Redundancy in Coupling Power Line Carrier Channels to the Power ...
Redundancy in Coupling Power Line Carrier Channels to the Power ...
Redundancy in Coupling Power Line Carrier Channels to the Power ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TWO PLC CHANNELS, COUPLED TOGETHER VIA PHASE TO PHASE<br />
USING TWO-FREQUENCY TUNERS<br />
T<br />
R<br />
S<br />
Primary Relay PLC<br />
Channel A<br />
T<br />
R<br />
S<br />
Secondary Relay<br />
PLC Channel B<br />
1→<br />
1→<br />
0.707→<br />
0.707←<br />
Balance Transformer<br />
(may be <strong>in</strong> house or<br />
switchyard)<br />
0.707→<br />
0.707←<br />
Balance Transformer<br />
(may be <strong>in</strong> house or<br />
switchyard)<br />
Note: Coax should be<br />
grounded <strong>in</strong> <strong>the</strong> house, not<br />
<strong>in</strong> <strong>the</strong> yard<br />
Double Frequency L<strong>in</strong>e Tuner<br />
0.707<br />
→<br />
0.707<br />
Double Frequency L<strong>in</strong>e Tuner<br />
0.707←<br />
→<br />
0.707←<br />
(A) 0.707→<br />
(B) 0.707→<br />
(A) 0.707←<br />
(B) 0.707←<br />
CCVTs