04.03.2013 Views

FIBRE OPTIC CONSTRUCTION - Ergon Energy

FIBRE OPTIC CONSTRUCTION - Ergon Energy

FIBRE OPTIC CONSTRUCTION - Ergon Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNDERGROUND<br />

<strong>CONSTRUCTION</strong> MANUAL<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> <strong>CONSTRUCTION</strong><br />

Back to MAIN INDEX<br />

Go to SECTION INDEX


<strong>CONSTRUCTION</strong> DESCRIPTION DWG <strong>CONSTRUCTION</strong> DESCRIPTION DWG<br />

FUP/OU/W/P<br />

FUP/OU/C/P<br />

FUP/O/W/P<br />

FUP/O/C/P<br />

FUP/O/W/E<br />

FUP/O/C/E<br />

FUP/OU/W/E<br />

FUP/OU/C/E<br />

FUP/U/U/E<br />

FUJ<br />

FUMGW<br />

FUMGC<br />

FUWSP<br />

A ORIGINAL ISSUE<br />

B 16.07.12<br />

Construction code guide - Pits<br />

Construction code guide - Joint Enclosures<br />

Construction code guide - Fibre Optic Cable<br />

Construction code guide - Warning Sign<br />

Construction code guide - Terminating Panels<br />

5182/1<br />

5182/2<br />

5182/4<br />

5182/5<br />

5182/6<br />

Construction code guide - Conduits & Miscellaneous 5182/7<br />

Pits and joints - Installation details<br />

Pits and joints - Material<br />

Pits and joints - Construction<br />

Joint enclosure construction<br />

5183/1<br />

5183/2<br />

5183/3<br />

5183/3<br />

Metal cable guard construction 5183/4<br />

Metal cable guard construction 5183/5<br />

Underground fibre optic cable warning sign post 5208<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

07.12.05<br />

A. Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> <strong>CONSTRUCTION</strong><br />

INDEX<br />

FILE: 5 65 5186 1<br />

Dwg Sh<br />

1<br />

B


A ORIGINAL ISSUE<br />

B 3.10.08<br />

CABLE CODE CABLE DESCRIPTION<br />

I.I. NUMBER<br />

FOCU12<br />

FOCU36<br />

FOCU48<br />

HARD COPY<br />

UNCONTROLLED<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> CABLE UNDERGROUND - <strong>CONSTRUCTION</strong> CODE<br />

FOCU36<br />

= Fibre Optic Cable Underground with 12 Fibres<br />

= Fibre Optic Cable Underground with 36 Fibres<br />

= Fibre Optic Cable Underground with 48 Fibres<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

7/12/05<br />

D. M K. c<br />

C.Lindsay<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> <strong>CONSTRUCTION</strong><br />

<strong>CONSTRUCTION</strong> CODE GUIDE<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> CABLE<br />

65 5182 4<br />

0104766<br />

0104441<br />

0104440<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

5182 4<br />

Dwg Sh<br />

B


Pit<br />

Kerb<br />

Real Property Boundary<br />

Real Property Boundary<br />

Kerb<br />

Real Property Boundary<br />

Kerb<br />

O/H TO U/G JOINTING PIT<br />

Footpath<br />

O/H - O/H JOINTING PIT ON POLE ALIGNMENT<br />

Footpath<br />

Pit<br />

Footpath<br />

Pole Alignment<br />

Electricity Footpath<br />

Allocation<br />

O/H - O/H JOINTING PIT ON ELECTRICAL ALLOCATION<br />

A ORIGINAL ISSUE<br />

B 24.8.05<br />

Pit<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

Electricity<br />

Footpath<br />

Allocation<br />

HARD COPY<br />

UNCONTROLLED<br />

FUP / O / W / P<br />

FUP / O / C / P<br />

FUJ<br />

FUP / O / W / E<br />

FUP / O / C / E<br />

FUJ<br />

FUP / OU / W / P<br />

FUP / OU / C / P<br />

FUP / OU / W / E<br />

FUP / OU / C / E<br />

FUJ<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

D. M K. c<br />

D. Hower<br />

Kerb<br />

Footpath<br />

Real Property Boundary<br />

NOTES:<br />

FOUNDATION<br />

Pit<br />

U/G TO U/G JOINTING PIT<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> CABLE <strong>CONSTRUCTION</strong><br />

65 5183 1<br />

F<br />

F<br />

Electricity Footpath<br />

Allocation<br />

1. Bed the pit in a 100mm min. layer of stabilised sand or stabilised fine<br />

crushed rock (20:1). Particle size shall not exceed 5mm.<br />

2. Ensure the level of the foundation will leave the top edge of the pit flush<br />

with the finished surface after installation.<br />

BACKFILL<br />

1. Backfill material shall be a granular material (not clay) suitable for<br />

compaction.<br />

2. Material to be compacted using a mechanical rammer. Care to be taken to<br />

ensure no distortion to pit.<br />

3. Cable bearers and covers must be installed prior to backfilling.<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> CABLE<br />

1. A 12 metre length of each cable shall be left coiled in the pit for jointing.<br />

2. Cable left coiled in a pit shall be in a 500mm minimum diameter loop.<br />

3. In a through pit with no cable joints, leave 24 metres of cable coiled in the pit.<br />

CONDUIT INSTALLATION<br />

2/5/03<br />

PITS AND JOINTS - INSTALLATION DETAILS<br />

5183 1<br />

FUP / U / U / E<br />

FUJ<br />

1. Conduit shall be installed to a depth of cover of 450mm minimum and<br />

DATE<br />

550mm maximum from the finished surface level and separated from<br />

existing communication conduits by 100mm. Ramp conduit down at pit to<br />

inable entry 50 to 100mm from bottom.<br />

APPROVED<br />

PASSED<br />

DRAWN<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

B


MATERIAL - PIT <strong>CONSTRUCTION</strong><br />

ASSY<br />

559-10<br />

559-55<br />

561-15<br />

562-1<br />

562-6<br />

562-11<br />

DESCRIPTION<br />

Conduit communication 50 dia. (white)<br />

Conduit bend communication 90<br />

Pit No. 8<br />

Cable guard 25mm single to conc.pole<br />

Cable guard 25mm double to conc. pole<br />

Cable guard 25mm to wood pole<br />

MATERIAL - JOINT ENCLOSURE <strong>CONSTRUCTION</strong><br />

ASSY<br />

560-5<br />

560-10<br />

DESCRIPTION<br />

Splicing enclosure 48 fibres<br />

Splicing enclosure 36 fibres<br />

MATERIAL - METAL CABLE GUARD<br />

ASSY<br />

531-6<br />

569-1<br />

B 29.12.05<br />

DESCRIPTION<br />

Guard, Metal (100) to wood pole<br />

Guard, metal (100) to concrete pole<br />

QTY<br />

FUP/O FUP/O FUP/O FUP/O FUP/OU FUP/OU FUP/U<br />

/W/P /C/P /W/E /C/E /W/E /C/E /U/E<br />

1<br />

1<br />

3<br />

2 2 4 4 2 2<br />

3<br />

1 1 1 1 1 1 1<br />

1<br />

2 2 1<br />

QTY<br />

FUJ/36 FUJ/48<br />

1<br />

1<br />

FUP/O FUP/O<br />

/W/P /C/P<br />

FUP/O<br />

/W/E<br />

1<br />

FUP/O<br />

/C/E<br />

2/5/03<br />

D. M K. c<br />

C.Lindsay<br />

2<br />

FUP/OU<br />

/W/E<br />

533-16 Connector PG 16/150mm† Cu main to 16/150mm† Cu tap 1 1 1<br />

A ORIGINAL ISSUE<br />

HARD COPY<br />

UNCONTROLLED<br />

1<br />

1<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

1<br />

QTY<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

1<br />

1<br />

2<br />

1<br />

FUP/OU<br />

/C/E<br />

1<br />

UNDERGROUND DISTRIBUTION<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> CABLE <strong>CONSTRUCTION</strong><br />

PITS AND JOINTS - MATERIAL<br />

FILE: 5<br />

65 5183 2<br />

5183 2<br />

Dwg Sh<br />

B


Compacted<br />

Backfill<br />

F<br />

F<br />

450mm Min<br />

550mm Max<br />

F<br />

Assy 559-10<br />

A ORIGINAL ISSUE<br />

B 11.08.10<br />

F<br />

Joint enclosure<br />

Assy 560-5 or 10<br />

F<br />

50mm<br />

F<br />

100<br />

100<br />

F<br />

F F<br />

F F<br />

Refer Note 2<br />

Sheet 1<br />

Conduit Installation<br />

F<br />

Assy 561-15<br />

F<br />

F<br />

FOC<br />

Stabilised Sand<br />

HARD COPY<br />

UNCONTROLLED<br />

50 to 100mm<br />

Assy 559-55<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

2m Min<br />

Assy Selection<br />

562-1, 6, or 11<br />

F<br />

450mm Min<br />

550mm Max<br />

F<br />

F<br />

Assy 559-10<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

24/8/05<br />

50 to 100mm<br />

D. M K. c<br />

C.Lindsay<br />

F<br />

F<br />

F<br />

F<br />

Joint enclosure<br />

Assy 560-5 or 10<br />

50mm<br />

F<br />

Assy 561-15<br />

F<br />

Pit Construction Type<br />

FUP / OU / W / P<br />

FUP / OU / C / P<br />

F<br />

FUP / O / W / P<br />

FUP / O / C / P<br />

FUP / O / W / E<br />

FUP / O / C / E<br />

FUP / OU / W / E<br />

FUP / OU / C / E<br />

FUP / U / U / E<br />

FOC<br />

Stabilised Sand<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> CABLE <strong>CONSTRUCTION</strong><br />

PITS AND JOINTS<br />

65 5183 3<br />

5183<br />

F<br />

Compacted<br />

Backfill<br />

50 to 100mm<br />

Joint Construction Type<br />

F<br />

F<br />

FUJ<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

3<br />

B


A ORIGINAL ISSUE<br />

REFER:- Overhead<br />

Construction Manual<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> CABLE<br />

Dwg. 1385 Sh 1<br />

for pole top details.<br />

Secure top of 25mm HFT<br />

conduit with saddle<br />

Wood pole<br />

25mm HFT conduit<br />

unsupported under<br />

metal cable guard<br />

Saddle<br />

Assy 531-6<br />

G.L.<br />

HARD COPY<br />

UNCONTROLLED<br />

100<br />

100<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

Conduit<br />

Bend<br />

2400 Min<br />

29/12/05<br />

D. M K.<br />

c<br />

L.Burton<br />

Extend HFT conduit as necessary<br />

to project above top of metal<br />

cable guard as shown<br />

Metal guard shall be earthed.<br />

Refer Overhead Construction<br />

Manual - EARTHING.<br />

UNDERGROUND DISTRIBUTION<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> CABLE <strong>CONSTRUCTION</strong><br />

<strong>CONSTRUCTION</strong><br />

65 5183 4<br />

5183<br />

Construction Type<br />

FUMG / W<br />

METAL CABLE GUARD TO WOOD POLE<br />

FILE: 5<br />

Dwg Sh<br />

4


REFER:- Overhead<br />

Construction Manual<br />

Concrete pole<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> CABLE<br />

Dwg. 1386 Sh 1<br />

for pole top details.<br />

A ORIGINAL ISSUE<br />

25mm HFT conduit<br />

unsupported under<br />

metal cable guard<br />

Bandit Strap<br />

Secure top of 25mm HFT<br />

conduit with bandit strap<br />

Assy 569-1<br />

G.L.<br />

HARD COPY<br />

UNCONTROLLED<br />

100<br />

100<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

2400 min<br />

Conduit<br />

Assy 533-16<br />

Bend<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

D. M K. c<br />

L.Burton<br />

Extend HFT conduit as necessary<br />

to project above top of metal<br />

cable guard as shown<br />

Metal guard shall be earthed.<br />

Connect earth cable to hole in top of guard & to<br />

existing earth cable at base of pole where provided.<br />

If pole is not earthed (no earth cable provided at base<br />

of pole), lug cable & connect to pole earth ferrule.<br />

Ensure mechanical protection is provided to all<br />

earth cable & connections above ground - earth<br />

if metal.<br />

29/12/05<br />

UNDERGROUND DISTRIBUTION<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> CABLE <strong>CONSTRUCTION</strong><br />

<strong>CONSTRUCTION</strong><br />

FILE: 5 65 5183 5<br />

5183<br />

Construction Type<br />

FUMG / C<br />

METAL CABLE GUARD TO CONCRETE POLE<br />

Dwg Sh<br />

5


MATERIAL<br />

ASSY DESCRIPTION QTY<br />

523-5 Warning sign A and post U/G fibre optic cable<br />

LOCATION OF SIGNS:<br />

Cable warning signs shall be used in areas remote<br />

from Electricity Footpath Allocation. e.g. parkland,<br />

carparks, easements.<br />

Signs shall be located to clearly identify the cable route.<br />

Locate a sign at each change of direction and at<br />

100m maximum centres, provided signs are visible,<br />

one to the next.<br />

Warning signs may be mounted directly on walls<br />

where allowable.<br />

NOTES:<br />

1. Concrete not included in material.<br />

Minimum concrete volume = 0.016m<br />

2. Concrete shall be grade N20.<br />

3. To prevent damage to sign when tightening<br />

bolts and nuts, compress flanges of grommets<br />

to half their normal thickness only.<br />

4. After fixing sign to post, deform thread of bolt<br />

to prevent removal of nut by vandals.<br />

A ORIGINAL ISSUE<br />

HARD COPY<br />

UNCONTROLLED<br />

3<br />

1<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

500<br />

F<br />

F<br />

F<br />

50<br />

F<br />

F<br />

5/12/05<br />

D. M K. c<br />

C.Lindsay<br />

F<br />

200 dia<br />

UNDERGROUND <strong>FIBRE</strong> <strong>OPTIC</strong> WARNING SIGNS<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

BURIED<br />

<strong>FIBRE</strong> <strong>OPTIC</strong><br />

CABLES<br />

OBTAIN CABLE<br />

LOCATION DETAILS<br />

0305<br />

IN THIS<br />

VICINITY<br />

TYPE A<br />

F<br />

F<br />

65 5208 1<br />

Assy 523-5<br />

Finished surface line<br />

Mass concrete footing<br />

<strong>FIBRE</strong> <strong>OPTIC</strong> <strong>CONSTRUCTION</strong><br />

5208<br />

Construction Type<br />

FUWSP<br />

UNDERGROUND DISTRIBUTION<br />

UNDERGROUND <strong>FIBRE</strong> <strong>OPTIC</strong> CABLE<br />

WARNING SIGN POST<br />

FILE: 5<br />

Dwg Sh

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!