Considerable progress has been made toward<br />
organizing a High-Temperature Materials Program,<br />
but two crucial preliminary steps that must be taken<br />
are the construction of the High-Temperature Materi<br />
als <strong>Laboratory</strong> (HTML) and the consolidation of our<br />
research in that building. The HTML is necessary<br />
for several reasons.<br />
First, it would allow six research groups (Environ<br />
mental Interactions, Mechanical Behavior, High-<br />
Temperature Chemistry, Physical Properties, Struc<br />
tural Characterization, and Materials Synthesis) to<br />
interact more effectively and thus make optimum<br />
progress. Also, researchers working in applied and<br />
basic areas would benefit significantly from their<br />
interaction within the <strong>Laboratory</strong>. Finally, the more<br />
than $3-million new equipment allocation together<br />
with existing equipment would make this facility a<br />
prime resource for researchers from all sectors,<br />
including industries and universities.<br />
The <strong>Laboratory</strong>'s programmatic radioactive waste<br />
management activities are also receiving increased<br />
attention. Three ORNL projects are in various stages<br />
of study, design, construction, or commissioning: the<br />
Intermediate-Level Waste Facilities Modification Pro<br />
ject was completed in <strong>FY</strong> 1980; the new<br />
Hydrofracture Facility will be commissioned during<br />
<strong>FY</strong> <strong>1982</strong>; and the Improvements to Radioactive<br />
Waste Facilities Project is to be completed in <strong>FY</strong><br />
1984. The information obtained during the planning,<br />
design, and operation stages of these facilities will<br />
benefit the overall Radioactive Waste Management<br />
Program in its implementing of low-level radioactive<br />
waste management programs at DOE and other<br />
federal installations.<br />
Current Status of the Physical<br />
<strong>Plan</strong>t<br />
Aside from the general deterioration of the plant<br />
caused by aging and/or increased loading, the over<br />
crowding of personnel and the lack of new facilities<br />
with new capabilities continue to be major problems.<br />
Even with the reductions in force effected during <strong>FY</strong><br />
1981 and the addition of the HTML in <strong>FY</strong> <strong>1987</strong>,<br />
Site and Facilities Development 47<br />
some 1100 personnel will still be situated in substan<br />
dard facilities. While the construction of this project<br />
continues to be delayed, existing buildings—Quonset<br />
huts, trailers, and old wooden structures—continue to<br />
deterioriate and to require extensive and expensive<br />
repairs and are poor environments for advanced tech<br />
nology enterprises. The last general laboratory facility<br />
constructed at ORNL was authorized in 1957. As<br />
Fig. 9 shows, most of our buildings date from war<br />
time or the immediate postwar years.<br />
Our programs today are much different from what<br />
they were earlier, and many impose special require<br />
ments that our present facilities were not designed to<br />
meet (i.e., the containment of toxic and carcinogenic<br />
substances, provisons for handling explosion hazards,<br />
precise climate control, and adequate height for spe<br />
cial columns). Though some modifications have been<br />
made, they often proved unsatisfactory.<br />
ORNL's actual and projected construction expendi<br />
tures are provided in Fig. 10. As has been noted,<br />
large construction projects are required to meet both<br />
current and projected program needs and to correct<br />
existing general plant deficiencies. Needs are reflected<br />
in the actual and projected costs for line-item pro<br />
jects. Many of the GPF and program deficiencies<br />
with estimated costs ranging from a few thousand to<br />
less than one million dollars will require correction via<br />
the GPP programs. Currently, funding is received<br />
under fusion energy, waste management, and energy<br />
conservation activities.<br />
For over a decade, ORNL has had to rely on<br />
severely inadequate GPP funding to provide for the<br />
necessary short-term maintenance and renovation of<br />
the <strong>Laboratory</strong>'s facilities. To illustrate the severity of<br />
this problem, Fig. 11 shows that GPP funding, as a<br />
fraction of <strong>Laboratory</strong> operating funds, has fallen<br />
very rapidly since 1964. To return to a comparative<br />
level with that of only a decade ago, GPP funding<br />
would have to be raised to almost $ 11 million in<br />
1983.<br />
The <strong>Laboratory</strong> currently uses 29 DOE-owned<br />
trailers at both the X-10 and Y-12 sites. The book<br />
value of these trailers is about $250 thousand. Most<br />
are used as temporary housing for personnel and are<br />
scheduled for retirement as new, permanent facilities<br />
become available.