IMPORTANT: For 3-phase <strong>pump</strong>s, check for proper rotation before installing <strong>pump</strong> into basin. See figure A for proper<br />
rotation.<br />
4.<br />
Fig. A – Proper impeller<br />
rotation, three phase models<br />
AFTER THE PUMP IS INSTALLED, THE ELECTRICAL CHECKS OF SECTION 4 MUST BE PERFORMED.<br />
4-1 PIGGY BACK SWITCH OPERATION<br />
1. Plug the Piggyback switch into a 6-20R receptacle. The receptacle must be<br />
wired to a 30-amp breaker. Be sure to have the breaker turned off before<br />
plugging in the switch.<br />
2. Plug the <strong>pump</strong> power cord into the piggyback switch as shown.<br />
3. The <strong>pump</strong> is ready to test and your breaker can be turned on.<br />
(Refer to section 5)<br />
4-2 DIRECT WIRING OF AUTOMATIC PUMP<br />
The <strong>pump</strong> can run on a voltage rating of<br />
230V or 208V. Check that it is the same as<br />
the supply voltage. The <strong>pump</strong>s are<br />
supplied with 6-20P (20-amp) cord plug<br />
ends. If a single phase <strong>pump</strong> is to be wired<br />
directly into a control device or junction box,<br />
and it is necessary to remove the plugs,<br />
have a certified electrician do the wiring in<br />
accordance with the National Electric Code<br />
and applicable local codes. See Fig. B for<br />
direct wire installation of single phase,<br />
<strong>automatic</strong> <strong>pump</strong>s.<br />
Bottom<br />
View<br />
Electrical Connection<br />
ALWAYS TURN OFF BREAKERS BEFORE<br />
WORKING ON ELECTRICAL CORDS.<br />
BE CAREFUL NOT TO DRILL OR SCREW INTO<br />
EXISTING WIRING.<br />
1. The control panel is preferably mounted<br />
in a cool, dry environment. Installation<br />
and connections are specific to the<br />
control panel. Control panels should be<br />
installed and serviced only by a<br />
qualified electrician (Refer to Figure 2, page 10).<br />
Check three phase <strong>pump</strong>s for proper<br />
rotation prior to installing <strong>pump</strong>(s) in<br />
basin. To change rotation, reverse any<br />
two of the three power leads to the<br />
<strong>pump</strong>. Code the wires for reconnection<br />
after installation.<br />
Check to make sure installation is in accordance<br />
with the National Electric Code and all applicable local codes. Installation and servicing is to be<br />
conducted by qualified personnel. This <strong>pump</strong> is supplied with a grounding conductor. To reduce<br />
the risk of electrical shock, be certain that it is connected to a properly grounded earth wire.<br />
Fig. B – Direct Wiring of 120V or 208-<br />
230V Single Phase, Automatic Pumps<br />
©Copyright 2010 Liberty Pumps Inc. All rights reserved - 6 -