24<br />

Pôle développement<br />

et Présérie<br />

Les activités du pôle Développement et Présérie en 2010<br />

ont été centrées sur les programmes EMBRAER Legacy<br />

450-500 (Fuselage arrière et Flaps), AIRBUS A350 (Slats),<br />

A400M (Bords d’attaques et système de dégivrage de<br />

l’aile, Portes du train d’atterrissage principal), BOMBAR-<br />

DIER C-Series (Bord d’attaque fixe, slats et système de<br />

dégivrage) et Learjet 85 (Bord d’attaque fixe).<br />

Pour le Legacy 450-500, SONACA Gosselies et ses filiales<br />

brésiliennes ont réalisé la fabrication des pièces du premier<br />

avion et le début d’assemblage du fuselage arrière.<br />

Les pièces composites de ce dernier ont passé avec succès<br />

le cap du « FPQ » (Qualification du procédé). Les premières<br />

pièces composites des Flaps ont également été<br />

réalisées, l’assemblage de celles-ci étant prévu début<br />

2011.<br />

Le jalon « Critical Design Review » a été partiellement atteint<br />

en AIRBUS A350, principalement lié à des retards sur<br />

des délivrables amont. Les définitions de détail pour la<br />

commande des outillages et la préparation de la fabrication<br />

des premières pièces ont commencé à être livrées par<br />

le Bureau d’Etudes aux équipes d’industrialisation. La<br />

livraison des composants du premier avion est prévue au<br />

dernier trimestre 2011.<br />

Le développement du bord d’attaque fixe du C-Series se<br />

déroule dans le cadre d’un planning particulièrement<br />

tendu, avec la livraison du démonstrateur système<br />

« CIASTA » prévue en mai 2011 et celle des composants<br />

pour les essais statiques en septembre 2011, alors que le<br />

jalon « Critical Design Review » est prévu en avril 2011.<br />

C’est un défi important, aussi bien pour SONACA et son<br />

partenaire AéRO-VODOCHODY que pour SHORTS, res-<br />

Development and<br />

Pre-serie Center<br />

In 2010, <strong>the</strong> activities of <strong>the</strong> Development and Pre-Series<br />

centre focused on several programmes: EMBRAER's Legacy<br />

450-500 (rear fuselage and flaps), AIRBUS' A350<br />

(Slats), A400M (leading edges and wing de-icing system,<br />

<strong>main</strong> landing gear doors), BOMBARDIER's C-Series (fixed<br />

leading edges, slats and de-icing system) and Learjet 85<br />

(fixed leading edge).<br />

For <strong>the</strong> Legacy 450-500, SONACA Gosselies and its Brazilian<br />

subsidiaries manufactured <strong>the</strong> parts of <strong>the</strong> first airplane<br />

and started assembling <strong>the</strong> rear fuselage. The<br />

composite parts of <strong>the</strong> latter were successfully qualified<br />

according <strong>to</strong> "FPQ" (process qualification). The first composite<br />

flap parts were also manufactured, and should be<br />

assembled early 2011.<br />

The Critical Design Review miles<strong>to</strong>ne was partially fulfilled<br />

in <strong>the</strong> AIRBUS A350 programme, <strong>main</strong>ly because of delays<br />

in <strong>the</strong> upstream deliverables. The design office started delivering<br />

<strong>the</strong> detailed drawings <strong>to</strong> <strong>the</strong> industrialisation<br />

teams, <strong>to</strong> order <strong>to</strong>oling and plan <strong>the</strong> manufacturing of <strong>the</strong><br />

first parts. The first aircraft components should start being<br />

delivered in <strong>the</strong> last quarter of 2011.<br />

The development of <strong>the</strong> C-Series fixed leading edge is<br />

progressing within a particularly tight schedule, with <strong>the</strong><br />

delivery of <strong>the</strong> "CIASTA" system demonstra<strong>to</strong>r planned for<br />

May 2011, and that of <strong>the</strong> components for <strong>the</strong> static tests<br />

scheduled for September, while <strong>the</strong> CDR miles<strong>to</strong>ne is<br />

for April 2011. This is an important challenge, both for<br />

SONACA and its partner AERO-VODOCHODY, and for SHORTS,<br />

that is in charge of <strong>the</strong> upstream delivery of a large amount<br />

of wing interface information. The detail definitions intended<br />

for <strong>the</strong> industrialisation started at <strong>the</strong> end of 2010.