19.11.2012 Views

BA ROWELD ROFUSE Sani 160 Anf... - Rothenberger South Africa

BA ROWELD ROFUSE Sani 160 Anf... - Rothenberger South Africa

BA ROWELD ROFUSE Sani 160 Anf... - Rothenberger South Africa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.5 Welding Process<br />

The welding process is monitored for its entire duration applying the<br />

welding parameters computed for the fitting.<br />

4.6 End of Welding<br />

The welding process was completed successfully if the actual welding time<br />

shown on the screen is 0, the green LED (End) is on, and at the same time<br />

the audible signal can be heard twice.<br />

4.7 Welding Aborted<br />

The welding process has caused errors if the red LED (Fault) is on and the<br />

audible signal buzzes intermittently. Additionally, an error code is displayed<br />

on the screen.<br />

An error has to be reacted to by pressing the STOP key.<br />

4.8 Cooling Time<br />

The cooling time as given in the fitting manufacturer’s instructions has to<br />

be respected. Note that during that time, no external forces must be<br />

applied to the pipe fitting joint which is still warm.<br />

4.9 Returning to the Start of Welding<br />

After welding is finished, disconnecting the welded fitting from the welding<br />

unit will cause the unit to return to the start of welding. An additional<br />

safety feature prevents a given electro fusion fitting from being welded<br />

twice inadvertently: after a properly completed or an aborted welding<br />

operation, the welding unit first has to be disconnected from the fitting<br />

to be ready for the next welding.<br />

ENGLISH 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!