Module 5: Bioretention Design Specs Details - Melanie Mills
Module 5: Bioretention Design Specs Details - Melanie Mills
Module 5: Bioretention Design Specs Details - Melanie Mills
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SW 12 th Ave., Portland, Kevin Perry<br />
Inlet w/ Grate! A<br />
A<br />
B<br />
B<br />
PLAN VIEW<br />
SECTION B-B<br />
BIORETENTION DESIGN NOTES<br />
1. For use with stormwater facilities with sloped sides or flat bottoms.<br />
2. Provide spot elevations on plans (TBSM, OE, GIE, IPE). See <strong>Details</strong> 100, 101.<br />
3. Refer to municipal standard drawings and match gutter pan of adjacent curb and gutter.<br />
4. If sloped sides, extend cobble from splash pad 1' into bottom of facility.<br />
5. Base material for curb, gutter, and sidewalk per municipal standards.<br />
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS<br />
Municipality<br />
Department Name<br />
GRATE AND FRAME<br />
SECTION A-A<br />
CONSTRUCTION NOTES<br />
1. After construction place sand bags at gutter<br />
openings to keep storm flows from entering<br />
facility until vegetation is established.<br />
detail number<br />
Inlet with Grate 123