Læs mere - ISC Rådgivende Ingeniører A/S
Læs mere - ISC Rådgivende Ingeniører A/S
Læs mere - ISC Rådgivende Ingeniører A/S
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
45 års virke · 45 years of activities<br />
Innovative Engineering
Indhold/<br />
Forord .......................................................4<br />
Indledning .................................................6<br />
Industrianlæg .......................................8-11<br />
Broer .................................................12-15<br />
Olie & Gas ...........................................16-19<br />
Marine anlæg ......................................20-23<br />
Vindkraft ............................................24-27<br />
Lufthavne ...........................................28-31<br />
Kraftværker ........................................32-35<br />
Jernbane og Metro ..............................36-39<br />
Husbygning ........................................40-43<br />
Bygherrerådgivning .............................44-47<br />
Specielle konstruktioner .......................48-51<br />
Kvalitetssikring og<br />
statisk kontrol .....................................52-55<br />
Det næste nu - Fremtid .........................56-59<br />
Adresser .............................................60-61<br />
Content/<br />
Preface ....................................................5<br />
Introduction ...............................................7<br />
Industrial Plants ....................................8-11<br />
Bridges .............................................12-15<br />
Oil and Gas .........................................16-19<br />
Marine Installations .............................20-23<br />
Renewables - Windpower ......................24-27<br />
Airports .............................................28-31<br />
Power Plants .......................................32-35<br />
Railroads and Metro .............................36-39<br />
House Building ....................................40-43<br />
Client Consultancy ...............................44-47<br />
Special Structures ...............................48-51<br />
Quality management and<br />
Static Verification ................................52-55<br />
What’s next - the Future ........................56-59<br />
Addresses ...........................................60-61
4<br />
Forord<br />
<strong>ISC</strong> kan fejre 45 års virke den 1. august 2012.<br />
Y<br />
DeRLIGeRe 5 åR er fløjet af sted, siden vi markerede 40 års jubilæet med bogen ”Langt spænd og Mange mål”. en af de store<br />
oplevelser, vi havde i den forbindelse var, at vi som et af de første firmaer fik lov til at benytte Kronborg Slot til at festligholde<br />
vores jubilæum.<br />
Det har igen været 5 udviklende år med mange skelsættende begivenheder og spændende opgaver for <strong>ISC</strong> <strong>Rådgivende</strong><br />
<strong>Ingeniører</strong> A/S. Vi har befæstet vores position indenfor olie- og gasområdet, ligesom vi har befæstet vores position indenfor<br />
offshore vindmølleparker (renewable energy) med en række opgaver, og endelig har vi taget et langt skridt ind på infrastrukturområdet<br />
med flere store markante brobyggerier udført og igangværende.<br />
Mange af disse aktiviteter vil naturligvis blive omtalt i dette hæfte, men nogle enkelte bør nu alligevel fremhæves her. Bl.a. indenfor<br />
olie og gas er der Halfdan feltet i den danske Nordsø, initiativerne omkring CO2 injicering i oliefelterne og endelig den spredning,<br />
<strong>ISC</strong> har opnået ved at have en række kunder nu både i den danske og norske sektor og verden om.<br />
<strong>ISC</strong> har vundet to centrale konkurrencer med bevægelige broer – nemlig Teglværksbroen i København, der er udført efter et helt<br />
nyt princip samt Odins Bro i Odense – en ca. 900 m lang brostrækning – der bl.a. består af en svingbro over Odense Kanal, den<br />
største svingbro i europa. endvidere har <strong>ISC</strong> i samarbejde med bl.a. Pihl vundet konkurrencen om en af de største broer, der er<br />
bygget i Norden siden Øresundsbroen, nemlig Sundsvall Broen - en 1,4 km lang bro over Sundsvall fjorden i Nordsverige.<br />
På vindmølleområdet har <strong>ISC</strong> projekteret Horns Rev platformen - den største transformerplatform, vi indtil nu har projekteret med<br />
en tilhørende naboplatform med hotelfaciliteter. Yder<strong>mere</strong> bør nævnes en række offshore transformerplatforme, der er blevet<br />
projekteret i den engelske sektor. Her skal specielt nævnes Walney 1 og 2 beliggende på 35 m vand.<br />
Der er naturligvis udført en række andre spændende opgaver både i Danmark og ude i verden i de forløbne 5 år, og en del af dem<br />
vil vi fortælle om i dette hæfte, som vi udgiver i forbindelse med, at det er 45 år siden <strong>ISC</strong> startede. Opgaverne er udvalgt blandt<br />
alle de aktiviteter, vi har haft i de forløbne 5 år, og de er blevet løst af <strong>ISC</strong>´s stab af engagerede og dygtige medarbejdere.<br />
Nye opgaver er på vej både i Danmark og i udlandet. Udover energisektoren vil de næste mange år byde på store udfordringer<br />
indenfor infrastruktursektoren med hensyn til udbygningen af både jernbaner og veje. Femernprojektet vil således byde på en<br />
række landopgaver, som <strong>ISC</strong> vil blande sig i. Dette gælder også det nye Ringmetroprojekt i København.<br />
De mange opgaver <strong>ISC</strong> udfører – der ligger på et teknisk højt niveau – stiller også krav til løbende opdatering af de programmer,<br />
der benyttes til løsning af opgaverne. Det kan bl.a. være til statiske beregninger og levetidsberegninger af komplicerede konstruktioner.<br />
Informationsteknologien er kommet for at blive og har nu udviklet sig til en forudsætning for løsningen af mange af vores<br />
spændende og udfordrende opgaver. De kræver stadig efteruddannelse og tilpasning til forandring.<br />
<strong>ISC</strong> har også spredt sig. Med en ny afdeling i Kolding og en knopskydning fra Viborg til Aalborg er vi nu godt repræsenteret i hele<br />
landet, så vi har mulighed for at løse opgaver både på lokalt plan, Danmark og naturligvis også internationalt. Med det avancerede<br />
kommunikationsudstyr, der nu er til rådighed, kan vi sammensætte projektgrupper på tværs af afdelingerne og kan således<br />
udnytte de gode ressourcer, vi har, optimalt og få de for de specifikke opgaver mest kompetente medarbejdere til at løse opgaverne.<br />
Vi vil ikke undlade at sende alle vore kunder en stor tak, fordi de har vist os tillid til at løse mange spændende og avancerede<br />
opgaver. Det er en forudsætning for vores udvikling og udbygning af vores medarbejderes videnbase.<br />
Med dette nye hæfte bringer vi Dem et tilbageblik med et udpluk af væsentlige arbejder – et godt ståsted for vores videre fremfærd<br />
i en globaliseret verden.<br />
Kjeld Thomsen, Adm. direktør.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
Preface<br />
On August 1st 2012 <strong>ISC</strong> Consulting engineers can celebrate 45 years of activities.<br />
5<br />
MORe YeARS have passed by since <strong>ISC</strong>´s 40 year anniversary was marked with the book “Long span and many goals”. One<br />
remarkable event associated with this was the adventure ball held at Kronborg Castle at elsinore.<br />
Once again it has been 5 stimulating years with many landmarks and exiting assignments for <strong>ISC</strong> Consulting engineers A/S. Our<br />
position within the oil and gas field has been recognized as well as in the field of renewable energy with a number of substations<br />
for offshore windmill parks. Also within the infrastructural field a long leap has been taken on several characteristic bridges – both<br />
carried out and in progress.<br />
Many of the activities will of course be described in this booklet, but some of them deserve to be highlighted here. In the oil and<br />
gas field we should highlight the Halfdan Field in the Danish Sector of the North Sea. Both the initiatives on CO2 injection in the<br />
oilfields and the fact that <strong>ISC</strong> now carries out assignments for a long line of clients in both the Danish and Norwegian part of the<br />
North Sea as well in as in other parts of the world.<br />
<strong>ISC</strong> has succeeded in winning two essential competitions on movable bridges – namely the Teglvaerks Bridge in Copenhagen, a<br />
whole new way of designing a bascule bridge, and the Odins Bridge in Odense – an approximately 900 m long bridge stretch –<br />
comprising a swing bridge across the Odense Canal – which until now is the longest swing bridge in europe. Furthermore <strong>ISC</strong> has<br />
in co-operation with contractors e. Pihl & Son A/S won the competition of one of the largest bridges built in Scandinavia since the<br />
Oresund Bridge – a 1.4 km long bridge crossing the Sundsvall Fjord in Northern Sweden.<br />
In the field of renewable energy the Horns Rev substation and hotel platform was built and put into service – probably the largest<br />
substation yet carried out by <strong>ISC</strong>. Several substations in the British Sector have also been designed, namely Walney 1 and Walney<br />
2 situated at 35 m water depth.<br />
During the last 5 years several other assignments have of course also been carried out – both in Denmark as well as in other countries<br />
around the world. Some of them will be presented to you in this booklet which has been prepared in order to mark 45 years<br />
of <strong>ISC</strong>´s activities. The examples have been chosen among all the interesting assignments carried out in the past 5 years – solved<br />
by the skilled and devoted people that make <strong>ISC</strong>.<br />
New assignments are on their way both in Denmark and abroad. Apart from the energy sector the coming years will offer challenges<br />
within the infrastructural sector with the extension and renovation of both railways and roads. The Femern Fixed Link will<br />
most likely include some landside assignments and <strong>ISC</strong> is eager to be a part of these. This also applies for the new Metro City Ring<br />
in Copenhagen.<br />
The many assignments carried out by <strong>ISC</strong> have a high technical standard which also demands an ongoing update of the computer<br />
programs which are needed in order to carry out the tasks. It can be static calculations or lifetime estimates of complex structures.<br />
The information technology has come to stay and has now become essential in order to solve many of the exiting, complex<br />
and challenging assignments. For this adjustment and education are needed.<br />
<strong>ISC</strong> is now represented in all parts of Denmark. With the opening of a new branch in Kolding in 2008 and the extension with a<br />
satellite branch from Viborg to Aalborg in 2009 we can provide our clients with the best of service and can solve the task both<br />
locally in Denmark and of course also internationally. With our advanced communication equipment we can compose the design<br />
groups for the given assignment with a selection of the most skilled and competent employees from any of our branches and<br />
make optimal use of our good resources.<br />
We will take advantage of this opportunity and send all of our clients a big thank you for the confidence shown by assigning us all<br />
the exiting, challenging and innovative tasks. These are the basis for our ongoing development and our staff´s know-how.<br />
With this booklet we present to you a bouquet of some of our essential work – and a good view of our further conduct towards new<br />
goals in a globalized world.<br />
Kjeld Thomsen, CeO.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 5
6<br />
Indledning <strong>ISC</strong><br />
I<br />
SC RåDGIVeNDe INGeNIØReR A/S har siden 40 års jubilæet i 2007<br />
været i positiv udvikling med en række nye aktiviteter og en flot<br />
klaring af skærene under ”finanskrisen” uden reduktion i staben af<br />
dygtige medarbejdere.<br />
Vi har sat fokus på samfundets behov – ikke mindst indenfor energisektoren<br />
- og tilpasset vores faglige aktiviteter hertil, hvilket har<br />
skabt basis for den positive udvikling, vi er i, som har resulteret i en<br />
betydelig øgning af medarbejderstaben siden årsskiftet 2010/11.<br />
Vi har placeret en smuk globus i granit ved vores hovedindgang i<br />
Øster Alle som symbol på, at vi fokuserer på verden som arbejdsplads.<br />
De aktiviteter, vi har haft i de foregående år, understreger, at<br />
dette er lykkedes.<br />
<strong>ISC</strong> har cementeret sin placering i energisektoren både indenfor olie<br />
og gas, vind-energi og den traditionelle kraftværksteknologi. Vi har<br />
løst en række opgaver indenfor energisektoren ude i verden. Vi har<br />
således opereret med interessante opgaver i Mexico, england, Skotland,<br />
Norge, Sverige, Holland, USA, Rusland, Qatar og Panama.<br />
Innovative Engineering - join us and be a part of our future<br />
Også geografisk i Danmark har vi spredt os og har åbnet en ny<br />
afdeling i Kolding og en i Aalborg. Vi har bygget et dejligt nyt<br />
kontorhus i esbjerg samt erhvervet et nyt domicil til vores Viborg<br />
afdeling.<br />
Vores meget omtalte abetræ i Øster Alle har udlevet sin tid. Det var<br />
kommet godt op i alderen og har måttet lide den tort at blive fældet.<br />
Til gengæld har vi lukket op for vores smukke bygning ved at udvide<br />
parkeringspladsen og skabe en <strong>mere</strong> tidssvarende beplantning og<br />
nogle dekorative figurer.<br />
Abetræet har måttet give op – til gengæld har vi fået <strong>mere</strong> kunst<br />
i haven bl.a. pelikaner og to smilende kinesere, som er med til at<br />
markere Kinas centrale placering i det 21. århundrede – et marked<br />
som <strong>ISC</strong> også i fremtiden vil fokusere på. Kaj Olesens stilige skulptur<br />
i rustfrit stål placeret foran indgangen til kontorerne i Hesseløgade –<br />
skærende blank i lyset og buldersort i mørket – markerer på en smuk<br />
måde, at <strong>ISC</strong> stadig har vind i sejlene!
I<br />
SC CONSULTING eNGINeeRS A/S has since our 40 year anniversary in<br />
2007 had a positive development with a long line of new activities<br />
and has ridden through the financial crisis as well without losing any<br />
of our highly skilled employees.<br />
The aim has been set on the need from society – not least within the<br />
field of energy and we have adjusted our professional qualifications<br />
to it. This has since New Year 2011 been the basis for the positive<br />
progress we have had and has been one of the reasons for increasing<br />
the number of <strong>ISC</strong> employees.<br />
Next to our main entrance at our headquarters in Copenhagen we<br />
have placed a beautiful granite sculpture of the earth symbolizing<br />
that the world is our working place. The activities we have had<br />
during years emphasize that we have lived up to our expectations.<br />
<strong>ISC</strong> has established a name in the field of energy both in the oil &<br />
gas sector, the renewable sector and in the traditional power plant<br />
technology. Many interesting assignments within the energy sector<br />
have been solved throughout the world in places such as Mexico,<br />
england, Scotland, Norway, Sweden, Holland, the US, Russia, Qatar<br />
and Panama.<br />
even within our own “territory” we have extended our presence with<br />
new branches in both Kolding and Aalborg during the past 5 years.<br />
We have expanded our esbjerg branch by building a new office<br />
building and for our Viborg branch we have purchased a beautiful<br />
old house ensuring our employees a good working environment.<br />
Our old well known “Monkey tree” could no longer stand the harsh<br />
Danish climate and had to go. This gave us the opportunity to clear<br />
the space in front of our beautiful domicile at Øster Alle with new<br />
plants, more parking space and some wonderful pieces of art.<br />
The Monkey tree gave up – but we have gained some beautiful art to<br />
look at – amongst them two smiling Chinese men – marking China’s<br />
central place in the 21st century – a market for future focus for our<br />
company. Kaj Olesen´s impressive static figure of sails in stainless<br />
steel placed in front of our office building in Hesseløgade – brightly<br />
shining in the daylight and black as coal in the night – marking that<br />
<strong>ISC</strong> still is sailing with the wind.<br />
Introduction<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 7
8<br />
Industrianlæg/<br />
Industrial Plants<br />
Industrianlæg er mangfoldige og optager en central plads i et bæredygtigt<br />
samfund. I almindelighed ser befolkningen ikke så meget til industrianlæg.<br />
Oftest er de gemt af vejen - og det af flere grunde. De kan være kæmpestore<br />
anlæg, der kræver meget plads, de kan være miljømæssigt generende, og<br />
de kan både lugte og støje, og de har ikke altid en særlig høj arkitekttonisk<br />
kaliber. Nogle har – andre har ikke.<br />
/<br />
Industrial plants come in many different disguises and have a central place in<br />
a sustainable culture. Usually the industrial plants are not visible to all; they<br />
are often hidden in remote places and that for many reasons. Often they<br />
demand an immense piece of space due to the size of the plant and they can<br />
be environmental hazardous and smelly and noisy as well. Architectonically<br />
some can be a disaster and some can be quite agreeable and interesting to<br />
look at.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 9
10<br />
N<br />
OGLe INDUSTRIANLæG kan pakkes ind i arkitektonisk<br />
smukke kasser – måske især den<br />
lidt finere industri som elektronik, pharma og<br />
legoklodser, hvorimod den svære industri som<br />
stål-, cement-, kraftværks-, afsvovlings- og raffinaderianlæg<br />
ikke altid på samme måde kan opnå<br />
særlig arkitektonisk værdi.<br />
Mange af industrianlæggene er helt surrealistiske<br />
at se på – og måske lidt spændende på grund<br />
af deres utrolige netværk af skorstene, siloer,<br />
rørsystemer i forskellige farver og udformninger.<br />
Men de gemmes oftest lidt af vejen og placeres<br />
hensigtsmæssigt i forhold til udskibningshavne-<br />
og baneanlæg. Derfor deler industrianlæg sig<br />
ofte i to klasser, nemlig de pænt arkitektonisk<br />
indpakkede og de industrier, der træder åbent<br />
frem og markerer, hvad der foregår.<br />
Indenfor de seneste 5 år har <strong>ISC</strong> været involveret<br />
i flere store industrianlæg. Blandt andet i opførelse<br />
af flere cementfabrikker i udlandet og ved<br />
projektering af store udskibningsanlæg i havne i<br />
både Hamborg og Mongstad i Norge. et industrianlæg<br />
med transportbånd, der fører direkte ud til<br />
skibene i havnen fornægter ikke sin funktion. Det<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
gør det måske <strong>mere</strong> interessant for iagttageren,<br />
når man endelig skal se på store konstruktioner<br />
– man kan tydeligt se, hvad der sker her. Anderledes<br />
er det med de industrianlæg, der er skjult<br />
og fint indpakket i kasser. Hertil hører ofte medicinalindustri<br />
eller kedelbygninger til kraftværker.<br />
Produktionsanlæg til store offshore konstruktioner<br />
er heller ikke nemme at skjule med indpakning.<br />
Man kan anlægge halbygninger til fremstilling<br />
af de enkelte dele - men når de store rør skal<br />
samles til jackets og topside anlæg og transporteres<br />
til havs, så kommer de frem i lyset, så man<br />
kan følge med i hvad der sker.<br />
Når store industrier placeres i landskabet eller<br />
ved havne, kan de være interessante at se på,<br />
hvis de ikke er helt anonyme og får lov til at stå<br />
frem med, hvad deres funktion egentlig er. Det er<br />
altid interessant, at man kan få en ide eller fornemmelse<br />
af, hvad det er, der foregår derinde,<br />
hvis man ikke i forvejen kender til virksomheden.<br />
Der signaleres forskelligt til omverdenen om<br />
mangfoldigheden i industrierne, afhængig af<br />
hvordan de fremtræder.<br />
Når store industrier placeres i<br />
landskabet eller ved havne,<br />
kan de være interessante at se på.<br />
/<br />
When big industrial plants<br />
are placed in the landscape or<br />
around harbours and their<br />
actual functions are left into<br />
the open they can be exiting and<br />
interesting to observe.
S<br />
OMe PLANTS are packaged nicely in architectonically<br />
attractive boxes – as is often the<br />
case with the refined industry such as electronical,<br />
pharmaceutical and toy factories whereas<br />
the heavier productions like steel- and cement<br />
plants, power plants, desulphurization installations<br />
and refineries not always can attain much<br />
architectonic value.<br />
Many of the industrial plants can have a quite<br />
surrealistic appearance – some might be somewhat<br />
fascinating due to the web of chimneys,<br />
silos, process pipe systems in various colours<br />
and shapes. These plants are, however, often<br />
the ones hidden away and conveniently placed<br />
near shipping facilities such as harbours and<br />
railroads. This is thus one of the reasons why<br />
the industrial plants usually are divided into two<br />
categories – the architectonically nicely covered<br />
plants and the plants that openly show us what is<br />
the function.<br />
Within the past 5 years <strong>ISC</strong> has been involved<br />
in several large industrial facilities such as the<br />
design of cement plants in the Middle east and<br />
Africa, and the design of large ship landing facilities<br />
in Mongstad in Norway and in Hamburg in<br />
Germany. The modernization of refineries for<br />
oil companies in Denmark and lately a big plant<br />
in Brazil producing flexible pipelines are other<br />
examples.<br />
A large conveyor belt that leads its load right out<br />
into the ships docked in the harbour cannot be<br />
hidden but visualizes the function to the spectator.<br />
This is not the case with the plants finely<br />
wrapped in boxes, which is often seen in the<br />
medical industry and power plants.<br />
The production yards for fabrication of the large<br />
offshore structures are not easily hidden either<br />
– they are surely difficult to wrap. Large halls<br />
can be used for the production of the various<br />
parts but when it comes to the assembly of the<br />
big pipes in the jacket and topside structures<br />
and further on to the transportation at sea, they<br />
emerge into the open air – and then the spectator<br />
can detect what is going on.<br />
When big industrial plants are placed in the landscape<br />
or around harbours and their actual functions<br />
are left into the open they can be exiting<br />
and interesting to observe. It is always motivating<br />
when you can get a hunch of what is going on<br />
in there if you are not familiar with the company<br />
allready. The signals to the outside world of the<br />
diversity in the industrial plants are many – depending<br />
on how they present themselves.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 11
12<br />
Broer/<br />
Bridges<br />
Konstruktion og design af broer har altid været noget særligt for bygningsingeniøren.<br />
Det kan der naturligvis være flere årsager til, men et særkende<br />
er, at mange brotyper som oftest indebærer særligt spændende statiske<br />
problemer, og det udfordrer ingeniøren til at være med til at forme noget<br />
optimalt, der kan indpasses i naturen over fjorde, sunde og bælter eller over<br />
dybe kløfter og dale mellem bjerge.<br />
/<br />
Designing bridges has always been a special issue for the engineer. Of<br />
course there can be several reasons for this but mainly because most<br />
bridges are spectacular and usually have many challenging static problems.<br />
It often challenges the engineer to create something unique that can be<br />
fitted into the environment across the waters of the fjords, belts and lakes<br />
or in the mountains across deep ravines and valleys.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 13
14<br />
D<br />
e FLeSTe BROeR står stille – de er statiske.<br />
Dem har <strong>ISC</strong> gennem årene været med til<br />
at projektere mange forskellige typer af med<br />
hver deres særkende. Der kan bl.a. nævnes udskiftning<br />
- på kun 41 døgn - af en 220 m lang<br />
betonbro ved Skovdiget i København. Den blev<br />
erstattet af en stålbro designet af <strong>ISC</strong>. en udsædvanlig<br />
præstation af entreprenøren muliggjort af<br />
det projekt, der var udarbejdet. Dette var også<br />
tilfældet med den noget mindre gangbro over<br />
Roskildevejen ved Baldersbrønde – her blev der<br />
opsat en ny bro på blot et enkelt døgn.<br />
Men broer, der kan bevæge sig, indebærer ofte<br />
flere spændende udfordringer end de broer, der<br />
er stationære. et af <strong>ISC</strong>´s specialområder er de<br />
bevægelige broer og brorampeanlæg til jernbaner<br />
og veje, som <strong>ISC</strong> har projekteret i både Danmark,<br />
Sverige og Tyrkiet.<br />
Bevægelige broer kræver en meget stor nøjagtighed<br />
i udførelsen. Samtidigt involveres flere discipliner<br />
– både el, instrumentering og mekanik<br />
udover den særlige viden og ekspertise, der skal<br />
til på de bærende områder.<br />
De seneste projekter indenfor de bevægelige<br />
broer er to nyskabelser. Klapbroen, der er indeholdt<br />
i den nye Teglværksbro i København, er<br />
bygget efter et helt nyt princip, hvor hydrauliske<br />
cylindre indgår i den bærende konstruktion. Den<br />
anden markante konstruktion er Odins bro - en<br />
svingbro over Odense Kanal, der er en del af en<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
ca. 900 m lang brostrækning på omfartsvejen<br />
omkring Odense. Denne svingbro er bygget<br />
efter et helt nyt princip med lejetyper, der ikke<br />
er anvendt før. Den bliver den største svingbro i<br />
europa med en samlet længde på ca. 200 m.<br />
Når man tænker på store broer over hav, er<br />
det typisk broer, der er fæstet til land på begge<br />
sider. <strong>ISC</strong> har gennem tiderne også projekteret<br />
store broer til havs, som ikke ender på land. Den<br />
største bro i Nordsøen er projekteret af <strong>ISC</strong> med<br />
en længde på 140 m med 100 m spænd og 40<br />
m udkragning. Den spænder mellem to olieplatforme<br />
i Halfdanfeltet.<br />
<strong>ISC</strong> har været med til at bygge store broer, der<br />
spænder vidt over vand, bl.a. som partner i<br />
ASO-gruppen, der projekterede Øresundsbroen<br />
med den længste skråstagsbro i verden for en<br />
jernbanebro, og den er i øvrigt europas længste<br />
jernbanebro.<br />
Broer bliver større og større i takt med materialernes<br />
større styrke og opfindsomhed i de bærende<br />
systemer. Man har nu nået spænd på omkring<br />
2000 m med hængebroer og arbejder med<br />
en hængebro over Messina strædet på helt op til<br />
3000 m. Sundsvallsbroen i Sverige, en 1,4 km<br />
lang vejbro over Sundsvall fjorden, er det næste<br />
store broprojekt under udarbejdelse hos <strong>ISC</strong>, og<br />
den involverer alle tænkelige udfordringer indenfor<br />
geometri og statik og udføres for et europæisk<br />
konsortium med Pihl som entreprenørleder.<br />
Broer, der kan bevæge sig,<br />
indebærer ofte flere<br />
spændende udfordringer<br />
end de broer,<br />
der er stationære.<br />
/<br />
Movable bridges often<br />
demands even more<br />
accuracy in the design<br />
and construction process<br />
than stationary bridges.
M<br />
OST BRIDGeS ARe STATIC – they are the ones<br />
not moving. Over the years <strong>ISC</strong> has designed<br />
many different bridge types – each with<br />
their own special hallmark. One of them was a<br />
240 m highway bridge north of Copenhagen,<br />
where a concrete bridge was replaced in just 41<br />
days by a steel bridge. An amazing accomplishment<br />
by the contractor but enabled due to the<br />
design project carried out by <strong>ISC</strong>. A somewhat<br />
smaller pedestrian bridge across one of the main<br />
thoroughfares around Copenhagen was replaced<br />
in less than 24 hours.<br />
But the bridges that move demands even more<br />
accuracy in the design and construction process.<br />
And surely it involves more skills – involving both<br />
the mechanical and the electrical engineer besides<br />
the structural engineer, with the know-how<br />
and expertise needed for concept and statical<br />
behavior.<br />
Two outstanding and innovative moving bridges<br />
have been designed during the past couple of<br />
years – each one of them with their own specialty.<br />
The Teglvaerks Bridge in the center of<br />
Copenhagen is outstanding due the fact that<br />
the hydraulic lift cylinders are a part of the load<br />
bearing structure. The other is Odins Bridge at<br />
Odense Canal – a double swing bridge which is a<br />
part of an approximately 900 m bridge line being<br />
a part of the around Odense. The bridge has a<br />
special feature consisting of a quite outstanding<br />
principle of bearings which has never been used<br />
before. The bridge is so far the biggest swing<br />
bridge in Northern europe with a total length of<br />
200 m.<br />
Over the years <strong>ISC</strong> has designed several large<br />
bridges at sea that are not attached to land. One<br />
of the largest bridges have been built at the Halfdan<br />
field in the North Sea; a 140 m long bridge<br />
with a cantilever of 40 m and spanning 100 m<br />
between two platforms.<br />
<strong>ISC</strong> has designed bridges spanning widely across<br />
big waters. Among others the Oresund Bridge<br />
between Denmark and Sweden as partner in the<br />
ASO joint venture group. The bridge is the longest<br />
cable stay bridge in the world with a railway<br />
track and the longest railway bridge in europe.<br />
The bridges keep getting longer and longer as<br />
the building materials of today keep gaining<br />
strength and the creativity in the design of load<br />
bearing systems increases. Bridges with spans<br />
of 2000 m have been built and now a bridge<br />
across the Messina Strait with a span of 3000 m<br />
is in progress. For <strong>ISC</strong> a 1.4 km bridge across the<br />
Sundsvall Fjord in the northern part of Sweden is<br />
next in line, providing all imaginable challenges<br />
in the field of geometry and static’s. It is being<br />
carried out in a joint venture with Pihl & Sons as<br />
lead contractors.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 15
16<br />
Olie og Gas/<br />
Oil and Gas<br />
<strong>ISC</strong>´s målrettede indsats indenfor olie- og gassektoren har udviklet sig på<br />
en overordentlig positiv måde i de senere år. Dels har vi fået store og udviklende<br />
opgaver for Mærsk Olie & Gas i den danske Nordsø udover aktiviteter<br />
i Qatar, og dels har vi udvidet vores kundekreds i den danske og norske oliesektor<br />
med nye væsentlige kunder. Således er Noreco blevet en kunde hos<br />
<strong>ISC</strong> i de forløbne år, og <strong>ISC</strong> har indgået en rammeaftale med DONG energy<br />
A/S i samarbejde med SeMCO Maritime om at udbygge, vedligeholde og<br />
modificere DONG energy´s felter i Nordsøen.<br />
/<br />
The great effort <strong>ISC</strong> has put into the oil and gas sector during the past years<br />
has developed into a very positive course. Many large and evolving assignments<br />
in the Danish North Sea sector have been given to us by Maersk Oil &<br />
Gas as well as assignments in Qatar. Our circle of clients has expanded with<br />
important operators in both the Norwegian and Danish sector of the North<br />
Sea. Noreco has thus provided <strong>ISC</strong> with various interesting assignments. <strong>ISC</strong><br />
has entered a frame agreement with DONG energy A/S in co-operation with<br />
SeMCO Maritime concerning the expansion, maintenance and modifications<br />
of DONG energy´s fields in the North Sea.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 17
18<br />
A<br />
F SæRLIG STORe opgaver i den danske sektor kan vi<br />
nævne udbygningen af Halfdan-feltet med 3 platforme<br />
og forbindelsesbroer - en opgave der ligeledes omfattede<br />
projektering af et af de største moduler i den danske Nordsø<br />
- en topside konstruktion med en vægt på 9.300 ton.<br />
Platformudvidelsen i forbindelse med Halfdan-feltet i den<br />
danske Nordsøsektor er etableret for at kunne opgradere<br />
Halfdan B feltet til bemandet operation med kontrolrum.<br />
Udbygningen er udført for at håndtere en kontinuerlig udvinding<br />
af oliereserver med et øget vandindhold.<br />
Halfdan BD har procesanlæg til separering af olie, gas og<br />
vand fra de eksisterende Halfdan B brønde. Vandet behandles/renses<br />
og sendes derefter i havet. Gassen kompri<strong>mere</strong>s<br />
herefter til brug for gasløft i oliebrøndene. I forbindelse med<br />
den bemandede operation og af sikkerhedshensyn er der<br />
installeret store brandpumper og gas trykaflastningssystem<br />
til afbrænding af gas i nødsituationer fx under brand og gas<br />
detekteringssituationer.<br />
en særlig interessant opgave, som <strong>ISC</strong> er involveret i, i samarbejde<br />
med andre firmaer, er SIRI platformen, som har haft<br />
bæreevneproblemer. Den er blevet gennemregnet, og <strong>ISC</strong><br />
har deltaget med forstærkningsforslag og kontrol af de forslag,<br />
der nu skal udføres i samarbejde med DONG energy.<br />
<strong>ISC</strong> har i denne periode også projekteret og ført tilsyn med<br />
den første jacket med topside for DONG energy A/S, nemlig<br />
platformen NINI øst, der er en star type platform.<br />
Der arbejdes stærkt med ideen om at anvende CO2 fra kraftværker<br />
til re-injicering i oliefelterne for derved dels at få<br />
lagret CO2 og dels at udnytte CO2 til at fremkalde en større<br />
revnevidde i kalken i oliefelterne, således at der kan ske en<br />
øget produktion. <strong>ISC</strong> har samarbejdet med Mærsk Olie og<br />
Gas om projektering af et forsøgsanlæg i fuld målestok. På<br />
denne front er <strong>ISC</strong> også involveret med et anlæg i Mongstad i<br />
Norge, hvor <strong>ISC</strong> har bistået med udviklingen af procesanlægget<br />
til re-injicering af CO2 i oliefelterne i den norske sektor af<br />
Nordsøen.<br />
Udover arbejder på de permanente installationer og ny installering<br />
af olieplatforme, har <strong>ISC</strong> også været meget aktiv<br />
med hensyn til projektopgaver på de borerigge, der borer<br />
ned til olien. <strong>ISC</strong> har således haft omfattende arbejder med<br />
ombygning af en række af Mærsk Drillings borerigge for at<br />
tilpasse dem til de norske normer for boring i den norske<br />
sektor. <strong>ISC</strong> har således projekteret og fulgt opgaven op<br />
vedrørende nye Texas dæk og nye platforme for redningsfartøjer,<br />
med medarbejdere placerede på værfter i Holland og i<br />
dok i Hirtshals.<br />
Det er altid positivt, at vore medarbejdere også bliver involveret<br />
i marken på disse opgaver. Således har de mulighed<br />
for at akkumulere den praktiske erfaring, der supplerer selve<br />
projekteringen af de komplicerede opgaver ved skrivebordet<br />
hjemme på tegnestuen.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
Der arbejdes stærkt med<br />
ideen om at anvende<br />
CO2 fra kraftværker til<br />
re-injicering i oliefelterne.<br />
/<br />
The idea of re-injection of<br />
CO2 from power plants into the<br />
oilfields is developing.
T<br />
He exPANSION of the Halfdan field in the North<br />
Sea has been one of the bigger assignments during<br />
the past couple of years. The assignment involved<br />
3 platforms with connecting bridges and the design of<br />
one of the largest modules in the Danish North Sea<br />
– a 9,300 ton topside structure.<br />
The platform expansion was made in order to upgrade<br />
the Halfdan B field to manned operation with a control<br />
room and to manage continuity in the flow of oil reserves<br />
with high water content.<br />
Halfdan BD includes a process installation unit for separating<br />
water and oil from the existing Halfdan B wells.<br />
The water is cleaned and treated before being pumped<br />
out into sea. The gas is then compressed and used for<br />
lifting oil in the wells. In connection with the operation<br />
being manned and for safety reasons large fire pumps<br />
have been installed as well as pressure relieve systems<br />
for burning gas in emergency situations such as fire<br />
and gas detection situations.<br />
A special interesting assignment in which <strong>ISC</strong> is involved<br />
in co-operation with other companies is the SIRI<br />
platform. The load bearing capacity is questionable and<br />
the platform now undergoes thorough investigation<br />
resulting in reinforcement suggestions.<br />
<strong>ISC</strong> has furthermore designed and performed site inspection<br />
with the first jacket including topside built for<br />
DONG energy A/S – the star platform Nini east.<br />
The idea of re-injection of CO2 from power plants into<br />
the oilfields is developing. In order to store the CO2 and<br />
at the same time exploiting it, the CO2 is re-injected<br />
into the oil fields to provoke larger cracks in the<br />
limestone thus increasing the production of oil. In cooperation<br />
with Mærsk Oil & Gas <strong>ISC</strong> has been working<br />
on the design of a full scale test installation. <strong>ISC</strong> is also<br />
involved in a similar project in Mongstad in Norway, a<br />
process plant for re-injection of CO2 in the Norwegian<br />
oil fields.<br />
Apart from working at the permanent installation and<br />
new oilrig installations, <strong>ISC</strong> has had quite a few assignments<br />
on the oilrigs that actually drill down to the oil<br />
reserves. <strong>ISC</strong> has been involved in many moderations<br />
of already existing drilling rigs for Maersk Drilling adjusting<br />
them to Norwegian standards so they can be<br />
operated in the Norwegian part of the North Sea. <strong>ISC</strong><br />
has designed and supervised new Texas Deck installations<br />
and new lifeboat installations with employees<br />
stationed both at the shipyards in Holland and at docks<br />
in Hirtshals.<br />
It is always important for our <strong>ISC</strong> employees to get a<br />
chance to be involved in the field on these kinds of<br />
jobs. Here they have a unique chance to accumulate<br />
some hands-on practical experience which can be an<br />
advantage in the design process of the complex assignments<br />
we design at the home office.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 19
20<br />
Marine Anlæg/<br />
Marine Installations<br />
Marine anlæg er i sagens natur konstruktioner, der placeres i grænseområdet<br />
til vandet - ved kystlinien - eller i vandet. I de senere år er der udover<br />
platforme til olieudvinding sket en enorm stigning i placering af marine anlæg<br />
i vandet til energiudvinding, nemlig via vores store vindmølleparker. Disse<br />
marine konstruktioner – ofte placerede langt fra kysterne – er karakteriseret<br />
ved, at de skal kunne modstå de særlige klimatiske belastninger fra vind,<br />
bølger og strøm og i visse områder også is. Karakteristisk ved disse marine<br />
konstruktioner er, at de sjældent ses, fordi de ligger så langt væk fra land og<br />
normalt er de placeret i områder, hvor man ikke sejler tæt forbi.<br />
/<br />
As the word implies marine installations are the structures placed in and in<br />
the border areas of the sea – at the coastline - and in the water. In the last<br />
couple of years - apart from the oil and gas platforms – another big industry<br />
is evolving fast - explicitly the large offshore wind mill farms with their wind<br />
turbines, substations and foundations. These marine installations, which are<br />
often placed far out in the open sea, are very special as they have to be able<br />
to withstand heavy wind and wave loads as well as heavy currents and in<br />
some areas even ice. Most of these marine installations you are not able to<br />
see because they are mostly placed far from shore and in areas where ship<br />
traffic does not pass by closely.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 21
22<br />
N<br />
OGLe AF De MARINe anlæg, <strong>ISC</strong> har været<br />
med til at projektere offshore, er dog placeret,<br />
så det er muligt at se dem uden at skulle ud<br />
og sejle, bl.a. transformerplatformen i det sydlige<br />
Øresund ikke så langt fra Øresundsbroen i den<br />
vindmøllepark, der er placeret på Lillgrund, og<br />
endvidere kan man se Nystedplatformen syd for<br />
Lolland Falster fra land.<br />
et af de største marine anlæg, der er placeret<br />
ude i vandet i Danmark, er Horns Rev transformerplatformen<br />
og den tilstødende beboelsesplatform<br />
for det personale, der arbejder på Horns<br />
Rev 2 platformen. <strong>ISC</strong> har projekteret begge<br />
disse marine konstruktioner.<br />
Udover de særlige belastningsforhold, der er for<br />
disse offshore marine konstruktioner, er der også<br />
det forhold, at det er nødvendigt at korrosionsbeskytte<br />
dem efter de bedste forskrifter, så de<br />
kan modstå rustangreb i mange år.<br />
Men før vindmølleparkerne gjorde deres indtog<br />
til havs, er der naturligvis også de enorme<br />
anlæg, der er bygget offshore til olie og gas udvinding<br />
i både den danske del af Nordsøen og i<br />
resten af verden. Disse anlæg er omtaler vi i Olie<br />
& Gas afsnittet andetsteds i hæftet.<br />
Marine anlæg er også defineret som de anlæg,<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
vi har i grænseområdet, nemlig havne, kajer,<br />
havnebusstoppesteder og broer i havne. På dette<br />
område har <strong>ISC</strong> også været aktive indenfor de<br />
seneste 5 år. Blandt andet er der projekteret<br />
kajanlæg på Grønland og fortøjningsanlæg på<br />
Odense Kanal i forbindelse med bygningen af<br />
Odins bro – europas største svingbro – som <strong>ISC</strong><br />
er rådgiver for.<br />
Med hensyn til havneanlæg så indeholder mange<br />
af vore færgehavne rampeanlæg til jernbane,<br />
og bil- og trailertrafik. På dette område har <strong>ISC</strong><br />
været aktive i de fleste færgehavne i Danmark.<br />
Her kan nævnes rampeanlæggene i Gedser,<br />
Rødby og esbjerg havne samt Trelleborg havn i<br />
Sverige og i Zonguldak i Tyrkiet.<br />
I Østersøen på Kriegers Flak, hvor vanddybden<br />
er 40-45 m, er der planlagt en af europas største<br />
vindmølleparker. Til denne har <strong>ISC</strong> udviklet<br />
et forslag til særlige dybhavsfundamenter for<br />
vindmøller baseret på <strong>ISC</strong>´s erfaring indenfor<br />
betonelementområdet. Denne park er stadigvæk<br />
i planlægningsfasen og vil skulle indeholde en<br />
lang række interessante konstruktioner, når den<br />
sættes i gang. I den tyske sektion af Kriegers Flak<br />
har <strong>ISC</strong> allerede været aktiv for en tysk vindmølleejer<br />
med projektering af offshore fundamentet<br />
for en transformerplatform til vindmølleparken<br />
Baltic 1.<br />
Et af de største marine<br />
anlæg, der er placeret<br />
ude i vandet i Danmark,<br />
er Horns Rev.<br />
/<br />
One of the largest<br />
marine installations is<br />
the Horns Reef.
T<br />
HeRe ARe, however, some exceptions as a<br />
few of the installations <strong>ISC</strong> has designed<br />
are actually placed so that they are visible from<br />
shore. One is the Lillgrund Wind Farm with the<br />
spectacular substation clad in glass, placed in<br />
the southern part of Oresund almost next to the<br />
Oresund Bridge wherefrom you can see it clearly.<br />
The Nysted Wind Farm can be observed from<br />
shore as well.<br />
One of the largest marine installations is the<br />
Horns Reef B substation in the Horns Reef 2<br />
Wind Farm with the adjoined hotel platform for<br />
the personnel working at the substation. Both<br />
installations were designed by <strong>ISC</strong>.<br />
Apart from the exceptional loads these installations<br />
are exposed to they also need to have an<br />
anti-corrosive treatment according to the most<br />
effective technique, in order for them to withstand<br />
rust occurrence that is almost inevitable in<br />
the marine habitat.<br />
However, before the off-shore wind farms made<br />
their entry, the Danish Sector of the North Sea<br />
and of course the seas all over the world accommodated<br />
the enormous installations designed for<br />
the extraction of oil and gas reserves - but that is<br />
another story which is described in another section.<br />
Marine installations are also defined as the installations<br />
we see in the border areas such as<br />
quays, docks, harbourbus stops and bridges in<br />
harbours. <strong>ISC</strong> has been active in these areas<br />
too, during the past 5 years, among others with<br />
the design of quay installations in Greenland.<br />
Furthermore mooring facilities in Odense Canal<br />
in connection with the building of the new swing<br />
bridge Odin’s Bridge – until now the largest swing<br />
bridge in europe – are designed by <strong>ISC</strong>.<br />
Many of our ferry harbours have large ramp installations<br />
for rail, vehicle and trailer traffic. <strong>ISC</strong><br />
has been involved in most of the Danish ferry<br />
harbour ramps and even in Sweden and Turkey.<br />
At Krieger’s Flak in the Baltic Sea where the water<br />
depths are 40-45 m, one of europe´s largest<br />
wind farms is planned to be located. <strong>ISC</strong> has for<br />
this project developed special deep sea foundations<br />
for wind turbines based on many years of<br />
experience working with concrete structures.<br />
The Krieger’s Flak Wind Farm is still in the planning<br />
phase but it will comprise many very interesting<br />
structures once the project is launched.<br />
In he German sector of Krieger’s Flak <strong>ISC</strong> has<br />
already been active for a German wind farm<br />
stakeholder with the design of foundation for the<br />
substation at the Wind Farm Baltic 1.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 23
24<br />
Vindkraft/<br />
Renewables – Windpower<br />
Med <strong>mere</strong> end 35 års erfaring med design af offshore olie og gas installationer,<br />
herunder jacket konstruktioner og design af fundering og design af topside<br />
konstruktioner, var det naturligt, at <strong>ISC</strong> også blev valgt til at projektere<br />
verdens første offshore transformerplatform i Nysted vindmøllepark syd for<br />
Lolland i Femernbælt. På det tidspunkt var Nysted vindmøllepark den største<br />
vindmøllepark i verden med en kapacitet på 165 MW leveret af 72 møller.<br />
/<br />
With more than 35 years of experience in designing offshore oil and gas<br />
installations, including jacket structures, foundations and design of topside<br />
structures as well, <strong>ISC</strong> was the obvious choice for the design of the world’s<br />
first offshore transformer substation at Nysted in the Femern Belt. At the<br />
time the Nysted Wind Farm was the world’s largest wind farm with a capacity<br />
of 165 MW generated from 72 wind turbines.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 25
26<br />
F<br />
OR <strong>ISC</strong> BLeV projekteringen af Nysted platformen<br />
startskuddet til en lind strøm af<br />
opgaver, og <strong>ISC</strong> har siden da markeret sig stærkt<br />
indenfor området og har projekteret fundamenter<br />
til vindmøller og hele transformerinstallationer<br />
inklusive jackets til en række vindmølleparker<br />
for kunder i landene omkring Baltikum, Nordsøen,<br />
Det Irske Hav, Øresund, Atlanterhavet og i<br />
det Kinesiske Hav ud for Shanghai.<br />
Transformerplatformen i en offshore vindmøllepark<br />
modtager kabler fra grupper af vindmøller<br />
der producerer strøm, der transfor<strong>mere</strong>s og<br />
derefter føres til land ved hjælp af et eller flere<br />
større undersøiske eksport-kabler. Derved opnås<br />
en optimering af anlægsinstallationen og en minimering<br />
af energitab. De transformerplatforme,<br />
<strong>ISC</strong> indtil videre har projekteret, vejer typisk mellem<br />
1000 ton og 2000 ton afhængig af kapacitet.<br />
en transformerplatform er normalt opbygget<br />
af 3-4 dæk, der indeholder diverse rum til en<br />
række forskellige funktioner såsom tavlerum,<br />
ventilationsrum, personalestuer og selvfølgelig<br />
selve transfor<strong>mere</strong>n. Nogle af platformene står<br />
helt råt og andre er beklædt med glas eller stålgitter<br />
dels for at give lidt læ for de, der arbejder<br />
på den og dels for at være arkitektonisk attraktiv.<br />
Transformerplatforme<br />
• Nysted – Femernbælt, Danmark<br />
• Lillgrund – Øresund, Sverige<br />
• Princess Amalia (Q7) - Nordsøen, Holland<br />
• Horns Rev II - Nordsøen, Danmark<br />
• Gunfleet Sands – Nordsøen, England<br />
• Walney I – Nordsøen, England<br />
• Walney II – Nordsøen, England<br />
• West of Duddon – Nordsøen, England<br />
• Baltic 1. Nordsøen, Tyskland<br />
• Borkum Reef - Nordsøen, Tyskland<br />
• North Wind - Belgien<br />
• Gemini - Holland<br />
Substations<br />
• Nysted – Femernbaelt, Denmark<br />
• Lillgrund – Oeresund, Sweden<br />
• Princess Amalia (Q7) - Nordsøen, Holland<br />
• Horns Rev II – The North Sea, Denmark<br />
• Gunfleet Sands – The North Sea, England<br />
• Walney I – The North Sea, England<br />
• Walney II – The North Sea, England<br />
• West of Duddon – The North Sea, England<br />
• Baltic 1 – The North Sea, Germany<br />
• Borkum Reef, – The North Sea, Germany<br />
• North Wind - Belgium<br />
• Gemini - Holland<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
Sidstnævnte gør sig især gældende i de tilfælde,<br />
hvor vindfarmen er placeret tæt på land.<br />
Udviklingen indenfor vindmølleparkområdet rækker<br />
for <strong>ISC</strong> også ud i fremtiden, idet der er udviklet<br />
en række særlige værktøjer til design af de<br />
specielle konstruktioner, der er nødvendige for at<br />
modstå de barske vind og bølgepåvirkninger, de<br />
udsættes for i offshore miljøet. Det gør os i dag i<br />
stand til at levere en unik rådgivning og service<br />
til vore nationale og udenlandske klienter, der<br />
omfatter komplette designs af både transformer<br />
platforme og fundamenter til vindmøllerne; fra<br />
den første konceptfase, hovedprojekt, udbud,<br />
fabrikation og søtransport til installation offshore<br />
og ibrugtagning.<br />
Til installation af vindmølle fundamenterne har<br />
<strong>ISC</strong> yder<strong>mere</strong> stået for udviklingen af et særligt<br />
montageudstyr til montage af monopiles som<br />
fundamenter for vindmøller på havet – en såkaldt<br />
”pilegripper” til at fastholde monopæle på op til<br />
8 m i diameter under ramningen af pælen ned<br />
i havbunden. Dette store stykke ”værktøj”, som<br />
vejer ca. 200 ton, har vist sin værdi på installation<br />
af et meget stort antal fundamenter til vindmøller<br />
rundt om i europa.<br />
De transformerplatforme,<br />
<strong>ISC</strong> indtil videre har<br />
projekteret, vejer<br />
typisk mellem 1000 ton<br />
og 2000 ton.<br />
/<br />
The substations designed<br />
by <strong>ISC</strong> typically<br />
weigh between 1000<br />
and 2000 ton.
F<br />
OR <strong>ISC</strong> THe DeSIGN of the Nysted Substation<br />
was the start of a long line of jobs, making<br />
<strong>ISC</strong> one of the strongest players in the field of the<br />
design of jackets, foundations and topsides for<br />
wind park substations. A number of substations<br />
have been designed for clients in the countries<br />
around the Baltic Sea, the North Sea, the Irish<br />
Sea, Oeresund, the Atlantic Ocean and in the<br />
China Sea.<br />
The function of a substation in an off-shore wind<br />
farm is to receive power from a group of wind<br />
turbines via cables and then transforming the the<br />
high voltage power before it is lead ashore via a<br />
larger or several larger subsea cables. In this way<br />
the installations are optimized and the energy<br />
loss is minimized. The substations designed by<br />
<strong>ISC</strong> typically weigh between 1000 and 2000 ton<br />
depending on the capacity. The substation structure<br />
is usually composed by a 3-4 deck structure,<br />
which contains various rooms for all the needed<br />
functions of the substation, such as electrical<br />
supervision panel, ventilation, staffrooms and<br />
sleeping quarters and of course much space is<br />
allocated for the transformers. Some substations<br />
are just raw structures others are clad in glass<br />
or stainless steel panel structures, either for<br />
protection of the staff working on the substation<br />
or just to give the substation an attractive look.<br />
This often applies for the substations situated<br />
close to shore.<br />
For <strong>ISC</strong> the future in the field of renewable energy<br />
holds a positive perspective. The experience<br />
and the development of specialized tools<br />
for the design of the special structures needed<br />
in order to withstand the rough climate at sea –<br />
with heavy wind and powerful wave exposure,<br />
provides <strong>ISC</strong> with the know-how which enables<br />
us to give a unique consultance and service to<br />
our national and international clients, comprising<br />
complete design of both the substations as<br />
well as the foundations for the wind turbines,<br />
spanning from the first concept phase, the main<br />
project, tender, fabrication, the sea transportation<br />
to the offshore installation and to the final<br />
commissioning.<br />
Furthermore <strong>ISC</strong> has developed a special tool<br />
for the installation of the offshore wind turbine<br />
monopile foundations. The tool is obviously<br />
called a pile gripper and it is a device which can<br />
hold and support monopiles up to 8 meters in diameter<br />
while they are being driven into the seabed.<br />
This large piece of equipment often weighs<br />
more than 200 ton and has shown its value by<br />
assisting at the driving of a large quantity of<br />
monopile foundations for the wind turbine farms<br />
all over europe.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 27
28<br />
Lufthavne/<br />
Airports<br />
Den omfattende viden <strong>ISC</strong> har akkumuleret igennem 40 år med projektering<br />
og udbygning af lufthavne, har naturligt tilført <strong>ISC</strong> en række opgaver<br />
indenfor den sidste 5 års periode. Hovedparten af opgaverne har været<br />
koncentreret om Københavns Lufthavn, Billund Lufthavn og Thulebasen i<br />
Nordgrønland.<br />
/<br />
An airport is a complex spider’s web of transportation where passengers,<br />
luggage, cargo and catering service meet the aircraft and crew, and where<br />
skilled mechanics have taken care of the maintenance, and determined<br />
flight controllers assure that the numerous aircrafts can move safely on<br />
ground as well as in the air.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 29
30<br />
E<br />
N LUFTHAVN eR som bekendt en kompliceret<br />
”trafikmaskine”, hvor passagerer, bagage,<br />
fragt og catering mødes med deres fly og besætning,<br />
og hvor teams af dygtige mekanikkere har sørget for<br />
flyets korrekte vedligehold, og beslutsomme flyveledere<br />
sørger for, at de mange fly kan bevæge sig<br />
sikkert på jorden og i luften.<br />
Det er indenfor det spektrum, at <strong>ISC</strong> har hentet et<br />
stort antal opgaver i Københavns Lufthavn. Lufthavnen<br />
er principielt i en stadig udvikling ikke mindst<br />
på grund af et stigende passagerantal og skiftende<br />
filosofier omkring forretningskonceptet i lufthavnen.<br />
De opgaver, <strong>ISC</strong> har løst i Københavns Lufthavn,<br />
omfatter stort set alt det, passagererne møder på<br />
deres vej fra parkeringshus til fly dvs. alt fra check<br />
in, security kontrol, odd-size bagage, forretningsområder,<br />
restauranter og naturligvis også selve terminalbygningens<br />
konstruktioner og installationer og<br />
hele vejen ud i flere fingre.<br />
Indenfor den sidste 5 års periode har <strong>ISC</strong> foretaget<br />
en total ombygning af taxfree området, som er relateret<br />
til den nye CSC bygning med security kontrol,<br />
som <strong>ISC</strong> også har projekteret. I forbindelse hermed<br />
er der også projekteret installationer og indretning<br />
omkring satellitternes taxfree områder rundt omkring<br />
i lufthavnen. Denne skal udbygges - og <strong>ISC</strong> er<br />
fortsat med på opgaven.<br />
Den særlige håndtering af odd-size bagage er blevet<br />
rationaliseret, og <strong>ISC</strong> har stået for en større udbygning<br />
omkring håndteringen af denne type bagage,<br />
dels for at gøre det nem<strong>mere</strong> for passagererne men<br />
ikke mindst for personalet, der håndterer bagagen.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
endvidere har <strong>ISC</strong> været stærkt involveret i hele<br />
ombygningen af finger C, således at Non Schengen<br />
passagerer også kan håndteres. Og endnu en ny<br />
udbygning af fingeren er nu i gang, hvor <strong>ISC</strong> er med<br />
som rådgiver i en design/construct total leverance<br />
med Norisol som pennefører. Herudover har <strong>ISC</strong><br />
projekteret en total renovering af Novia loungen i<br />
lufthavnen og påbegyndt opgaver i den gamle SAS<br />
Cargo bygning, der nu ejes af Københavns Lufthavne,<br />
med blandt andet en adskillelse af airside<br />
og landside i forbindelse med nye udlejninger af<br />
arealer.<br />
I Billund lufthavn, hvor <strong>ISC</strong> har tidligere projekteret<br />
hele det nye terminalkompleks, er <strong>ISC</strong> i øjeblikket<br />
engageret i flere væsentlige ombygninger i selve terminalbygningen,<br />
der blandt andet omfatter tax-free<br />
området, transitområde og special butikker.<br />
På Thule Basen, i Grønland, har <strong>ISC</strong> haft en eksklusiv<br />
design kontrakt med USAF i flere perioder. en lang<br />
række meget interessante opgaver er blevet løst i løbet<br />
af de seneste 5 år. Her iblandt ventilationsanlæg<br />
til det store radar anlæg, energioptimering for hele<br />
lufthavnen, elinstallationer, kystsikring af lossepladsområder<br />
og mange andre specialiserede opgaver.<br />
<strong>ISC</strong> vil fastholde sin målsætning om at udvide ekspertisen<br />
omkring lufthavnsanlæg til andre fremtidige<br />
lufthavnsopgaver fremover samt fastholde det store<br />
engagement i Københavns Lufthavn. <strong>ISC</strong> har således<br />
indgået rammeaftaler indenfor samtlige tekniske<br />
disciplinområder. <strong>ISC</strong> er parat til at gå i luften med<br />
enhver opgave, der måtte byde sig.<br />
De opgaver, <strong>ISC</strong> har løst<br />
i Københavns Lufthavn<br />
omfatter stort set alt det,<br />
passagererne møder på sin<br />
vej fra parkeringshus til fly.<br />
/<br />
<strong>ISC</strong> has been assigned tasks<br />
more or less within<br />
everything the passenger<br />
meets on his way through<br />
the airport – from the<br />
car park and<br />
metro to the aircraft.
T<br />
He AIRPORT IS ALWAYS in a developing phase not<br />
least due to the increasing number of passengers<br />
and various philosophies of the retail store concept in<br />
the airport. It is within this sphere <strong>ISC</strong> has retrieved a<br />
large number of assignments at Copenhagen Airport.<br />
<strong>ISC</strong> has been assigned tasks more or less within<br />
everything the passenger meets on his way through<br />
the airport – from the car park and metro to the aircraft.<br />
From the check-in counter, the security check,<br />
odd size luggage handling, the tax-free stores, restaurants<br />
and of course also the terminal building itself –<br />
structural design and mechanical installations – and all<br />
the way out to the concourses <strong>ISC</strong> has set a mark.<br />
Within the past 5 years <strong>ISC</strong> has performed a total<br />
rebuilding of the tax-free area which is connected<br />
directly to the new CSC building (Centralized Security<br />
Check) – also an <strong>ISC</strong> design - containing the security<br />
check. In connection with the rebuilding the mechanical<br />
installations was redesigned and the interior was<br />
updated around the concourses´ tax-free areas in the<br />
rest of the airport.<br />
The special handling of the odd size luggage has been<br />
rationalized and <strong>ISC</strong> has been in charge of a major<br />
addition for improved handling of this type of luggage<br />
making it much easier for the passengers and not<br />
least for the staff.<br />
Furthermore <strong>ISC</strong> has been strongly involved in the<br />
rebuilding of Concourse C in order for the handling<br />
of the Non Schengen passengers. Another new addition<br />
to the con is already on the drawing board, where<br />
<strong>ISC</strong> once more is involved as consultants in a design/<br />
construct overall deliverance with Norisol as main<br />
contractor. The Novia Lounge has also undertaken a<br />
total makeover designed by <strong>ISC</strong>. Next in line lies an<br />
upgrading of the old SAS Cargo building, now owned<br />
by Copenhagen Airport, which is being divided into<br />
an airside and a landside section in connection with<br />
rental areas.<br />
At Billund airport, where <strong>ISC</strong> in the 90´s designed the<br />
complete terminal building, we are now involved in<br />
several alterations and modernization involving the<br />
tax-free area, the transit area and the concourses.<br />
At the US Air Force Base in Thule, Greenland, <strong>ISC</strong> has<br />
during several periods of time been granted an exclusive<br />
design contract. A long line of various interesting<br />
assignments have been solved during the last 5 years,<br />
such as ventilation systems for the big radar installation,<br />
energy optimization of the entire airport, electrical<br />
installations, coastal fortification of landfill areas<br />
as well as other specialized tasks.<br />
<strong>ISC</strong> wishes to maintain the vision of intensifying the<br />
know-how and expertise of airport installations for future<br />
assignments at other airports and also continues<br />
the profound commitment at Copenhagen Airport. <strong>ISC</strong><br />
has entered framework agreements within all technical<br />
disciplines. <strong>ISC</strong> is ready for take-off anytime with<br />
whatever assignment presented.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 31
32<br />
Kraftværker/<br />
Power Plants<br />
Stabilitet i energiforsyningen er alfa og omega i et moderne samfund. Større<br />
og større energimængder skal være til rådighed døgnet rundt. Traditionelle<br />
kraftværker er fortsat en forudsætning for en stabil energiforsyning i de<br />
fleste lande i verden, og sådan vil det formentlig blive ved med at være<br />
mange år endnu. Alle brændsler til at producere el og varme udleder CO2 -<br />
men der er forskel på brændslerne. CO2 fra biobrændsler recirkuleres i<br />
biosfæren og belaster således ikke atmosfæren netto. Det er fremtidens<br />
udfordring at få omstillet energiproduktionen, så netto tilvækst af CO2 i<br />
atmosfæren ikke stiger.<br />
/<br />
In a modern society the stability of the power supply around the clock is<br />
essential and the demand for more energy is increasing every day. The<br />
traditional power plants will for many years ahead still be prerequisite in<br />
order to maintain a stable power supply in most countries. All types of fuel<br />
used for power and heat production produces CO2 - but there is, however, a<br />
difference between the various fuel types and of how much the atmosphere<br />
is burdened. The CO2 from bio-fuels are for instance recycled in the biosphere<br />
and does not affect the atmosphere in the end. One of futures great<br />
challenges is thus to convert our power production in order for the net content<br />
of CO2 in atmosphere does not increase.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 33
34<br />
I<br />
SC HAR VæReT med i front i den omstilling, der pågår, og<br />
er planlagt på kraftværker i Danmark og i den øvrige verden.<br />
<strong>ISC</strong> har for DONG været involveret i omstilling til bio-brændsel<br />
på to af de største kraftværker i Danmark, Avedøreværket<br />
og Skærbækværket. en meget væsentlig del af denne<br />
omstilling er håndtering, transport og lagring samt formaling<br />
af biobrændslerne. <strong>ISC</strong> har i denne forbindelse bidraget<br />
med konstruktioner for kajanlæg, mekaniske installationer<br />
for lossefaciliteter, transportsystemer fra kajanlæg til lagre<br />
samt bygninger og konstruktioner til møller og siloer.<br />
For udnyttelse af overskudsvarme til fjernvarmeanlæg er<br />
der fra Amagerværket boret en tunnel under Københavns<br />
havn til Østerbro. Her er der for Københavns energi udført<br />
stålkonstruktioner i skakt og tunnel til rørfremføring. Man<br />
har derudover udnyttet tunnelen til at fremføre forskellige<br />
andre ledninger.<br />
For det DONG ejede selskab Inbicon har <strong>ISC</strong> medvirket med<br />
opbygningen af et demonstrationsanlæg i Kalundborg,<br />
Sjælland. Anlægget skal producere 5,4 millioner liter<br />
bioethanol, 13.000 tons lignin biopiller og 11.100 tons<br />
melasse årligt på basis af 30.000 tons halm som råmateriale.<br />
Biopillerne kan bruges som brændsel i kraftværker, og<br />
melassen kan bruges til dyrefoder eller andre formål. Dermed<br />
udnyttes alle elementer i biomassen.<br />
<strong>ISC</strong> har endvidere bidraget med motorinstallationer til flere<br />
anlæg på verdensplan for bio-brændsel kraftværker – anlæg,<br />
hvor den største del af brændslet består af planteolier.<br />
Der er ikke udsigt til, at det i en overskuelig fremtid bliver<br />
muligt at sikre en stabil energiforsyning, som alene er<br />
baseret på biomasse eller andre vedvarende energikilder.<br />
Vindmøller og andre vedvarende energiformer producerer<br />
udelukkende el, når naturkræfterne vil det. Og vi kan endnu<br />
ikke på effektiv vis lagre el, til senere brug. Derfor er der<br />
fortsat brug for traditionelle kraftværker til produktion af el<br />
og varme.<br />
Derfor er der også for de fossile kraftværkers vedkommende<br />
behov for at finde løsninger, der reducerer udledning af<br />
CO2 til atmosfæren.<br />
I forbindelse med etablering af et kraftværk i Mongstad,<br />
Norge, har <strong>ISC</strong> været involveret i udarbejdelse af dele af<br />
indledende projekt for et ’Carbon Capture’ anlæg hvor CO2<br />
fra Mongstad kraftværket via røggaskanaler kompri<strong>mere</strong>s<br />
og ledes til oliefelter i den norske Nordsø. Udover at CO2 på<br />
denne måde bliver deponeret, bidrager processen også til<br />
en fortrængning af olien fra felterne, hvorved udnyttelsen<br />
øges.<br />
Der er efterhånden gennemført installation af afsvovlingsanlæg<br />
på de fleste danske kulfyrede værker. <strong>ISC</strong> har været<br />
involveret i adskillige af disse anlæg og har på det seneste<br />
bidraget med yderligere et anlæg på Asnæsværkets blok 2,<br />
der er på 125 MW. Afsvovlings-anlægget er dimensioneret<br />
til at kunne omstilles til afsvovling af blok 4, der er på 250<br />
MW.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
<strong>ISC</strong> har for DONG været<br />
involveret i omstilling til<br />
bio-brændsel på to af de<br />
største kraftværker i<br />
Danmark, Avedøreværket<br />
og Skærbækværket.<br />
/<br />
<strong>ISC</strong> has for DONG Energy<br />
been involved in<br />
converting two of the<br />
largest Danish Power<br />
Plants, the Avedøre<br />
Power Plant and<br />
the Skaerbaek Power<br />
Plant to bio-fuel.
I<br />
SC HAS BeeN in the frontline as regards the changes already<br />
made and the changes planned for in the future both in Denmark<br />
and abroad.<br />
<strong>ISC</strong> has for DONG energy been involved in converting two of the<br />
largest Danish Power Plants, the Avedøre Power Plant and the<br />
Skaerbaek Power Plant to bio-fuel.<br />
A considerable part of this conversion is the handling, transportation<br />
and storage as well as the processing of the bio-fuels. <strong>ISC</strong><br />
has in this matter, contributed with the design of the quays, the<br />
mechanical installations for the unloading facilities, the transportation<br />
systems from the quays to the storerooms as well as the<br />
buildings and structures for silos and mills.<br />
For utilization of the surplus heat to district heating a tunnel has<br />
been drilled from the Amager Power Plant under Copenhagen<br />
harbour to Osterbro, Copenhagen. For Copenhagen energy the<br />
design of the steel structures for conveying pipes in the shafts and<br />
tunnel, has been carried out by <strong>ISC</strong>. The tunnel is used for conveying<br />
electrical cables and other pipes as well.<br />
For the DONG owned company Inbicon, <strong>ISC</strong> has designed part<br />
of a bio-ethanol demo-installation in Kalundborg, Denmark. The<br />
installation has been designed to produce 5.4 million liters bioethanol,<br />
13,000 ton lignin bio-pills and 11,000 ton molasses,<br />
based on 30,000 ton straw as the raw material. The bio-pills are<br />
used for fuel and the molasses are used for feed and several<br />
other purposes – thus nothing is wasted as all the bio-mass elements<br />
can be used.<br />
<strong>ISC</strong> has furthermore designed processing engine equipment for<br />
several bio-fueled power plants around the world, where the main<br />
part of the fuel used is plant oil.<br />
It is, however, not likely that we in the near future will be able to<br />
secure a stable energy production based alone on bio-fuel or other<br />
renewable energy sources. Wind-turbines and other renewable<br />
sources of energy solely produce power when it suits the powers<br />
of our nature. We have unfortunately not yet discovered an effective<br />
technique for storing electricity – it has to be consumed<br />
instantly. We therefore still need the traditional power plants in<br />
order to maintain a constant power production.<br />
We will need to discover a way to reduce the amount of CO2<br />
derived into the atmosphere from the fossil fuel powered plants.<br />
In Mongstad, Norway, <strong>ISC</strong> has been involved in a study for a<br />
Carbon Capture installation where the CO2 from the Mongstad<br />
Power Plant via exhaust gas channels is compressed and led into<br />
the wells in the oilfields in the Norwegian sector of the North Sea.<br />
Apart from being an effective technique for storing the CO2, the<br />
method also contributes to the process of extracting the oil from<br />
the wells and thus an increase in the production.<br />
By now most Danish coal fuelled power plants have had desulfurization<br />
installations installed. <strong>ISC</strong> has designed several of these<br />
installations and has recently designed yet one for the Asnaes<br />
Power Plant block 2, a 125 MW plant. The desulfurization installation<br />
is designed so it can be converted to Block 4 which has a<br />
capacity of 250 MW.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 35
36<br />
Jernbane og Metro/<br />
Railroads and Metro<br />
Jernbanebyggeriet i Danmark tog fart omkring starten af det 20. århundrede<br />
og strækningerne var mange og planerne om nye strækninger var endnu<br />
flere. Siden er mange strækninger igen nedlagt, statslige såvel som private,<br />
og omfanget af jernbaner i Danmark har stabiliseret sig.<br />
/<br />
The building of railroads in Denmark really took a leap forward in the beginning<br />
of the 20th century and soon most of the country was well covered with<br />
rails, and plans for several new stretches were on the drawing board. Since<br />
then many of the old railroad stretches have been closed down both the<br />
public as well as the privately owned, and the extent of railroads in Denmark<br />
have since been pretty much stagnant.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 37
38<br />
N<br />
Ye STRæKNINGeR er dog siden hen kommet<br />
til i forbindelse med de store infrastruturprojekter,<br />
Storebæltsforbindelsen, Øresundsforbindelsen<br />
og ikke mindst letbaner så som Metroen<br />
i København.<br />
De efterhånden ældre og ganske hårdt udnyttede<br />
jernbanesystemer har de seneste år krævet omfattende<br />
modernisering af både skinnesystemer,<br />
signalsystemer og konstruktioner. Via især <strong>ISC</strong>’s<br />
involvering i den tredje etape af den Københavnske<br />
Metro med sine forskelligartede konstruktioner<br />
og gennemdesignede publikumsfaciliteter er<br />
<strong>ISC</strong> gearet til at deltage i de kommende opgaver<br />
med modernisering af det danske jernbanenet.<br />
<strong>ISC</strong> har således været involveret i udskiftning af<br />
to broer for BaneDanmark, en stibro (Stenhøj)<br />
over banen lidt uden for Fredericia og en stibro<br />
(Handsted Kirkesti) over banen i Handsted lidt<br />
nord for Horsens.<br />
For Banedanmark har <strong>ISC</strong> på Kong Frederik<br />
d. Ix’s bro gennemført et projekt med at udskifte<br />
lejer på jernbaneklappen og på de to vejklapper,<br />
der efter mange år i drift viste tydelige tegn på<br />
utilstrækkelige tætningsforhold.<br />
<strong>ISC</strong> har for BaneDanmark også gennemført en<br />
validering af projektet for en ny overkørsel af vej<br />
og sti over bane ved Øster Doense.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
BaneDanmark er nu i gang med at anlægge en<br />
ny, dobbeltsporet jernbane mellem København<br />
og Ringsted via Køge. KØR-projektet er en del af<br />
dette anlæg. Strækningen mellem København og<br />
Ringsted via Roskilde er i dag en flaskehals, hvor<br />
der ikke er mulighed for at køre flere tog, der kan<br />
imødekomme fremtidens transportbehov. <strong>ISC</strong> er<br />
involveret i dette projekt til at varetage projektledelse,<br />
byggeledelse og tilsyn med etablering af<br />
anlægget.<br />
Tilknyttet den Københavnske Metro’s fjerde etape<br />
også kaldet Metro Cityringen blev <strong>ISC</strong> og samarbejdspartnere<br />
af Metroselskabet prækvalificeret<br />
og afgav tilbud på rådgivningsopgaverne som<br />
bygherrerådgiver. <strong>ISC</strong> havde dannet et internationalt<br />
konsortium med nogle af verdens største<br />
rådgivningsfirmaer.<br />
<strong>ISC</strong> har akkumuleret en stor erfaring under<br />
projektering af Østamager banen, der indeholdt<br />
anlægsarbejder af en 4,1 km dobbeltsporet<br />
banestrækning med overjordiske stationer,<br />
under- og overføringer, banegrave og banedæmninger,<br />
underjordiske teknikrum, regnvandsbassiner<br />
og pumpestationer. Med dette i<br />
rygsækken forventer <strong>ISC</strong> fremadrettet at følge<br />
sporet på en række opgaver i forbindelse med<br />
etableringen af den nye del af metroen og på<br />
det øvrige jernbanenet.<br />
<strong>ISC</strong> er gearet til at deltage<br />
i de kommende opgaver<br />
med modernisering af<br />
det danske jernbanenet.<br />
/<br />
<strong>ISC</strong> is fully equipped to<br />
take part of the future<br />
assignments concerning<br />
the up-date of the<br />
Danish rail network.
N<br />
eW STReTCHeS have since been added in connection<br />
with big infrastructural projects such as the<br />
Great Belt bridge, the Oresunds Bridge and last but<br />
not least a Metro line in Copenhagen.<br />
The old and very well exploited railroads have, however,<br />
in the past years been in great need of extensive<br />
renovation as well as modernization. This goes for<br />
the rail systems, the signal systems and the structural<br />
parts.<br />
<strong>ISC</strong> is with the knowhow achieved during the involvement<br />
in the third phase of the Copenhagen Metro<br />
Line – with all the many different facets such as structures<br />
and thoroughly designed passenger facilities<br />
- fully equipped to take part of the future assignments<br />
concerning the up-date of the Danish rail network.<br />
<strong>ISC</strong> has thus been involved in the replacement of two<br />
pedestrian bridges for BaneDanmark. One across<br />
the rail just outside Fredericia and the other bridge<br />
across the rail in Hansted just a little north of Horsens.<br />
For BaneDanmark <strong>ISC</strong> has also been involved in the<br />
replacement of bearings on the King Frederik the Ix´s<br />
bascule bridge rail parts and on the two road parts as<br />
well, that after many years of wear and tear showed<br />
evident signs of insufficient sealing. A validation of<br />
the design of a new crossing for pedestrians and<br />
vehicles at the railroad at easter Doense has been<br />
carried out as well.<br />
BaneDanmark is now planning a new double rail<br />
line between Copenhagen and Ringsted via Koge.<br />
The KOR project is part of this facility. The distance<br />
between Copenhagen and Ringsted via Roskilde is<br />
presently a bottle neck as there is no possible way to<br />
make more trains pass this strech in order to meet today’s<br />
transportation demands. <strong>ISC</strong> is involved in this<br />
with project management, construction management<br />
and supervision of the establishment of the civil<br />
structures.<br />
<strong>ISC</strong> was prequalified as member of a joint venture<br />
group for the fourth phase of the Copenhagen metro<br />
and tendered for the consultancy tasks. <strong>ISC</strong> has<br />
formed an international consortium with some of the<br />
most prestigious consultancy companies in the world<br />
within the railroad planning and building and expect<br />
prospectively to be a part of the establishment of the<br />
new Copenhagen City Metro.<br />
With experience gained during the work on the east<br />
Amager Metro which comprised a 4.1 km double<br />
tracks railway with over-ground stations, transmissions<br />
over and under, railway cut and cover tunnel<br />
and embankments, sub terrain technical rooms, rainwater<br />
basins and pump installations. With this gained<br />
expertise, <strong>ISC</strong> will continue to follow the track.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 39
40<br />
Husbyggeri/<br />
House Building<br />
Betegnelsen husbygning dækker over en mangfoldighed af bygningstyper og<br />
anvendelser, spændende fra det, der traditionelt tænkes på, når talen falder<br />
på husbygning, nemlig boligbyggeri i en eller flere etager, til en række andre<br />
<strong>mere</strong> eller mindre specialiserede bygningstyper: skoler, plejehjem, kontorbygninger,<br />
kantiner, udstillingsbygninger, menighedshuse, kirker, børnehaver<br />
og kollegier.<br />
/<br />
The term house building covers quite a large variation of buildings and the<br />
use of them, spanning from what is traditionally considered when talking of<br />
house building – residential building of one or more floors - to a number of<br />
more or less specialized types of buildings namely schools, nursing homes,<br />
office buildings, canteens, exhibition buildings, churches, congregation<br />
houses, kindergartens and colleges.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 41
42<br />
I<br />
SC HAR NeTOP, i denne sidste 5 års periode,<br />
stort set været hele spektret rundt med hensyn<br />
til opgaver omkring husbygning. <strong>ISC</strong> har således<br />
afsluttet det store demenscenter i Liselund ved<br />
Viborg ligesom det store arbejde med TV2’s<br />
store hovedsæde på Teglholmen er færdiggjort.<br />
Her er der blandt andet bygget en meget kompliceret<br />
parkeringskælder i forbindelse med denne<br />
totalombygning af en allerede eksisterende bygning.<br />
<strong>ISC</strong> har fulgt succesen op med parkeringskældre<br />
i Nimbusparken, hvor de samme principper som i<br />
TV2´s kælder er anvendt.<br />
Der er blevet gennemført en lange række energikonsulentopgaver,<br />
og der er blevet projekteret<br />
skoler i både København, Glostrup, Lyngby-Taarbæk<br />
mv. Tilsvarende har vores Kalundborg afdeling<br />
udført skolebyggerier i Vestsjælland med<br />
blandt andet Marbæk skole i Skibby og science<br />
centret på Kalundborg Gymnasium. Også vores<br />
Kolding afdeling har aktiviteter indenfor skolebyggeriet<br />
med renovering og energioptimering<br />
af diverse skoler i det Østjyske område.<br />
Husbygningsområdet indbefatter lidt utraditionelle<br />
byggerier som kirker, hvor <strong>ISC</strong> har projekteret<br />
ombygning af Haslev Kirke og kirken for De<br />
sidste dages hellige – Mormonkirken og sikrede<br />
anstalter for blandt andet kriminelle unge som<br />
elmehussikringen i Nykøbing Sjælland, en mate-<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
rielgård til Kalundborgs Kommune, der udover at<br />
huse materiel indeholder omklædningsfaciliteter,<br />
kontorer mv. Ikke mindst havneadministrationsbygningen<br />
i Odense i forbindelse med bygningen<br />
af Odins Bro over Odense Kanal giver spændende<br />
udfordringer med den særegne udformning.<br />
et særligt spændende byggeri – nemlig vores<br />
eget <strong>ISC</strong> hus i esbjerg – er et nybyggeri der har<br />
lukket et hul og samlet karreen omkring Kirkegade/Jyllandsgade<br />
og Borgergade. Huset har et<br />
samlet areal på ca. 2000 m 2 og er bygget som<br />
udvidelse til vores eksisterende kontorhus i Borgergade<br />
og har hermed givet vores medarbejdere<br />
en topmoderne arbejdsplads.<br />
Afslutningen af CSC bygningen i Københavns<br />
Lufthavne er også sket indenfor denne periode.<br />
Dette byggeri har stillet store krav til både rådgivere<br />
og entreprenører, da vi med et sådant<br />
bygværk til security griber ind i alle de ædlere<br />
dele i lufthavnen.<br />
<strong>ISC</strong> har haft stor succes med at deltage i totalentreprisekonkurrencer<br />
om institutionsbyggeri,<br />
og der er inden for de seneste 5 år vundet opgaver<br />
på Sjælland og i Jylland.<br />
Naturligvis satser <strong>ISC</strong> altid på at få de utraditionelle<br />
opgaver – det er udfordrende, når det er<br />
noget, der ikke ligner det, der er lavet før.<br />
<strong>ISC</strong> har haft stor succes<br />
med at deltage i totalentreprisekonkurrencer<br />
om<br />
institutionsbyggeri.<br />
/<br />
<strong>ISC</strong> has achieved considerable<br />
success in entering turn-key<br />
tender competitions for<br />
institutional buildings.
I<br />
SC HAS FOR the past 5 years, more or less, been<br />
through the whole spectrum regarding house<br />
building assignments. A large center for dementia<br />
in Liselund at Viborg has just been terminated and<br />
the new TV2 headquarters at Teglholmen in Copenhagen<br />
has been completed as well. This project also<br />
involved a rather complex sub terrain car park in<br />
connection to the total remake of an already existing<br />
building.<br />
More sub terrain car parks have followed successfully<br />
with among others the Nimbus Park where the<br />
main principles from the TV2 car park were used.<br />
energy awareness is a big issue and in this context<br />
<strong>ISC</strong> has performed a long line of energy consultancy<br />
assignments. In Copenhagen, Glostrup and<br />
Lyngby-Taarbaek, schools have been renovated as<br />
well. The Kalundborg branch has built schools in<br />
Western Zealand among others the Marbaek School<br />
in Skibby and the Science Centre at Kalundborg<br />
Gymnasium has been entirely updated. The Kolding<br />
branch has been very active in the field as well and<br />
has renovated and energy optimized several schools<br />
in eastern Jutland.<br />
The house building field also comprises special constructions<br />
such as churches. <strong>ISC</strong> has performed the<br />
rebuilding of Haslev Church and the Danish church<br />
of the Latter Days Saints. Also secured institutions<br />
for young criminals such as the elmehus institution<br />
in Nykoebing Zealand, and the supply yard for the<br />
municipality of Kalundborg has been renovated with<br />
new staff facilities, offices etc.<br />
The harbour administration in Odense is having a<br />
new administration building in connection with the<br />
erection of the Odins Bridge across the canal – with<br />
special features linked to the design of the bridge<br />
offering the engineers many interesting challenges.<br />
An interesting building that lies close to our heart<br />
is of course our own new office house in esbjerg.<br />
The new building finally closes the gap in the block<br />
Kirkegade, Jyllandsgade and Borgergade. The<br />
building comprises a total of 2000 m 2 and is built<br />
as an extension to our old office building in Borgergade<br />
and has provided our staff with new and upto<br />
date facilities.<br />
The completion of the CSC building (Centralized Security<br />
Check) in Copenhagen Airport also has taken<br />
place during this period. The structure has brought<br />
on a lot of challenges to both consultants and contractors<br />
as such a construction surely affects all the<br />
essential fragments in an institution like an airport.<br />
<strong>ISC</strong> has achieved considerable success in entering<br />
turn-key tender competitions for institutional buildings<br />
and has won several of these during the past<br />
5 years all over Denmark. <strong>ISC</strong> aims on attaining the<br />
untraditional assignments – we like the challenges in<br />
performing something not seen before.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 43
44<br />
Bygherredrådgivning/<br />
Client Consultancy<br />
Gennem de 45 år <strong>ISC</strong> har eksisteret, er der naturligvis oparbejdet en bredtfavnende<br />
erfaring omkring gennemførelsen af mange store anlægsopgaver,<br />
nybyggeri, ombygninger og renoveringer. De mange opgaver, der er løst<br />
gennem tiden, har givet <strong>ISC</strong> den basale erfaring og viden, der skal til, for<br />
at kunne tilbyde professionel og uvildig bygherrerådgivning omfattende opgaver<br />
i alle projektfaserne.<br />
/<br />
Through the past 45 years of <strong>ISC</strong>´s existence a thorough know-how has<br />
been accumulated regarding the implementation of many big constructions,<br />
new buildings, renovations and restorations. The many assignments solved<br />
throughout the years have given <strong>ISC</strong> the basic understanding and expertise<br />
needed in order to offer professional and independent client consultancy<br />
comprising all the phases of an assignment.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 45
46<br />
E<br />
N BYGHeRReRåDGIVeR skal være en uvurderlig<br />
støtte for bygherren. Den store opgave<br />
er, at sørge for at alle processer kører så<br />
smertefrit som muligt og at varetage bygherrens<br />
interesser igennem hele projektforløbet og<br />
opfylde bygherrens forventninger med hensyn<br />
til kvalitet, økonomi, leveringsomfang, funktion,<br />
æstetik samt drift og vedligehold af byggeriet.<br />
Bygherrerådgivningen begynder med, at der<br />
udarbejdes et koncept for hele forløbet baseret<br />
på bygherrens initiale behov. Konceptet gennemføres<br />
med en udarbejdelse af behovsanalyser,<br />
funktionskrav, placering, pris, udbudsform og<br />
andre faktorer, der måtte være vigtige for netop<br />
dette projekt.<br />
På grundlag heraf udarbejder bygherrerådgiveren<br />
det samlede kontraktgrundlag, inklusive<br />
udbudsdokumenter for det samlede arbejde med<br />
specifikationer af tekniske og juridiske forhold.<br />
Dette kontraktgrundlag danner grundlaget for<br />
udbud af arbejdet til entreprenører, det være sig<br />
for udførelse i totalentreprise, hovedentreprise<br />
eller som fagentreprise. På grundlag af entreprenørens<br />
tilbud bistår bygherrerådgiveren med<br />
udarbejdelse af kontrakter med den eller de<br />
entreprenører, hvis tilbud måtte blive accepteret.<br />
Bygherrerådgiveren støtter i hele byggefasen<br />
bygherren omkring de kontraktlige forhold samt<br />
foranlediger kontrol af entreprenørens arbejder<br />
og byggesagens økonomi.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
endnu en opgave, der sorterer under bygherrerådgiveren,<br />
er hensyntagen til miljøet og de<br />
godkendelser, der skal til hos de lokale myndigheder<br />
og sidst men ikke mindst sikring af, at det<br />
samlede projekt bliver afleveret i overensstemmelse<br />
med de forventninger, bygherren har til<br />
byggeriet.<br />
Bygherrerådgiverens aktiviteter slutter endeligt<br />
med sikring af ibrugtagning af projektet og overdragelse<br />
af arbejderne med en afleveringsforretning<br />
sammen med entreprenøren. Bygherrerådgiveren<br />
kan bistå tilsvarende med indretningen,<br />
evt. særinstallationer og selvfølgelig planlægning<br />
af flytning og indflytning. Bygherrerådgiverens<br />
opgave er også at sikre, at de nødvendige manualer<br />
for drift og vedligehold, serviceaftaler og<br />
såkaldt facility management foreligger.<br />
Opgaven er fulgt endeligt til dørs, når bygherrerådgiveren<br />
har sørget for, at hele projektet er<br />
forløbet så glat som muligt, at alle miljøforhold<br />
er overholdt, at tidsplanen<br />
er blevet overholdt og de<br />
rigtige dokumenter er udfyldt<br />
– og ikke mindst, at<br />
budgettet er overholdt, og<br />
at bygherren har fået det<br />
for sine penge, han har<br />
betalt for.<br />
Bygherrerådgivning har det<br />
overordnede mål, at sikre<br />
bygherren et byggeri der:<br />
• Opfylder den ønskede<br />
funktion og kvalitet<br />
• Overholder det fastlagte<br />
budget<br />
• Færdiggøres i henhold<br />
til den fastlagte tidsplan.<br />
Bygherrerådgiveren støtter<br />
i hele byggefasen bygherren<br />
omkring de kontraktlige forhold<br />
samt foranlediger kontrol af<br />
entreprenørens arbejder og<br />
byggesagens økonomi.<br />
/<br />
The consultant assists the<br />
client throughout the full<br />
construction process with<br />
the contractual matters and<br />
controls the contractors´<br />
work and that the costs are<br />
kept within the budget.
A<br />
The overall goal for<br />
consultancy is to ensure<br />
that the client gets a<br />
building that:<br />
• Fulfills the wished<br />
function and quality<br />
• Keeps the budget<br />
• Is finished within the<br />
time schedule.<br />
CLIeNT CONSULTANT should act as an impartial<br />
support for the client. The main mission<br />
is to ensure that all phases are running as<br />
smoothly as possible and to entail all of the<br />
client’s interests throughout the entire process<br />
and make sure that the expectations of the<br />
client are fulfilled concerning quality, economics,<br />
functionality, aesthetics, maintenance and operation<br />
of the construction.<br />
The whole process begins with drawing up a<br />
concept for the process based on the client’s<br />
initial requirements. The concept is conducted<br />
with the preparation of a requirement analysis,<br />
demands to functionality, placement, cost, tender<br />
and other factors that might be essential for this<br />
specific job.<br />
Based on this the consultant draws up the overall<br />
contract basis including the tender documents<br />
for the total job including the specification of the<br />
technical and legal issues. This contract forms<br />
the basis for the tenders from the contractors<br />
depending on whether it is a turn-key contract, a<br />
main contract or a reimbursable contract. Based<br />
on the contractors’ proposal the consultant conducts<br />
the draw-up of the agreements with the<br />
contractors who´s proposal have been accepted.<br />
The consultant assists the client throughout the<br />
full construction process with the contractual<br />
matters and controls the contractors’ work and<br />
that the costs are kept within the budget.<br />
Another responsibility of the consultant is to<br />
verify that the considerations of the environment<br />
are fulfilled and the needed authorizations are<br />
achieved from the authorities. Last but not least<br />
it is the consultant’s responsibility that the result<br />
meets the client’s expectations.<br />
The consultant’s job is not finished until the<br />
project is handed over and taken into use in<br />
co-operation with the contractors. It is possible<br />
for the consultant to assist with the interior,<br />
special mechanical installations and of course<br />
the planning of the moving in. The consultant´s<br />
job is also to assure that the time schedule is<br />
kept, the budget is held, that all the manuals for<br />
maintenance and operation, service agreements<br />
and all the so called facility management are<br />
present.<br />
The assignment is finally at its end<br />
when the consultant has ensured<br />
that the job has been fulfilled as<br />
efficiently as possible, that all environmental<br />
regulations have been<br />
respected, all the needed documents<br />
have been filled out and the client<br />
has got what he paid for. When all<br />
this have been taken care of, the<br />
consultant can call it a day.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 47
48<br />
Specielle<br />
konstruktioner/<br />
Special Structures<br />
Udvikling af avanceret design er knyttet til konstruktioner,<br />
hvor der er særlige belastningsforhold og levetidsproblemer,<br />
der skal dokumenteres. Det kan også være konstruktioner, der<br />
skal have særlige bevægelsesmuligheder, eller det kan være<br />
konstruktioner, som via specielle belastninger får særlige<br />
svingningsproblemer.<br />
/<br />
The development of advanced structures is usually related<br />
to structures where special load conditions apply and where<br />
complications related to life time expectancy will need documentation.<br />
It can also apply to structures that require special<br />
motion facilities or structures exposed to exceptional loads<br />
and related oscillation problems.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 49
50<br />
K<br />
ONSTRUKTIONeR, der har sådanne særlige<br />
kendetegn, vil vi normalt betegne som<br />
specielle konstruktioner. Udviklingen af specielle<br />
konstruktioner går hånd i hånd med den avancerede<br />
IT- teknologi, der er udviklet indenfor de sidste<br />
20 år og de meget avancerede programmer,<br />
der findes til at udføre finite element analyser<br />
(FeM). Dette gælder både indenfor brobygning,<br />
maskiner, offshore konstruktioner mv.<br />
Mange af <strong>ISC</strong>´s opgaver ligger netop indenfor<br />
kategorien specielle konstruktioner, både indenfor<br />
brobygning, bygge- og anlæg og indenfor<br />
kraftværkssektoren, offshore og vindmølleparkområdet.<br />
Spændvidden i opgaverne er stor – både målt<br />
i størrelse, i teknisk variation og anvendelse af<br />
materialer. Forudsætningen for at kunne løse opgaverne<br />
med specielle konstruktioner er først og<br />
fremmest, at ekspertisen er til stede, men også<br />
at vi har et værktøj, der på en håndterbar måde<br />
er i stand til at dokumentere disse specielle konstruktioners<br />
bæreevne i relation til de gældende<br />
normer.<br />
Arkitekternes ”sprælske” fantasi indebærer ofte<br />
specielle konstruktioner og konstruktionselementer,<br />
som giver mange interessante udfordringer<br />
for den ingeniørmæssige behandling og doku-<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
mentation. Flere af de konstruktioner af rumlig<br />
art, der udformes i dag til mange typer anlæg,<br />
ville ikke kunne bearbejdes eller behandles uden<br />
anvendelse af den moderne IT-teknologi. Man<br />
kan i realiteten konstatere, at den har været<br />
grundlaget for de mange utroligt kreative former<br />
og konstruktioner, som er opført i de senere år.<br />
<strong>ISC</strong> har boltret sig indenfor denne sektor med<br />
udviklingen af mange specielle løsninger til konstruktioner<br />
og har i øjeblikket en række specielle<br />
konstruktioner under udvikling eller udførelse.<br />
Herunder kan nævnes montagegrej til vindmølleparker,<br />
særlige konstruktions- og bevægelsessystemer<br />
til europas største svingbro, design<br />
af en af Sveriges største broer over Sundsvall<br />
fjorden, udviklingen af dybhavsfundamenter til<br />
vindmøller, offshore jacket konstruktioner, ekstremt<br />
store rørkonstruktioner, motorfundamenter<br />
af forskellig art, montageudstyr til hængebroer<br />
og meget <strong>mere</strong>.<br />
europas største svingbro – Odins bro - får indbygget<br />
et særligt udviklet lejesystem, der kan opfylde<br />
de krav, der stilles her til åbningshastighed<br />
og belastning. Broen over Sundsvall fjorden i<br />
Sverige giver ekstraordinære geometriske udfordringer,<br />
som kun kan løses ved hjælp af nutidens<br />
IT programmer.<br />
Spændvidden i opgaverne<br />
er stor – både målt i størrelse,<br />
i teknisk variation og<br />
anvendelse af materialer.<br />
/<br />
The contents of the tasks<br />
span widely, both when it is a<br />
matter of the structures sizes,<br />
the mechanical variations<br />
and in the choice of materials.
S<br />
TRUCTUReS COMPRISING these features are<br />
normally categorized as special structures.<br />
The design of special structures accompanies the<br />
advanced IT technology which has been developed<br />
during the past 20 years and the very innovative<br />
programs available for performing Finite<br />
element Analyses (FeM). This is indispensable<br />
when designing bridges and engines as well as in<br />
the design of offshore structures, wind farms etc.<br />
Many of the tasks performed by <strong>ISC</strong> lie specifically<br />
within the field categorized as special structures<br />
i.e. bridge building, construction, the power<br />
sector, the off-shore sector and the wind farm<br />
sector.<br />
The contents of the tasks span widely, both when<br />
it is a matter of the structures’ sizes, the mechanical<br />
variations and in the choice of materials.<br />
The main qualifications needed in order to carry<br />
out the special structure designs are primarily<br />
that the expertise and know-how is present but<br />
obviously also that the tools which in a manageable<br />
way can handle the documentation of the<br />
structures according to the current available<br />
standards are available.<br />
The creativity of the architects’ minds often results<br />
in special structures and it is the elements<br />
in the structures that provide interesting challenges<br />
to the engineer while handling the assignment.<br />
The processing of many of these spatial structures<br />
of various kinds we see nowadays would<br />
not be possible without help from the available<br />
modern IT technology. One might find that exactly<br />
this has been essential for the design of many<br />
of the extremely creative structures we have<br />
seen erected during the recent years.<br />
<strong>ISC</strong> has been fortunate to be a player in this field<br />
and has several special structures and solutions<br />
for these lined up on the drawing board. This applies<br />
for the off-shore jacket structures, extreme<br />
piping structures, various engine foundations,<br />
mounting tools for suspension bridges, special<br />
bearings for swing bridges, mounting equipment<br />
for wind farm parks, foundations for extreme<br />
deep waters, the design of one of the largest<br />
bridges in Sweden, the Sundsvall Bridge among<br />
others.<br />
The design of the largest european swing bridge<br />
namely the Odin’s Bridge requires a special new<br />
bearing system which is able to handle the demands<br />
of the opening frequency and static loads.<br />
The Sundsvall Bridge also provides extraordinary<br />
geometrical and static challenges which are only<br />
solvable with the help of the modern IT software<br />
due to the increasing complex demands of lifetime<br />
estimates, oscillation calculations etc.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 51
52<br />
Kvalitetssikring og<br />
statisk kontrol/<br />
Quality management and<br />
Static Verification<br />
Der er i det senere år konstateret en række bæreevnesvigt af konstruktioner<br />
i Danmark, der maner til eftertanke med hensyn til ekspertisen og<br />
kontrollen i de rådgivende firmaer med konstruktion og beregning af<br />
bærende konstruktioner.<br />
/<br />
In the past years a number of structural failures have occurred in Denmark.<br />
This calls for further reflection concerning the capability, expertise and<br />
control carried out by the consultants regarding design and analysis of the<br />
structures.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 53
54<br />
H<br />
eR KAN NæVNeS eksempler i Ballerup Cykel<br />
Arena, Valby Hallen samt en række nedbrud<br />
af landbrugsbygninger som følge af snelast, der i<br />
de fleste tilfælde ikke har oversteget normlasten.<br />
Tilsvarende er der i de senere år flere eksempler<br />
på nedstyrtninger af stilladser til betonbroer<br />
med mennesketab til følge. Det er derfor meget<br />
tiltrængt, at bygningsreglementet og normen,<br />
foreskriver uafhængig kontrol af konstruktioner i<br />
høj konsekvensklasse, samt at trediepartskontrol<br />
i ekstra høj konsekvensklasse skal udføres af et<br />
andet firma end det, der har forestået projekteringen.<br />
Analogt kræves uafhængig kontrol af entreprenørers<br />
stilladskonstruktioner for broer af såvel<br />
BaneDanmark som Vejdirektoratet. Den primære<br />
opgave er her at kontrollere midlertidige stilladsers<br />
bæreevne og stabilitet som defineret i ”Tilsynshåndbog<br />
for broentrepriser”.<br />
<strong>ISC</strong>’s anerkendte statikere har i forbindelse hermed<br />
haft til opgave at kontrollere, at den statiske<br />
dokumentation er dækkende, tilstrækkelig og<br />
korrekt. et af hovedprincipperne i den uafhængige<br />
kontrol er, at materialet kontrolleres med<br />
”friske” øjne, og at alt, der er væsentligt, for den<br />
bærende konstruktions funktion og virke, nøje<br />
bliver gennemgået. Kontrollen har til formål at<br />
verificere, at de valgte løsninger er mulige, forsvarlige,<br />
opfylder krav til robusthed og sikrer, at<br />
der ikke er væsentlige fejl og mangler i den stati-<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
ske dokumentation. Kontrollen afsluttes med udfærdigelsen<br />
af en statikererklæring / kontrolnotat<br />
som bilag til den samlede statiske dokumentation<br />
for det enkelte projekt.<br />
Det har været naturligt for <strong>ISC</strong>, der har en stor<br />
stab af meget erfarne og dygtige konstruktører<br />
og statikere, at tage dette vigtige arbejdsområde<br />
op. <strong>ISC</strong> har i de senere år gennemført statisk<br />
kontrol af store betonbygværker, brobyggerier<br />
og kontrol af stilladser til broer. Som eksempler<br />
kan nævnes universitetshospitalet i århus, Teglværksbroen,<br />
antennemaster, højlagre og stadionbyggerier.<br />
Denne supplerende kontrol er kommet for at<br />
blive. Behovet understreges yderligere af, at uddannelsen<br />
på de tekniske universiteter i elementær<br />
statik og fysisk forståelse for konstruktioner<br />
og statiske virkemåder er blevet gradvist ringere<br />
i takt med den tiltagende anvendelse af færdige<br />
statistikprogrammer.<br />
De tests, der har været udført på grupper af<br />
yngre ingeniører på dette område på DTU og i<br />
større danske ingeniørfirmaer, har givet alar<strong>mere</strong>nde<br />
dårlige resultater og understreger, at<br />
der på læreanstalterne bør rustes op på dette<br />
område. Hos <strong>ISC</strong> sikrer vi, og lægger stor vægt<br />
på, at der ved ansættelse gives en generel brush<br />
up på dette område, så vore ingeniører har basal<br />
forståelse for statikken og kan udføre opgaver<br />
på forsvarlig vis.<br />
Et af hovedprincipperne<br />
i den uafhængige kontrol<br />
er, at materialet kontrolleres<br />
med ”friske” øjne<br />
/<br />
One of the main principles<br />
in the independent control is<br />
that the design is looked upon<br />
with new eyes.
A<br />
S exAMPLeS the breakdown of the Ballerup Bicycle<br />
Arena and the Valby Arena can be mentioned as<br />
well as several farm buildings that could not withstand<br />
snow loads that did not exceed the load specifications in<br />
the standards.<br />
We have also during the past years seen several breakdowns<br />
in scaffoldings for concrete bridges, unfortunately<br />
resulting in the loss of life. It is therefore essential<br />
that the building regulation together with the eurocodes<br />
0, require independent control of structures in the high<br />
consequence class and that third part control is carried<br />
out at the extreme high consequence class. This control<br />
is to be carried out by an independent company not<br />
involved in the design.<br />
equivalent, independent control of the contractors’ scaffolding<br />
structures is required by BaneDanmark as well<br />
as by the Danish Road Authorities – The Vejdirektoratet.<br />
The main task is here to check load capacity and stability<br />
of temporary scaffoldings as it is defined in “The<br />
Handbook for inspection of bridge contracts”.<br />
The certified statical controllers at <strong>ISC</strong> have for such<br />
cases been assigned the task of monitoring that the<br />
statical documentations is sufficient, adequate and correct.<br />
One of the main principles in the independent control<br />
is that the design is looked upon with new eyes and<br />
everything vital for the functionality and use of the load<br />
bearing structures is thoroughly reviewed. The purpose<br />
of the control is to verify that the chosen solutions are<br />
relevant for the functionality, secure and fulfills the<br />
requirements for stability and without any flaws or lacks<br />
in the statical documentation can be found. The documentation<br />
is terminated with an approval report as well<br />
as a memorandum as appendix to the overall statical<br />
documentation for the particular assignment.<br />
Having a large number of highly skilled and experienced<br />
design engineers and statics employed it has been<br />
obvious for <strong>ISC</strong> to take an active part in this particular<br />
area. During the past years <strong>ISC</strong> has carried out static<br />
control of large concrete buildings, bridges and scaffoldings.<br />
The new university hospital at Aarhus, the<br />
Teglvaerks Bridge, antenna masts, high storage buildings<br />
and stadiums can be mentioned as examples.<br />
This extra control has come to stay. The strong need<br />
is further emphasized by the fact that the education<br />
at the technical universities in elementary statical and<br />
physical understanding of structures and their function<br />
has gradually been degraded in line with the increasing<br />
implementation of readymade statical design programs.<br />
Tests recently given to young engineers in this topic at<br />
DTU and in the larger Danish engineering companies<br />
have shown alarmingly bad results. We recommend that<br />
the educational institutions upgrade this area instantly.<br />
At <strong>ISC</strong> we ensure that our engineers when employed<br />
are given a general brush up on the topic so that all<br />
our structural engineers have a general understanding<br />
of statics and are able to solve any task in an accurate<br />
manner.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 55
56<br />
Det næste nu<br />
– Fremtid/<br />
What´s next<br />
– the future<br />
<strong>ISC</strong> har over de sidste 45 år opbygget en videnbase med et bredt spektrum<br />
af særlige aktiviteter. Det er denne videnbase, vi skal bygge videre på i<br />
både Danmark og udlandet i en globaliseret verden under stadig forandring.<br />
/<br />
During the past 45 years <strong>ISC</strong> has acquired a substantial amount of knowhow<br />
with a broad spectrum of specialized activities. This is the base we<br />
have and want to continue for application both in Denmark as well as internationally<br />
in a globalized world which is constantly moving on.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 57
58<br />
D<br />
e TRe OMRåDeR, <strong>ISC</strong> har placeret sig centralt i,<br />
er bygge- og anlægsområdet med særlig vægt<br />
på industribygning og brobygning. Det er energiområdet<br />
med kraftværker indenfor fossile brændsler,<br />
som kul, olie, gas og diesel samt renewable området<br />
som vindmølleparker. endelig vores særlige placering<br />
indenfor olie- og gasområdet med opgaver, i<br />
<strong>mere</strong> end 35 år, over hele verden. Her har vi bl.a.<br />
opnået at blive vurderet som den bedste til offshore<br />
rådgivning i Danmark.<br />
Det er for aktiviteter indenfor disse områder, vi har<br />
spidskompetencer. Vi planlægger at vokse organisk,<br />
så vi hele tiden opdaterer den professionelle viden<br />
forankret i vore medarbejdere. Det er den brede<br />
viden sammen med specialviden indenfor de særlige<br />
nicheområder, vi skal bygge vores fremtid på.<br />
Vi har her en central placering indenfor projektering<br />
af offshore installationer på olie- og gasområdet,<br />
hvor vi nu har løst opgaver for kunder i <strong>mere</strong> end 35<br />
år. Vi har en kundebase, der omfatter alle olie- og<br />
gasproducenter i Nordsøen, i Norge og ude i verden.<br />
Vi har et godt fodfæste og et godt renommé her, og<br />
det skal vores kvalitetssikringssystem sikre, at vi<br />
også kan bevare fremover.<br />
På renewable området har vi fra 2003 til i dag skabt<br />
et solidt fodfæste og kan bryste os med, at vi nok er<br />
det firma, der har sat flest aftryk i form af offshore<br />
transformerplatforme, siden vi etablerede den første<br />
i verden i Nysted ud for Lollands kyst.<br />
Vi skal naturligvis indenfor byggeområdet fortsætte<br />
det udmærkede samarbejde, vi har i dag med mange<br />
kommuner om <strong>mere</strong> krævende byggerier indenfor<br />
husbygning. Vi har opnået SKI aftale på dette om-<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future<br />
råde, som har vist sig at bære frugt.<br />
Vi har et fortrinligt samarbejde med en lang række<br />
entreprenører, hvor vi som rådgivere indgår i totalleveringsgrupper.<br />
Dette samarbejde har udmøntet<br />
sig i flere spændende opgaver med bl.a. brobygning<br />
både i Danmark og i udlandet. Senest med den meget<br />
store bro over Sundsvallsfjorden i Sverige.<br />
<strong>ISC</strong> har en central placering med hensyn til projektering<br />
af lufthavnsbyggerier – ikke mindst i Københavns<br />
Lufthavn - men også i Rønne og Billund Lufthavn.<br />
Vi skal fremover udnytte denne specialviden<br />
ikke bare i de danske lufthavne men også ud over<br />
vore grænser.<br />
Vi skal kontinuerligt dygtiggøre vore medarbejdere<br />
med et fremadrettet blik, så de fortsat er rustet til<br />
at kunne projektere bæredygtige byggerier, der lever<br />
op til de standarder og krav, der er - og de, der<br />
måtte komme.<br />
Vi skal sikre, også fremover, at <strong>ISC</strong> bliver den foretrukne<br />
arbejdsplads for unge ingeniører, der vil<br />
arbejde med avancerede og spændende opgaver<br />
– unge ingeniører, der ønsker at tage udfordringen<br />
op og få et stort ansvar i firmaet på et meget tidligt<br />
tidspunkt. Vi satser – også fremover – på organiseret<br />
organisk vækst, fordi dette i det lange løb for <strong>ISC</strong> har<br />
vist sig at sikre en velkonsolideret virksomhed og<br />
en sikker oplæring af nye medarbejdere i et teknisk<br />
kreativt miljø. Vi har i <strong>ISC</strong> aldrig haft som primært<br />
mål på at blive de største – vi tæller ikke hoveder – vi<br />
sigter grundliggende på at være de bedste indenfor<br />
de udvalgte områder, vi satser på at arbejde i. Det<br />
er garantien for, at medarbejderne får en sikker og<br />
udfordrende arbejdsplads.<br />
Vi skal sikre, også fremover,<br />
at <strong>ISC</strong> bliver den foretrukne<br />
arbejdsplads for unge<br />
ingeniører der vil arbejde med<br />
avancerede og<br />
spændende opgaver.<br />
/<br />
It is a primary goal that<br />
<strong>ISC</strong> also in the future<br />
continues to be the preferred<br />
working place for the young<br />
engineers who wish to<br />
deal with advanced, inspiring<br />
and innovative assignments.
I<br />
SC HAS GAINeD a central position in three main areas. One is the civil<br />
works sector with special emphasis on the industrial and bridge building<br />
field. Secondly we have the energy sector with both power plants<br />
based on fossil energy such as coal, oil, gas and the renewables based<br />
on wind. Finally, we have a special place within the oil and gas sector<br />
where we have been active throughout the world in the last 35 years.<br />
We have here achieved to be rated the best offshore consultants in Denmark.<br />
It is within these sectors we have our key abilities. Our plan is to keep<br />
on growing organically in order to maintain the professional know-how<br />
embedded in our personnel. It is the wide ranged knowledge together<br />
with the unique skills we possess within the special niches where we are<br />
superior that generates the basis for our future development.<br />
We hold a central position in the oil and gas sector where we have designed<br />
offshore installations for our clients for more than 35 years. Our<br />
clients comprise all oil and gas producers in the North Sea in Denmark<br />
and in Norway and several producers around the world as well. We have<br />
in this sector a well-established position and a good reputation and we<br />
have our quality assurance system to secure that this position is held<br />
also in the future.<br />
Since 2003 we have acquired a main position in the renewable energy<br />
sector. We can most likely boast off being the company that has put<br />
most substations on the map since we established the first in the world<br />
in Nysted just off the southern Danish coast.<br />
Of course we also here have to keep focus on the excellent relationship<br />
we have established within the public sector, constructing interesting<br />
and challenging buildings. We have achieved a SKI agreement applicable<br />
for contracts with all municipalities in Denmark.<br />
We have an excellent relationship with a long list of contractors where<br />
we in joint ventures take part as consultants. These collaborations have<br />
resulted in several interesting assignments – lately the large bridge<br />
across the Sundsvall Fjord in Sweden.<br />
Airport design has always been one of our main operating fields. We<br />
have since 1967 held a central position here not least in Copenhagen<br />
Airport – but in Billund and Roenne airports as well. We are still there<br />
and will continue to participate with our attained know-how both nationally<br />
and internationally.<br />
We will keep on educating our personnel, so they are prepared for the<br />
requirements demanded in the future for sustainable constructions<br />
meeting the standards and demands - and the demands that might<br />
come.<br />
It is a primary goal that <strong>ISC</strong> also in the future continues to be the preferred<br />
working place for the young engineers who wish to deal with<br />
advanced, inspiring and innovative assignments – young engineers<br />
that wish to pick up the challenge and at an early stage in their career<br />
achieve a large amount of responsibility. We aim – also in the future – to<br />
continue our organic growth, as it has proven to be the right track for<br />
<strong>ISC</strong> in order to assure a well consolidated business and a safe comprehensive<br />
training of our new employees in a technical environment. It has<br />
never been a primary goal for <strong>ISC</strong> to be the biggest - we do not make<br />
headcounts – we <strong>mere</strong>ly aim to be the best within the activity areas we<br />
have chosen as our main track. This is the guarantee we give our engineers<br />
and designers – a secure and challenging working place.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 59
45 åRS VIRKe · 45 YeARS OF ACTIVITIeS<br />
Udgiver: <strong>ISC</strong> <strong>Rådgivende</strong> <strong>Ingeniører</strong> A/S<br />
Redaktion afsluttet marts 2012<br />
Redaktion: Kjeld Thomsen, Mette Høm Arentoft og Nils Hartmann.<br />
Illustrationer og fotos: <strong>ISC</strong> og Nils Hartmann.<br />
Omslag: Janusz Tyrpak.<br />
Det har ikke været muligt at finde samtlige rettighedshavere til copyright for alle illustrationer<br />
og fotos. Hvis ophavsretten er krænket, er det utilsigtet. Retmæssige, dokumenterede<br />
krav vil blive honoreret efter samme retningslinier, som hvis der på forhånd var indhentet<br />
tilladelse.<br />
Grafisk opsætning: Open design/advertising - www.openkommunikation.com<br />
Produktion: Frydenberg A/S<br />
60<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> <strong>Rådgivende</strong> <strong>Ingeniører</strong> A/S<br />
<strong>ISC</strong> Consulting Engineers A/S<br />
Hovedkontor<br />
Øster Allé 31<br />
2100 København Ø<br />
Tlf. +45 35 27 88 00<br />
Fax +45 35 27 88 44<br />
CVR 26 34 07 13<br />
info@isc.dk<br />
København<br />
Hesseløgade 16<br />
2100 København Ø<br />
info@isc.dk<br />
Esbjerg<br />
Borgergade 70<br />
6700 esbjerg<br />
esbjerg@isc.dk<br />
Viborg<br />
Gl Aalborgvej 4<br />
8800 Viborg<br />
viborg@isc.dk<br />
Kalundborg<br />
Stejlhøj 17<br />
4400 Kalundborg<br />
klb@isc.dk<br />
Kolding<br />
esbjergvej 24<br />
6000 Kolding<br />
kol@isc.dk<br />
Aalborg<br />
Sofiendalsvej 92A I<br />
9200 Aalborg<br />
viborg@isc.dk<br />
www.isc.dk<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 61
62<br />
<strong>ISC</strong> arbejder<br />
globalt/<br />
<strong>ISC</strong> works<br />
worldwide<br />
<strong>ISC</strong> står for ingeniørvidenseksport indenfor en række<br />
områder og har udført projektarbejder i <strong>mere</strong> end 70 lande.<br />
/<br />
<strong>ISC</strong> has throughout the year’s implemented technical<br />
know-how for various projects in more than 70 countries<br />
throughout the world.<br />
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future
<strong>ISC</strong> Innovative Engineering - join us and be a part of our future 64