Production structure<br />
Directors’ Report on <strong>PGNiG</strong> S.A.’s Operations in 2008<br />
Unit 2008 2007<br />
1. Natural gas million m 3 * 4,073.9 4,276.1<br />
- Zielona Góra Branch million m 3 * 2,297.4 2,391.0<br />
- Sanok Branch million m 3 * 1,776.5 1,885.1<br />
2. Crude oil thousand tonnes 487.4 518.2<br />
- Zielona Góra Branch thousand tonnes 442.5 472.0<br />
- Sanok Branch thousand tonnes 44.9 46.2<br />
3. Condensate thousand tonnes 11.2 9.6<br />
4. Sulphur thousand tonnes 21.3 23.3<br />
5. Propane-butane mix thousand tonnes 17.4 18.2<br />
6. Helium million m 3 2.2 2.3<br />
7. LNG million m 3 * 20.1 21.7<br />
* High-methane equivalent<br />
In 2008, a total of 16 boreholes were put in operation in the Sanok Branch area; in the case of the<br />
Zielona Góra Branch, two new boreholes were commissioned. The new boreholes increased the<br />
natural gas production capacity by ca. 510 m 3 /min.<br />
In 2008, <strong>PGNiG</strong> S.A. conducted a number of projects aiming to maintain natural gas and crude oil<br />
production from the existing fields. In order to increase hydrocarbon production, 7,772 m of<br />
operational drill holes were performed. In 2008, drilling of ten operational drills was completed in the<br />
following fields: Radlin, Sędziszów, Dzieduszyce, Cierpisz, Bonikowo, Strachocina, Rudka and<br />
Trzebownisko. With a view to limiting the natural decline in production, 42 non-producing boreholes<br />
were overhauled. Flow-rate intensification measures were taken to maintain or increase the production<br />
capacity of the operational boreholes.<br />
In connection with the pressure decrease on the reserves in Palikówka and Kuryłówka, it was<br />
necessary to install compressors at interconnector terminal points. This prevented decommissioning of<br />
certain boreholes and enabled transfer of the produced gas to the transmission system. There are plans<br />
to install two more compressors on the Jodłówka reserve in 2009.<br />
The exploration and production segment uses the Underground Storage Facilities in Brzeźnica,<br />
Strachocina and Swarzów, to secure the necessary storage capacity to handle the produced gas during<br />
the low-demand periods. Besides, the underground storage facilities enable optimum production from<br />
domestic deposits during the year and provide tools for rational management of natural gas reserves.<br />
The table below sets forth the available capacities of the underground storage facilities as at the end of<br />
2008.<br />
Available capacities of the underground storage facilities used by the exploration and production<br />
segment<br />
million m 3<br />
Brzeźnica 65.0<br />
Strachocina 150.0<br />
Swarzów 90.0<br />
22 of 55