13.07.2015 Views

Instrucciones de montaje - Waeco

Instrucciones de montaje - Waeco

Instrucciones de montaje - Waeco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CA-800-Install.book Seite 29 Mittwoch, 20. Februar 2008 12:28 12CoolAir6.2.6 Lay the supply linesInstallationMake sure there is no voltage at electrically operated components beforecarrying out work on them!It is standard that the system has a 3.5 m long 4 mm 2 cable. If you requirelonger cables, the cable cross section must be increased by an authorisedworkshop:Cut off the 4 mm 2 cable as closely as possible to the <strong>de</strong>vice (max. 0.5 m)and then make a proper connection to a larger cable cross section. Themanufacturer recommends a cross section of 6 mm 2 from lengths of 3.5 mto 6 m.Fit a fuse of at least 25 amps to the connection with the vehicle's powersupply.The roof air conditioner must be connected to a battery that is able to supplythe required current (see chapter "Technical data" on page 34).You can connect the system directly to both the HGV's multiplier and thebattery. However, connection to the multiplier is preferable. Ask your vehiclemanufacturer for the specifications of the multiplier.➤➤➤Lay the supply cable and connect it to the vehicle (red cable to plusand black cable to minus).Plug the supply line plug into the socket in the roof air conditioner.Secure the power cable against excessive vibration at the plug using acable tie (see fig. 6 on page 5, Pos. 1).29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!