24.03.2018 Views

toshibel_cz

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RAV – schéma chladicího okruhu a umístění čidel<br />

Venkovní jednotka:<br />

Muffler<br />

Ø45 × 230 L<br />

Solenoid valve<br />

Check<br />

valve<br />

P<br />

Check joint<br />

High-pressure side<br />

Pressure switch<br />

TO sensor<br />

TL sensor<br />

BUSINESS/RAV<br />

4-way<br />

valve<br />

Check joint<br />

Low-pressure side<br />

TD sensor<br />

P<br />

Pressure<br />

sensor<br />

TE sensor<br />

Distributor<br />

Heat exchanger<br />

Ø8, 2 rows, 60 stages + Ø9.5, 1 row, 60 stages<br />

13-13 pass + under cool pass<br />

TS sensor<br />

Liquid tank<br />

Ø45 × 420 L<br />

PMV 1<br />

Accumulator<br />

(8500cc) Ø161.6<br />

Packed valve<br />

Ø12.7<br />

Compressor<br />

DA550A3F-11M<br />

PMV 2<br />

: Cooling<br />

: Heating<br />

: Strainer<br />

Ball valve<br />

Ø19.1<br />

Vnitřní jednotka:<br />

(Indoor unit)<br />

Distributor<br />

(Strainer incorporated)<br />

TCJ sensor<br />

To outdoor unit<br />

TC sensor<br />

Refrigerant pipe<br />

at liquid side<br />

(Outer dia : ØB)<br />

Air heat<br />

exchanger<br />

– 31 –<br />

Refrigerant pipe<br />

at gas side<br />

(Outer dia : ØA)<br />

To outdoor unit<br />

Heating<br />

Cooling<br />

TOSHIBA I 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!