02.03.2013 Views

brochure - eWISA

brochure - eWISA

brochure - eWISA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Reviewing recent Dam Failures in South Africa as a prelude to dam safety<br />

• Adequately preparing to conduct a Dam Safety Inspection focusing on the different types of dam safety<br />

inspections and the possible composition of the inspection teams for each.<br />

• Documenting and Reporting Findings from a Dam Safety Inspection. Focus is on the techniques and<br />

procedures used to document an inspection and the formats and writing of inspection reports<br />

3. Analysing the Operation and Maintenance Plan / Manual (OMM)<br />

• Overview of the operation and Maintenance plan<br />

• Establishing and maintain an Emergency Preparedness Program designed to mitigate the effects of natural<br />

disasters or unexpected impacts on Dam management<br />

• Learn how to Organise an Operation and Maintenance Program focusing on the importance of maintenance to<br />

dam safety, and provides information on planning, implementing, and evaluating an operation and maintenance<br />

program<br />

4. Strategies for Extending Service Life of Dams<br />

Positively identifying foundation problems and solutions<br />

• Providing an overview of design and construction of recent dam projects<br />

• Discussing the major issues that were faced during the design phase of the project<br />

• Describing how challenges were addressed during and throughout the construction of recent dam<br />

• Managing the remediation work: Stepping through the major hurdles and identifying the solutions that were used<br />

• Innovative rehabilitation technologies to address repair challenges<br />

• Advanced methods for increasing reservoir storage and spillway discharge capacity<br />

• Non-structural approaches to facility life extension<br />

Innovative Surveillance and Monitoring Systems<br />

• Emerging technologies for monitoring dams and their foundations<br />

• Performance evaluation of dams using monitoring data<br />

• Design and construction of instrumentation systems considering operations and<br />

• maintenance requirements<br />

5. Emergency Preparedness Plans (EPP)<br />

• Defining the environment for emergency preparedness<br />

• Planning the best practices and implementing (EPP)<br />

• Evaluation of Facility Emergency Preparedness. Providing instructions on how to evaluate the adequacy of site<br />

conditions and procedures, and how to inspect and evaluate the adequacy of the emergency<br />

6. Decommissioning Dams at the Completion of their Useful Service Life<br />

• Case studies in dam removal and restoration<br />

• Predicting future conditions following removal and restoration<br />

Pieter Gouws, PG Consulting<br />

16:30 Close of Day<br />

Day Two:<br />

1. Dam Wall or embankment stabilization<br />

• Introduction<br />

• Dam protection using the TECCO® slope stabilization system and TECCO® high-tensile steel wire pillars<br />

• Stabilizing Concept<br />

• Dimensioning<br />

• The Tecco® High-Tensile Slope Stabilisation System<br />

• Tecco® Pillars<br />

• Planning And Execution<br />

2. Improved Technical Approaches for Managing the following Infrastructure<br />

• Rock fall barriers and drapes<br />

• Slope stabilization systems<br />

VISIT OUR WEBSITE: www.amabhubesi.com TEL: +27 11 326 0353 • FAX: +27 11 326 0354

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!