Considerable progress has been made toward<br />

organizing a High-Temperature Materials Program,<br />

but two crucial preliminary steps that must be taken<br />

are the construction of the High-Temperature Materi<br />

als <strong>Laboratory</strong> (HTML) and the consolidation of our<br />

research in that building. The HTML is necessary<br />

for several reasons.<br />

First, it would allow six research groups (Environ<br />

mental Interactions, Mechanical Behavior, High-<br />

Temperature Chemistry, Physical Properties, Struc<br />

tural Characterization, and Materials Synthesis) to<br />

interact more effectively and thus make optimum<br />

progress. Also, researchers working in applied and<br />

basic areas would benefit significantly from their<br />

interaction within the <strong>Laboratory</strong>. Finally, the more<br />

than $3-million new equipment allocation together<br />

with existing equipment would make this facility a<br />

prime resource for researchers from all sectors,<br />

including industries and universities.<br />

The <strong>Laboratory</strong>'s programmatic radioactive waste<br />

management activities are also receiving increased<br />

attention. Three ORNL projects are in various stages<br />

of study, design, construction, or commissioning: the<br />

Intermediate-Level Waste Facilities Modification Pro<br />

ject was completed in <strong>FY</strong> 1980; the new<br />

Hydrofracture Facility will be commissioned during<br />

<strong>FY</strong> <strong>1982</strong>; and the Improvements to Radioactive<br />

Waste Facilities Project is to be completed in <strong>FY</strong><br />

1984. The information obtained during the planning,<br />

design, and operation stages of these facilities will<br />

benefit the overall Radioactive Waste Management<br />

Program in its implementing of low-level radioactive<br />

waste management programs at DOE and other<br />

federal installations.<br />

Current Status of the Physical<br />

<strong>Plan</strong>t<br />

Aside from the general deterioration of the plant<br />

caused by aging and/or increased loading, the over<br />

crowding of personnel and the lack of new facilities<br />

with new capabilities continue to be major problems.<br />

Even with the reductions in force effected during <strong>FY</strong><br />

1981 and the addition of the HTML in <strong>FY</strong> <strong>1987</strong>,<br />

Site and Facilities Development 47<br />

some 1100 personnel will still be situated in substan<br />

dard facilities. While the construction of this project<br />

continues to be delayed, existing buildings—Quonset<br />

huts, trailers, and old wooden structures—continue to<br />

deterioriate and to require extensive and expensive<br />

repairs and are poor environments for advanced tech<br />

nology enterprises. The last general laboratory facility<br />

constructed at ORNL was authorized in 1957. As<br />

Fig. 9 shows, most of our buildings date from war<br />

time or the immediate postwar years.<br />

Our programs today are much different from what<br />

they were earlier, and many impose special require<br />

ments that our present facilities were not designed to<br />

meet (i.e., the containment of toxic and carcinogenic<br />

substances, provisons for handling explosion hazards,<br />

precise climate control, and adequate height for spe<br />

cial columns). Though some modifications have been<br />

made, they often proved unsatisfactory.<br />

ORNL's actual and projected construction expendi<br />

tures are provided in Fig. 10. As has been noted,<br />

large construction projects are required to meet both<br />

current and projected program needs and to correct<br />

existing general plant deficiencies. Needs are reflected<br />

in the actual and projected costs for line-item pro<br />

jects. Many of the GPF and program deficiencies<br />

with estimated costs ranging from a few thousand to<br />

less than one million dollars will require correction via<br />

the GPP programs. Currently, funding is received<br />

under fusion energy, waste management, and energy<br />

conservation activities.<br />

For over a decade, ORNL has had to rely on<br />

severely inadequate GPP funding to provide for the<br />

necessary short-term maintenance and renovation of<br />

the <strong>Laboratory</strong>'s facilities. To illustrate the severity of<br />

this problem, Fig. 11 shows that GPP funding, as a<br />

fraction of <strong>Laboratory</strong> operating funds, has fallen<br />

very rapidly since 1964. To return to a comparative<br />

level with that of only a decade ago, GPP funding<br />

would have to be raised to almost $ 11 million in<br />

1983.<br />

The <strong>Laboratory</strong> currently uses 29 DOE-owned<br />

trailers at both the X-10 and Y-12 sites. The book<br />

value of these trailers is about $250 thousand. Most<br />

are used as temporary housing for personnel and are<br />

scheduled for retirement as new, permanent facilities<br />

become available.