Section Area of Responsibility Responsibility<br />
V-I-1.4.1 Organizational<br />
Responsibilities<br />
V-I-5.13.4c Objective Quality Evidence<br />
to Support Controlled FBW<br />
V-I-8.3.1g and<br />
V-I-8.3.7e(2)<br />
SCS Work<br />
Departure from Specification<br />
Procedures<br />
FWD-B-17<br />
COMUSFLTFORCOMINST 4790.3 REV C<br />
• Organize and implement a QA program<br />
• (<strong>Submarine</strong>s) Organize and implement<br />
program to verify performance of required<br />
maintenance<br />
• Organize and implement a work request<br />
screening process<br />
• (<strong>Submarine</strong>s) Review Ship’s Force Controlled<br />
Work Packages<br />
• (<strong>Submarine</strong>s) Ensure ship’s certification<br />
continuity report is received before ship is<br />
underway<br />
• Review and sign MOA<br />
• (<strong>Submarine</strong>s) Administer a DFS system<br />
• Monitor QA program and procedures<br />
• Schedule and conduct QA program assessment<br />
• Review and endorse TYCOM audit report<br />
• Conduct periodic monitoring of Ship’s Force<br />
work and QA program<br />
• (<strong>Submarine</strong>s) Perform annual<br />
SUBSAFE/SOC/FBW SCS awareness training<br />
• (<strong>Submarine</strong>s) Conduct oral interview with<br />
Ship’s Force relieving QAO<br />
• Ensure fact-finding critiques are held to<br />
establish causes of errors during maintenance<br />
• Provide sufficient time for crew training during<br />
Upgrades/Alterations or Major Repair Work on<br />
the FBW SCS<br />
• Conduct FBW SCS certification audits<br />
• Report by message, crew readiness and<br />
verification from the ISEA/activity performing<br />
work that work necessary for at-sea testing is<br />
complete<br />
• Certify to the TYCOM the FBW SCS material<br />
condition of parts installed, repaired and/or<br />
tested by the ISEA is satisfactory<br />
• Transmit a <strong>Submarine</strong> Material Transfer<br />
Message to the gaining ISIC for deploying/<br />
deployed submarines when the unit out chops<br />
• Perform 100% audit of FBW SCS<br />
Upgrades/Alterations or Major Repair Work<br />
• Provide the Job Control Number and Departure<br />
serial number for Departures initiated by a<br />
depot level activity