<br />

The overall improvement <strong>of</strong> <strong>the</strong> management<br />

<strong>of</strong> hospitals aims at reduc<strong>in</strong>g and<br />

rationalis<strong>in</strong>g expenditure <strong>of</strong> all public<br />

hospitals <strong>in</strong> <strong>Greece</strong> lead<strong>in</strong>g to <strong>the</strong><br />

improvement <strong>of</strong> <strong>the</strong> quality <strong>of</strong> services<br />

provided to <strong>the</strong> residents <strong>of</strong> <strong>Greece</strong><br />

L<strong>in</strong>k with<br />

MOU (c)<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

2 3 19 End 2014<br />

3 9<br />

3 End 2013<br />

2 34<br />

2 44<br />

3 End 2014<br />

3 8<br />

RESPONSIBLE<br />

M<strong>in</strong>istry <strong>of</strong> F<strong>in</strong>ance -<br />

M<strong>in</strong>istry <strong>of</strong> Adm<strong>in</strong>istrative<br />

Reform; General<br />

Secretary for<br />

Adm<strong>in</strong>istrative Reform -<br />

Special Secretary for <strong>the</strong><br />

AROP<br />

M<strong>in</strong>istry <strong>of</strong> Adm<strong>in</strong>istrative<br />

Reform - M<strong>in</strong>istry <strong>of</strong><br />

Development - General<br />

Secretary for<br />

Adm<strong>in</strong>istrative Reform -<br />

Special Secretary for <strong>the</strong><br />

AROP<br />

M<strong>in</strong>istry <strong>of</strong> Culture &<br />

Tourism<br />

M<strong>in</strong>istry <strong>of</strong> Development,<br />

Shipp<strong>in</strong>g Affairs and<br />

Competitiveness<br />

M<strong>in</strong>istry <strong>of</strong> Infrastructure,<br />

Transport and Networks<br />

M<strong>in</strong>istry <strong>of</strong> Agricultural<br />

Development and Food<br />

M<strong>in</strong>istry <strong>of</strong> Health and<br />

Social Solidarity, - M<strong>in</strong>istry<br />

<strong>of</strong> Adm<strong>in</strong>istrative Reform;<br />

General Secretary for<br />

Adm<strong>in</strong>istrative Reform -<br />

Special Secretary for <strong>the</strong><br />

AROP<br />

24/25


Special Secretariat NSRF JANUARY 2011<br />

<strong>List</strong> <strong>of</strong> <strong>Priority</strong> <strong>Projects</strong> <strong>in</strong> <strong>Greece</strong> <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> <strong>Structural</strong> <strong>Funds</strong> and Cohesion Fund <strong>in</strong> NSRF 2007-2013<br />

This is an updated list <strong>of</strong> priority projects to be <strong>co</strong>-<strong>funded</strong> <strong>by</strong> <strong>the</strong> European Commission, <strong>in</strong>itially presented dur<strong>in</strong>g <strong>the</strong> visit <strong>of</strong> European Commissioner for<br />

Regional Policy Johannes Hahn on September 28th, 2011.<br />

The 181 projects have been selected <strong>by</strong> <strong>the</strong> Greek Authorities <strong>in</strong> <strong>co</strong>llaboration with <strong>the</strong> Commission Services, on <strong>the</strong> basis <strong>of</strong> criteria related to maturity,<br />

size and high social and e<strong>co</strong>nomic impact and will be updated when necessary.<br />

N° NAME OF PROJECT<br />

15<br />

Integrated plan for <strong>the</strong> support <strong>of</strong><br />

entrepreneurial activities and <strong>of</strong><br />

<strong>the</strong> associated employability<br />

through <strong>co</strong>nsult<strong>in</strong>g and tra<strong>in</strong><strong>in</strong>g<br />

actions and <strong>the</strong> support <strong>of</strong><br />

employment <strong>in</strong> areas suffer<strong>in</strong>g<br />

from <strong>the</strong> <strong>co</strong>nsequences <strong>of</strong> <strong>the</strong><br />

e<strong>co</strong>nomic crisis .<br />

LOCATION /<br />

PROGRAMME<br />

Convergence and<br />

phas<strong>in</strong>g out regions<br />

TOTAL COST<br />

(CO-FINANCED)<br />

72.000.000<br />

CRITERIA (1)<br />

E<strong>co</strong>nomic and social impact (a) Maturity (b)<br />

Stimulation <strong>of</strong> job access and perpetual<br />

<strong>in</strong>tegration to labour market <strong>of</strong> those seek<strong>in</strong>g<br />

employment and <strong>of</strong> <strong>in</strong>active <strong>in</strong>dividuals.<br />

Support <strong>of</strong> new enterprises, <strong>in</strong> order to foster<br />

<strong>the</strong>ir adaptability to <strong>the</strong> new crisis <strong>co</strong>nditions<br />

affect<strong>in</strong>g <strong>the</strong> e<strong>co</strong>nomy and <strong>the</strong> labour<br />

market. With<strong>in</strong> <strong>the</strong> above <strong>co</strong>ntext two actions<br />

are envisaged: ACTION 1: Plan support<strong>in</strong>g<br />

entrepreneurial <strong>in</strong>itiatives <strong>by</strong> jobless people<br />

and new entrepreneurs (<strong>in</strong> start-up status).<br />

ACTION 2: Integrated plan for <strong>the</strong> support <strong>of</strong><br />

entrepreneurial activities and <strong>of</strong> <strong>the</strong><br />

associated employability through <strong>co</strong>nsult<strong>in</strong>g<br />

and tra<strong>in</strong><strong>in</strong>g and <strong>the</strong> provision <strong>of</strong> <strong>in</strong>centives<br />

for access<strong>in</strong>g and en<strong>co</strong>urag<strong>in</strong>g active labour<br />

market participation.<br />

L<strong>in</strong>k with<br />

MOU (c)<br />

3 1<br />

Dur<strong>in</strong>g<br />

implementati<br />

on<br />

(<strong>in</strong><br />

equivalent<br />

man-years)<br />

Cannot be<br />

estimated<br />

JOB CREATION<br />

After<br />

implem.<br />

M<strong>in</strong>.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

After<br />

implem.<br />

Max.<br />

forecast<br />

(gross<br />

number <strong>of</strong><br />

jobs<br />

created)<br />

2.000 jobs<br />

depend<strong>in</strong>g on<br />

<strong>the</strong> bus<strong>in</strong>ess<br />

plan proposal<br />

TOTAL ESF <strong>co</strong>st (euros): 984.332.481 Total job creation: 124.896 90.000 108.000<br />

(1) This <strong>co</strong>lumn will be <strong>co</strong>mpleted ac<strong>co</strong>rd<strong>in</strong>g to <strong>the</strong> follow<strong>in</strong>g criteria fulfilled:<br />

a) E<strong>co</strong>nomic and social impact: (1) none; (2) small; (3) medium; (4) high<br />

b) Stade <strong>of</strong> project Maturity/Implementation: (0) Project immature (1) Preparation <strong>of</strong> award procedure-draft <strong>of</strong> tender docs (2) Contract<strong>in</strong>g phase (3) Implementation phase<br />

c) L<strong>in</strong>k with MOU: (1) no l<strong>in</strong>k; (2) limited l<strong>in</strong>k; (3) strong l<strong>in</strong>k<br />

ESTIMATED<br />

COMPLETION<br />

DATE<br />

End 2014<br />

RESPONSIBLE<br />

M<strong>in</strong>istry <strong>of</strong><br />

Competitiveness,Develop<br />

ment and Shipp<strong>in</strong>g<br />

25/25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!