DISEÑO <strong>DE</strong> LA PROTECCION <strong>DE</strong>L COLECTOR Y <strong>DE</strong> LA PLANTA <strong>DE</strong> TRATAMIENTO <strong>DE</strong> LAS AGUAS RESIDUALES EN EL<br />

<strong>MUNICIPIO</strong> <strong>DE</strong> SANTIAGO <strong><strong>DE</strong>PARTAMENTO</strong> <strong>NORTE</strong> <strong>DE</strong> SANTAN<strong>DE</strong>R<br />

<strong>DE</strong>SCRIPCION <strong>DE</strong>L ITEM: SUMINISTRO, PREPARACION Y COLOCACION <strong>DE</strong> CONCRETO <strong>DE</strong> 3 0 0 0 PSI<br />

TAMAÑO MAXIMO 1 1 /2 " Y 1 "; PARA COLUMNAS - PLACAS Y MUROS<br />

COSTOS DIRECTOS<br />

EQUIPO<br />

MATERIALES<br />

TRANSPORTE<br />

MANO <strong>DE</strong> OBRA<br />

ANALISIS <strong>DE</strong> PRECIOS UNITARIOS<br />

FECHA: JUNIO de 2 0 1 0<br />

OBRA: RECUPERACION Y PROTECCION <strong>DE</strong> LA RED <strong>DE</strong>L COLECTOR <strong>DE</strong> AGUAS RESIDUALES <strong>DE</strong>L <strong>MUNICIPIO</strong><br />

<strong>DE</strong>SCRIPCION<br />

Formaleta Metálica De 1,00 m x 0,50 m<br />

Vibrador Gas / Eléctrico 4.0 Ft<br />

Cercos de Madera<br />

Herramienta Menor<br />

<strong>DE</strong>SCRIPCION<br />

Concreto Normal 3000 PSI = 21,0 Mpa.<br />

Desperdicios<br />

ING. CONSULTOR: HECTOR FRANCISCO LIZCANO BUENO<br />

UNIDAD TARIFA RENDIMIENTO V. TOTAL PRECIO<br />

UNITARIO<br />

Du 210,00 0,01 16.153,85 EN: M 3<br />

Hm 55.000,00 5,00 11.000,00<br />

140,00 0,02 7.000,00<br />

UNIDAD V. UNITARO CANTIDAD V. TOTAL<br />

M 3<br />

290.000,00 1,05 304.500,00<br />

10.032,00<br />

MATERIAL VOLUMEN DISTANCIA M 3 - TON /KM TARIFA V. TOTAL<br />

TRABAJADOR UNIDAD JORNAL JORNAL TOTAL RENDIMIENTO V. TOTAL<br />

Cuadrilla de Construcción 1 x 3 Día 196.692,00 0,64 307.331,25<br />

COSTOS INDIRECTOS<br />

<strong>DE</strong>SCRIPCION<br />

TOTAL COSTO DIRECTO:<br />

PORCENTAJE V. TOTAL<br />

PRECIO UNITARIO TOTAL:<br />

HECTOR FRANCISCO LIZCANO BUENO – INGENIERO CONSULTOR 157<br />

3 4 . 1 5 3 , 8 5<br />

3 1 4 . 5 3 2 , 0 0<br />

0 , 0 0<br />

3 0 7 . 3 3 1 , 2 5<br />

6 5 6 . 0 1 7 , 0 0<br />

6 5 6 . 0 1 7 , 0 0