Section Area of Responsibility Responsibility<br />

V-I-1.4.1 Organizational<br />

Responsibilities<br />

V-I-5.13.4c Objective Quality Evidence<br />

to Support Controlled FBW<br />

V-I-8.3.1g and<br />

V-I-8.3.7e(2)<br />

SCS Work<br />

Departure from Specification<br />

Procedures<br />

FWD-B-17<br />

COMUSFLTFORCOMINST 4790.3 REV C<br />

• Organize and implement a QA program<br />

• (<strong>Submarine</strong>s) Organize and implement<br />

program to verify performance of required<br />

maintenance<br />

• Organize and implement a work request<br />

screening process<br />

• (<strong>Submarine</strong>s) Review Ship’s Force Controlled<br />

Work Packages<br />

• (<strong>Submarine</strong>s) Ensure ship’s certification<br />

continuity report is received before ship is<br />

underway<br />

• Review and sign MOA<br />

• (<strong>Submarine</strong>s) Administer a DFS system<br />

• Monitor QA program and procedures<br />

• Schedule and conduct QA program assessment<br />

• Review and endorse TYCOM audit report<br />

• Conduct periodic monitoring of Ship’s Force<br />

work and QA program<br />

• (<strong>Submarine</strong>s) Perform annual<br />

SUBSAFE/SOC/FBW SCS awareness training<br />

• (<strong>Submarine</strong>s) Conduct oral interview with<br />

Ship’s Force relieving QAO<br />

• Ensure fact-finding critiques are held to<br />

establish causes of errors during maintenance<br />

• Provide sufficient time for crew training during<br />

Upgrades/Alterations or Major Repair Work on<br />

the FBW SCS<br />

• Conduct FBW SCS certification audits<br />

• Report by message, crew readiness and<br />

verification from the ISEA/activity performing<br />

work that work necessary for at-sea testing is<br />

complete<br />

• Certify to the TYCOM the FBW SCS material<br />

condition of parts installed, repaired and/or<br />

tested by the ISEA is satisfactory<br />

• Transmit a <strong>Submarine</strong> Material Transfer<br />

Message to the gaining ISIC for deploying/<br />

deployed submarines when the unit out chops<br />

• Perform 100% audit of FBW SCS<br />

Upgrades/Alterations or Major Repair Work<br />

• Provide the Job Control Number and Departure<br />

serial number for Departures initiated by a<br />

depot level activity