20.02.2013 Views

RVG manual English, German, French, Italian, Spanish, Dutch, 02 ...

RVG manual English, German, French, Italian, Spanish, Dutch, 02 ...

RVG manual English, German, French, Italian, Spanish, Dutch, 02 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Flow (horizontal) Flow (vertical)<br />

from left to right from top to bottom<br />

E = Oil filler neck O = Oil-level gauge glass<br />

A = Oil drain sleeve V = Screw plug<br />

9. Commissioning<br />

© Elster GmbH · All rights reserved · Subject to technical modification<br />

Elster-Instromet<br />

Figure 8: Horizontal and vertical installation positions, oil filling and oil-level display for Type<br />

<strong>RVG</strong>-ST<br />

Flow direction Oil-level gauge glass Oil quantity<br />

Horizontal<br />

Vertical<br />

Oil level<br />

On the front side<br />

of the meter<br />

On the side<br />

of the housing cover<br />

Oil level<br />

Approx. 25 ml<br />

Approx. 80 ml<br />

Table 4: Guide values for oil quantity on commissioning and for oil changes for Type<br />

<strong>RVG</strong>-ST<br />

In order not to damage the meter,<br />

– slowly fill the system until operating pressure is reached.<br />

– The pressure rise may not exceed 350 mbar/s. You should use a bypass line for filling<br />

(recommendation: 12 mm pipe diameter).<br />

– Do no exceed the measuring range even briefly!<br />

– Conduct a tightness test!<br />

Attention: you must please note the instructions in Section 5, „Operating Location“.<br />

15<br />

<strong>English</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!