Waterproofing system<br />

The waterproofing system, consisting<br />

of the drainage and protection layer<br />

and the waterproof liner, plays an<br />

important role in the NATM tunnel<br />

design.<br />

The drainage and protection layer<br />

functions as:<br />

• drainage on the outside of the<br />

tunnel<br />

• cushioning layer between rock face<br />

and concrete structure<br />

• protection of the waterproof liner<br />

The waterproof liner offers protection<br />

against leakage.<br />

The waterproofing system must be<br />

continuous and easy to handle and<br />

install.<br />

As during installation and use, the<br />

waterproofing system is exposed to<br />

extreme mechanical, physical,<br />

chemical, and - incidentally -<br />

biological loads, the materials must<br />

be resistant to these loads. They<br />

must also be able to adapt to<br />

irregularities of surfaces on which<br />

they are installed and may <strong>no</strong>t cause<br />

any harm to the environment.<br />

Challenging aspects<br />

The prestigious NEAT project<br />

includes a variety of striking and<br />

challenging aspects.<br />

The long base tunnels will provide a<br />

modern flat-trajectory line, allowing<br />

for substantially longer and heavier<br />

good and passenger trains that travel<br />

twice as fast. The latter trains can<br />

even reach a speed of some 200<br />

km/h.<br />

Such trains can<strong>no</strong>t be used on the<br />

existing Alpine lines, due to the steep<br />

grades and small radii of curvature.<br />

The flat-trajectory involves unusually<br />

deep construction - maximum<br />

overburden is 2,300 m - and high<br />

temperatures, which can reach 45ºC.<br />

The water pressure from strata<br />

overlying the Gotthard base tunnel<br />

has been estimated at as high as 100<br />

bar.<br />

High demands<br />

In view of the exceptional conditions,<br />

the materials to be used for the<br />

construction of the two base tunnels<br />

must meet the most stringent<br />

requirements for a designed service<br />

life of 100 years.<br />

Waterproofing systems, however, are<br />

relatively “young” and have only<br />

available for 30 years. This means<br />

that <strong>no</strong> long-term experience has<br />

been gained with these systems.<br />

Consequently, for this part of the<br />

tunnel construction the requirements<br />

<strong>Colbond</strong> <strong>Geosynthetics</strong> News <strong>13</strong> - 2002<br />