26.02.2013 Views

Download Satelite no. 27 (June 2005) - Satair.com

Download Satelite no. 27 (June 2005) - Satair.com

Download Satelite no. 27 (June 2005) - Satair.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Airbus A380 flies – with a little help from SHG!<br />

By Rod Scott, CEO, <strong>Satair</strong> Hardware Group<br />

The A380 superjumbo successfully performed its maiden<br />

flight from Toulouse on 28 April. This huge doubledecker<br />

passenger aircraft is seen as a major engineering<br />

triumph between the European partners in France, the UK,<br />

Germany and Spain, as well as hundreds of globally-based<br />

subcontactors. It is expected to enter service with Singapore<br />

Airlines towards the end of next year.<br />

‘<strong>Satair</strong> Hardware is pleased to have played its small part in<br />

helping the Airbus A380 get off the ground’, says Rod Scott,<br />

CEO, ‘we wish Airbus every success with this magnificent<br />

aircraft’.<br />

The Value Stream Mapping (VSM) tool came into its own for<br />

the Goods Receipt/Inspection Department at <strong>Satair</strong> Hardware<br />

UK, reducing the backlog of goods waiting to be booked into<br />

the warehouse from up to six weeks to less than one.<br />

Angela Goldberg, Continuous Improvement Specialist<br />

was seconded to the department to perform the Value<br />

Stream Mapping exercise and then implement the newly<br />

designed process and provide training for the new Priority<br />

Administrator, Goods Receipt Processor and Inspectors.<br />

Angela mapped the process from goods receipt to placing<br />

the parts on the stores bench to them being put away. ‘The<br />

exercise involved actually ’working’ the process to uncover<br />

all of the tasks that the Goods Receipt Processor and the<br />

Inspectors were required to do’ Angela explains. Angela then<br />

identified the different tasks as ‘value added’ and ‘<strong>no</strong>n-value<br />

added’ which highlighted the areas for improvement.<br />

The proposed changes were supported at Director level,<br />

through the Goods Inward Improvement Team (Arnie<br />

Sivertsen - Warehouse Manager, Tim Williams - Quality<br />

Manager, Brian Mullen - Inspection Team Leader and Nigel<br />

Thomas - Managing Director) who reviewed, authorised<br />

changes and took actions in order for the new Goods Inward<br />

Process to be a success.<br />

The entire Goods Receipt/Inspection Department required<br />

repositioning to reduce the distance staff had to walk in order<br />

to process parts through the system. Analysis also showed that<br />

the Inspectors were spending less than 20% of their available<br />

N O : 2 7 : J U N E : 0 5<br />

SHG has supplied a wide range of products which include<br />

■ Textron Aerospace Fasteners and other hardware on<br />

airframe and engine nacelle structure, including<br />

<strong>com</strong>posite applications<br />

■ Avibank Hook and Pressure relief latches on engine<br />

cowlings<br />

■ Clickbond <strong>com</strong>posite fasteners onto IFS/Thrust reverser<br />

blanket attachment<br />

Efficiency improvements in <strong>Satair</strong> Hardware UK<br />

By Angela Goldberg, Continuous Improvement Specialist<br />

time inspecting parts, with the rest of their time spent<br />

unpacking parts and looking for priority parts for customers.<br />

The Goods receipt process has <strong>no</strong>w been re-engineered<br />

allowing the Goods Receipt Processor to unpack deliveries<br />

without involving the Inspection staff. ‘We <strong>no</strong>w have a<br />

Priority Administrator to locate priority deliveries and assist<br />

with unpacking when necessary’ Angela said. ‘Certificate<br />

scanning is <strong>no</strong>w undertaken by an existing resource, which<br />

frees the Inspectors to inspect product’.<br />

TOTAL TIME SAVED<br />

PER TRANSACTION (MINUTES)<br />

Before<br />

changes<br />

After<br />

changes<br />

Time<br />

saved<br />

<strong>2005</strong> © F. Espinasse<br />

■ LISI MONADNOCK spacers and stand off on airframe<br />

fuselage<br />

■ MONOGRAM fasteners on airframe and nacelle<br />

structures<br />

■ Mortorq and other hardware products on Goodrich<br />

power generators<br />

■ Hardware products from SHG’s manufacturing facility<br />

■ Hardware on fluid control systems for the Rolls Royce<br />

Trent 900<br />

Avibank Hook and Pressure relief latches on engine cowlings<br />

‘This means that the Inspectors are <strong>no</strong>w spending 80% of<br />

available time inspecting parts, and in just one month<br />

have seen these changes result in the backlog of goods<br />

waiting to be booked into the warehouse being reduced<br />

to just one week - a great demonstration of continuous<br />

improvement’ Angela concluded.<br />

CHANGE IN NUMBER OF<br />

PARTS PROCESSED DAILY<br />

Unpack Book-in Total

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!