LED LUMINAIRES 2009 - 2010 - Firalux
LED LUMINAIRES 2009 - 2010 - Firalux
LED LUMINAIRES 2009 - 2010 - Firalux
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
We have an in-house products<br />
evaluation laboratory at the factory. It<br />
consists of goniophotometer machine,<br />
dust test chamber, water jet chamber,<br />
submersion tank, temperature test<br />
chamber and coming soon the impact<br />
test equipment.<br />
Some of the products such as the<br />
underwater luminiares and the<br />
in-ground uplighters are highly<br />
concerned with the safety issue.<br />
So we have carried out a 100% in-line<br />
testing on these luminaires to see if<br />
there is any leakage on the body.<br />
Before the luminaire can be packed<br />
into the box for sales, all of them have<br />
been tested at the end of the<br />
production line. The testing standard<br />
carries out according to VDE practices<br />
which include the functional test, the<br />
insulation test, the earth connection<br />
test and the dielectric strength test.<br />
Because we only have one world to<br />
live in, protecting it from waste and<br />
pollution for the next generation is<br />
everyone’s duty. At the factory we<br />
have a substantial waste water<br />
treatment facility. The chemical<br />
substances that we use in the<br />
pretreatment line are free from<br />
hazardous heavy- metal substances.<br />
We are now applying for ISO 14001.