ZWR2MSKU 2P EFM - Elcon Systemtechnik
ZWR2MSKU 2P EFM - Elcon Systemtechnik
ZWR2MSKU 2P EFM - Elcon Systemtechnik
Erfolgreiche ePaper selbst erstellen
Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.
7 Technical data/ continuation<br />
<strong>ZWR2MSKU</strong><br />
Environmental conditions: as per ETS 300 019<br />
Operation Air temperature: -25°C … +55°C<br />
Relative air humidity: 5% … 95%<br />
Storage Air temperature: -25°C … +55°C<br />
Relative air humidity: 10% … 100%<br />
Transport Air temperature: -25°C … +70°C<br />
Relative air humidity: 60% … 95%<br />
Standards:<br />
Safety EN 60 950-1<br />
Electromagnetic compatibility EN 55022, class B; ITU-T K.21;<br />
ETSI EN 300 386; ETSI ES 201 468<br />
8 Remarks<br />
Keep this Operating Manual available! Before putting the device into operation, please make<br />
yourself familiar with the safety precautions (→ Chapter 9).<br />
We reserve the right to apply technical modifications aimed to further improvement of the<br />
product performance.<br />
9 Safety precautions<br />
For your own safety, the following hints shall be observed. Please read them carefully, before<br />
you put the device into operation.<br />
Precautions against electrostatic discharge<br />
Upon opening and installation of components of the SHDSL transmission system, attention<br />
shall be paid to the safety precautions as stipulated by DIN 100 015.<br />
Safety precautions during thunderstorms<br />
Keep away from manipulations on the SHDSL transmission system and its components<br />
during thunderstorms (Do not disconnect or connect sub-units or cables).<br />
Grounding and potential equalization<br />
During installation, operation and maintenance of the SHDSL transmission system, the<br />
regulations as set out in DIN VDE 0800, part 2, shall be observed.<br />
Warning of dangerous electric voltage<br />
The SHDSL transmission system has interfaces being under dangerous electric voltage.<br />
Therefore, all works on the system should be performed by personnel who has the required<br />
special knowledge.<br />
© ELCON <strong>Systemtechnik</strong> GmbH 2009 Version: 2009/09/09<br />
<strong>ZWR2MSKU</strong> <strong>2P</strong> <strong>EFM</strong><br />
Zwischenregenerator für<br />
SHDSL-Übertragungssysteme<br />
Regenerative repeater for<br />
SHDSL transmission systems<br />
Bedienungsanleitung<br />
User manual<br />
Art.-Nr. 102719
Deutsch: Seite 1<br />
English: Page 14<br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
Version: 2009/09/09 Version: 2009/09/09<br />
6 Display elements/ continuation<br />
7 Technical data<br />
DSL1 DSL2 EIN<br />
ELCON 07 0001 G__ Ä__<br />
<strong>ZWR2MSKU</strong> 900171<br />
Figure 9: View of the front panel with LED display<br />
DSL interface:as per ETSI TS 101 524 resp. ITU-T G.991.2<br />
Bit rate 192 kbps … 3840 kbps / 5696 kbps<br />
Line digit rate up to 1282 2 / 3 kbaud / 1426 kbaud<br />
Line code TC-16-PAM / TC-32-PAM<br />
Impedance 135 Ω<br />
Degree of protection TNV3<br />
Power supply:<br />
Input voltage range of the local power supply -40.5 V to -75 V �<br />
Power consumption 1-DA mode < 3 W / < 2.2 W (local / remote powered)<br />
2×1-DA mode < 4.8 W / < 3.8 W (local / remote powered)<br />
Casing:<br />
Version Metal casing with integrated display elements<br />
and physical interfaces<br />
Display elements 3 LEDs for status indication<br />
Casing dimensions 109.4 × 194 × 67.5 mm 3 (W × D × H)<br />
Weight ca. 1.35 kg<br />
S__<br />
25
6 Display elements<br />
The <strong>ZWR2MSKU</strong> front panel offers 3 light-emitting diodes to signal the different operating<br />
states. Their meaning is determined in below table:<br />
LED Colour State Meaning<br />
ON green ON Local or remote power supply is applied to the<br />
<strong>ZWR2MSKU</strong>; Internal self test showed no faults<br />
blinking at<br />
1 Hz<br />
device is being initialized<br />
blinking at Int-B-alarm set (Device PCB temperature exceeds 80°C) or<br />
4 Hz internal error (e.g. SDFE-load)<br />
dimmed<br />
blinking at<br />
1 Hz<br />
EOC-reset command or Annex Autonegotiation enabled<br />
OFF No supply voltage<br />
ON SHDSL path is not connected, BER > 10 -3 DSL1 /<br />
DSL2 **<br />
red<br />
, LOS<br />
blinking at<br />
4 Hz<br />
SHDSL line (DSL LTU-side) is being activated<br />
blinking at Waiting time between end of activation procedure at LTU<br />
2 Hz side and start of activation at NTU side<br />
blinking at SHDSL line (DSL NTU-side) is being activated or device<br />
1 Hz is being initialized<br />
flashes short- SHDSL section before <strong>ZWR2MSKU</strong> is being activated<br />
ly every (RSP signalling)<br />
second * (Standard mode: section between ZWR and NTU;<br />
<strong>EFM</strong>-mode: section between ZWR and LTU)<br />
flashes shortly<br />
every 5 s<br />
SRU-C loop or diagnostic mode enabled<br />
goes out Line Probing Session enabled<br />
shortly every (Standard mode: section between ZWR and NTU;<br />
second <strong>EFM</strong>-mode: section between ZWR and LTU)<br />
goes out<br />
shortly every<br />
5 s<br />
Line active, but EBER alarm<br />
dimmed<br />
blinking at<br />
1 Hz<br />
EOC-reset command or Annex Autonegotiation enabled<br />
OFF Faultless data transmission<br />
* Signalling may occur also then if there is no physical link to the LTU<br />
** the LED DSL2 is only active in 2×1DA mode<br />
Table 2: Meaning of the LED displays<br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
Version: 2009/09/09 Version: 2009/09/09<br />
24 1<br />
Inhalt<br />
1. Kurzbeschreibung <strong>ZWR2MSKU</strong> 2<br />
2. Steckerbelegung 5<br />
3. Blockschaltbild <strong>ZWR2MSKU</strong> 8<br />
4. Bedienelemente 9<br />
5. Montage des <strong>ZWR2MSKU</strong> in den Baugruppenträger 10<br />
6. Anzeigeelemente 11<br />
7. Technische Daten 12<br />
8. Hinweise 13<br />
9. Sicherheitshinweise 13
1 Kurzbeschreibung <strong>ZWR2MSKU</strong><br />
Der <strong>ZWR2MSKU</strong> dient z.B. der Reichweitenerhöhung von digitalen Übertragungssystemen<br />
und kommt zum Einsatz, wenn die Leitungslänge zwischen dem Leitungsendgerät LTU und<br />
dem Netzabschlussgerät NTU die maximale Reichweite der DSL-Schnittstelle überschreitet.<br />
Mit einem <strong>ZWR2MSKU</strong> erzielt man eine Verdoppelung, mit zwei kaskadierten<br />
<strong>ZWR2MSKU</strong> eine Verdreifachung der Übertragungsreichweite eines SHDSL-Systems.<br />
Der Zwischenregenerator <strong>ZWR2MSKU</strong> ist mit vier Kupferschnittstellen (DSL-<br />
Schnittstellen) ausgeführt und regeneriert das gedämpfte, verzerrte Signal der ankommenden<br />
Impulsfolgen und leitet es dann weiter.<br />
Auf der DSL-Schnittstelle wird zur Datenübertragung ein TC-16-PAM- bzw. TC-32-PAMcodiertes<br />
Sendesignal verwendet. Die Übertragung erfolgt bidirektional über ein oder zwei<br />
Doppeladern (1-DA- oder 2×1-DA-System). Das anliegende Digitalsignal wird dabei transparent<br />
auf der SHDSL-Strecke durchgereicht. Die Sende- und Empfangsschaltung der Leitungsschnittstellen<br />
ist mit entsprechenden SHDSL-Transceivern mit Echokompensation<br />
realisiert. Die Übertragungsrate je Kupferdoppelader beträgt bis zu 3840 kBit/s (mit Leitungscode<br />
TC-16-PAM) bzw. bis zu 5696 kBit/s (mit Leitungscode TC-32-PAM). Anpassungen<br />
der Bitrate werden gemäß LTU-Konfiguration unterstützt. Die Betriebsart (1 DA /<br />
2×1 DA) wird mit einem Schalter eingestellt. Dieser befindet sich im Inneren des Gerätes<br />
und ist nach Entfernen des Gehäusebodens zugänglich.<br />
Das Übertragungssystem ist gemäß den Ausführungen der von ETSI herausgegebenen Technical<br />
Specification TS 101 524 bzw. ITU-T G.991.2 realisiert.<br />
Per SDSL-Overhead (EOC-Kanal) können verschiedene Einstellungen des <strong>ZWR2MSKU</strong><br />
vom LTU aus konfiguriert und Informationen (z.B. Performancedaten oder Temperatur)<br />
abgefragt werden. Auf diesem Weg ist optional auch ein Softwaredownload möglich.<br />
Die Versorgungsspannung des <strong>ZWR2MSKU</strong> wird aus der DSL-seitigen Fernspeisung abgeleitet,<br />
diese wird am LTU bzw. am NTU vom Fernspeisemodul RPS8 bereitgestellt. Weiterhin<br />
besteht die Möglichkeit, den <strong>ZWR2MSKU</strong> mit einer lokalen Speisespannung (z.B. mittels<br />
Speisemodul SPM) zu versorgen, wobei dann die Fernspeisung nicht mehr genutzt wird.<br />
Die Regenerator-Gehäuse sind als Metallkassetten für die Verwendung in einer ZWR-<br />
Aufnahme / in einem ZWR-Baugruppenträger BGT bzw. in einem Zwischenregeneratoreinsatz<br />
ZWRE für den Kvz oder in einer Muffe ausgeführt. Es werden für einen <strong>ZWR2MSKU</strong><br />
zwei Steckplätze benötigt.<br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
5 Assembly of <strong>ZWR2MSKU</strong> into the subrack<br />
For inserting the <strong>ZWR2MSKU</strong> into its slot, please use either both upper, the two central, or<br />
both lower guide rails. This permits to assemble up to three <strong>ZWR2MSKU</strong> per ZWR holder.<br />
When plugging the <strong>ZWR2MSKU</strong> into the ZWR holder, make sure that the LEDs on front<br />
panel are on topside. The two pilots on the housing back side are used as reverse polarity<br />
protection. The metal bracket on the front of the repeater can be used for removing the unit<br />
from the slot.<br />
Commissioning<br />
After inserting the <strong>ZWR2MSKU</strong> into the corresponding slot, the device can be put into<br />
operation. Prerequisite for starting up the <strong>ZWR2MSKU</strong> is the applied local supply voltage or<br />
an activated RPS8 which has been plugged beside the LTU / NTU. The applied voltage is<br />
indicated through the green shining LED „ON“. Further, putting the device into operation<br />
additionally requires activation of the SHDSL transmission path from the LT and NT.<br />
1. The device is beginning with an self-test procedure in the first ca. 5 seconds. During<br />
this time all LEDs are blinking (Note: the LED DSL2 is only active in 2×1DA<br />
mode).<br />
2. After this the LTU is starting up the SHDSL line to the <strong>ZWR2MSKU</strong> (first transmission<br />
path section) and the red LED „DSL“ for the corresponding SHDSL link<br />
is blinking with a frequency of 4 Hz.<br />
3. After successful set-up of the first transmission path section, the red LED „DSL“<br />
for the corresponding SHDSL link is blinking with 1 Hz frequency. During this<br />
time the second transmission path section between the <strong>ZWR2MSKU</strong> and the NTU<br />
/ the second <strong>ZWR2MSKU</strong> will be built-up.<br />
4. As for the <strong>ZWR2MSKU</strong>, the two ends of the transmission line have been set up<br />
when the red LED „DSL“ goes out.<br />
The <strong>ZWR2MSKU</strong> is controlled by the LTU and can be managed by the Network Management<br />
System (NMS).<br />
Special characteristic during the SHDSL Start-up<br />
Please take into account, that the restart time of an aborted SHDSL line could reach up to<br />
2 minutes by using one <strong>ZWR2MSKU</strong> and up to 4 minutes by using two repeaters in the<br />
SHDSL transmission path (the given time targets are defined by the ITU-/ ETSI standards<br />
ITU-T G.991.2 and ETSI TS 101 524).<br />
To ensure that the line is set up successfully, both twin wires have to be connected correctly.<br />
Version: 2009/09/09 Version: 2009/09/09<br />
2 23
4 Operating elements<br />
The switches on the circuit board allow to execute a configuration of the <strong>ZWR2MSKU</strong>.<br />
These switches are placed inside the device and become accessible after removing the casing<br />
bottom plate. For this, release the six screws on the casing bottom. The location of the<br />
switches and their position in default state can be seen in figure 8. The switches shall be<br />
operated by means of a suitable screwdriver (blade width approx. 3 mm). When changing the<br />
switch position, make sure to not damage the PCB lying beneath.<br />
With help of the „MODE“ switch you can select the mode of operation: 1-pair mode (1-DA)<br />
or dual 1-pair mode (2×1-DA) (related markings on the circuit board: „1P“ and „<strong>2P</strong>“).<br />
The switches „RPS CONFIG“ allow to determine for each SHDSL separately („RPS1“ /<br />
„RPS2“), whether the remote power supply shall be transmitted to the next <strong>ZWR2MSKU</strong> /<br />
to the next NTU (marking: „ “) or whether this shall not be executed (marking: „ “).<br />
After setting the switches, the casing bottom plate need to be fixed again by fastening the six<br />
screws.<br />
Figure 8: Switch for setting the operating mode and remote power supply<br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
1 Kurzbeschreibung <strong>ZWR2MSKU</strong>/ Fortsetzung<br />
Speisekonzept<br />
Der <strong>ZWR2MSKU</strong> kann mit lokaler Speisung oder mit Fernspeisung (LTU-seitig oder NTUseitig)<br />
betrieben werden. Liegt eine lokale Speisespannung an (-40,5 V � ... -75 V �), so<br />
wird diese vom <strong>ZWR2MSKU</strong> verwendet, auch wenn noch zusätzlich eine Fernspeisespannung<br />
anliegt. Die lokale Speisung hat immer den Vorrang. Bei Fernspeisung wird der<br />
<strong>ZWR2MSKU</strong> über beide Doppeladern mit jeweils 112 V � (± 3 V �) vom Leitungsendgerät<br />
/ Netzabschlussgerät aus gespeist. Es ist möglich, die Fernspeisespannung zum nächsten<br />
<strong>ZWR2MSKU</strong> / zum nächsten NTU durchzureichen.<br />
Der prinzipielle Aufbau eines SHDSL-Systems mit einem Regenerator sowie mit zwei<br />
kaskadierten Regeneratoren wird in den nachfolgenden Bildern gezeigt.<br />
Bild 1: Aufbau eines 2×1 DA-SHDSL-Systems mit einem Regenerator<br />
Bild 2: Aufbau zweier 2×1 DA-SHDSL-Systeme mit je zwei kaskadierten Regeneratoren<br />
Version: 2009/09/09 Version: 2009/09/09<br />
22 3<br />
LTU<br />
mit RPS8<br />
LTU<br />
mit RPS8<br />
LTU<br />
mit RPS8<br />
LTU<br />
mit RPS8<br />
LTU<br />
mit RPS8<br />
LTU<br />
mit RPS8<br />
DSL (1-Paar Kupferkabel,<br />
LTU-seitig)<br />
Fernspeisung<br />
über DSL oder<br />
DSL (1-Paar Kupferkabel,<br />
LTU-seitig)<br />
<strong>ZWR2MSKU</strong><br />
<strong>ZWR2MSKU</strong><br />
Nr. 1<br />
Fernspeisung des LTUseitigen<br />
<strong>ZWR2MSKU</strong><br />
Nr. 1 über das LTU<br />
DSL (1-Paar Kupferkabel,<br />
LTU-seitig)<br />
<strong>ZWR2MSKU</strong><br />
Nr. 1<br />
Fernspeisung des LTUseitigen<br />
<strong>ZWR2MSKU</strong><br />
Nr. 1 über das LTU<br />
DSL (1-Paar-Kupferkabel,<br />
NTU-seitig)<br />
lokale Speisung<br />
(SPM - Option)<br />
DSL<br />
(2×1-Paar<br />
Kupferkabel)<br />
DSL<br />
(2×1-Paar<br />
Kupferkabel)<br />
weitergeleitete<br />
Fernspeisung des<br />
LTU-seitigen<br />
<strong>ZWR2MSKU</strong> Nr. 2<br />
vom LTU über<br />
<strong>ZWR2MSKU</strong> Nr. 1<br />
NTU<br />
NTU<br />
<strong>ZWR2MSKU</strong><br />
Nr. 2<br />
DSL (1-Paar Kupferkabel,<br />
NTU-seitig)<br />
Fernspeisung des NTUseitigen<br />
<strong>ZWR2MSKU</strong> Nr. 2<br />
über das NTU (spez. Option)<br />
<strong>ZWR2MSKU</strong><br />
Nr. 2<br />
DSL (1-Paar Kupferkabel,<br />
NTU-seitig)<br />
NTU mit<br />
RPS8<br />
NTU mit<br />
RPS8<br />
NTU mit<br />
RPS8<br />
NTU mit<br />
RPS8
1 Kurzbeschreibung <strong>ZWR2MSKU</strong>/ Fortsetzung<br />
Ansichten<br />
Gehäuse<br />
LED-Anzeige<br />
Bügelgriff<br />
Bild 3: Ansicht der Gehäusefrontseite<br />
Gehäuse<br />
Positionierbolzen<br />
13-pol. Steckverbinder<br />
Bild 4: Ansicht Gehäuserückseite <strong>ZWR2MSKU</strong><br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
3 Block diagram of <strong>ZWR2MSKU</strong><br />
The block diagram of the <strong>ZWR2MSKU</strong> is shown in figure 7. The device consists of the<br />
following function units:<br />
Microprocessor system<br />
consisting of microcontroller, SRAM and a FLASH.<br />
DSL interface connection<br />
consisting of one quad SHDSL transceiver with corresponding I/O circuitry, with hybrid<br />
network, transmitters and protective elements.<br />
UB power supply interface<br />
The interface is short-circuit-proof, so that a reverse polarity would cause no response of the<br />
internal fuse, and no damage to the device / sub-unit. The supply voltage ranges from<br />
-40.5 V to -75 V.<br />
Figure 7: Block diagram of <strong>ZWR2MSKU</strong><br />
Version: 2009/09/09 Version: 2009/09/09<br />
4 21<br />
UB<br />
DSL<br />
DSL<br />
Power pack<br />
DC / DC<br />
EMC<br />
EMC<br />
Line<br />
interface<br />
Line<br />
interface<br />
Remote supply<br />
DC / DC<br />
Quad SHDSL Transceiver<br />
AFE/DSP<br />
AFE/DSP<br />
Controller &<br />
Peripheral<br />
AFE/DSP<br />
AFE/DSP<br />
Line<br />
interface<br />
Line<br />
interface<br />
EMC<br />
EMC<br />
DSL<br />
DSL
2 Interfaces/ continuation<br />
ZWR No. 1<br />
ZWR No. 2<br />
ZWR No. 3<br />
Figure 6: ZWR holder incl. three <strong>ZWR2MSKU</strong> and connector panel<br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
2 Steckerbelegung<br />
Steckverbinder-Anschlussbelegung des <strong>ZWR2MSKU</strong><br />
Stiftleiste 1:<br />
2, 3 SHDSL-Anschluss in Richtung LT (1. Pfad)<br />
7 FPE<br />
11, 12 Lokale Speisespannung im Bereich von -40,5 V � ... -75 V �<br />
11: Minuspotential<br />
12: Pluspotential<br />
Stiftleiste 2:<br />
7 FPE<br />
11, 12 SHDSL-Anschluss in Richtung NT (1. Pfad)<br />
Stiftleiste 3:<br />
2, 3 SHDSL-Anschluss in Richtung LT (2. Pfad)<br />
7 FPE<br />
Stiftleiste 4:<br />
7 FPE<br />
11, 12 SHDSL-Anschluss in Richtung NT (2. Pfad)<br />
Version: 2009/09/09 Version: 2009/09/09<br />
20 5<br />
1<br />
2<br />
3<br />
4<br />
2<br />
12<br />
3 7 11<br />
11<br />
2<br />
12<br />
7<br />
3 7<br />
11<br />
7<br />
Bild 5: Anschlussbelegung der Steckverbinder des <strong>ZWR2MSKU</strong><br />
12
2 Steckerbelegung/ Fortsetzung<br />
Belegung des Anschlussfelds der ZWR-Aufnahme<br />
PIN F1 an F1 ab<br />
F2 an<br />
F2 ab<br />
→ DSL zum NT → DSL vom LT → Stromversorgung<br />
1 a/b - DSL1 out (ZWR1) DSL1 in (ZWR1) a = + ; b = - (ZWR1)<br />
2 a/b - DSL2 out (ZWR1) DSL2 in (ZWR1) -<br />
3 a/b - DSL1 out (ZWR2) DSL1 in (ZWR2) a = + ; b = - (ZWR2)<br />
4 a/b - DSL2 out (ZWR2) DSL2 in (ZWR2) -<br />
5 a/b - DSL1 out (ZWR3) DSL1 in (ZWR3) a = + ; b = - (ZWR3)<br />
6 a/b - DSL2 out (ZWR3) DSL2 in (ZWR3) -<br />
Tabelle 1: Belegung des Anschlussfelds der ZWR-Aufnahme<br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
2 Interfaces/ continuation<br />
Pin assignment of connector panel of the ZWR holder<br />
PIN F1 an F1 ab<br />
F2 an<br />
F2 ab<br />
→ DSL to NT → DSL from LT → Power supply<br />
1 a/b - DSL1 out (ZWR1) DSL1 in (ZWR1) a = + ; b = - (ZWR1)<br />
2 a/b - DSL2 out (ZWR1) DSL2 in (ZWR1) -<br />
3 a/b - DSL1 out (ZWR2) DSL1 in (ZWR2) a = + ; b = - (ZWR2)<br />
4 a/b - DSL2 out (ZWR2) DSL2 in (ZWR2) -<br />
5 a/b - DSL1 out (ZWR3) DSL1 in (ZWR3) a = + ; b = - (ZWR3)<br />
6 a/b - DSL2 out (ZWR3) DSL2 in (ZWR3) -<br />
Table 1: Pin assignment of connector panel of the ZWR holder<br />
Version: 2009/09/09 Version: 2009/09/09<br />
6 19
2 Interfaces<br />
Pin assignment of the <strong>ZWR2MSKU</strong><br />
Pin connector 1:<br />
2, 3 SHDSL connection in LT direction (1 st path)<br />
7 FPE<br />
11, 12 Local supply voltage ranging from -40.5 V � ... -75 V �<br />
11: Negative potential<br />
12: Positive potential<br />
Pin connector 2:<br />
7 FPE<br />
11, 12 SHDSL connection in NT direction (1 st path)<br />
Pin connector 3:<br />
2, 3 SHDSL connection in LT direction (2 nd path)<br />
7 FPE<br />
Pin connector 4:<br />
7 FPE<br />
11, 12 SHDSL connection in NT direction (2 nd path)<br />
1<br />
2<br />
3<br />
4<br />
2<br />
12<br />
3 7 11<br />
11<br />
2<br />
12<br />
7<br />
3 7<br />
11<br />
7<br />
Figure 5: Connector pin assignment of the <strong>ZWR2MSKU</strong><br />
12<br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
2 Steckerbelegung/ Fortsetzung<br />
ZWR Nr. 1<br />
ZWR Nr. 2<br />
ZWR Nr. 3<br />
Bild 6: ZWR-Aufnahme mit drei <strong>ZWR2MSKU</strong> und Anschlussfeld<br />
Version: 2009/09/09 Version: 2009/09/09<br />
18 7
3 Blockschaltbild <strong>ZWR2MSKU</strong><br />
Das Blockschaltbild der <strong>ZWR2MSKU</strong>-Baugruppe ist in Bild 7 gezeigt. Folgende Funktionsblöcke<br />
lassen sich unterscheiden:<br />
Mikroprozessorsystem<br />
bestehend aus Mikrokontroller, SRAM und FLASH.<br />
DSL Schnittstellenanschaltung<br />
bestehend aus einem 4-fach SHDSL-Transceiver mit entsprechender Ein- und Ausgangsbeschaltung<br />
mit Hybridnetzwerk, Übertragern und Schutzelementen.<br />
UB Stromversorgungsschnittstelle<br />
Die Schnittstelle ist kurzschlusssicher und eine Verpolung führt nicht zum Ansprechen der<br />
internen Sicherung bzw. zu einer Zerstörung des Gerätes / der Baugruppe. Der Speisespannungsbereich<br />
liegt im Bereich von -40,5 V bis -75 V.<br />
UB<br />
DSL<br />
DSL<br />
Netzteil<br />
DC / DC<br />
EMV<br />
EMV<br />
Leitungsschnittstelle <br />
Leitungsschnittstelle<br />
Quad SHDSL-Transceiver<br />
AFE/DSP<br />
AFE/DSP<br />
Fernspeisung<br />
DC / DC<br />
Controller &<br />
Peripherie<br />
AFE/DSP<br />
AFE/DSP<br />
Bild 7: Blockschaltbild <strong>ZWR2MSKU</strong><br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
Leitungsschnittstelle <br />
Leitungsschnittstelle<br />
EMV<br />
EMV<br />
DSL<br />
DSL<br />
1 Short description of <strong>ZWR2MSKU</strong>/ continuation<br />
Version: 2009/09/09 Version: 2009/09/09<br />
8 17<br />
Views<br />
Casing<br />
LED display<br />
Metal bracket<br />
Figure 3: View of the casing front side<br />
Pilots<br />
13-pole connectors<br />
Casing<br />
Figure 4: View of casing back side <strong>ZWR2MSKU</strong>
1 Short description of <strong>ZWR2MSKU</strong>/ continuation<br />
Supply concept<br />
The <strong>ZWR2MSKU</strong> can be either locally powered or operated with remote power supply<br />
(LTU-side or NTU-side). If local supply voltage is provided (-40.5 V � ...–75 V �), then<br />
the <strong>ZWR2MSKU</strong> makes use of it even under the condition remote power supply would be<br />
additionally applied. Local feeding always has priority over remote power supply, if both of<br />
them are available. In case of remote power supply, the <strong>ZWR2MSKU</strong> is fed by the line<br />
terminating unit / network terminating unit through both twin wires with each 112 V �<br />
(± 3 V �). It is possible to transmit the remote power supply to the next <strong>ZWR2MSKU</strong> / to<br />
the next NTU.<br />
The figures below show the basic structure of an SHDSL system including one repeater,<br />
respectively, two cascaded repeaters.<br />
LTU<br />
with RPS8<br />
LTU<br />
with RPS8<br />
LTU<br />
with RPS8<br />
LTU<br />
with RPS8<br />
LTU<br />
with RPS8<br />
LTU<br />
with RPS8<br />
DSL (1-pair copper<br />
cable, LTU-side)<br />
Remote power<br />
supply via DSL or<br />
Figure 1: Structure of a 2×1-DA-SHDSL system with one repeater<br />
DSL (1-pair copper<br />
cable, LTU-side)<br />
<strong>ZWR2MSKU</strong><br />
<strong>ZWR2MSKU</strong><br />
No. 1<br />
Remote power supply<br />
of the LTU-side<br />
<strong>ZWR2MSKU</strong> no. 1<br />
via LTU<br />
DSL (1-pair copper<br />
cable, LTU-side)<br />
<strong>ZWR2MSKU</strong><br />
No. 1<br />
Remote power supply<br />
of the LTU-side<br />
<strong>ZWR2MSKU</strong> no. 1<br />
via LTU<br />
DSL (1-pair copper<br />
cable, NTU-side)<br />
local powering<br />
(SPM - option)<br />
DSL<br />
(2×1-pair<br />
copper cable)<br />
DSL<br />
(2×1-pair<br />
copper cable)<br />
Forwarded<br />
remote power supply<br />
of the LTU-side<br />
<strong>ZWR2MSKU</strong> no. 2<br />
from LTU via<br />
<strong>ZWR2MSKU</strong> no. 1<br />
Figure 2: Structure of two 2×1-DA-SHDSL systems with two cascaded repeaters per system<br />
NTU<br />
NTU<br />
<strong>ZWR2MSKU</strong><br />
No. 2<br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
DSL (1-pair copper<br />
cable, NTU-side)<br />
Remote power supply<br />
of the NTU-side<br />
<strong>ZWR2MSKU</strong> no. 2<br />
via NTU (special option)<br />
<strong>ZWR2MSKU</strong><br />
No. 2<br />
DSL (1-pair copper<br />
cable, NTU-side)<br />
NTU with<br />
RPS8<br />
NTU with<br />
RPS8<br />
NTU with<br />
RPS8<br />
NTU with<br />
RPS8<br />
4 Bedienelemente<br />
Mit den auf der Leiterplatte befindlichen Umschaltern kann eine Konfiguration des<br />
<strong>ZWR2MSKU</strong> vorgenommen werden. Diese befinden sich im Inneren des Gerätes und sind<br />
nach Entfernen des Gehäusebodens zugänglich. Dazu sind die sechs Schrauben auf der<br />
Gehäuseunterseite zu lösen. Die Position der Schalter sowie deren Stellung zum Zeitpunkt<br />
der Auslieferung können Sie Bild 8 entnehmen. Zur Bedienung der Schaltelemente muss ein<br />
geeigneter Schraubendreher (Klingenbreite ca. 3 mm) benutzt werden. Achten Sie beim<br />
Ändern der Schalterposition darauf, Leiterzüge und Bauelemente der darunter befindlichen<br />
Leiterplatte nicht zu beschädigen.<br />
Der Umschalter „MODE“ dient zum Wechseln der Betriebsart zwischen 1-Paar- (1-DA-)<br />
und Dual-1-Paar- (2×1-DA-)Modus (Kennzeichnungen auf der Leiterplatte: „1P“ und „<strong>2P</strong>“).<br />
Mit den Umschaltern „RPS CONFIG“ wird für jede SHDSL-Strecke („RPS1“ / „RPS2“)<br />
separat festgelegt, ob die Fernspeisung zum nächsten <strong>ZWR2MSKU</strong> / zum nächsten NTU<br />
durchgereicht werden soll (Kennzeichnung: „ “) oder ob die Fernspeisung nicht durchgereicht<br />
werden soll (Kennzeichnung: „ “).<br />
Befestigen Sie nach dem Einstellen der Schalter den Gehäuseboden wieder mit den sechs<br />
Schrauben.<br />
Bild 8: Umschalter für Betriebsart und Fernspeisung<br />
Version: 2009/09/09 Version: 2009/09/09<br />
16 9
5 Montage des <strong>ZWR2MSKU</strong> in den Baugruppenträger<br />
Der <strong>ZWR2MSKU</strong> ist so in die ZWR-Aufnahme zu stecken, dass entweder die beiden oberen,<br />
die beiden mittleren oder die beiden unteren Führungsschienen genutzt werden. Damit<br />
lassen sich maximal drei <strong>ZWR2MSKU</strong> pro ZWR-Aufnahme montieren. Achten Sie beim<br />
Einstecken des <strong>ZWR2MSKU</strong> in die ZWR-Aufnahme darauf, dass sich die LEDs auf der<br />
Frontseite oben befinden. Die beiden Positionierbolzen an der Gehäuserückseite dienen<br />
dabei zum Schutz gegen unbeabsichtigte Verpolung. Mittels des an der Vorderseite des Regenerators<br />
befindlichen Metallbügels kann das Gerät aus dem Einschubfach herausgezogen werden.<br />
Inbetriebnahme<br />
Nachdem der <strong>ZWR2MSKU</strong> in den entsprechenden Einschub gesteckt worden ist, kann das<br />
Gerät in Betrieb genommen werden. Zur Inbetriebnahme des <strong>ZWR2MSKU</strong> muss die lokale<br />
Versorgungsspannung anliegen bzw. am LTU / NTU ein RPS8 montiert und aktiviert sein.<br />
Das Vorhandensein einer Spannung wird durch das Leuchten der grünen LED „ON“ angezeigt.<br />
Eine weitere Voraussetzung für die Inbetriebnahme ist, dass die SHDSL-<br />
Übertragungsstrecke vom LT und NT aktiviert wurde.<br />
1. Das Gerät durchläuft einen Autotest, der etwa 5 Sekunden dauert. Während dieser<br />
Zeit blinken alle LEDs (Hinweis: die DSL2-LED ist nur im 2×1DA-Betrieb aktiv).<br />
2. Anschließend beginnt das LTU mit dem Aufbau der SHDSL-Strecke zum<br />
<strong>ZWR2MSKU</strong> (erster Streckenabschnitt), wobei die rote LED „DSL“ der betreffenden<br />
SHDSL-Übertragungsstrecke mit einer Frequenz von 4 Hz blinkt.<br />
3. Nach erfolgreichem Aufbau des ersten Streckenabschnitts blinkt die rote LED<br />
„DSL“ der betreffenden Übertragungsstrecke mit einer Frequenz von 1 Hz, während<br />
dessen der zweite Streckenabschnitt zwischen dem <strong>ZWR2MSKU</strong> und dem<br />
NTU / dem zweiten <strong>ZWR2MSKU</strong> aufgebaut wird.<br />
4. Für den <strong>ZWR2MSKU</strong> sind beide Seiten der Übertragungsstrecke dann aufgebaut,<br />
wenn die rote LED „DSL“ erlischt.<br />
Der <strong>ZWR2MSKU</strong> wird durch das LTU gesteuert und kann vom Network Management<br />
System (NMS) gemanagt werden.<br />
Besonderheit beim Aufbau der SHDSL-Strecke<br />
Bitte beachten Sie, dass der Neustart einer ausgefallenen SHDSL-Strecke bis zu 2 Minuten –<br />
bei Nutzung eines <strong>ZWR2MSKU</strong> – und bis zu 4 Minuten – bei Nutzung von zwei Regeneratoren<br />
innerhalb der SHDSL-Übertragungsstrecke dauern kann (die zulässigen Zeiten sind in<br />
den ITU-/ ETSI-Standards ITU-T G.991.2 bzw. ETSI TS 101 524 festgelegt).<br />
Damit ein erfolgreicher Streckenaufbau stattfinden kann, müssen jeweils beide Doppeladern<br />
korrekt angeschlossen sein.<br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
1 Short description of <strong>ZWR2MSKU</strong><br />
The <strong>ZWR2MSKU</strong> has been developed e.g. to increase the range of digital transmission<br />
systems and is used if the line length between the line terminating unit LTU and the network<br />
terminating unit NTU exceeds the maximum range of the DSL interface.<br />
When using one <strong>ZWR2MSKU</strong> the range is doubled, whereas application of two cascaded<br />
<strong>ZWR2MSKU</strong> allows to triple the transmission range of the SHDSL system.<br />
The regenerative repeater <strong>ZWR2MSKU</strong> is equipped with four copper interfaces (DSL ports)<br />
and regenerates the attenuated and distorted signal of incoming pulse sequences and forwards<br />
it further.<br />
A TC-16-PAM- resp. TC-32-PAM-coded transmit signal is used for data transmission at the<br />
DSL interface. The bidirectional transmission runs over one or two twin wires (1-DA system<br />
or 2×1-DA system). The supplied digital signal is transparently sent via the SHDSL path.<br />
The transmit-receive circuit at the line interfaces is implemented by adequate SHDSL transceivers<br />
using the echo compensation method. The line digit rate on the twin-wire copper line<br />
is up to 3840 kbps (with line code TC-16-PAM) resp. up to 5696 kbps (with line code TC-<br />
32-PAM). Fractional rates are supported according to LTU configuration. The operating<br />
mode (1 DA / 2×1 DA) can be set with help of a switch inside the device that becomes accessible<br />
after removing the casing bottom plate.<br />
The transmission system has been implemented as required by the Technical Specification<br />
ETSI TS 101 524 resp. ITU-T G.991.2.<br />
Individual settings of the <strong>ZWR2MSKU</strong> are configured per SDSL-Overhead (EOC channel)<br />
from the LTU, which also provides the option to poll certain information (e.g. performance<br />
data or temperature). Optionally, the software can be downloaded this way, too.<br />
The supply voltage of the <strong>ZWR2MSKU</strong> is derived from the DSL-side remote power supply<br />
that is provided to the LTU resp. to the NTU by the remote power feeding module RPS8. It<br />
is also possible to feed the <strong>ZWR2MSKU</strong> with a local supply voltage (e.g. by means of the<br />
power feeding module SPM), where in such case the remote power supply is not used any<br />
more.<br />
The repeater casings are designed as metallic cassettes for use in a ZWR holder / in a ZWR<br />
subrack BGT resp. a special repeater compartment ZWRE to be plugged into a cable junction<br />
box or into a sleeve. One <strong>ZWR2MSKU</strong> requires two slots.<br />
Version: 2009/09/09 Version: 2009/09/09<br />
10 15
Contents<br />
1. Short description of <strong>ZWR2MSKU</strong> 15<br />
2. Interfaces 18<br />
3. Block diagram of <strong>ZWR2MSKU</strong> 21<br />
4. Operating elements 22<br />
5. Assembly of <strong>ZWR2MSKU</strong> into the subrack 23<br />
6. Display elements 24<br />
7. Technical data 25<br />
8. Remarks 26<br />
9. Safety precautioms 26<br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
6 Anzeigeelemente<br />
An der Gerätefront des <strong>ZWR2MSKU</strong> befinden sich 3 Leuchtdioden, die die verschiedenen<br />
Betriebszustände signalisieren. Die Bedeutung ist in folgender Tabelle definiert:<br />
LED Farbe Zustand Bedeutung<br />
ON grün AN lokale oder Fernspeisung liegt am <strong>ZWR2MSKU</strong> an, interner<br />
Selbsttest wurde fehlerfrei durchlaufen<br />
blinkt mit<br />
1 Hz<br />
Gerät wird initialisiert<br />
blinkt mit Int-B-Alarm aktiv (Gerätetemperatur ≥ 80°C) oder interner<br />
4 Hz Fehler (z.B. SDFE-Load)<br />
blinkt gedimmt<br />
mit<br />
1 Hz<br />
EOC-Reset-Befehl oder Annex Autoneg. aktiv<br />
AUS keine Speisespannung<br />
AN SHDSL-Strecke nicht angeschlossen, BFR > 10 -3 DSL1 /<br />
DSL2 **<br />
rot<br />
, LOS<br />
blinkt mit<br />
4 Hz<br />
SHDSL-Strecke (DSL LTU-seitig) wird aktiviert<br />
blinkt mit Wartezeit zwischen Ende der Aktivierung zur LTU-Seite<br />
2 Hz und Beginn der NTU-seitigen Aktivierung<br />
blinkt mit SHDSL-Strecke (DSL NTU-seitig) wird aktiviert oder<br />
1 Hz Gerät wird initialisiert<br />
blitzt kurz vor dem <strong>ZWR2MSKU</strong> liegender SHDSL-Strecken-<br />
aller 1 s * abschnitt wird aktiviert (RSP-Signalisierung)<br />
(Standard-Mode: Abschnitt zwischen ZWR und NTU;<br />
<strong>EFM</strong>-Mode: Abschnitt zwischen ZWR und LTU)<br />
blitzt kurz<br />
aller 5 s<br />
SRU-C Loop oder Diagnostic Mode aktiv<br />
verlöscht Line Probing Session aktiv<br />
kurz aller 1 s (Standard-Mode: Abschnitt zwischen ZWR und NTU;<br />
<strong>EFM</strong>-Mode: Abschnitt zwischen ZWR und LTU)<br />
verlöscht<br />
kurz aller 5 s<br />
Strecke aktiv, aber Alarm EBER<br />
blinkt gedimmt<br />
mit<br />
1 Hz<br />
EOC-Reset-Befehl oder Annex Autoneg. aktiv<br />
AUS fehlerfreie Datenübertragung<br />
* Signalisierung kann auch auftreten, wenn keine physische Verbindung zum LTU besteht<br />
** die DSL2-LED ist nur im 2×1DA-Betrieb aktiv<br />
Tabelle 2: Bedeutung der LED-Anzeigen<br />
Version: 2009/09/09 Version: 2009/09/09<br />
14 11
6 Anzeigeelemente/ Fortsetzung<br />
7 Technische Daten<br />
DSL1 DSL2 EIN<br />
ELCON 07 0001 G__ Ä__<br />
<strong>ZWR2MSKU</strong> 900171<br />
S__<br />
Bild 9: Frontansicht mit LED-Anzeige<br />
DSL-Schnittstelle: entspr. ETSI TS 101 524 bzw. ITU-T G.991.2<br />
Bitrate 192 kBit/s … 3840 kBit/s / 5696 kBit/s<br />
Schrittgeschwindigkeit bis zu 1282 2 / 3 kBaud / 1426 kBaud<br />
Leitungscode TC-16-PAM / TC-32-PAM<br />
Impedanz 135 Ω<br />
Sicherheitsgrad TNV3<br />
Stromversorgung:<br />
Eingangsspannungsbereich der Lokalspeisung -40,5 V bis -75 V �<br />
Leistungsaufnahme 1-DA-Betrieb < 3 W / < 2,2 W (lokal / ferngespeist)<br />
2×1-DA-Betrieb < 4,8 W / < 3,8 W (lokal / ferngespeist)<br />
Gehäuse:<br />
Ausführungsvariante Metallgehäuse mit integrierten Anzeige-<br />
elementen und physikalischen Schnittstellen<br />
Anzeigeelemente 3 LEDs zur Statusanzeige<br />
Gehäuseabmessungen 109,4 × 194 × 67,5 mm 3 (B × T × H)<br />
Gewicht ca. 1,35 kg<br />
<strong>ZWR2MSKU</strong> <strong>ZWR2MSKU</strong><br />
7 Technische Daten/ Fortsetzung<br />
Umweltbedingungen: entsprechend ETS 300 019<br />
Betrieb Lufttemperatur: -25°C … +55°C<br />
rel. Luftfeuchtigkeit: 5% … 95%<br />
Lagerung Lufttemperatur: -25°C … +55°C<br />
rel. Luftfeuchtigkeit: 10% … 100%<br />
Transport Lufttemperatur: -25°C … +70°C<br />
rel. Luftfeuchtigkeit: 60% … 95%<br />
Normen:<br />
Sicherheit EN 60 950-1<br />
EMV EN 55022, Kl. B; ITU-T K.21;<br />
ETSI EN 300 386; ETSI ES 201 468<br />
8 Hinweise<br />
Diese Anweisung aufbewahren!<br />
Bei Inbetriebnahme des Gerätes sind die Sicherheitshinweise zu beachten (→ Kapitel 9).<br />
Technische Änderungen sind dem technischen Fortschritt geschuldet und dienen der Verbesserung<br />
des Gerätes.<br />
9 Sicherheitshinweise<br />
Folgende Sicherheitshinweise sind zu Ihrer Sicherheit zu befolgen. Lesen Sie diese, bevor<br />
Sie das Gerät in Betrieb nehmen.<br />
ESD-Schutzmaßnahmen<br />
Beim Öffnen und bei Einbau von Komponenten des SHDSL-Übertragungssystems sind die<br />
Schutzmaßnahmen nach DIN 100 015 zu beachten.<br />
Vorsichtsmaßnahmen bei Gewitter<br />
Vermeiden Sie Arbeiten am SHDSL-Übertragungssystem und dessen Komponenten bei<br />
Gewittertätigkeit (Ziehen und Stecken von Baugruppen bzw. Leitungen).<br />
Erde und Potentialausgleich<br />
Bei Installation, Betrieb und Wartung des SHDSL-Übertragungssystems ist die DIN VDE<br />
0800, Teil 2 zu beachten.<br />
Warnung vor gefährlicher elektrischer Spannung<br />
Das SHDSL-Übertragungssystem enthält Schnittstellen mit gefährlicher elektrischer Spannung.<br />
Alle Arbeiten am System sollten von Fachpersonal durchgeführt werden.<br />
Version: 2009/09/09 Version: 2009/09/09<br />
12 13