12.02.2013 Views

FIDIC 2009 London Conference: Carol Hessler

FIDIC 2009 London Conference: Carol Hessler

FIDIC 2009 London Conference: Carol Hessler

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>FIDIC</strong> <strong>2009</strong> <strong>London</strong> <strong>Conference</strong><br />

<strong>Conference</strong> :: 13 – 16 September<br />

September<br />

Water Projects<br />

$145 million total<br />

The Lesotho Compact<br />

Procurement Timeframe<br />

Metolong Conveyance Construction: 2010<br />

Metolong Water Treatment Works Design-Build: Late <strong>2009</strong>- Early 2010<br />

Water Distribution Systems Design: Late <strong>2009</strong><br />

Construction: 2010<br />

Rural Water Supply & Sanitation Construction: Late <strong>2009</strong> – Early 2010<br />

Health Clinics, Out-Patient Departments,<br />

etc.<br />

Health Projects<br />

$103 million total<br />

Design-build: Late <strong>2009</strong> – Early 2010<br />

■15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!