V.V.MEHTA AND ASSOCIATES<br />
CHARTERED ACCOUNTANTS<br />
To:<br />
The Superintending Engineer (VC)<br />
MSEDCL<br />
<strong>Vashi</strong> Circle<br />
Navi Mumbai.<br />
On the understanding based on the explanation and briefing given to us, the requirement of this<br />
assignment is to calculate the power / units procured for the purpose of mitigating load shedding<br />
in the areas which were declared ZLS zones so as to fmd the cost of those units.<br />
It is also given to understand that Franchisee is expected to supply everyday for 12 Hours at a<br />
mutually agreed rate and in the event of non-performance of the expected condition; the actual<br />
supply time will have to be considered.<br />
Further it is given to understand that, in the event of the total power regularly ordered from the<br />
Franchisee is in excess of the requirement in the ZLS then in that event, such power shall not be<br />
accounted for as units used for mitigating load shedding in ZLS area and accordingly such units<br />
shall be at the cost of the Distribution Company and not to' be charged to the Consumers of ZLS<br />
area.<br />
Further it is explained to us and as per our understanding, the energy used for mitigating load<br />
shedding in the said area is calculated on the basis of average load and the duration of the planned<br />
load shedding, where the planned load shedding means the proposed load shedding if the ZLS is<br />
not proposed for any area.<br />
Further it is understood that the "average load" referred to in the calculation is in fact not exactly<br />
the "average load" as computing the same is highly complicated and complex process and hence<br />
the average load is considered as the general running load during the period in which the load<br />
shedding is avoided under ZLS.<br />
We have relied on the expert for the technical verification and the appropriateness and<br />
reasonableness of assumptions and methods used and their application are the responsibility of<br />
the expert however we have obtain an understanding of those assumptions and methods to<br />
determine that they are reasonable b~sed on our knowledge of your business and on the results of<br />
our review process.<br />
Page 1 of2<br />
601 BALARAMA BANDRA KURLA COMPLEX BANDRA EAST MUMBAI 400051<br />
TELEPHONE: 022 30686900 FAX: 022 30686904
V.V.MEHTA AND ASSOCIATES<br />
CHARTERED ACCOUNTANTS<br />
Disclaimer:<br />
1) Timings, factors, figures and parameters provided by various units like Corporate<br />
Office, field units are taken as correct at their face value and their authenticity is not<br />
verified.<br />
2) Actual Quantities used from the Grid or given to the Grid are assessed ones and not<br />
actually measured. However the method adopted is the possible one to arrive at the<br />
nearest to the actual figures. Under the circumstances, the factors and figures are not<br />
as accurate but are nearest to the actuals.<br />
3) Average load of feeders were taken as the loads established during previous year<br />
2009-10. Similarly Base losses are taken as observed during the year April 2010 -<br />
March 2011.<br />
1) % distribution and collections losses based on the performance during the year 2009<br />
-2010 for grouping the areas.<br />
2) Average loads of areas concerned<br />
3) Load profile statement<br />
4) MW and MUs requirement sheet to mitigate load shedding as per individual<br />
circulars from Corporate Office and the consolidated statement<br />
5) Statements showing Units purchased, power purchase cost, reliability charges.<br />
6) Calculation of financial implication of Zero Load Shedding Program wherein as per<br />
the information provided, the amount burden for mitigating Load shedding is<br />
Rs.(6.25)Cr, Rs. (6.10) Cr and Rs. (4.99) Cr for the months of January, February<br />
and March 2011 respectively. The total burden for this quarter being Rs.(17.34) Cr.<br />
Based on the above, we state that the documents produced before us does not contain material<br />
arithmetic discrepancies.<br />
Proprietor.<br />
Mumbai<br />
Page 2 of2<br />
601 BALARAMA BANDRA KURLA COMPLEX BANDRA EAST MUMBAI 400051<br />
TELEPHONE: 022 30686900 FAX: 022 30686904
Sr. No Particulars<br />
1<br />
MU requirement as per LSprotocol and considering effective load<br />
shedding days in a month at Transmission periphery<br />
Data to be<br />
obtained from:<br />
Units legends Jan-ll Feb-ll Mar-ll<br />
LM MU a 38.46 34.48 30.32<br />
2<br />
Monthly support from additional<br />
) at MSETCLBoundry<br />
PPfor ZLS(As per CE(PP)statement<br />
pp<br />
MU b 38.46 34.48 30.32<br />
3 Cost of Power Purchase for ZLS Rs.Cr c 16.12 15.10 13.46<br />
4 Annual Sliding Distribution loss ending quarter IR % d 8.69% 8.69% 8.69%<br />
Average Billing Rate of Zl.SArea<br />
5<br />
ABR = {total revenue billed in the month - (electricity duty + TOSE+ IT & respective<br />
RCbilled in the month + Additional RC)}/ total units billed in that O&M circle<br />
Rs./ kWh e 5.484 5.724 5.358<br />
month<br />
6 Recovery through Reliability Charges IT RsCr f 4.0465 4.0531 4.3389<br />
7 Consumption on which RCis to be levied IT MU g 175.9380 176.2226 188.6490<br />
Exe. Engineer (Ve)<br />
M.S.E.D.C. Ltd. <strong>Vashi</strong>
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD., VASHI CIRCLE<br />
RECONCILIATION OF RELIABILITY CHARGES IN RESPECTOF ZERO LOAD SHEDDING MODEL OF REVENUE DIVISIONS PERIOD JAN-2011 TO MAR 2011<br />
Sr. No Particulars Units Formulae Jan-ll Feb-ll Mar-ll<br />
1<br />
2<br />
MU requirement as per LS protocol and considering effective<br />
load shedding days in a mortth at Transmission periphery<br />
Monthly support from additional PP for ZLS (As per CE(PP)<br />
statement) at MSETCL Boundry<br />
\<br />
MU a ~I 38.46 'V 34.48 "" 30.3;'<br />
MU b •<br />
"'-..I<br />
38.46 '" 34.48<br />
"J<br />
Total (Jan<br />
2011 to<br />
Mar-<br />
2011)<br />
"'103.2582<br />
30.32 J103.2582<br />
3 Cost of Power Purchase for ZLS Rs. Cr c " 16.12 .," 15.10 , V13.46 ,,44.68<br />
4 Additional Energy available at the TD interface MU d= b * (1- 0.0485) ~ 36.60<br />
......,32.81 ......., 28.85<br />
"" 98.25<br />
--.......8.69% ..•....8.69% .......•8.69%'<br />
5 Annual Sliding Distribution loss ending quarter % e<br />
-48.69%<br />
6 Additional sales after accounting dist loss MU f=d*(l-e) " 33.41 "" 29.95 " 26.34' ""'" 89.71<br />
7<br />
Average Billing Rate of ZLS Area<br />
ABR = {total revenue billed in the month - (electricity duty +<br />
TOSE + RC billed in the month + Additional RC)} / total units<br />
billed in that month<br />
Rs./ kWh g "'" 5.48 \" 5.72 'v 5.36 '\" 5.53<br />
8 Revenue generated through additional sale Rs.cr h = (f * g )/10 ~18.32<br />
-......,,17.14<br />
"<br />
'" 14.12 -- 49.58<br />
9 Recovery through Reliability Charges Rs Cr i I 4.05 v 4.05 "" 4.34 ~ 12.44<br />
10 Consumption on which RC is to be levied MU j .~ 175.94 1176.22 ""v- 188.65 "" 540.81<br />
11 Total Revenue.Generated Rs Cr k=h+i ......,22.37<br />
'" 21.20 v 18.45 '" 62.02<br />
12 Under / (Over) Recovery of ZLS PP cost Rs Cr I=c-k "'" (6.25) """ (6.10) ,",(4.99) ......,(17.34)<br />
13 Incremental Reliability Charge to be recovered / refunded Rs/kWh m=i/j (0.36) (0.35) (0.26) (0.32)<br />
([~<br />
\}~ Exe. Entnecr lVC)<br />
M.S.E.D.C. Ltd. <strong>Vashi</strong>
Annexure-B Summary of Reliability Charges Charged to<br />
Consumers under ZLS of <strong>Vashi</strong> Circle<br />
Month Units Amount<br />
Mus Cr.<br />
Jan-11 "' 175.9380 -=J 4.0465<br />
--.....I<br />
Feb-11 176.2226 4.0531<br />
Mar-11 188.6490 ~ 4.3389<br />
Total 540.8096 12.4385<br />
Exe. Engineer (Ve)<br />
M.S.E.D.C. Ltd. <strong>Vashi</strong>
Annexure-C- Power Purchase Data, MUS<br />
available and its Cost for <strong>Vashi</strong> Circle<br />
Month Mus Rs.Cr<br />
Jan-11 ,38.4600 .J 16.1200<br />
Feb-11 34.4800 15.1000<br />
Mar-11 30.3200 13.4600<br />
Total 103.2600 44.6800<br />
~<br />
Exe. Engineer (Ve)<br />
M.S.E.D.C. Ltd. <strong>Vashi</strong>
KellaDlllty Llemana excluamg<br />
ELECTRICITY DUTY TAXON SALE Demand Excluding Charges per Reliability Charges Units Billed per Rate of<br />
MONTH DEMAND in Rs ..Cr •. Rs.Cr RsCr. EO+Tax on sale TOSE & EO Cr. month Rs. Cr Rs. Cr. Month in Mus Realization<br />
A B C D=B+C E=A-D F H=E-F I J=H/I<br />
Jan-11 178.77 17.96 1.690 19.650 159.119 4.047 155.072 282.787 ...••. ~ 5.48<br />
Feb-11 187.23 16.90 1.700 18.600 168.635 4.053 164.582 287.553 -....15.72<br />
Mar-11 192.08 19.40 1.860 21.260 170.824 4.339 166.486 310.695 V 5.36<br />
Month Distribution Losses LT Losses<br />
FY 2010-11<br />
"<br />
Maharashtra State Electricity Dist.Co.Ltd.<br />
<strong>Vashi</strong>, Circle<br />
Collection Efficiency<br />
LT)<br />
( HT+<br />
Collection Efficiency ( LT)<br />
Input HT Sale LT Sale Total sale Demand Collection Demand Collectic!O<br />
% Loss LT Input<br />
% LT<br />
Loss<br />
% Efficiency % Efficiency<br />
ATCE Eft<br />
MUs MUs MUs MUs Crores Crores Crores Crores ( HT+LT) LT<br />
Apr·10 347.6 190,8 119.8 310.6 10.6 150.9 20.6 192.23 178.48 92.8 73,9 61,6 83.4 83.0 66.2<br />
fv1ay-10 359.4 188.6 126.1 314.7 12.4 164.9 23.6 185.33 177.52 95.8 73.2 71,6 97,9 83.9 74.8<br />
-<br />
Jun-10 336,7 197,6 129,8 327.4 2.7 133.0 2.4 190.77 186.46 97.7 74.6 no 96.5 95.1 94.2<br />
Jul-10 328.1 185.2 113.6 298.7 8,96 137.2 17.25 177.26 187.71 106,90 66.5 71.9 108.13 96.41 89.48<br />
Aug-10 329.8 187.8 109.9 297.7 9.72 136.2 19.28 187.47 187.13 99.82 66.2 67.9 102.56 90.12 82.79<br />
'.<br />
Sep-10 333.7 190.4 114.6 306.0 8.61 137.5 16:63 165.77 155.24 93.66 64.0 62.2 97.19 85.58 81.03<br />
Oct·10 348.7 194.6 113.0 307.7 11.78 148.1 23.68 200.23 197.58 98.68 70.3 76.1 108.31 87.05 82.66<br />
Nov-10 . 330.4 19004 121.0 311.4 5.76 134.1 9.81 200.06 196.18 98.06 74.7 70.7 94.67 92.41 85.39<br />
Dec-10 314.7 185.9 114.1 300.0 4.68 123.1 7.28 195.66 206.17 105.37 71.9 78.0 108.40 100.44 100.51<br />
Jan-l1 309.6 182.4 100.3 282.8 8.66 121.5 17.42 175.45 188.88 107.65 59.8 69.4 116.02 98.33 95.80<br />
Feb-ll 301.0 183.2 104.4 287.6 4.46 112.1 6.91 166.01 176.98 106.61 57.6 59.4 103.20 101.86 96.07<br />
Mar·11 362.2 199.8 110.9 310.7 14.21 156.2 29.00 185:77 191.81 103.25 61.5 67.2 109.17 88.58 77.50<br />
TOTAL 4001.9 2276.7 1377.5 3654.2 8.69 1654.8 16.8 2222.0 2230.1 100.4 814.3 . 828.1 101.7 91.65 84.66<br />
(Cf<br />
Exe. Engineer (Ve)<br />
M.S.E.D.C. Ltd. <strong>Vashi</strong><br />
-
MW & Mus requirement for <strong>Vashi</strong> Circle to mitigate Load shedding as per Circular No. 33 dated<br />
19.11.2010<br />
Average load<br />
Division<br />
"<br />
DCl Group<br />
of MIDC/<br />
INDUSTRIES<br />
HAVING ONE<br />
DAY<br />
STAGGERIN<br />
G<br />
Protocol as per<br />
CIR_33_19.11.2010<br />
Average<br />
load of<br />
Urban<br />
feeder<br />
Protocol as per<br />
CIR_33_19.11.2010<br />
TOTAL MWH<br />
MW LS hrs. MWH MW LS hrs. MWH<br />
Nerul 13 A 9.00 2.29 21 75.71 2.00 151 172<br />
<strong>Vashi</strong> 14 . A 143.71 2.29 329 106.70 2.00 213 542<br />
Panvel 28 C 64.34 2.29 147 90.95 3.50 318 466<br />
Total 217.05 497 273.36 683 1180<br />
MW / MUs<br />
Mwh, requirement 497 683 1180<br />
REQUIREMET wrto 12<br />
hrs at Vashl Circle<br />
Periphery<br />
MW req uIrement 41 57 98<br />
MUs requirement at<br />
MSETCL Peripheri<br />
(Trns. Loss 4.85%)<br />
Mwh requirement 522 718 1240.35<br />
MW requirement 44 60 103<br />
MW Requirement<br />
IMSETCL Periphery @<br />
Exe. Engineer (Ve)<br />
M.S.E.D.C. Ltd. Vash:
Monthwise power req MSETCL peri_2<br />
POWER REQUIREMENT VASHI CIRCLE<br />
Jan-2010 Feb·10 Mar-10<br />
%LS<strong>Vashi</strong><br />
MU<br />
requireme<br />
ntas per<br />
.Drotoeol<br />
Actual MU<br />
requireme<br />
nt<br />
%LS<strong>Vashi</strong><br />
MU<br />
requireme<br />
ntas per<br />
Drotocol<br />
Actual MU<br />
requireme<br />
nt<br />
%LS<br />
<strong>Vashi</strong><br />
MU<br />
requireme<br />
nt as per<br />
nrnt""nl<br />
Actual MU<br />
requireme<br />
nt<br />
1 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
2 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
3 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
4 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
5 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
6 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
7 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
8 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
9 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
10 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
11 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
12 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
13 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
14 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
15 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
16 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
17 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
18 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
19 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
20 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
21 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
22 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
23 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
24 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
25 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
26 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
27 103 1.24 1.24 103 1.24 1.241 82 0.98 0.980<br />
28 103 1.24 1.24 82 0.98 0.980 82 0.98 0.980<br />
29 103 1.24 1.24 100 0.00 0.000 82 0.98 0.980<br />
30 103 1.24 1.24 100 0.00 0.000 82 0.98 0.980<br />
31 103 1.24 1.24 100 0.000 82 0.98 0.980<br />
Total MU<br />
requirement<br />
for the ---...<br />
'"' 38.4&60 ~ 34.478<br />
month at<br />
MSETCL<br />
oheriDherv<br />
ReqUirement of Vashl Circle to mrtlgate load<br />
shedding as per Load Management Section<br />
Circular No. 33 dl<br />
19.11.2010<br />
MW MUs<br />
Requirement Requirement<br />
for 12 hrs to for to<br />
mitigate load mitigate load<br />
shedding shedding<br />
MW MUs<br />
30.380<br />
Exe. . eer (Ve)<br />
M.S.E.D.C. Ltd. <strong>Vashi</strong>
Sr.No Particulars<br />
1<br />
2<br />
Detailed Calculation of Financial Implication of Zero<br />
Load Shedding Programme in <strong>Vashi</strong> Circle<br />
Summary of Reliability Charges Charged to<br />
Consumers<br />
3 Monthly Power Purchased, its cost<br />
4 Rate of Realization<br />
5 Power requirement<br />
6 Requirement of Power as per Circular No. 32.33<br />
7 Summarised IT report for Reliability Charges<br />
8<br />
Distribution Loss for year during the period from Jan-<br />
2011 to Mar 2010