09.07.2020 Views

Newsletter ACERA - Junio 2020

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10.<br />

INSTALLED CAPACITY<br />

6.530 MW<br />

The increase in NCRE’s installed capacity is due<br />

to the entry of new solar photovoltaic and<br />

run-of-river mini hydro plants, increasing by 0,7%<br />

the NCRE’s capacity as compared to May.<br />

Thermal<br />

25.818 MW<br />

BESS<br />

50,3% 0,2%<br />

Conventional<br />

Hydraulic<br />

24,2%<br />

NCRE<br />

25,3%<br />

Technology<br />

NCRE<br />

Biogas<br />

Biomass<br />

Wind<br />

Geothermal<br />

Run-of-river mini-hydro<br />

Solar Photovoltaic<br />

Thermosolar<br />

Conventional Hydraulic<br />

Dam Hydraulic<br />

Run-of-river Hydraulic<br />

Thermal<br />

Coal<br />

Cogeneration<br />

Fuel Oil No. 6<br />

Natural Gas<br />

Diesel Oil<br />

Propane<br />

Liquefied petroleum gas<br />

BESS<br />

Battery Storage System<br />

Overall Total<br />

Net Power<br />

MW<br />

Net Power<br />

%<br />

Prior<br />

month<br />

variation<br />

6.530 25,3% 0,7%<br />

61<br />

414<br />

2.230<br />

48<br />

557<br />

3.111<br />

110<br />

0,2%<br />

1,6%<br />

8,6%<br />

0,2%<br />

2,2%<br />

12,0%<br />

0,4%<br />

0,0%<br />

0,0%<br />

0,0%<br />

0,0%<br />

2,3%<br />

1,0%<br />

0,0%<br />

6.243 24,2% 0,2%<br />

3.434 13,3% 0,0%<br />

2.809 10,9% 0,4%<br />

12.991 50,3% 0,0%<br />

4.824<br />

18<br />

142<br />

4.860<br />

3.081<br />

14<br />

52<br />

18,7%<br />

0,1%<br />

0,6%<br />

18,8%<br />

11,9%<br />

0,1%<br />

0,2%<br />

0,0%<br />

0,0%<br />

0,0%<br />

0,0%<br />

0,0%<br />

0,0%<br />

0,0%<br />

54 0,2% 0,0%<br />

54 0,2% 0,0%<br />

25.818 100% 0,2%<br />

STATE OF NCRE PROJECTS<br />

ACCORDING TO THEIR PROGRESS<br />

NCRE Projects in construction<br />

5.235MW<br />

59%<br />

Solar photovoltaic Projects<br />

Technology<br />

Battery Storage System<br />

Biogas<br />

Biomass<br />

Wind<br />

Geothermal<br />

Pump hydraulic<br />

Run-of-river mini-hydro<br />

Solar Photovoltaic<br />

Thermosolar<br />

Overall Total<br />

In Construction<br />

MW<br />

Approved<br />

MW<br />

In Qualification<br />

MW<br />

-<br />

5<br />

166<br />

1.849<br />

33<br />

-<br />

78<br />

3.104<br />

-<br />

-<br />

14<br />

149<br />

4.566<br />

70<br />

300<br />

290<br />

12.391<br />

2.192<br />

28<br />

-<br />

30<br />

4.005<br />

-<br />

-<br />

58<br />

12.526<br />

1.200<br />

5.235 19.972 17.847

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!