FIDIC 2009 London Conference: Carol Hessler
FIDIC 2009 London Conference: Carol Hessler
FIDIC 2009 London Conference: Carol Hessler
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>FIDIC</strong> <strong>2009</strong> <strong>London</strong> <strong>Conference</strong><br />
<strong>Conference</strong> :: 13 – 16 September<br />
September<br />
Water Projects<br />
$145 million total<br />
The Lesotho Compact<br />
Procurement Timeframe<br />
Metolong Conveyance Construction: 2010<br />
Metolong Water Treatment Works Design-Build: Late <strong>2009</strong>- Early 2010<br />
Water Distribution Systems Design: Late <strong>2009</strong><br />
Construction: 2010<br />
Rural Water Supply & Sanitation Construction: Late <strong>2009</strong> – Early 2010<br />
Health Clinics, Out-Patient Departments,<br />
etc.<br />
Health Projects<br />
$103 million total<br />
Design-build: Late <strong>2009</strong> – Early 2010<br />
■15