15.02.2013 Views

Module 5: Bioretention Design Specs Details - Melanie Mills

Module 5: Bioretention Design Specs Details - Melanie Mills

Module 5: Bioretention Design Specs Details - Melanie Mills

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SW 12 th Ave., Portland, Kevin Perry<br />

Inlet w/ Grate! A<br />

A<br />

B<br />

B<br />

PLAN VIEW<br />

SECTION B-B<br />

BIORETENTION DESIGN NOTES<br />

1. For use with stormwater facilities with sloped sides or flat bottoms.<br />

2. Provide spot elevations on plans (TBSM, OE, GIE, IPE). See <strong>Details</strong> 100, 101.<br />

3. Refer to municipal standard drawings and match gutter pan of adjacent curb and gutter.<br />

4. If sloped sides, extend cobble from splash pad 1' into bottom of facility.<br />

5. Base material for curb, gutter, and sidewalk per municipal standards.<br />

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS<br />

Municipality<br />

Department Name<br />

GRATE AND FRAME<br />

SECTION A-A<br />

CONSTRUCTION NOTES<br />

1. After construction place sand bags at gutter<br />

openings to keep storm flows from entering<br />

facility until vegetation is established.<br />

detail number<br />

Inlet with Grate 123

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!