04.09.2013 Views

Appendix Z to RMWI 2 - Generic Checklist - Extranet

Appendix Z to RMWI 2 - Generic Checklist - Extranet

Appendix Z to RMWI 2 - Generic Checklist - Extranet

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Appendix</strong> A <strong>to</strong> <strong>RMWI</strong> 2 – Conduct Risk Assessment Workshop<br />

CHECKLIST OF GENERIC SAFETY HAZARDS AND RISKS<br />

While some elements in this list<br />

may not necessarily be risks in<br />

their own right, they may be, or<br />

give an indication of, a precursor<br />

event.<br />

Events Listing:<br />

- Collision.<br />

- Communications irregularity<br />

- Derailment.<br />

- Explosion<br />

- Fire<br />

- Level crossing irregularity<br />

- Loading irregularity<br />

- Locomotive irregularity<br />

- Near miss<br />

- Other incidents with serious<br />

potential.<br />

- Personal behaviour irregularity<br />

- Personal fitness irregularity<br />

- Rollings<strong>to</strong>ck irregularity<br />

- Safeworking irregularity<br />

- Schedule irregularity<br />

- Security irregularity<br />

- Signage irregularity<br />

- Signalling irregularity<br />

- Signal passed at danger (SPAD)<br />

- Slip, trip or fall<br />

- Track irregularity<br />

- Track work irregularity<br />

- Train integrity irregularity<br />

Other party involved:<br />

- Train<br />

- Rollings<strong>to</strong>ck<br />

- Road vehicle<br />

- Passenger<br />

- Trespasser<br />

- Employee<br />

- Contrac<strong>to</strong>r<br />

- Member of public<br />

- Suspected suicide<br />

- Animal<br />

- Infrastructure<br />

- Obstruction<br />

- Missile<br />

- Buildings<br />

- Other object<br />

- Adjacent track owner<br />

- Road Authority<br />

- Private siding owner<br />

Location type listing:<br />

- Running lines<br />

- Yards and sidings.<br />

- Level crossing<br />

- Pedestrian crossing.<br />

- Rail corridor (i.e. land adjacent <strong>to</strong><br />

track)<br />

- Buildings and structures<br />

Pg. 1 of 10 V1.0


Safeworking system type:<br />

This section is included <strong>to</strong> allow<br />

comparisons of the performance of the<br />

various systems of safeworking:<br />

- Centralised train control (CTC)<br />

- Level crossing - actively protected<br />

(LX)<br />

- Level crossing – passively protected<br />

(LX)<br />

- Level crossing – unprotected (LX)<br />

-Au<strong>to</strong>matic Block Signalling (ABS)<br />

- Self res<strong>to</strong>ring switches (SRS)<br />

- Train authority (TA)<br />

- Alternative safeworking system<br />

(ASW)<br />

- Advanced train management system<br />

(ATMS)<br />

Cause listing<br />

Collision:<br />

- Door open<br />

- Out of gauge loading<br />

- Load shift<br />

- Loading fell from train<br />

- Safeworking breach by train<br />

controller<br />

- Safeworking breach by train driver<br />

- Safeworking breach by track<br />

maintainer<br />

- Driver misjudged end of authority<br />

- Driver completely overran authority<br />

- Vandalism<br />

- Signal failure – ‘wrong side’<br />

- Driver misjudged braking<br />

- Driver completely missed signal<br />

- Started against signal<br />

- Signal lamp at blackout<br />

- Inadequate visibility<br />

- Broken rail<br />

- Heat buckle<br />

- Spread track<br />

- Flood damage<br />

- Rail alignment<br />

- Turnout condition<br />

- Points condition<br />

- Train parting<br />

- Rollings<strong>to</strong>ck runaway<br />

Communications irregularities:<br />

- Locomotive radio set failure<br />

- Maintenance vehicle radio set failure<br />

- Hand held radio set failure<br />

- Radio system failure<br />

- Radio system poor quality<br />

- Radio system poor coverage<br />

- CTC failure<br />

- Telemetry failure<br />

- Data communications error<br />

Derailment:<br />

- Load shift<br />

- Loading fell from train<br />

- Safeworking breach by train<br />

controller<br />

- Safeworking breach by train driver<br />

Pg. 2 of 10 V1.0


- Safeworking breach by track<br />

maintainer<br />

- Driver misjudged end of authority<br />

- Driver completely overran authority<br />

- Vandalism<br />

- Signal failure – ‘wrong side’<br />

- Driver misjudged braking<br />

- Driver completely missed signal<br />

- Started against signal<br />

- Signal lamp at blackout<br />

- Inadequate visibility<br />

- Broken rail<br />

- Heat buckle<br />

- Spread track<br />

- Flood damage<br />

- Rail alignment<br />

- Turnout condition<br />

- Points condition<br />

- Train parting<br />

- Rollings<strong>to</strong>ck runaway<br />

Explosion:<br />

- Terrorism<br />

Electrical infrastructure<br />

irregularity:<br />

- Overhead traction supply<br />

Fire:<br />

- On train<br />

- On corridor<br />

- Entered/Exited corridor<br />

Level crossing irregularity:<br />

- Signage damaged<br />

- Warning devices failed<br />

- Warning devices damaged<br />

- Warning devices not operating<br />

- Warning devices operating<br />

continuously<br />

Loading irregularities:<br />

- Door open<br />

- Out of gauge loading<br />

- Load shift<br />

- Uneven distribution of load<br />

- Loading fell from train<br />

- Dangerous goods spill<br />

Locomotive irregularities:<br />

- Engine failure<br />

- Traction mo<strong>to</strong>r failure<br />

- Wheel set failure<br />

- Draw gear failure<br />

- Locomotive brake fault<br />

Near Miss:<br />

- Near miss at level crossing<br />

- Near miss at other location<br />

Personal behaviour irregularity:<br />

- Assault<br />

Personal fitness irregularity:<br />

- Alcohol test positive<br />

- Drugs test positive<br />

- Fatigue<br />

Rollings<strong>to</strong>ck irregularities:<br />

- Draw gear failure<br />

- Hot box<br />

Pg. 3 of 10 V1.0


- Bearing acoustic reading high.<br />

- Bearing failure<br />

- Wheel failure<br />

- Axle failure<br />

- Major braking system failure<br />

- Air leak/loss of air<br />

- Dragging brakes<br />

- Dragging equipment<br />

- Door fault<br />

Safeworking irregularities:<br />

- Safeworking breach by train<br />

controller<br />

- Safeworking breach by train driver<br />

- Safeworking breach by track<br />

maintainer<br />

- Driver misjudged end of authority<br />

- Driver completely overran authority<br />

Schedule irregularities:<br />

- Train cancelled or terminated<br />

- Train held account early running<br />

- Industrial delays<br />

- Train underpowered<br />

- Train over length for loop<br />

- Meteorological conditions<br />

- Unscheduled s<strong>to</strong>p<br />

- Speed restrictions<br />

- Personnel or procedural fault<br />

- Fuelling fault<br />

Security irregularities:<br />

- Trespass on rail corridor<br />

- Trespass on trains<br />

- Vandalism<br />

- Theft<br />

Signage irregularities:<br />

- Sight obscured<br />

- Signage damaged<br />

- Signage poorly positioned<br />

- Signage missing<br />

Signalling irregularities:<br />

- Signal failure – ‘wrong side’<br />

- CTC failure<br />

- Points failure<br />

- Track circuit failure<br />

- Relay failure<br />

- Cable failure<br />

- Interlocking failure<br />

- Power supply failure<br />

Signal passed at danger incidents<br />

(SPADS):<br />

- Driver misjudged braking<br />

- Driver completely missed signal<br />

- Signal res<strong>to</strong>red as train approached<br />

- Started against signal<br />

- Signal system polling<br />

- Signal lamp at blackout<br />

- Inadequate visibility<br />

Slip, trip or fall:<br />

- From train<br />

- Between platform and train<br />

- On train<br />

- On track<br />

Pg. 4 of 10 V1.0


- On platform/concourse<br />

- On escala<strong>to</strong>r/lift<br />

- On stairs<br />

- From structure<br />

- Caught in train doors<br />

Track irregularities:<br />

- Broken Rail<br />

- Heat buckle<br />

- Spread track<br />

- Flood damage<br />

- Rail alignment<br />

- Vegetation control<br />

- Ballast condition<br />

- Mud hole<br />

- Turnout condition<br />

- Points condition<br />

Track work irregularity:<br />

- Late hand back<br />

Train integrity irregularity:<br />

- Train parting<br />

- Rollings<strong>to</strong>ck runaway<br />

- End of train marker defective<br />

- End of train marker missing<br />

Major system and subsystem:<br />

- Track circuits<br />

- Track switching system<br />

- Interlocking control<br />

- Signals<br />

- Level crossings<br />

- Signals equipment housing<br />

- Signals power supply<br />

- Opera<strong>to</strong>r control system<br />

- Train Control voice radio system<br />

- CTC telemetry system<br />

- Other telemetry<br />

- CAR communications system<br />

- TAR FO communications system<br />

- Cable carrier system<br />

- Long line communications system<br />

- Train Control centre system<br />

- Driver initiated control equipment<br />

(DICE)<br />

- Alternative Safeworking System<br />

(ASW)<br />

- Track<br />

- Rail<br />

- Rail Corridor/Track other<br />

- Pole Line<br />

Track circuits:<br />

- Audio Frequency Overlay (AFO)<br />

- Bonds<br />

- Broken Rail<br />

- Cable u/g<br />

- Derailment<br />

- Discrimination<br />

- Dragging Load<br />

- Electro Code<br />

- Fuse<br />

- Insulated Joints<br />

- Inverter<br />

Pg. 5 of 10 V1.0


- Microcode<br />

- Microtrax<br />

- Rail Connec<strong>to</strong>r<br />

- Rail Surface<br />

- Short Modulated Track Circuit (SMTC)<br />

- Supply<br />

- Track Adjustment<br />

- Track diode<br />

- Track Leads<br />

- Track Leakage<br />

- Track Machinery<br />

- Track Relay<br />

- Track Resis<strong>to</strong>r<br />

- Track Shorted<br />

- Train Not Clear<br />

- Westrace<br />

- Wiring<br />

- Relay Base<br />

- Relay Coils<br />

- Relay Contacts<br />

- Relay Diode<br />

- Relay Electronic<br />

- Supply<br />

- Westrace<br />

- Wiring<br />

Signals:<br />

- Cable u/g<br />

- Contacts<br />

- Fuse<br />

- Lamp<br />

- Lamp Holder<br />

- LED<br />

- Lens<br />

- O.O.G. Detec<strong>to</strong>r<br />

- Regula<strong>to</strong>r<br />

- Signal ID<br />

- Signal Mechanism<br />

- Signal Sighting<br />

- Supply<br />

- Vital Radio Link<br />

- Wiring<br />

Level crossings:<br />

- Cable u/g<br />

- Flasher Unit<br />

- Fuse<br />

- Gate Arm<br />

- Gate Mechanism<br />

- Gong<br />

- Lamp<br />

- Lamp Alignment<br />

- Lamp Unit<br />

- LED<br />

- Predic<strong>to</strong>r<br />

- Regula<strong>to</strong>r<br />

- Supply<br />

- Wiring<br />

Signals equipment housing:<br />

- Cable u/g<br />

- Enclosure<br />

Pg. 6 of 10 V1.0


- Relay Room<br />

- Security Device<br />

Signals power supply:<br />

- Cable u/g<br />

- Charging Equipment<br />

- Fuse<br />

- Internal Wiring<br />

- Mains supply<br />

- Power Distribution<br />

- Solar Panel<br />

- Standby Genera<strong>to</strong>r<br />

- Switchboard<br />

Opera<strong>to</strong>r control system:<br />

- Lamp Indica<strong>to</strong>rs<br />

- LED Indica<strong>to</strong>rs<br />

- Local Control Panel<br />

- Local Push But<strong>to</strong>n<br />

Train Control voice radio system:<br />

- Antenna<br />

- Antenna Alignment<br />

- Batteries<br />

- Cable Distribution Frame<br />

- Cable u/g<br />

- Coaxial Cable<br />

- DC-DC Converter<br />

- Design Limitations<br />

- Diplexer<br />

- Equipment Shelter<br />

- Harness<br />

- Interference<br />

- Line Interface Unit<br />

- Modem<br />

- Multicoupler<br />

- Power Supply/Charger<br />

- Radio Transceiver<br />

- Telstra Leased Service<br />

- Tower Structure<br />

- Voting Controller<br />

CTC telemetry system:<br />

- Antenna<br />

- Antenna Alignment<br />

- Au<strong>to</strong>cross<br />

- Batteries<br />

- Cable Distribution Frame<br />

- Cable u/g<br />

- Coaxial Cable<br />

- Computer Server<br />

- DC-DC Converter<br />

- Diplexer<br />

- Equipment Shelter<br />

- ETSA Supply<br />

- Harness<br />

- Interference/Propagation<br />

- JZA Module/PCB<br />

- Line Interface Unit<br />

- Modem<br />

- Moscad CPU/RTU<br />

- Moscad Digital Input/Counter<br />

- Moscad Digital Output Module<br />

Pg. 7 of 10 V1.0


- Moscad FIU<br />

- Multicoupler<br />

- Pole Line<br />

- Power Supply/Charger<br />

- Printer<br />

- Radio Transceiver<br />

- Teknis Unit<br />

- Telstra Leased Service<br />

- Tower Structure<br />

- Uninterruptible Power<br />

- Visual Display Unit<br />

- Westinghouse S2/Westcad<br />

- Wiring<br />

Other telemetry:<br />

- Antenna<br />

- Antenna Alignment<br />

- Batteries<br />

- Cable Distribution Frame<br />

- Cable u/g<br />

- Coaxial Cable<br />

- DC-DC Converter<br />

- Equipment Shelter<br />

- Interference<br />

- Line Interface Unit<br />

- Modem<br />

- Power Supply/Charger<br />

- Radio Transceiver<br />

- Teknis Unit<br />

- Telstra Leased Service<br />

- Tower Structure<br />

- Wiring<br />

CAR communications system:<br />

- 12 Channel Mux Equipment<br />

- 3 Channel Panel<br />

- 8 bit Telemetry Unit<br />

- Antenna<br />

- Antenna Alignment<br />

- Band Pass Filter<br />

- Batteries<br />

- Cable Distribution Frame<br />

- Cable u/g<br />

- Coaxial Cable<br />

- DC-DC Converter<br />

- Diplexer<br />

- Equipment Shelter<br />

- Harness<br />

- Hybrid & Relay Set<br />

- Interference<br />

- Microwave Tx/Rx Bay<br />

- Multicoupler<br />

- Order wire<br />

- Power Supply/Charger<br />

- Radio Transmitter/Receiver<br />

- Solar Array Frame<br />

- Solar Panel<br />

- Solar Regula<strong>to</strong>r<br />

- Tower Structure<br />

- Voting Controller<br />

TAR FO communications system:<br />

Pg. 8 of 10 V1.0


- Antenna<br />

- Antenna Alignment<br />

- Batteries<br />

- Cable Distribution Frame<br />

- Coaxial Cable<br />

- DC Distribution Board<br />

- DC-DC Converter<br />

- Diplexer<br />

- Equipment Shelter<br />

- Fibre Optic Cable<br />

- Fibre Optic Cable Tail<br />

- Fibre Optic Mux Equipment<br />

- Fibre Optic OLTE<br />

- Harness<br />

- Interference<br />

- Multicoupler<br />

- Power Supply/Charger<br />

- Radio Transceiver<br />

- Solar Array Frame<br />

- Solar Panel<br />

- Solar Regula<strong>to</strong>r<br />

- Tower Structure<br />

Cable carrier system:<br />

- AWA Cable Carrier Repeater<br />

- AWA Cable Carrier Terminal<br />

- Multiplex Equipment<br />

- Quad Underground Cable<br />

- Power<br />

- Power Supply/Charger<br />

Track:<br />

- Ballast/Mud hole<br />

- Buckle<br />

- Cant<br />

- Flood damage<br />

- Gauge<br />

- Line<br />

- Misalignment<br />

- Points & Crossings/Other<br />

- Rough Track<br />

- Rough Track Not Found<br />

- Sleepers<br />

- Spread Track<br />

- Top/Twist<br />

- Under track structure<br />

Rail:<br />

- Broken Rail<br />

- Contamination<br />

- Damaged/Broken Crossing<br />

- Fish bolts<br />

- Fishplate<br />

- Flash butt weld<br />

- IRJ<br />

- Joint condition<br />

- Junction weld<br />

- Thermit weld<br />

Rail Corridor:<br />

- Debris/Rubbish Obstruction<br />

- Fallen Trees<br />

- Inadequate Line of Sight<br />

Pg. 9 of 10 V1.0


- Operational Sign Issue<br />

- Structure Obstruction<br />

- Tools/Equipment Obstruction<br />

- Track Machine Failure<br />

- Weeds/Vegetation<br />

Pole Line:<br />

- Cross arm<br />

- Drop off cable<br />

- Impedance Matching Unit<br />

- Insula<strong>to</strong>r<br />

- Lightning Protection<br />

- Multi core Aerial Cable<br />

- Open Wire Conduc<strong>to</strong>r<br />

- Pole<br />

- Pole Stay<br />

- Tree through aerials<br />

Human Fac<strong>to</strong>rs:<br />

Behavioural - Judgement, haste,<br />

panic, boredom, complacency,<br />

personality, habit, perception<br />

Medical - Health, fatigue, drug &<br />

alcohol abuse, sensory acuity, stress,<br />

illness, disorientation, shift work,<br />

Operational - Experience,<br />

supervision, training, knowledge, staff<br />

compatibility<br />

Task related - Briefing, workload,<br />

decision making, concentration,<br />

situational awareness, distractions,<br />

expectancy<br />

Equipment design - Lighting,<br />

ergonomics, inadvertent operation,<br />

location of controls, complexity,<br />

exposed parts, braking<br />

Environment - Weather, noise,<br />

visibility, illusions, smoke, fumes, heat<br />

& cold<br />

Information transfer - Interrupted<br />

communication, loss of<br />

communication, response <strong>to</strong> alarms,<br />

misinterpretation<br />

Survival - Crashworthiness, response<br />

and control procedures, training<br />

Pg. 10 of 10 V1.0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!