Les activités du pôle Développement et Présérie en 2010<br />
ont été centrées sur les programmes EMBRAER Legacy<br />
450-500 (Fuselage arrière et Flaps), AIRBUS A350 (Slats),<br />
A400M (Bords d’attaques et système de dégivrage de<br />
l’aile, Portes du train d’atterrissage principal), BOMBAR-<br />
DIER C-Series (Bord d’attaque fixe, slats et système de<br />
dégivrage) et Learjet 85 (Bord d’attaque fixe).<br />
Pour le Legacy 450-500, SONACA Gosselies et ses filiales<br />
brésiliennes ont réalisé la fabrication des pièces du premier<br />
avion et le début d’assemblage du fuselage arrière.<br />
Les pièces composites de ce dernier ont passé avec succès<br />
le cap du « FPQ » (Qualification du procédé). Les premières<br />
pièces composites des Flaps ont également été<br />
réalisées, l’assemblage de celles-ci étant prévu début<br />
2011.<br />
Le jalon « Critical Design Review » a été partiellement atteint<br />
en AIRBUS A350, principalement lié à des retards sur<br />
des délivrables amont. Les définitions de détail pour la<br />
commande des outillages et la préparation de la fabrication<br />
des premières pièces ont commencé à être livrées par<br />
le Bureau d’Etudes aux équipes d’industrialisation. La<br />
livraison des composants du premier avion est prévue au<br />
dernier trimestre 2011.<br />
Le développement du bord d’attaque fixe du C-Series se<br />
déroule dans le cadre d’un planning particulièrement<br />
tendu, avec la livraison du démonstrateur système<br />
« CIASTA » prévue en mai 2011 et celle des composants<br />
pour les essais statiques en septembre 2011, alors que le<br />
jalon « Critical Design Review » est prévu en avril 2011.<br />
C’est un défi important, aussi bien pour SONACA et son<br />
partenaire AéRO-VODOCHODY que pour SHORTS, res-<br />
Development and<br />
Pre-serie Center<br />
In 2010, <strong>the</strong> activities of <strong>the</strong> Development and Pre-Series<br />
centre focused on several programmes: EMBRAER's Legacy<br />
450-500 (rear fuselage and flaps), AIRBUS' A350<br />
(Slats), A400M (leading edges and wing de-icing system,<br />
<strong>main</strong> landing gear doors), BOMBARDIER's C-Series (fixed<br />
leading edges, slats and de-icing system) and Learjet 85<br />
(fixed leading edge).<br />
For <strong>the</strong> Legacy 450-500, SONACA Gosselies and its Brazilian<br />
subsidiaries manufactured <strong>the</strong> parts of <strong>the</strong> first airplane<br />
and started assembling <strong>the</strong> rear fuselage. The<br />
composite parts of <strong>the</strong> latter were successfully qualified<br />
according <strong>to</strong> "FPQ" (process qualification). The first composite<br />
flap parts were also manufactured, and should be<br />
assembled early 2011.<br />
The Critical Design Review miles<strong>to</strong>ne was partially fulfilled<br />
in <strong>the</strong> AIRBUS A350 programme, <strong>main</strong>ly because of delays<br />
in <strong>the</strong> upstream deliverables. The design office started delivering<br />
<strong>the</strong> detailed drawings <strong>to</strong> <strong>the</strong> industrialisation<br />
teams, <strong>to</strong> order <strong>to</strong>oling and plan <strong>the</strong> manufacturing of <strong>the</strong><br />
first parts. The first aircraft components should start being<br />
delivered in <strong>the</strong> last quarter of 2011.<br />
The development of <strong>the</strong> C-Series fixed leading edge is<br />
progressing within a particularly tight schedule, with <strong>the</strong><br />
delivery of <strong>the</strong> "CIASTA" system demonstra<strong>to</strong>r planned for<br />
May 2011, and that of <strong>the</strong> components for <strong>the</strong> static tests<br />
scheduled for September, while <strong>the</strong> CDR miles<strong>to</strong>ne is<br />
for April 2011. This is an important challenge, both for<br />
SONACA and its partner AERO-VODOCHODY, and for SHORTS,<br />
that is in charge of <strong>the</strong> upstream delivery of a large amount<br />
of wing interface information. The detail definitions intended<br />
for <strong>the</strong> industrialisation started at <strong>the</strong> end of 2010.