22.02.2013 Views

Construction sites: ERDF and FFB, a joint venture

Construction sites: ERDF and FFB, a joint venture

Construction sites: ERDF and FFB, a joint venture

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ERDF</strong> press service<br />

Press attaché<br />

01 47 74 75 98<br />

<strong>FFB</strong> press service<br />

Anaïk Cucheval,<br />

Press <strong>and</strong> Communication Manager<br />

01 40 69 51 39<br />

cuchevala@national.ffbatiment.fr<br />

PRESS RELEASE<br />

<strong>Construction</strong> <strong>sites</strong>:<br />

<strong>ERDF</strong> <strong>and</strong> <strong>FFB</strong>, a <strong>joint</strong> <strong>venture</strong><br />

<strong>ERDF</strong> chairwoman Michèle Bellon <strong>and</strong> Didier Ridoret, chairman of the Fédération<br />

Française du Bâtiment (<strong>FFB</strong>), have today signed an agreement aimed at improving<br />

cooperation regarding the connection of construction <strong>sites</strong>. This <strong>joint</strong> arrangement will<br />

also accompany the introduction of new regulations <strong>and</strong> the improvement of prevention<br />

<strong>and</strong> safety, in particular with regard to electrical hazards.<br />

<strong>FFB</strong> <strong>and</strong> <strong>ERDF</strong>: a natural partnership<br />

Thursday 13 September 2012<br />

Since 2007, the changes brought about by the total opening up of the energy market <strong>and</strong><br />

changes in the code of urban planning have complicated matters for construction<br />

professionals as regards access to the power grid.<br />

These difficulties have essentially consisted in changes in procedures, ever more points<br />

of contact <strong>and</strong> longer waiting times.<br />

Furthermore, environmental issues <strong>and</strong> the imminent emergence of smart grids (smart<br />

power distribution network) are also affecting the respective businesses of <strong>ERDF</strong> <strong>and</strong><br />

<strong>FFB</strong>.<br />

These factors have thus prompted the two parties to enter into dialogue in order to work<br />

out a general framework of cooperation.<br />

<strong>FFB</strong> chairman Didier Ridoret <strong>and</strong> <strong>ERDF</strong> chairwoman Michèle Bellon (<strong>ERDF</strong> multimedia library -<br />

Cyril Entzmann)<br />

<strong>ERDF</strong>, Électricité Réseau Distribution France, a public limited company with a board of directors <strong>and</strong> a Supervisory Board, having a capital of 270,037,000 euros - Tour Winterthur 92085 La Défense Cedex - R.C.S. Nanterre 444 608 442


<strong>ERDF</strong> press service<br />

Press attaché<br />

01 47 74 75 98<br />

<strong>FFB</strong> press service<br />

For more information: www.ffbatiment.fr<br />

Anaïk Cucheval,<br />

Press <strong>and</strong> Communication Manager<br />

01 40 69 51 39<br />

cuchevala@national.ffbatiment.fr<br />

Commitments to cooperate in several areas:<br />

Accelerating temporary site connections:<br />

Building work cannot commence without electricity, which is why the two parties<br />

undertake to see to it that connection times are shortened.<br />

Accompanying the introduction of new regulations on statements of<br />

work<br />

<strong>ERDF</strong> <strong>and</strong> <strong>FFB</strong> undertake to:<br />

- inform all parties involved (contracting owners, companies) about changes in<br />

regulations <strong>and</strong> their impact;<br />

- produce communication tools on this subject;<br />

- develop a system for capitalizing on <strong>and</strong> sharing information.<br />

Taking action in the field of prevention <strong>and</strong> safety:<br />

<strong>FFB</strong> undertakes to raise awareness among its members about electrical hazards,<br />

while <strong>ERDF</strong> will provide the relevant documents <strong>and</strong> information.<br />

Carrying out <strong>joint</strong> initiatives in the field of smart grids<br />

<strong>ERDF</strong> <strong>and</strong> <strong>FFB</strong> undertake to conduct <strong>joint</strong> technological awareness-raising<br />

campaigns on smart grids.<br />

Électricité Réseau Distribution France (<strong>ERDF</strong>), formed on 1 January 2008, manages 95% of the electricity<br />

distribution networks in metropolitan France. The company, with a workforce of 35000, operates, develops<br />

<strong>and</strong> maintains 1.3 million km of electric lines serving 35 million customers. In this capacity it carries out<br />

numerous operations on this network such as connections, entries into service, repairs <strong>and</strong> changes of<br />

supplier.<br />

For more information: www.erdfdistribution.fr<br />

<strong>FFB</strong> - Fédération française du bâtiment - represents 57,000 members, 42,000 of whom are small building<br />

firms. They generate two thirds of annual construction turnover (129 billion euros excluding tax) <strong>and</strong> employ<br />

two thirds of the industry's 1,180,000 employees. <strong>FFB</strong>'s mission is to federate all sizes of construction firms<br />

in order to effectively defend the profession's collective interests.<br />

<strong>ERDF</strong>, Électricité Réseau Distribution France, a public limited company with a board of directors <strong>and</strong> a Supervisory Board, having a capital of 270,037,000 euros - Tour Winterthur 92085 La Défense Cedex - R.C.S. Nanterre 444 608 442

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!