• Reviewing recent Dam Failures in South Africa as a prelude to dam safety<br />
• Adequately preparing to conduct a Dam Safety Inspection focusing on the different types of dam safety<br />
inspections and the possible composition of the inspection teams for each.<br />
• Documenting and Reporting Findings from a Dam Safety Inspection. Focus is on the techniques and<br />
procedures used to document an inspection and the formats and writing of inspection reports<br />
3. Analysing the Operation and Maintenance Plan / Manual (OMM)<br />
• Overview of the operation and Maintenance plan<br />
• Establishing and maintain an Emergency Preparedness Program designed to mitigate the effects of natural<br />
disasters or unexpected impacts on Dam management<br />
• Learn how to Organise an Operation and Maintenance Program focusing on the importance of maintenance to<br />
dam safety, and provides information on planning, implementing, and evaluating an operation and maintenance<br />
program<br />
4. Strategies for Extending Service Life of Dams<br />
Positively identifying foundation problems and solutions<br />
• Providing an overview of design and construction of recent dam projects<br />
• Discussing the major issues that were faced during the design phase of the project<br />
• Describing how challenges were addressed during and throughout the construction of recent dam<br />
• Managing the remediation work: Stepping through the major hurdles and identifying the solutions that were used<br />
• Innovative rehabilitation technologies to address repair challenges<br />
• Advanced methods for increasing reservoir storage and spillway discharge capacity<br />
• Non-structural approaches to facility life extension<br />
Innovative Surveillance and Monitoring Systems<br />
• Emerging technologies for monitoring dams and their foundations<br />
• Performance evaluation of dams using monitoring data<br />
• Design and construction of instrumentation systems considering operations and<br />
• maintenance requirements<br />
5. Emergency Preparedness Plans (EPP)<br />
• Defining the environment for emergency preparedness<br />
• Planning the best practices and implementing (EPP)<br />
• Evaluation of Facility Emergency Preparedness. Providing instructions on how to evaluate the adequacy of site<br />
conditions and procedures, and how to inspect and evaluate the adequacy of the emergency<br />
6. Decommissioning Dams at the Completion of their Useful Service Life<br />
• Case studies in dam removal and restoration<br />
• Predicting future conditions following removal and restoration<br />
Pieter Gouws, PG Consulting<br />
16:30 Close of Day<br />
Day Two:<br />
1. Dam Wall or embankment stabilization<br />
• Introduction<br />
• Dam protection using the TECCO® slope stabilization system and TECCO® high-tensile steel wire pillars<br />
• Stabilizing Concept<br />
• Dimensioning<br />
• The Tecco® High-Tensile Slope Stabilisation System<br />
• Tecco® Pillars<br />
• Planning And Execution<br />
2. Improved Technical Approaches for Managing the following Infrastructure<br />
• Rock fall barriers and drapes<br />
• Slope stabilization systems<br />
VISIT OUR WEBSITE: www.amabhubesi.com TEL: +27 11 326 0353 • FAX: +27 11 326 0354